Loading...
Item 4G C Greenscaping LP SubmissionSECTION 00 30 00 BID FORM To Whom It May Concern: The pursuant to the foregoing notice to bidders, the undersigned bidder hereby proposes to do all work and furnish all necessary superintendence, labor, materials, and equipment to complete all work upon which they bid, as provided by the attached specifications and shown on the plans binds themselves on acceptance of this proposal to execute a contract and bond, according to accompanying forms, for performing and completing the said work within the time stated, maintaining same as required by the detailed specifications for the following prices, to -wit: Bid Items Item No. Approx. Description of Items with Unit Total Quantity Bid Prices Written in Words Price Amount (Furnish and install, including all appurtenant work, complete in place, the following items) 1 1 LS Grading, including site preparation, removal and subgrade preparation for the sum of: FifetPan thousand Dollars and No Cents 2 112 LF Concrete Mow Edge„ for lump sum of: Nineteen Dollars and No Cents Per Linear Foot 3 36 LF 11" Stone Retaining Wall, for the lump sum of: One hundred fifty-four . Dollars and No Cents Per Linear Foot 4 26 LF V-7" Stone Retaining Wall, for the lump sum of: One hundred eighty Dollars and No Cents Per Linear Foot' David McCaskill Design Group Southlake Entry Monument 00 30 00 - 1 $ 15, 000.00 $ 15, 000.00 $ 19.00 $ 2,128.00 $ 154.00 $ 5,544.00 $ 180.00 $ 4,680.00 Issue date, March 2017 Bid Form 5 189 Sy Solid Sod Bermuda Grass, for the lump sum of: Five Dollars and No Cents, Per Square Yard 6 700 SF Bed Preperation, for the sum of: Two Dollars and No Cents Per Square Foot 7 39 SF River Cobbles, for the lump sum of: Twenty-four Dollars and No Cents . Per Square Foot 8 3 EA Little Gem Magnolias, for lump sum of: One hundred forty-five. Dollars and No Cents Per Each 9 17 EA Lantana, for the lump sum of Twenty-six Dollars and No Cents. Per Each 10 9 EA Little Rascal Holly, for the lump sum of: Sixteen Dollars and No Cents Per Each 11 14 EA Purple Pixie Loropetalum, for lump sum of: Twenty-eight Dollars and No Cents Per Each 12 2 EA Red Beauty Holly, for the lump sum of David McCaskill Design Group Southlake Entry Monument 00 30 00 - 2 $ 5.00 $ 945.00 $ 2.00 $ 1 A00.00 $ 24.00 $ 936.00 $ 145.00 $ 435.00 $ 16.00 $ 144.00 $ 28.00 $ 392.00 Issue date, March 2017 Bid Form Thirty-two Dollars and No Cents $ 32.00 $ 64.00 Per Each 13 11 EA Thundercloud Texas Sage, for th,(p lump sum of: Thirty-two Dollars and No Cents $ 32.00 $ 352.00 Per Each • 14 130 EA Blue Rug Juniper, for lump sum pf: Sixteen Dollars and No Cents' $ 16.00 $ 2,080.00 Per Each 15 47 EA Mexican Petunia, for the'lump sum of Seven Dollars and No Cents $ 7.00 $ 329.00 Per Each 16 47 EA Stella D'oro Day Lily, for the lump sum of: Sixteen Dollars and No Cents,' $ 16.00 $ 752.00 Per Each 17 443 SF Bark Mulch, for the lump sum of_. One Dollars and No; Cents $ 1.00 $ 443.00 Per Each 18 1 LS Monument Sign, including foundation, limestone blocks, letters, shield and lightinq, for the lump sum of: Ninety-seven thousand, six hundred twenty-three Dollars and No . Cents $ 97,623.00$ 97,623.00 19 1 LS Irrigation , for the lump sum of: Eight thousand, five hundred Dollars and No Cents $ 8,500.00 $ 8,500.00 David McCaskill Design Group Issue date, March 2017 Southlake Entry Monument 00 30 00 - 3 • Bid Form r. 20 1 LS Electrical Service, for the lump sum of: Seven thousand, four hundred Dollars and No I Cents $ 7,400.00 $ 7,400.00 TOTAL AMOUNT BID $ 149,589.00 Receipt is acknowledged of the following addenda: Addendum No. 1 4-12-1 � 17 Addendum No. 2 Addendum No. 3 The undersigned bidder agrees to commence work within ten (10) days after the date of written notice to commence work, and to substantially complete the work on which he has bid within 60 calendar days as provided in the general conditions of agreement. The undersigned hereby declares that he has visited the site and has carefully examined the contract documents relative to the work covered'by the above bid. Respectfully Submitted, C. Green Scalping, LP Contractor By: urtis J. Green Name Printed Title: Vice President . Address: 2401 Handley Ederville Rd. Ft. Worth, TX 76118 817-577-9299 SEAL - IF BIDDER IS A CORPORATION David McCaskill Design Group Issue date, March 2017 Southlake Entry Monument 00 30 00 - 4 Bid Form r SECTION 00 