Item 6E - PresentationOrdinance 1075B –Amendment to the
Southlake 2030 Mobility Master Plan
Item 6E
Existing Active Transportation Recommendations
Proposed New Active Transportation
Recommendations
Recommendation Priority
Tier
Department
Responsible Strategic Link VGO
AT14 Continue participating in the Bicycle Pedestrian
Advisory Committee through the NCTCOG 1 PDS, CS, PW Partnerships &
Volunteerism; C5 9.1
AT15
As the City designs, constructs or provides
maintenance on City roads, consider opportunities to
incorporate bicycle signage in a manner that provides
linkages to bicycle facilities in neighboring cities
1 PW
Quality Development,
Mobility, Infrastructure;
C2, C3
1.2,
3.7
AT16 Consider citywide participation in Bike (Safety) Month
(May) 1 PDS, CS, ED,
Police
Mobility, Safety &
Security, Partnerships &
Volunteerism; C1, C3, C5,
C6,
3.7,
5.8,
9.1
AT17 Host a Bicycle Safety Forum 1 PDS, PW,
Police
Mobility, Safety &
Security, Partnerships &
Volunteerism; C1, C5, C6,
B2
3.7,
5.8,
9.1
AT18 Develop bicycle-related Story Maps 1 PDS, PW, ED
Mobility, Partnerships &
Volunteerism,
Performance
Management & Service
Delivery; C2, B2, B6
3.7,
9.3
AT19 Pursue grant funding opportunities for projects related
to bicycle safety 1 PDS, Police,
PW
Mobility, Safety &
Security, Performance
Management & Service
Delivery; C1, B4, F1
3.7,
5.8
Proposed New Active Transportation
Recommendations, Continued
Recommendation Priority
Tier
Department
Responsible Strategic Link VGO
AT20
Consider holding annual collaboration meetings
between surrounding municipalities and NCTCOG to
discuss bicycle/pedestrian safety issues and promote
regional planning for active transportation
1 PDS, CS, ED,
Police
Mobility, Safety & Security,
Partnerships &
Volunteerism, Quality
Development; C1, C2, C5,
B2
3.7,
5.8,
9.1
AT21 Promote the linkage from Southlake to the Cotton Belt
Trail 1 Police, PW
Mobility, Safety & Security,
Performance Management
& Service Delivery; C2, C3,
B6
3.4
AT22
Consider designing, installing and/or constructing any
future bike facilities according to AASHTO / NACTO
guidelines
3 PW
Quality Development,
Mobility, Infrastructure;
C1, B1, F2
1.2,
3.7,
10.6
AT23
Explore opportunities to implement new technology
and improvements that promote bicycle and pedestrian
safety
1 PW, PDS
Quality Development,
Mobility, Infrastructure,
Safety & Security; C1, C2,
B6, F2
1.2,
3.2,
10.6
AT24
Research and consider pursuing Bicycle Friendly
Community status through the League of American
Bicyclists
3 PDS, CS Quality Development; B1 1.2
Existing Bicycle Facilities Master Plan
Recommendations
Staff Recommended
Proposed Bicycle
Facilities Map
Staff: No sharrows
(N. Kimball –Dove to
FM 1709)
Staff: No sharrows
(Kirkwood)
Presented to City Council April 4, 2017
Proposed Bicycle Facility
Master Plan Map
No sharrows per City Council motion
Proposed Bicycle Facility Master Plan
Recommendations
Bicycle Facility Plan Recommendations
Tier 1
Roadway Description Recommendation
1.W. Bob Jones Road Between T.W. King and N. White Chapel Signed Route
2.T.W. King Road Between Kirkwood and W. Bob Jones Signed Route
3.Kirkwood Boulevard Between Kimball and S.H. 114 Signed Route
4.Dove Road Between Westlake city limits and Grapevine city limits Signed Route (Existing)*
5.Carroll Avenue Between Continental and Burney Lane Signed Route (Existing)*
6.Burney Lane Between Carroll and Midway Drive Signed Route
7.Midway Drive Between Burney Lane and Grapevine city limits Signed Route
8.Continental Boulevard/
Union Church Between Pearson and Kimball Signed Route (Existing)*
9.Brumlow Avenue Between Continental and S.H. 26 Signed Route (Existing)*
10.Kimball Avenue Between Kirkwood and Dove and 1709 Signed Route
11.Kimball Avenue Between Continental and S.H. 26 Signed Route
11.Peytonville Avenue Between Continental and Dove Signed Route (Existing)*
Tier 1 (1-3 Years)
Tier 2 (4-6 Years)
Tier 3 (7+ Years)
*Existing signage locations should be reviewed/reassessed to ensure optimal signage placement
**Requires private development of Kirkwood per Mobility Master Plan
Updated to include revisions per City
Council motion on April 4, 2017
Proposed Bicycle Facility Master Plan
Recommendations, Continued
Bicycle Facility Plan Recommendations
Tier 1
Roadway Description Recommendation
12.Randol Mill Avenue (F.M.
