Item 4D CITY OF
SOi STH AKE Item 4D
MEMORANDUM
(February 7, 2017)
To: Shana Yelverton, City Manager
From: Rob Cohen, Director of Public Works
Subject: Approve Agreement for Engineering Services with Baird,
Hampton & Brown, Inc. for design of Water System and
Pavement Improvements within Whispering Dell Estates in an
amount not to exceed $129,895.
Action
Requested: Approve Agreement for Engineering Services with Baird, Hampton
& Brown, Inc. for design of Water System and Pavement
Improvements within Whispering Dell Estates in an amount not to
exceed $129,895.
Background
Information: Public Works crews have made multiple repairs to the water
distribution system within the Whispering Dell Estates subdivision in
years past. While making repairs crews have found these water
lines buried at minimal depth, constructed of outdated materials,
and undersized. These factors make these lines susceptible to
breaks when placed under normal operating pressures. The
condition of the streets within Whispering Dell Estates has also
suffered as a result of these ongoing repairs as well as normal
deterioration over the years typical of asphalt streets. The purpose
of this project is to first replace the existing 6" water mains with 8"
lines constructed to current acceptable standards, then do a
complete mill and overlay of both streets.
Both streets within this subdivision are currently served by dead-
end water mains. Staff has decided to explore options for
extending these lines to connect to another subdivision as part of
this project. This would provide a looped system for Whispering
Dell Estates, as well as the adjacent subdivision. A looped system
not only improves water quality but results in a more efficient
system from an operational perspective. While some of the
easements necessary for these extensions are already in place,
additional work will be needed to obtain all of the required
easements.
The scope with Baird, Hampton & Brown, Inc. will include surveying
services, an alignment study to determine the best option for
Pagel of 2
Item 4D
looping to an adjacent subdivision, preparation of bid and contract
documents required for the project, and support to City staff during
construction.
Financial
Considerations: Funding for this project was approved in the FY2016 Water Impact
Fee Fund portion of the Capital Improvement Program.
Strategic Link: This item relates to the City's strategy map relative to the focus
areas of Safety & Security and Infrastructure. This item specifically
relates to (Cl) Achieve the highest standards of safety & security
and (F2) Invest to provide & maintain high quality public assets.
Citizen Input/
Board Review: N/A
Legal Review: This is the standard Agreement for Engineering Services previously
reviewed by the City Attorney.
Alternatives: The City Council may approve, amend or deny the contract.
Supporting
Documents: Location Map
Agreement for Engineering Services
Staff
Recommendation: Approve Agreement for Engineering Services with Baird, Hampton
& Brown, Inc. for design of Water System and Pavement
Improvements within Whispering Dell Estates in an amount not to
exceed $129,895.
Staff Contact: Rob Cohen, Director of Public Works
Kyle D. Hogue, P.E., City Engineer/Deputy Director
Page 2 of 2
(COmom!
y ( \
LU
:
\
. EMERALD e Lu
A o - TO-z
�
-
»�— - —— —---
d »r ,mrm mom E e \
� § o 0
/ [
/ z ae«msmm o / S e
) LU
. , m e �` k
sos/ §. sf ` \
La
e +, , y !
w
G p
0\ / �
m \ z , :se . U. ,
} civ, *
ae q
\ /mw, J
\
s® 3
E -ILEOWE /
° m.m, ,
\y s!
\ (
z�/ �
�/ ) L Z.,
Js Is
_ )
2
C ee
\
ILD o. 2 z . LU
.�'
\ . w 11111W
_ Lu
� m _QR-
\ q\mEW- /
\ . «
{ me««sc sre
.
91 Location M W-O-E
-
AGREEMENT FOR ENGINEERING SERVICES
THIS AGREEMENT is made this day of 2014 by and
between the City of Southlake, Texas (hereinafter referred to as "CITY"), and Baird,
Hampton & Brown, Inc. (hereinafter referred to as "ENGINEER").
WHEREAS, CITY contemplates the need to make utility and pavement
improvements within the Whispering Dell Estates subdivision on North Carroll Avenue.
This project is to be known as the Whispering Dell Estates Water System and Paving
Improvements project and hereinafter referred to as the "Project".
WHEREAS, ENGINEER is qualified, able, and desirous of performing the
necessary engineering work upon which the Project is based and is willing and able to
work with CITY staff to organize and coordinate the professional services necessary to
complete the Project.
NOW, THEREFORE, CITY engages ENGINEER to perform, and ENGINEER
agrees to perform, the engineering work for the Project, as more fully described herein
below, and CITY agrees to pay as compensation, and ENGINEER agrees to accept as
compensation, the payments on the dates and in the amounts herein specified, all in
accordance with the terms more fully set out below and as provided in Attachment A
which is attached hereto and incorporated by reference as if fully set forth herein.
I. ARTICLE
ENGINEERING SERVICES
A. Scope of Work
ENGINEER will provide the supervision, direction, personnel and equipment to
perform the engineering Services outlined in Attachment A in accordance with the terms
set forth in this Agreement and in Attachment A.
B. Definitions
Services refer to the professional services performed by ENGINEER pursuant to
this Agreement.
C. Changes
CITY, without invalidating the Agreement, may order changes within the general
scope of the work required by the Agreement by altering, adding to and/or deducting
from the work to be performed. If any change causes an increase or decrease in
ENGINEER's cost of, or the time required for, the performance of any part of the
Services under the Agreement, an equitable adjustment will be made by mutual
agreement and this Agreement shall be modified in writing accordingly.
Page 1
D. Coordination with Owner
The CITY shall make available to ENGINEER for use in performing Services
hereunder all existing plans, maps, field notes, statistics computations and other data in
the CITY's possession relative to existing facilities and to the Project.
E. Site and Local Conditions
ENGINEER has the right to examine the site in order to become acquainted with
local conditions and accepts conditions at the site unless otherwise noted in writing to
the CITY. Any coordination or scheduling of work by CITY shall not relieve ENGINEER
from its responsibilities specified hereunder. Necessary arrangement for access to any
site by ENGINEER's employees will be made with CITY.
F. Assignment and Subcontractors/Third Party Rights
The rights and obligations covered herein are personal to each party hereto and
not to any third party and for this reason neither this Agreement nor any contract
hereunder shall be assigned by either party in whole or in part; nor shall ENGINEER
subcontract any of its obligations under this Agreement without the prior written consent
of CITY.
