Loading...
Item 5 - PresentationOrdinance 1075B –Amendment to the Southlake 2030 Mobility Master Plan Item 5 Amendment Overview •Proposed recommendations of the Bicycle Safety Committee •Intersection Capacity Improvements •Reprioritization of an existing Mobility Master Plan recommendation Bicycle Safety Committee •Formed after joint City Council, SPDC, Parks Board Meeting •Consists of members of the Community Engagement Committee and Parks Board •Met with staff to discuss active transportation and bicycle facilities and possible amendments to the Mobility Master Plan Committee Meetings •September 26 – Review of existing Active Transportation recommendations, discussion of possible recommendations •November 14 – Review of proposed recommendations •February 20 – Final review of proposed recommendations and map Existing Active Transportation Recommendations Possible Active Transportation Recommendations Recommendation Priority Tier Department Responsible Strategic Link VGO AT14 Continue participating in the Bicycle Pedestrian Advisory Committee through the NCTCOG 1 PDS, CS, PW Partnerships & Volunteerism; C5 9.1 AT15 As the City designs, constructs or provides maintenance on City roads, consider opportunities to incorporate bicycle signage in a manner that provides linkages to bicycle facilities in neighboring cities 1 PW Quality Development, Mobility, Infrastructure; C2, C3 1.2, 3.7 AT16 Consider citywide participation in Bike (Safety) Month (May) 1 PDS, CS, ED, DPS Mobility, Safety & Security, Partnerships & Volunteerism; C1, C3, C5, C6, 3.7, 5.8, 9.1 AT17 Host a Bicycle Safety Forum 1 PDS, PW, DPS Mobility, Safety & Security, Partnerships & Volunteerism; C1, C5, C6, B2 3.7, 5.8, 9.1 AT18 Develop bicycle-related Story Maps 1 PDS, PW, ED Mobility, Partnerships & Volunteerism, Performance Management & Service Delivery; C2, B2, B6 3.7, 9.3 AT19 Pursue grant funding opportunities for projects related to bicycle safety 1 PDS, DPS, PW Mobility, Safety & Security, Performance Management & Service Delivery; C1, B4, F1 3.7, 5.8 Possible Active Transportation Recommendations, Continued Recommendation Priority Tier Department Responsible Strategic Link VGO AT20 Consider holding annual collaboration meetings between surrounding municipalities and NCTCOG to discuss bicycle/pedestrian safety issues and promote regional planning for active transportation 2 PDS, CS, ED, DPS Mobility, Safety & Security, Partnerships & Volunteerism, Quality Development; C1, C2, C5, B2 3.7, 5.8, 9.1 AT21 Promote the linkage from Southlake to the Cotton Belt Trail 1* PDS, PW Mobility, Safety & Security, Performance Management & Service Delivery; C2, C3, B6 3.4 AT22 Consider designing, installing and/or constructing any future bike facilities according to AASHTO / NACTO guidelines 3 PW Quality Development, Mobility, Infrastructure; C1, B1, F2 1.2, 3.7, 10.6 AT23 Explore opportunities to implement new technology and improvements that promote bicycle and pedestrian safety 1* PW, PDS Quality Development, Mobility, Infrastructure, Safety & Security; C1, C2, B6, F2 1.2, 3.2, 10.6 AT24 Research and consider pursuing Bicycle Friendly Community status through the League of American Bicyclists 3 PDS, CS Quality Development; B1 1.2 *AT21 & AT23 proposed change from Priority Tier III to Tier I by the Bicycle Safety Committee Existing Bicycle Facilities Master Plan Recommendations Adopted Bicycle Facility Map Proposed Changes Draft Bicycle Facilities Map* *Staff not recommending shared lane markings on future Kirkwood Blvd. or Kimball Ave. RECOMMENDATIONS – INTERSECTION CAPACITY ANALYSIS Signal Re- timing Improve Crosswalks Better Signage Modify Intersection Landscaping Add Roundabouts Additional Turn Lanes Recommendations