1938) Between Florence and Westlake city limits Signed Route (Existing)*
13.Florence Road Between F.M. 1938 and Pearson Signed Route
14.Pearson Lane Between Union Church and Florence Signed Route
15.White Chapel Boulevard Between Continental and northern roadway terminus Signed Route (Existing)*
16.Kimball Avenue Between 1709 and S.H. 26 Signed Route
Tier 2
Roadway Description Recommendation
17.Kirkwood Boulevard Between Kimball and S.H. 114 Sharrow (upon
completion)
Tier 3
Roadway Description Recommendation
17.Brumlow Avenue Between Continental and S.H. 26 Dedicated Bike Lane
18.Kirkwood Boulevard Between Kimball and S.H. 114 Signed Route**
New bicycle facility
recommendation
*Existing signage locations should be reviewed/reassessed to ensure optimal signage placement
**Requires private development of Kirkwood per Mobility Master Plan
Tier 1 (1-3 Years)
Tier 2 (4-6 Years)
Tier 3 (7+ Years)
Updated to include revisions per City
Council motion on April 4, 2017
Adopted Bicycle Facility Map Proposed Bicycle Facility Map
Figure 9C-9. Shared Lane Marking - MUTCD,
2009 Edition, published by FHWA
Dove Rd.
30 MPH
N. Kimball
40 MPH
S. Kimball
35 MPH
Future
Kirkwood
Blvd. ≥
35 MPH
Speed Limit Exhibit
RECOMMENDATIONS – INTERSECTION CAPACITY ANALYSIS
Signal Re-
timing
Improve
Crosswalks
Better
Signage
Modify
Intersection
Landscaping
Add
Roundabouts
Additional
Turn
Lanes
Recommendations Overview
Tier No. of Recs. Rec. ID
Tier 1 71 IC1 – IC71
Tier 2 2 IC72 – IC73
Tier 3 14 IC74 – IC87
Total 87 Recs. IC1 – IC87
Intersections Studied
1 Southlake Boulevard (FM 1709) and Pearson Lane
2 Southlake Boulevard (FM 1709) and Watermere Drive / Jellico Circle
3 Southlake Boulevard (FM 1709) and Davis Boulevard / Randol Mill Avenue
(FM 1938)2
4 Southlake Boulevard (FM 1709) and Peytonville Avenue3
5 Southlake Boulevard (FM 1709) and Southridge Lakes Parkway / Waterford
Drive
6 Southlake Boulevard (FM 1709) and Shady Oaks Drive3
7 Southlake Boulevard (FM 1709) and White Chapel Boulevard
8 Southlake Boulevard (FM 1709) and Diamond Boulevard / Byron Nelson
Parkway3
9 Southlake Boulevard (FM 1709) and Tower Blvd
10 Southlake Boulevard (FM 1709) and Carroll Avenue
11 Southlake Boulevard (FM 1709) and Central Avenue
12 Southlake Boulevard (FM 1709) and Village Center Drive
13 Southlake Boulevard (FM 1709) and Kimball Avenue
14 Southlake Boulevard (FM 1709) and Nolen Drive
15 Southlake Boulevard (FM 1709) and Commerce St / Gateway Drive
16 Carroll Avenue and Zena Rucker Road
17 Kimball Avenue and Village Center Drive
(Two-way Stop Controlled)
18 Dove Road and Peytonville Avenue4
19 Dove Road and Shady Oaks Drive5
(Northbound Stop Controlled)
20 Dove Road and White Chapel Boulevard
21
Peytonville Avenue / Southridge Lakes Parkway and Peytonville Avenue /
Raven Bend Court
(All Way Stop Controlled)
22 Shady Oaks Drive and Highland Street / Turnberry Lane
(All Way Stop Controlled)
23
Carroll Avenue and Highland Street / Kirkwood Boulevard
(Two-way Stop Controlled)
24 Continental Boulevard and Davis Boulevard (FM 1938)
25 Continental Boulevard and Peytonville Avenue5
(All Way Stop Controlled)
26 Continental Boulevard and White Chapel Boulevard
27 Continental Boulevard and Byron Nelson Parkway5
(All Way Stop Controlled)
28 Continental Boulevard and Carroll Avenue
29 Continental Boulevard and Kimball Avenue
REPRIORITIZATION OF EXISTING RECOMMENDATION MT3
MT3
Continental Blvd and S Peytonville Ave Roundabout
This project involves the design and construction of a roundabout at the Continental Boulevard
and S Peytonville Avenue intersection. The funding request includes drainage improvements.
Funding does not include burying of the utilities. The funding request also includes landscaping,
irrigation, electrical work, and art for the roundabout.