G. Independent Contractor
ENGINEER covenants and agrees that it will perform the work hereunder as an
independent contractor, and not as an officer, agent, servant, or employee of CITY; that
ENGINEER shall have exclusive control of and exclusive right to control the details of
the work performed hereunder, and all persons performing same, and shall be solely
responsible for the acts and omissions of its officers, agents, employees, contractors,
subcontractors, and consultants, that the doctrine of respondent superior shall not apply
as between CITY and ENGINEER, its officers, agents, employees, contractors,
subcontractors, and consultants, and nothing herein shall be construed as creating a
partnership or joint enterprise between CITY and ENGINEER.
H. Disclosure
By signature of this contract, ENGINEER warrants to CITY that it has made full
disclosure in writing of any existing conflicts of interest or potential conflicts of interest,
including personal financial interests, direct or indirect, in property abutting the proposed
Project and business relations with abutting property owners. ENGINEER further
warrants that it will make disclosure in writing of any conflicts of interest that develop
subsequent to the signing of this contract and prior to final payment under the contract.
Finally, Engineer warrants that it has submitted to the City a completed Conflicts of
Interest Questionnaire as required by Chapter 176 of the Texas Local Government
Code.
Page 2
I. Approval by CITY
Approval by CITY of this Agreement shall not constitute or be deemed to be a
release of the responsibility and liability of ENGINEER, its officers, agents, employees,
and subcontractors for the accuracy and competency of the Services performed under
this Agreement, including but not limited to surveys, designs, working drawings and
specifications and other engineering documents.
Such approval shall not be deemed to be a waiver or an assumption of such
responsibility and liability by CITY for any negligent act, error, or omission in the
performance of ENGINEER's professional services or in the conduct or preparation of
the subsurface investigations, surveys, designs, working drawings and specifications or
other engineering documents by ENGINEER, its officers, agents, employees and
subcontractors, it being the intent of the parties that approval by CITY signifies the
CITY's approval of only the general design concept of the Improvements to be
constructed.
J. Indemnification
ENGINEER SHALL AND DOES HEREBY AGREE TO INDEMNIFY AND HOLD
HARMLESS CITY, ITS OFFICERS, AGENTS, AND EMPLOYEES FROM ANY AND
ALL DAMAGES, LOSS OR LIABILITY OF ANY KIND WHATSOEVER, BY REASON OF
DEATH OR INJURY TO PROPERTY OR PERSON CAUSED BY ANY OMISSION OR
NEGLIGENT ACT OF ENGINEER, ITS OFFICERS, AGENTS, EMPLOYEES,
INVITEES, OR OTHER PERSONS FOR WHOM IT IS LEGALLY LIABLE, WITH
REGARD TO THE PERFORMANCE OF THIS CONTRACT, AND ENGINEER WILL, AT
ITS COST AND EXPENSE, DEFEND, PAY ON BEHALF OF, AND PROTECT CITY
AND ITS OFFICERS, AGENTS, AND EMPLOYEES AGAINST ANY AND ALL SUCH
CLAIMS AND DEMANDS. THE PROVISIONS OF THIS SECTION ARE SUBJECT TO
THE LIMITATIONS OF TEXAS LOCAL GOVERNMENT CODE SECTION 271 .904 AND
SHALL BE CONSTRUED TO THAT EFFECT.
K. No Third Party Beneficiary
For purposes of this Agreement, including its intended operation and effect, the
parties specifically agree and contract that: (1) this Agreement only affects
matters/disputes between the parties to this Agreement, and is in no way intended by
the parties to benefit or otherwise affect any third person or entity (except the
indemnitees identified or described in Article I, Section J., above), notwithstanding the
fact that such third person or entities may be in a contractual relationship with CITY and
ENGINEER, or both; and (2) the terms of this Agreement are not intended to release,
either by contract or operation of law, any third person or entity from obligations they
owe to either CITY or ENGINEER.
L. Successors and Assigns
CITY and ENGINEER each bind themselves and their successors, executors,
Page 3
administrators and assigns to the other party to this Agreement and to the successors,
executors, administrators and assigns of such other party with respect to all covenants
of this Agreement. Neither CITY nor ENGINEER shall assign or transfer its interest in
this Agreement without prior written consent of the other.
II. ARTICLE
CITY'S RESPONSIBILITIES
CITY will:
1. Provide full information as to CITY's requirements for the Project;
2. Assist ENGINEER by placing at ENGINEER's disposal all information in
CITY's control or knowledge which is pertinent to the Project, including
executed right-of-way easements and final field survey data;
3. Examine all work presented by ENGINEER and respond within reasonable
time and in writing to the material submitted by ENGINEER;
4. Pay all costs incident to advertising for obtaining bids or proposals from
Contractors;
5. Give prompt written notice to ENGINEER whenever CITY observes or
otherwise becomes aware of any defect in ENGINEER's work or in
Contractor's work;
6. Designate in writing a person to act as its representative with respect to
this Agreement, such person having complete authority to transmit
instructions, receive information, and make or interpret the CITY's
decisions;
7. Provide all information and criteria as to the CITY's requirements,
objectives, and expectations for the Project including all numerical criteria
that are to be met and all standards of development, design, or
construction.
8. Provide to the ENGINEER all previous studies, plans, or other documents
pertaining to the Project and all new data reasonably necessary in the
ENGINEER's opinion, such as site survey and engineering data,
environmental impact assessments or statements, zoning or other land
use regulations, etc., upon all of which the ENGINEER may rely; and
9. Arrange for access to the site and other private or public property as
required for the ENGINEER to provide its services.
10. Provide any other information or assistance as outlined in Attachment A
hereto.
Page 4
III. ARTICLE
COMPENSATION FOR ENGINEERING SERVICES
The CITY shall compensate ENGINEER for services rendered under this
Agreement, in accordance with the following:
For the completion of the work contemplated in Article I, the ENGINEER shall be
paid a fee in an amount not to exceed $119,845 for basic services. Optional special
services shall be performed upon City's request for a fee in an amount not to exceed
$10,050 with a total fee in an amount not to exceed cost ceiling of $129,895 as billed
monthly by ENGINEER.
IV. ARTICLE
TIMES OF BILLING AND PAYMENT
The ENGINEER shall bill CITY monthly for any services and expenses incurred
in accordance with the work performed subject to the limits set out in Article III.
Payment shall be due within thirty (30) days of receipt by CITY of a properly prepared
and correct invoice from ENGINEER. ENGINEER's invoices shall be accompanied by
such records or other written proof as CITY deems necessary to verify the billings.