4150 CONTRACTOR QUALIFICATION Firm Name C. Green Scaping, LP Date Organized _ X Partnership 2401 Handley Ederville Rd. City Ft. Worth 1983 Corporation State Texas Zip Code 76118 Telephone Numbers (office) 817-577-9299 (mobile) Number of years in business under the present name: Former name(s) of firm: Green Scaping Co., Green Scaping, Inc., C. Green Scaping, LP CLASSIFCATION: X General X Building —Electrical _ HVAC XPlumbing X. Utilities X Earthwork X Paving X Other LIST OF SIMILAR COMPLETED PROJECTS Amount of Name, Email Address and Contract Project Title Date Completed Telephone Number of the Owner $310,000 +/- Cottonbelt Trail March 2016 City of Colle ville - Heather Dowe $3.1 million +/- Bedford Boys Ranch April 2016 City of Bedford - Don Henderson 1 $181,000 +/-�Filqhland Plainview Enhanceme s Feb. 2016 Cityof Hurst - Eric Starnes 817-788- $ 1 million +/- ear Creek Park and Rec Area I January 2017 City of Cedar Hills - Dennis Sims: LIST OF SIMILAR PROJECTS UNDER CONSTRUCTION OR UNDER CONTRACT Amount of Anticipated Name, Email Address and Contract project Title Completion Date Telephone Number of the Owner $520,000 +/- LID Lockett Park May 2017 City of Colleyville - Heather Dc $ 821,000 +1- Main street April 2017 City of Grand Prairie - Craig Alem $ 1.6 million +/- Legends Baseball Field Texas Star qark May 2017 1 City of Euless - Ray McDonalc $ 800,000 +/- western Trail Extensio July 2017 1 City of Euless - Ray McDonald E 1 817-503-1182 317-952-2308 7218 ?14-553-5778 well 817-503-1182 lnder972-237-8135 817-685-1669 17-685-1669 David McCaskill Design Group Issue date, March 201 Southlake Entry Monument 004150 - 1 Contractor's Qualifications LIST OF SURETY BONDS IN FORCE ON ABOVE COMPLETED WORK (LIST 2 PROJECTS) Amount of Contract Project Title Date Completed Name and Telephone Number of the Owner Bond Firm $ 520,818.50 LD Lockett Park May 2017 Ramey & King Insurance - Rachyl Mu $ 821,770.00 Main Street Apirl 2017 Ramey & King Insurance - Rachyl Mu $ 1,951,485.70 Legends Baseball May 2017 Ramey & King Insurance - Rachyl Mullin. CONSTRUCTION SUPERINTENDENT'S NAME AND THEIR CONSTRUCTION EXPERIENCE Info Ilins 940-382-9691 Ilins 940-382-9691 940-382-9691 Tracy Lemoine - Park superintendent, has multiple park construction experience underneath him. Results oriented, hands on construction and development professional with over 10 years of expertise in all facets of the industry. Verifiable track record for the successful completion of multi -million dollar projects through coordinating trades, developing partnerships, and building positive rapport with architects, engineers, local officials, vendors, and clients while maintaining costs. Versed in contract negotiations, project estimating, impending design problems, document preparation, building code and regulations, material purchasing, site management and safety David McCaskill Design Group Issue date, March 201 Southlake Entry Monument 004150-2 Contractor's Qualifications ADDENDUM NO. 1 TO THE CONSTRUCTION DOCUMENTS FOR SOUTHLAKE ENTRY MONUMENT April 27, 2017 1.01 GENERAL A. This addendum modifies the construction documents dated March 2017, as noted within and shall become a part of the construction documents. B. Bidder shall acknowledge receipt of this addendum in the space provided on the Bid Form. Failure to do so may subject the Bidder to disqualification. C. Each holder of bid documents registered with David McCaskill Design Group will receive a copy of this addendum. Each Bidder is responsible for distribution of the information included in this addendum to the sub -bidders and suppliers. 1.02 TECHNICAL SPECIFICATIONS A. Add to Section 0110 00 —SUMMARY OF WORK 1.06 COMPLETION DATE A. The project shall be completed on or before September 1, 2017. B. Funding for this project must be spent by September 1, 2017. If work is completed after September 1, 2017 reimbursement may not be available due to the cessation of this funding source. B. Sign in Sheet —the sign in sheet for the Pre -Bid Conference is attached. David McCaskill Design Group Issue date, April 27, 2017 Southlake Entry Monument 1 Addendum No. 1 SIGN IN SHEET SOUTHLAKE ENTRY MONUMENT PRE -BID MEETING April 20, 2017 DAVID MSCASKILL DESIGN GROUP Adam Parson Firm Fort Worth Civil Constructors Email AddressName adam@fwcivcon.com 817.562.2292 Gene Hubble I.S. Construction Group 8hubble@innoser.com 817.898.9139