Overview Tier No. of Recs. Rec. ID Tier 1 71 IC1 – IC71 Tier 2 2 IC72 – IC73 Tier 3 14 IC74 – IC87 Intersections Studied 1 Southlake Boulevard (FM 1709) and Pearson Lane 2 Southlake Boulevard (FM 1709) and Watermere Drive / Jellico Circle 3 Southlake Boulevard (FM 1709) and Davis Boulevard / Randol Mill Avenue (FM 1938)2 4 Southlake Boulevard (FM 1709) and Peytonville Avenue3 5 Southlake Boulevard (FM 1709) and Southridge Lakes Parkway / Waterford Drive 6 Southlake Boulevard (FM 1709) and Shady Oaks Drive3 7 Southlake Boulevard (FM 1709) and White Chapel Boulevard 8 Southlake Boulevard (FM 1709) and Diamond Boulevard / Byron Nelson Parkway3 9 Southlake Boulevard (FM 1709) and Tower Blvd 10 Southlake Boulevard (FM 1709) and Carroll Avenue 11 Southlake Boulevard (FM 1709) and Central Avenue 12 Southlake Boulevard (FM 1709) and Village Center Drive 13 Southlake Boulevard (FM 1709) and Kimball Avenue 14 Southlake Boulevard (FM 1709) and Nolen Drive 15 Southlake Boulevard (FM 1709) and Commerce St / Gateway Drive 16 Carroll Avenue and Zena Rucker Road 17 Kimball Avenue and Village Center Drive (Two-way Stop Controlled) 18 Dove Road and Peytonville Avenue4 19 Dove Road and Shady Oaks Drive5 (Northbound Stop Controlled) 20 Dove Road and White Chapel Boulevard 21 Peytonville Avenue / Southridge Lakes Parkway and Peytonville Avenue / Raven Bend Court (All Way Stop Controlled) 22 Shady Oaks Drive and Highland Street / Turnberry Lane (All Way Stop Controlled) 23 Carroll Avenue and Highland Street / Kirkwood Boulevard (Two-way Stop Controlled) 24 Continental Boulevard and Davis Boulevard (FM 1938) 25 Continental Boulevard and Peytonville Avenue5 (All Way Stop Controlled) 26 Continental Boulevard and White Chapel Boulevard 27 Continental Boulevard and Byron Nelson Parkway5 (All Way Stop Controlled) 28 Continental Boulevard and Carroll Avenue 29 Continental Boulevard and Kimball Avenue REPRIORITIZATION OF EXISTING RECOMMENDATION MT3 MT3 Continental Blvd and S Peytonville Ave Roundabout This project involves the design and construction of a roundabout at the Continental Boulevard and S Peytonville Avenue intersection. The funding request includes drainage improvements. Funding does not include burying of the utilities. The funding request also includes landscaping, irrigation, electrical work, and art for the roundabout. Proposed reprioritization from Tier 2 to Tier 3 REPRIORITIZATION OF EXISTING RECOMMENDATION MT3 Ref. No. Issues Recommendations Implementation Metric Strategic Link VNT Link VGO Tie Priority Tier Responsible Department MT3 Traffic increases in the vicinity of Continental and S Peytonville during peak times, school pick up/drop off times, and during heavy use of Koalaty Park. Construct a roundabout at the intersection of W Continental and S Peytonville. Complete construction of the W Continental/S Peytonville roundabout. Mobility, Infrastructure, C1, C2 Efficient Mobility Options 3.1, 3.3, 3.5, 3.9 2 PW Ref. No. Issues Recommendations Implementation Metric Strategic Link VNT Link VGO Tie Priority Tier Responsible Department MT3 Traffic increases in the vicinity of Continental and S Peytonville during peak times, school pick up/drop off times, and during heavy use of Koalaty Park. Construct a roundabout at the intersection of W Continental and S Peytonville. Complete construction of the W Continental/S Peytonville roundabout. Mobility, Infrastructure, C1, C2 Efficient Mobility Options 3.1, 3.3, 3.5, 3.9 3 PW Existing prioritization (Tier 2) Proposed prioritization (Tier 3) Timeline •City Council Work Session – February 21 •Planning & Zoning Commission – March 23 •SPIN Town Hall Forum – March 28 •City Council 1st Reading – April 4 •City Council Public Hearing – April 18 Questions?