Invoices shall be made to City Finance Department's office at 1400 Main Street,
Suite 440, Southlake, Texas 76092.
If CITY fails to make payment due ENGINEER within thirty (30) days of the day
when payment for services and expenses is due under the terms of this Agreement,
ENGINEER shall be entitled to interest on such unpaid sums at the rate provided in
Chapter 2251 of the Texas Government Code.
V. ARTICLE
ADDITIONAL ENGINEERING SERVICES
In addition to performing the engineering services set out in Article I, hereof,
ENGINEER agrees to perform additional services as requested by CITY from time to
time and CITY agrees to compensate ENGINEER for such services in accordance with
ENGINEER's standard hourly fee and expenses (see Attachment A) for actual time
expended and actual out-of-pocket sums expended, such services to be one or more of
the following:
1 . Make or prepare detailed description of sites, maps, or drawings related
thereto and outside the scope of the Project;
2. Appearances before courts or boards on matters of litigation or hearings
related to the Project;
Page 5
3. Preparation of environmental impact assessments or statements for any
governmental agency;
4. Miscellaneous engineering work for CITY not related to the Project;
5. To provide resident project construction inspection, unless such inspection
is not required, in writing, by the CITY;
6. Other services agreed to by the parties in writing and incorporated herein.
VI. ARTICLE
STANDARD OF CARE
In performing its professional services, the ENGINEER will use that degree of
care and skill ordinarily exercised, under similar circumstances, by reputable members
of its profession in the same locality at the time the services are provided and in
accordance with any applicable governmental laws, regulations and ordinances.
VII. ARTICLE
PERIOD OF SERVICE
This Agreement shall be effective upon execution by CITY and ENGINEER, and
shall remain in force until work is completed on the Project or until terminated under the
provisions hereinafter provided in Article VIII.
VIII. ARTICLE
TERMINATION
The CITY may terminate this Agreement at any time for convenience, with or
without cause by giving written notice to the ENGINEER. Such termination may be
made effective on such future date as agreed by the parties, but absent such
agreement shall be immediate. Upon receipt of such notice the ENGINEER shall
immediately discontinue all services and work and the placing of all orders or the
entering into contracts for supplies, assistance, facilities, and materials in connection
with the performance of this Agreement and shall proceed to cancel promptly all existing
contracts insofar as they are chargeable to this Agreement.
The ENGINEER, upon termination, shall be paid for all services rendered
through the date of termination together with any additional reimbursable expense then
due.
Page 6
IX. ARTICLE
OWNERSHIP OF DOCUMENTS
1 . All completed or partially completed reports prepared under this
Agreement, including the original drawings in both paper and electronic
formats, shall become the property of CITY if this Agreement is
terminated. Upon completion and payment of the contract, the final
design, drawings, specifications and documents in both paper and
electronic formats shall be owned by CITY.
2. Reuse, change or alteration by CITY or others acting by or on behalf of
CITY of such documents without the permission of ENGINEER shall be at
CITY's sole risk.
X. ARTICLE
INSURANCE
ENGINEER shall carry and maintain at all times relevant hereto, at ENGINEER's
expense, insurance of the type and of minimum coverage limits as follows:
1 . Workers Compensation - Statutory Employer's Liability - Limits as required
by the State of Texas.
2. Comprehensive General Liability, Bodily Injury and Property Damage
including contractual liability in a combined single limit - $500,000 per
occurrence.
3. Comprehensive Automotive Liability, Bodily Injury and Property Damage in
a combined single limit - $1 ,000,000 per accident.
Certificates of insurance for the above coverage in a form acceptable to CITY,
evidencing the coverage required above, shall be provided to CITY upon execution of
this Agreement. Such certificates shall provide that the insurer will give CITY not less
than ten (10) days notice of any material changes in or cancellation of coverage. In the
event any subcontractor of ENGINEER, with or without CITY's consent, provides or
renders services under this Agreement, ENGINEER shall ensure that the
subcontractor's services are covered by the same insurance limits as set forth above.
ENGINEER shall not commence work under this Agreement until it has obtained
Professional Liability (Errors and Omissions) Insurance as required hereunder and such
insurance coverage has been approved by CITY. Such insurance shall be in the
minimum amount of $1,000,000 and shall include coverage of Contractually Assumed
Liability. The insurance coverage prescribed herein shall be maintained until one (1)
year after CITY's acceptance of the construction project and shall not be canceled
without prior written notice to CITY. In this connection, upon the signing and return of
this Agreement by ENGINEER, a Certificate of Insurance shall be furnished to CITY as
Page 7
evidence that the insurance coverage required herein has been obtained by
ENGINEER, and such certificate shall contain the provision that such insurance shall
not be cancelled or modified without thirty (30) days prior written notice to CITY.
ENGINEER shall notify CITY within ten (10) days of any modification or alteration in
such Professional Liability (Errors and Omissions) Insurance.
XI. ARTICLE
AUTHORIZATION, PROGRESS AND COMPLETION
CITY and ENGINEER agree that the Project is planned to be completed by
October 31, 2017. ENGINEER shall employ manpower and other resources, and use
professional skill and diligence to meet the schedule; however, ENGINEER shall not be
responsible for schedule delays resulting from conditions beyond its control. By mutual
agreement, CITY and ENGINEER may modify the Project schedule during the course of
the Project and if such modifications affect ENGINEER's compensation, it shall be
modified accordingly, subject to CITY's approval.
It is understood that this Agreement contemplates full and complete engineering
services for this Project, including any and all Services necessary to complete the work.
For additional Engineering Services, the authorization by CITY shall be in writing and
shall include the definition of the services to be provided, the schedule for commencing
and completing the services, and the basis for compensation as agreed upon by CITY
and ENGINEER.
XII. ARTICLE
NOTICE
Any notice required under this Agreement will be in writing and given either
personally, by registered or certified mail, return receipt requested, or by a nationally
recognized overnight courier service, addressed to the parties as follows:
If to CITY: Shana Yelverton
City Manager
City of Southlake
1400 Main Street, Suite 460
Southlake, Texas 76092
Phone: 817-748-8400
Fax: 817-748-8010
If to ENGINEER: Konstantine Bakintas, P.E.
Baird, Hampton & Brown, Inc.
4550 SH 360, Suite 180
Grapevine, TX 76051
Phone: 817.251.8550
Page 8
All notice shall be effective upon the date of receipt.