Proposed reprioritization from Tier 2 to Tier 3
REPRIORITIZATION OF EXISTING RECOMMENDATION MT3
Ref.
No. Issues Recommendations Implementation
Metric Strategic Link VNT
Link
VGO
Tie
Priority
Tier
Responsible
Department
MT3
Traffic increases
in the vicinity of
Continental and S
Peytonville during
peak times,
school pick
up/drop off
times, and during
heavy use of
Koalaty Park.
Construct a
roundabout at the
intersection of W
Continental and S
Peytonville.
Complete
construction of the
W Continental/S
Peytonville
roundabout.
Mobility,
Infrastructure,
C1, C2
Efficient
Mobility
Options
3.1,
3.3,
3.5,
3.9
2
PW
Ref.
No. Issues Recommendations Implementation
Metric Strategic Link VNT
Link
VGO
Tie
Priority
Tier
Responsible
Department
MT3
Traffic increases
in the vicinity of
Continental and S
Peytonville during
peak times,
school pick
up/drop off
times, and during
heavy use of
Koalaty Park.
Construct a
roundabout at the
intersection of W
Continental and S
Peytonville.
Complete
construction of the
W Continental/S
Peytonville
roundabout.
Mobility,
Infrastructure,
C1, C2
Efficient
Mobility
Options
3.1,
3.3,
3.5,
3.9
3
PW
Existing prioritization (Tier 2)
Proposed prioritization (Tier 3)
REPRIORITIZATION OF EXISTING RECOMMENDATION MT25
Existing prioritization (Tier 3)
Proposed prioritization (Tier 2)
Ref.
No. Issues Recommendations Implementation
Metric Strategic Link VNT
Link
VGO
Tie
Priority
Tier
Responsible
Department
MT25
Increased traffic
volumes on FM
1938,
connecting to
SH 114 and
Continental
Blvd.
Consider options for
lane configurations
at the intersection
of FM 1938 and W
Continental.
Conduct a study of
the FM 1938/W
Continental
intersection.
Mobility,
Infrastructure,
C1, C2, CB04
Efficient
Mobility
Options
3.1,
3.3,
3.5,
3.9 3
PW
Ref.
No. Issues Recommendations Implementation
Metric Strategic Link VNT
Link
VGO
Tie
Priority
Tier
Responsible
Department
MT25
Increased traffic
volumes on FM
1938,
connecting to
SH 114 and
Continental
Blvd.
Consider options for
lane configurations
at the intersection
of FM 1938 and W
Continental.
Conduct a study of
the FM 1938/W
Continental
intersection.
Mobility,
Infrastructure,
C1, C2, CB04
Efficient
Mobility
Options
3.1,
3.3,
3.5,
3.9 2
PW
MT25
FM 1938 and W Continental Traffic Management Study
Increased traffic volumes are expected along Davis Boulevard (FM 1938) as it is widened north of
Southlake Bou levard (FM 1709). A study to determine options at this signalized intersection will
be necessary as traffic increases.
SUMMARY OF RECOMMENDATIONS
Intersection Capacity
Improvement
Recommendations
•Remove existing Priority
Intersection List and Reference
Map from Mobility Master Plan
•Include the 87 proposed
Intersection Capacity
Improvement Recommendations
(IC1 - IC87)
•Reprioritize existing
recommendation MT3 & MT25
Bicycle Safety
Recommendations
•Include 11 Active Transportation
Recommendations (AT14 - AT24)
•Amend Bicycle Facilities Map and
Recommendations
CITY COUNCIL MOTION – APRIL 4, 2017
•Approved (7-0) noting:
–Include AT14 – AT24 and associated priority tiers
–Removing existing Tier 2 sharrow on Kirkwood Blvd.
–Kirkwood Blvd. reprioritized from Tier 1 to Tier 3 signed route (contingent upon
development)
–Extending Tier 1 signed route on N. Kimball from Kirkwood and Dove to Dove and 1709
–Removing Tier 1 sharrow route between Continental and S.H. 26 on S. Kimball
–Tier 1 signed route between 1709 and S.H. 26 on S. Kimball, not signed and sharrow
–Tier 1 signed route on Dove between Westlake and Grapevine City limits, not sharrow
–Removing existing Priority Intersections List (pages 83-84, existing Mobility Plan)
–Removing the Priority Crosswalk Intersection Reference Map (page 85, existing Mobility
Plan)
–Including 87 proposed intersection capacity improvement recommendations and priority
tiers
–Reprioritizing the priority tier for existing recommendation MT3 from Tier 2 to Tier 3
Timeline
•City Council Work Session – February 21
•Planning & Zoning Commission – March 23
•SPIN Town Hall Forum – March 28
•City Council 1st Reading – April 4
•City Council Public Hearing – April 18
Questions?