XIII. ARTICLE
SEVERABILITY
In the event that any provision of this Agreement shall be found to be void or
unenforceable, such finding shall not be construed to render any other provisions of this
Agreement either void or unenforceable. All provisions, which are void or
unenforceable, shall not substantially affect the rights or obligations granted to or
undertaken by either party.
XIV. ARTICLE
VENUE-LAW
Venue of any suit or cause of action under this Agreement shall lie exclusively in
Tarrant County, Texas. This Agreement shall be construed in accordance with the laws
of the State of Texas.
IN WITNESS WHEREOF the parties have caused this Agreement to be executed
in two equal originals on the date and year first above mentioned.
CITY OF SOUTHLAKE:
By:
Laura Hill, Mayor
ATTEST:
By:
City Secretary
ENGINEER: Baird, Hampton & Brown, Inc.
By:
Konstantine Bakintas, Principal
Page 9
THE STATE OF TEXAS §
COUNTY OF TARRANT §
Before me on this day personally appeared known to me [or
proved to me on the oath of or through
(description of identity card or other document)] to be the person whose name is
subscribed to the foregoing instrument and that he/she is the duly authorized
of , and acknowledged
to me that he/she executed the same for the purposes and consideration therein
expressed.
Given under my hand and seal of office this day of
A.D.
(SEAL) Notary Public, State of Texas
Notary's Name Printed
Page 10
ATTACHMENT A
BAIRD, HAMPTON & BROWN, INC. 13 - ENGINEERING & SURVEYING
December 22, 2016
Mr, Kyle Hogue, PE
Deputy Director of Public Works/City Engineer
City of Southlake
1400 Main Street, Suite 320
Southlake,Texas 76092
Tel 817-748-8100, Email khogue@ci.southlake.tx.us
RE: Engineering&Surveying Services for
WATER SYSTEM IMPROVEMENTS AT WHISPERING DELL ESTATES
Whispering Lane&Whispering Dell Court
City of Southlake
Mr. Hogue:
We are pleased to have been selected to assist the City of Southlake with the referenced project; and
look forward to working with you. In the following pages we've summarized our understanding of the
project's scope of work; and offer our revised opinion of probable construction cost, revised
professional services fees, as well as a design and construction schedule.
These items, as well as our professional services fee summary, have been prepared in the form of
Exhibits to the City's Standard Professional Services Contract, and incorporate the items we discussed.
We hope you find the enclosed information complete; and look forward to getting started.
Thank you,
BAIRD, HAMPTON & BROWN
�]
Konstantine Bakintas, PE
Principal, Sr. Civil Engineer
Enclosure: Project Summary, Exhibits& Estimates
e:\2016.000.000\2016.723.000\docs\contract\scope of work&fee prop osaIIetter_12-13-16.doc
4550 SH 360,Ste 180,Grapevine,Texas 76051 1 Tel:817-251-85501 Fax:817-251-8810
TBPE Firm#44 1 TBPLS Firm#10011302 1 www.bhbinc.com
Mr. Kyle Hogue, PE
December 22, 2016
Page 2
Baird, Hampton & Brown - Engineering& Surveying
WATER SYSTEM IMPROVEMENTS AT WHISPERING DELL ESTATES
Whispering Lane&Whispering Dell Court
City of Southlake
Project Summary
Pg. 1 of 2
Scope of Work:
Whispering Dell Estates is a small (two cul-de-sac) residential development platted in the early('80s)
eighties.The city's water distribution system extends into this development with 6-inch diameter lines
that dead-end at each of the cul-de-sacs.These water lines are to be replaced with 8-inch diameter lines,
and extended/looped eastward to Sunshine Lane; see Exhibit A.
These water lines are needed to upgrade and complete the city's water distribution system, and provide
increase flow volumes and improved water pressures.The proposed improvements will include fire
hydrants, valves and other appurtenances to provide a complete and functional system meeting today's
standards.
Water Line construction and reconstruction will be by open trench and trenchless technology methods.
These improvements consist of(1) replacing 2,670 LF of existing undersized water lines within the
development, (2) extending/looping these lines by constructing 2,725 LF of new water lines, and (3)
resurfacing the 2,650 LF of asphaltic residential roadway, within the development, with an edge-mill and
overlay process.
Please note that the off-site water line extensions, intended to loop the distribution system, may require
utility easements. During the Concept Design stage of this project we will identify and investigate the
feasibility and benefits of several alignments, and recommend the most appropriate alternative.
Engineer's Opinion of Probable Construction Cost:
From a budgetary perspective, and without the benefit a survey, we've prepared an Opinion of Probable
Construction Cost; see Exhibit B.This estimate will be refined as the project moves forward to the
Concept Report, Preliminary Plans and Final Plans phases.
Water Line Reconstruction w/in Whispering Dell Estate (2,670 LF) $430,000
Looping of Water System to Sunshine Lane (2,725 LF) $256,000
Asphaltic Pavement Overly(2,670 LF) $128,000
Project Total Opinion of Probable Construction Cost $814,000
Note:These Opinions of Probable Construction Cost do not include easement acquisition.
4550 SH 360,Ste 180,Grapevine,Texas 76051 1 Tel:817-251-85501 Fax:817-251-8810
TBPE Firm#44 1 TBPLS Firm#10011302 1 www.bhbinc.com
Mr. Kyle Hogue, PE
December 22, 2016
Page 3
WATER SYSTEM IMPROVEMENTS AT WHISPERING DELL ESTATES
Project Summary
Pg. 2 of 2
Project Schedule:
A detailed Project Schedule (Exhibit C), which includes surveying, engineering, bidding and construction,
has been prepared and enclosed herewith.The schedule has been prepared with assumptions as to the
responsiveness of the franchise utility companies and the timeliness of city reviews.The schedule may
be summarized as follows:
Pre-Engineering&Surveying 35 working days
Concept Report Phase 65 It It
Preliminary Engineering Plans 145 It It
Final Construction Plans 60 It It
Bid &Award 70 It It
Construction 120 working days
Total Project Schedule 375 working days-from 02/06/17 thru 07/13/18
Please Note:The above schedule provides for approximately four months for franchise utility adjustments and
easement acquisition—if needed.
Professional Services Fee Estimate:
Based upon our years of experience with similar utility reconstruction projects, we've prepared the
enclosed Professional Services Fees (Exhibit D) Summary.The summary tabulates individual tasks to be
performed and the estimated man-hour effort required to complete these tasks. A fee for each task is
then developed by multiplying the tabulated hours with the respective hourly rates for the various
positions described. Our standard hourly rate schedule is included in the Agreement for Engineering
Services.The professional services fees may be summarized as follows:
BASIC SERVICES(fixed fee)
Topographic Surveying Services $ 24,730.00
Alignment Study $ 10,285.00
Concept Design Report $ 20,905.00
Plans, Specs& Estimates $49,985.00
Bid Project& Record Drawings $ 13,940.00
Subtotal for Engineering& Surveying $119,845.00
SPECIAL SERVICES(hourly or per each)
Assistance w/Neighborhood Meeting $ 2,130.00 (hourly)
Legal Easement Exhibits for Acquisition $ 1,595.00 (Each)
Limited Construction Support Services $ 6,325.00 (hourly)
Subtotal for Special Services $10,050.00
TOTAL FOR PROFESSIONAL SERVICES $129,895.00
4550 SH 360,Ste 180,Grapevine,Texas 76051 1 Tel:817-251-85501 Fax:817-251-8810
TBPE Firm#44 1 TBPLS Firm#10011302 1 www.bhbinc.com
TP
r �
0 125' 250' A—
SCALE 1"=250' r. Y
- _. - -- _'*a' I'll F• P. 'F r
15L• � .•4��4�',� �� �} '"rte �•
L f.
L l--T. .1 F. •Y '�I�
rt
w
±unsO eL.F.ne
� •.��_ x �/ S hin La
q
3 � �y
5
� ±1575 L.F. f
3
Q -� ±1290 L.F.
' .i
3Z I
z ; %
� N
1
Whispering Ln Whispering Ln �
SS SS SS SS SS SS SS
W w w _w
yI� I N
Q III7
3:-, -
- ±1380 L.F.
Z ,
. 3
4.
L
THIS DOCUMENT IS RELEASED FOR THE
1400 Main Street Exhibit A m
1 x PURPOSE OF INTERIM REVIEW UNDER
S011thlake,TX 76092 ° THE AUTHORITY OF KONSTANTINE
0(817)748-8400 Water System Improvements m ° BAKINTAS, P.E. Tx No. 67022 IT IS NOT
F(8 17)748-8077 INTENDED FOR CONSTRUCTION, BIDDING
OR PERMIT PURPOSES.
BAIRD,HAMPTON&BROWN,INC. Whispering Dell Estates m
E B ENGINEERING&SURVEYING SOuthlake,TXm BHB PROJECT NO:
4550 SH 360he:www.Sui[e 180 Grapevine,TX]6051 Te1:81]-251-8550 Fax:81]-251-8810 U Z 2016.723.000
Webs .bbbl,--, E-Mall:mall@bbbIh,—m TBPE FI-#44 TBPLS I'll,#1010111302
BHB No.2016.723.000 BHB Engineering Surveying 11/9/2016
4550 S.H.360,Suite 180 Grapevine,TX76051
Tel 817-251-8550,vwwv.bhbinc.com
EXHIBIT B
ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST
Water Line Replacement&Pavement Overlay Project
Whispering Lane&Whispering Dell Court
City of Southlake
November 9,2016
Water Line Replacement by Open Trench Construction and Whisperng Whispering
Lane Dell Court
w/Pavement Overlay (1,380 LF) (1,290 LF)
Item Estimated Extended Estimated Extended
No. Item Description Unit Cost Unit Quantity Price Quantity Price AMOUNT
WATER LINE RECONSTRUCTION
1 Project sign 450 MO 2 900 - - $ 900
2 Implement and Maintain Erosion Control 3,500 MO 3 10,500 3 10,500 $ 21,000
3 Implement and Maintain Traffic Control 1,000 MO 3 3,000 3 3,000 $ 6,000
4 Temporary Water Service Line w/Services 15 LF 1,380 20,700 1,290 19,350 $ 40,050
5 Remove&Salvage Exist.FH&Valves 500 EA 2 1,000 2 1,000 $ 2,000
6 Connect to Exist.w/12"X 8"Tapping Sleeve&Valve 2,750 EA 1 2,750 - $ 2,750
7 8"PVC Water Pipe by Open Trench 35 LF 1,380 48,300 1,290 45,150 $ 93,450
8 6"PVC Water Pipe by Open Trench 32 LF 50 1,600 50 1,600 $ 3,200
9 8"Gate Valve w/Box&Lid 1,900 EA 1 1,900 1 1,900 $ 3,800
10 Fire Hydrant Assembly 2,350 EA 2 4,700 2 4,700 $ 9,400
11 6"Gate Valve w/Box&Lid 1,750 EA 2 3,500 2 3,500 $ 7,000
12 C.I./D.I.Fittings 5,400 TON 0.3 1,798 0.3 1,798 $ 3,596
13 1"Service Tap 250 EA 17 4,250 19 4,750 $ 9,000
14 1"Type W Copper Water Service Line 20 LF 120 2,400 80 1,600 $ 4,000
15 1"Type W Copper Water Service Line by HDD 95 LF 250 23,750 550 52,250 $ 76,000
16 Furnish&Set 1"Meter Box&Lid 250 EA 17 4,250 19 4,750 $ 9,000
17 Trench Excavation Safety for Water Line Depths>S' 2 LF 345 690 323 645 $ 1,335
18 Cement Treated Sand Backfill at Roadway Trench 50 LF 165 8,250 165 8,250 $ 16,500
19 Permanent HMAC Roadway Trench Repair 10 LF 165 1,650 165 1,650 $ 3,300
20 Sawcut Demolish&Remove Concrete Driveway 3 SF 1,890 5,670 2,160 6,480 $ 12,150
21 Concrete Driveway Trench Repair 6 SF 1,890 11,340 2,160 12,960 $ 24,300
22 Sawcut Demolish&Remove Concrete Sidewalk 3 SF 200 600 25 75 $ 675
23 Concrete Sidewalk Trench Repair 5 SF 200 1,000 25 125 $ 1,125
24 Top Soil in Disturbed(Open Cut)Areas 18 CY 409 7,360 287 5,160 $ 12,520
25 Solid Sod for Disturbed(Open Cut)Areas 5 SY 2,453.33 12,267 1,720 8,600 $ 20,867
Suptotal $184,125 $199,793 $ 383,918
Contigency 11.9% $ 21,875 12.1% $ 24,207 $ 46,082
Water Line Total $206,000 $224,000 $ 430,000
LOOPING OF WATER LINES TO SUNSHINE LANE (2,725 LF)
26 Implement and Maintain Erosion Control 3,500 MO 2 $ 7,000
27 Implement and Maintain Traffic Control 1,000 MO 2 $ 2,000
28 Connect to Exist w/6"Tee&6"X 8"Reducer 2,000 EA 1 $ 2,000
29 8"PVC Water Pipe by Open Trench 35 LF 2,455 $ 85,925
30 8"PVC Water by Horizontal Direction Drilling(HDD) 225 LF 270 $ 60,750
31 8"Gate Valve w/Box&Lid 1,900 EA 8 $ 15,200
32 C.I./D.I.Fittings 5,400 TON 0.50 $ 2,700
33 Trench Excavation Safety for Water Line Depths>S' 2 LF 246 $ 491
34 Cement Treated Sand Backfill at Roadway Trench 50 LF 25 $ 1,250
35 Permanent HMAC Roadway Trench Repair 10 LF 25 $ 250
36 Remove,Salvage&Reinstall Existing Fence 10 LF 2,455 $ 24,550
37 Top Soil in Disturbed(Open Cut)Areas 18 CY 546 $ 9,820
38 Solid Sod for Disturbed(Open Cut)Areas 5 SY 3,273 $ 16,367
Suptotal $ 228,303
Contigency 12.1% $ 27,697
Water Line Total $ 256,000
PAVEMENT RESURFACING
39 Edge Mill Existing Asphaltic Pavement(8-ft) 4 SY 2,453 9,813 2,293 9,173 $ 18,987
40 Miscellaneous Pavement&Subgrate Rehabilitation 65 SY 39 2,507 36 2,351 $ 4,858
41 2-Inch HMAC,Type D Surface Course 12 SY 3,857 46,284 3,617 43,404 $ 89,688
Subtotal $ 58,604 $ 54,928 $ 113,533
Contigency 12.6% $ 7,396 12.9% $ 7,072 $ 14,467
Pavement Total $ 66,000 $ 62,000 $ 128,000
Water Line Replacement&Pavement Rehabilitation Project Total= $ 814,000
Opinion-of-Probable-Cost.xlsx Page 1 of 1
m oQ
N
CO
N
F �
W 0
O
N
N
Q a
------------------------------------------------ ----------- O
co-0 n5 n5 C
O
N LL
ON LT cl
O
O m w w a` o
U -
O
LU
O z
N
J N
0 0
LU --- --- ------- - - --- ----------------
= N
U U) °
0
� o
H NN Q a a
Z
y� E E E
CO3 --- ------------------- - --------------------------------- D D >
LU ° U) U) c
c o
LT O °
L
T N (6 r rn
CL a o LL
N
D ON
06 1- E w N Q
XU --- ------- --- ---------------------------------------------
C
C a)-0
aI a =
w 0 a
W 0 3:
CWO O'-'� a)
T
LU
OL 00 h h h h h 00 00 00 00 00 a
mw r \ r r r r r r r r r \ r r r r \ r r r r r r r r \ r r r r U)LM � M� 4 O V T MC,
= � N 7 N N N 7
06 6 Q , h M N M .- V V Lo Lo I- r- r- r- O O h O p n5
o- W a LL LL LL LL LL LL LL LL LL LL LL LL LL LL LL LL LL ' LL LL LL LL 'm LL LL LL LL LL LL LL E F
LO
-p LU f0 f0 M X
N N N N N N N 0 M M M N 0 N N N N N W W
N C C C C N N N M V 0 0 0 h O O O
m Z U) O O O O C c C C '-CC
O C c C O '- C C C c C C '-CC
O O O O LL O O O LL O O O O O O LL O C C C O O O O =
W g g g _
CL =
_ E 0 o o o o o o o o o o o o o o o o o o o o 0 o o o o o o o o
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
o C _
O a3 a3 a3 N N (0 L6 L6 L6 L6 L6 (0 L6 L6 L6 L6 L6 L6 (0 L6 L6 L6 L6 (0 L6 L6 L6 L6 L6 L6 0
m p p p LO O p o LO O O LO p In O O O O O p In O O In 0 0 0 0 In In O
I-- M M �p M V O) O) W M CF) M M N
M N
_
x
Q LU
7 N
U w E
Y CO .2 w O E
U)
>
o N .o E w O U ° 0 Q > m Q °
E v v ai L7) �' o .v rn ' m n E ° n F o o a
o Q � n E E E �° a E o a m > ui a E
U o a) LT
J atS ° ° 06cr ° z ° ° aci m o .N Q o o C a z .S
v m N Q U > E ° E U .s w 0 U a D c0� -° 06 � � o
m w E - E O E 06 v - i v O LT m
n o o �6 c 3 5 w m 3 Q
w a! s n C n a o 0 0 w o o a! n ° �_ .Q � m o m
o c E 2 cn n U '> D o a '> � E S o n LL E c ° N O t Q
m p •� L0 L71 0 cr v C m 0 E 0 •c U � U O m -° r
o O Q ° E E o E oo c o i
Of a1 c w n a! c n >. m E m n >. w w m m n >, � O n
c w o o v o m c c ° c U n o
E Ei rn v c c U co U LL v a U w co LL LE LE co U y C
ao o2 a) o Y
z y o d U d LL 0 d CO U d z U L
m t o U U
U
� - F
U .
N M V LU (O r W d) O N M V LU CO r W O N M V LU
O - N N N N N N N N N N M (6
U) a o
Estimated Man-Hour Effort.xls BHB Engineering&Survyeing 12/13/2016
4550 SH 360,Ste.180,Grapevine,TX 76051
Tel 817-251-8550,vmw.bhbinc.com
EXHIBIT D
PROFESSIONAL SERVICES FEES:Item/Task Description&Estimated Man-Hour Effort
Water Line Replacement&Pavement Rehabilitation Project
Whispering Lane&Whispering Dell Court
December 13,2016
Project Project Project Engineering Project Survey Survey Direct
Item/Task Description Director Manager Engineer CADD/Tech Surveyor Field Crew CADD/Tech Clerical Costs Amount
(Hrs) (Hrs) (Hrs) (Hrs) (Hrs) (Hrs) (Hrs) (Hrs) ($) ($)
210/hr 165/hr $110/hr $90/hr $110/hr $140/hr $85/hr $55/hr
BASIC SERVICES(fixed fee amount) $119,845
Surveying Services $ 24,730
Topographic Surveying(cul-de-sacs) 1 2 2 2 12 32 40 10,140
Topographic Surveying(looped line) 1 2 2 2 16 32 32 9,900
Alignment,ROW Mapping 1 2 1 2 10 6 6 3,280
Set Project Control Points 1 2 2 4 4 1,410
Subtotal= 3 6 6 8 40 74 82 0 0
Water Line Loop Alignment Study 10,285
-Review Record Drawings&Visit Site 4 8 4 25 1,925
-Research Various Plats for Easements 2 6 2 1,270
-
IdentifyAlignmentsw/in Easements 1 1 4 4 1,175
-
IdentifyAlignmentsw/o Easements 1 1 4 4 1,175
-Prepare OPCS for Alignments(6 max) 2 6 12 8 3,450
-Evaluate Alignment Alternatives 2 2 4 2 1,290
Subtotal= 6 16 38 20 0 2 0 2 25
Concept Design Report 20,905
Review Record Drawings&Visit Site 4 12 8 25 2,725
Prepare Water Line Drawings 4 24 40 6,900
Pavement Overlay Drawings 2 6 12 2,070
Opinions of Probable Constr.Cost 1 4 8 16 3,190
Prepare and Submit Concept Report 1 6 20 12 2 75 4,655
Concept Plans Review Conference 2 4 2 1 15 1,365
Subtotal= 4 24 72 88 0 0 0 3 115
Preliminary Plans&Estimates $ 23,065
Revise Plans&Incorporate Comments 2 8 12 2,290
Project Geometric Layout&Control 1 4 12 12 3,270
Water Line Plans w/o Profile 2 6 24 32 25 6,955
Pavement Overlay Plans 1 2 4 8 25 1,725
Details,Trafffic Control&Erosion Control 4 16 24 4,580
Opinions of Probable Constr.Cost 1 4 8 12 50 2,880
Submital&Review Meetings 2 4 2 1 15 1,365
Subtotal= 7 24 66 88 0 0 0 1 115
Final Plans,Specs&Estimates $ 26,920
Revise Plans&Incorporate Comments 2 12 16 3,090
Water Line Plans w/o Profile 1 8 12 16 4,290
Pavement Overlay Plans 1 2 2 4 1,120
Details,Trafffic Control&Erosion Control 2 4 8 1,490
Esitimated Quantities Per Sheet 2 16 24 4,250
Tech.Specs.&Contract Docs. 2 8 40 24 4 100 8,600
Final Plans QA/QC w/Site Verification 4 4 8 4 25 2,765
Submital&Review Meeting 2 4 2 15 1,315
Subtotal= 10 32 96 96 0 0 0 4 140
Limited Construction Administration Services 13,940
Incorporate Comments&Issue Bid Docs. 2 8 12 16 100 4,600
Bid Project,Tab.Results&Recom. 1 6 12 8 100 3,020
Pre-Con Mtg.&Final Inspection 2 8 16 4 2 50 4,010
Prepare Record Drawings&CAD Files 2 4 16 100 2,310
Subtotal= 3 16 32 20 0 0 0 10 250
SPECIAL SERVICES(Hourly) $ 10,050
Assist w/Neighborhood Meeting(Hourly) 2 4 4 4 2 150 2,130
Utility&Temp.Constr.Easements(Each) 1 1 6 8 1,595
Additional Constr.Admin.Support(Hourly) 2 20 16 8 2 25 6,325
Subtotal= 4 25 20 13 6 0 8 4 175
Total for Professional Services 31 127 292 313 46 74 90 22 $ 795 $129,895
BASIC ENGINEERING SERVICES
for
WATER DISTRIBUTION SYSTEM IMPROVEMENTS
Whispering Lane&Whispering Dell Court
Whispering Dell Estates
City of Southlake
Whispering Dell Estates is a small (two cul-de-sac) residential development platted in the early ('80s)
eighties.The city's water distribution system extends into this development with 6-inch diameter lines that
dead-end at each of the cul-de-sacs.These water lines are to be replaced with 8-inch diameter lines, and
extended/looped eastward to Sunshine Lane; see Exhibit A.
These water lines are needed to upgrade and complete the city's water distribution system, and provide
increase flow volumes and improved water pressures. The proposed improvements will include fire
hydrants, valves and other appurtenances to provide a complete and functional system meeting today's
standards.
Water Line construction and reconstruction will be by open trench and trenchless technology methods.
These improvements consist of (1) replacing 2,670 LF of existing undersized water lines within the
development, (2) extending / looping these lines by constructing 2,725 LF of new water lines, and (3)
resurfacing the 2,650 LF of asphaltic residential roadway, within the development, with an edge-mill and
overlay process.
Please note that the off-site water line extensions, intended to loop the distribution system, may require
utility easements. During the Concept Design stage of this project we will identify and investigate the
feasibility and benefits of several alignments, and recommend the most appropriate alternative.
The scope of work for BASIC Engineering Services involves a Concept Design and Project Plans,
Specifications, Contract Documents and Estimates for the above described water distribution system
improvements.
I. GENERAL
A. Design Meetings
1. The ENGINEER will meet with the CITY's staff during the Concept(30%), Preliminary
(65%) and Final Plan (95%) phases of the PROJECT.
2. The ENGINEER, if requested,will assist the CITY's staff in a meeting with property
owners during the Preliminary phase of the PROJECT.
B. Project Management,Administration and Coordination
ENGINEERING SERVICES FOR THE CITY OF SOUTHLAKE BY BAIRD,HAMPTON&BROWN,INC.
Whispering Dell Estates Water System Improvements (December 2016) Page 1 of 17
1. The ENG INEERwilI establish and maintain PROJECT schedules and budgets,develop
progress reports, prepare invoices, and meet with other entities on an as needed
basis for the duration of the PROJECT's design.
2. Supervision of Subconsultants
The ENGINEER will establish a work program and schedule for each subconsultant,
if any, at the beginning of each phase/section of the PROJECT.The ENGINEER will
be responsible for the coordination,supervision,review and incorporation of work
performed by subconsultants.
C. Data Collection
1. The ENGINEER will collect, compile and evaluate existing data collected from the
CITY,or other entities that supply needed existing information for the design of the
PROJECT.
2. Texas 811(DigTess/One Call)will be notified prior to beginning the survey. Utilities
identified by paint or pin flags on the ground will be included in the survey data
collected.
3. A location map/schematic will be provided with the Concept Report to the affected
utility companies. These plans will be used by the utility companies to show
approximate locations of their facilities which are or may be affected by the
PROJECT.
4. The ENGINEER will solicit Record/As-Built Drawings and/or future plans for the
following facilities in the PROJECT area:
i. Roadways
ii. Water Lines
iii. Sanitary Sewer Lines
iv. Storm Drain Lines
V. Telephone Underground and/or Overhead Lines
vi. Electric Underground and/or Overhead Lines
vii. Natural Gas Lines
5. The ENGINEER will identify potential utility conflicts and providethis information to
utility companies at the Preliminary Plans phase.
II. SURVEYING
A. Establish Survey Control
Establish survey control along the project alignments as necessary. These control points will be
established based on and tied to established CITY horizontal and vertical control points. The
ENGINEERING SERVICES FOR THE CITY OF SOUTHLAKE BY BAIRD,HAMPTON&BROWN,INC.
Whispering Dell Estates Water System Improvements (December 2016) Page 2 of 17
horizontal control for the PROJECT will be established on the State Plane Coordinate System
(NAD'83 Surface Coordinates) from CITY monumentation, if available. Control points will be
established using GPS and/or conventional surveying methods.
B. Surveying for Engineering Design
Perform necessary surveying operations for the complete design of the project as outlined in this
Scope of Services. Surveying shall include the following:
a. Locate Public ROW or easement and topographically survey visible surface features within
the ROW of the alignment or easement. Locate property corners sufficient to determine
location of ROW or easement and any platted easements that are within or crossing the project
limits.
b. Topographic survey will include:
1. CONCRETE FLAT WORK
2. PAVEMENT(STREET AND DRIVEWAY)
3. LEAD WALKS and MAIL BOXES
4. UTILITY POLES& SIGN POSTS
5. WATER VALVE BOX LIDS
6. MANHOLE LIDS& FLOWLINES
7. FIRE HYDRANTS
8. TREES(4-inches and larger)
9. FENCES/WALLS/ DECKS
10. ALL MARKED UTILITIES
c. Record elevation data at visible break lines and at a minimum of every 50 feet; and
provide 1-ft elevation contours as may be appropriate.
C. Existing Underground and/or Overhead Utilities
Utility owner's will be contacted,on an as needed basis,and requested to assist in locating existing
utilities identified for the PROJECT. Above ground features of existing utilities within the limits of
the PROJECT will be surveyed as noted above. The location of utilities between above ground
features will be determined from visual inspection, utility records, and/or from locations
determined by the respective utility companies. The utilities will be tied to the PROJECT control
points and depths determined in sufficient detail to identify potential conflicts with proposed
construction.These efforts equate to a Subsurface Utility Engineering(SUE)Quality Level D&C,and
shall be performed in accordance with CI/ASCE 38-02.
II. CONCEPT DESIGN PLANS
A. Utility Line
1. Existing and proposed water line layouts, dimensions and other pertinent
information will be presented over the topographic survey and aerial photographs.
ENGINEERING SERVICES FOR THE CITY OF SOUTHLAKE BY BAIRD,HAMPTON&BROWN,INC.
Whispering Dell Estates Water System Improvements (December 2016) Page 3 of 17
2. Existing Right-of-Way and Easements will be noted, and proposed Water Line
Easements identified.
3. Schematic design of all proposed public sewer lines and appurtenances will be
described.
B. Quantities and Cost Estimate
1. PROJECT quantities will be calculated and tabulated for inclusion in the bid
proposal and cost estimates.
2. The ENGINEER's opinion of probable construction costs will be prepared for the
entire PROJECT using current unit cost data.
C. Submit Concept Report for Review
1. Submit sets (3) printed sets of the concept plans for CITY review.
III. PLANS,SPECS&ESTIMATES
A. Prepare Preliminary(65%) Design Plans
1. Incorporate CITY review comments and directives from the Concept Report.
2. Develop dimensioned water Line layouts over actual field surveys.
3. Plans and profiles shall be at a scale of no less than 1"=40' and no more than
1"=20'; profiles will document all critical crossings.
4. Update Quantities and Cost Estimate
5. Submit three (3) printed sets of plans and estimates for CITY review
6. Attend project review meeting with CITY
B. Prepare Final (95%) Design Plans
1. Incorporate CITY review comments and directives from the Preliminary Plans
submittal.
2. Complete Water Plans& Profiles (as needed)
3. Prepare Construction Details
4. Prepare Project Specification and Contract Documents
5. Update Quantities and Cost Estimate
6. Submit three (3) printed sets for CITY review
7. Attend project review meeting with CITY
C. Prepare Final Bid Documents
1. Incorporate CITY review comments and directives from the Final (95%) Design
plans.
2. Provide final plans, specifications, and cost estimates
3. Submit two (2) sets of final bid documents for CITY approval and bidding.
IV. CONSTRUCTION PHASE
A. Assist the CITY in the advertisement of the PROJECT for bid.The CITY shall bear the cost of
advertisement in an official publication.The ENGINEER shall provide all necessary printing
ENGINEERING SERVICES FOR THE CITY OF SOUTHLAKE BY BAIRD,HAMPTON&BROWN,INC.
Whispering Dell Estates Water System Improvements (December 2016) Page 4 of 17
of construction plans, specifications and contract documents for use in obtaining bids,
awarding contracts, and constructing the PROJECT.
B. The ENGINEER shall be responsible for dispersing all plans and specifications from its office
to prospective bidders, and maintaining a Bidders List.
C. Assist the CITY in the opening and tabulation of the construction bids for the PROJECT and
recommend to the CITY the proper action on all proposals received.
D. Assist in the preparation of formal Contract Documents and in coordinating their execution
by the respective parties.
E. Conduct,in company with the Contractor and the CITY,a final inspection of the PROJECTfor
conformance with the design concept of the PROJECT and compliance with the Contract
Documents; and approve in writing final payment to the Contractors.
F. Prepare Record Drawings, with the assistance of the CITY's Resident PROJECT
Representative,to reflect available information as to how the work was constructed.The
CITY's Resident PROJECT Representative will provide the ENGINEER a red-lined set of
drawings depicting changes during construction.The ENGINEER shall revise original design
drawings, noting changes during construction, and submit one (1) printed sets of Record
Drawings and one set of electronic files in pdf format,to the CITY.
ENGINEERING SERVICES FOR THE CITY OF SOUTHLAKE BY BAIRD,HAMPTON&BROWN,INC.
Whispering Dell Estates Water System Improvements (December 2016) Page 5 of 17
SPECIAL SERVICES
for
WATER DISTRIBUTION SYSTEM IMPROVEMENTS
Whispering Lane&Whispering Dell Court
Whispering Dell Estates
City of Southlake
The scope of workfor SPECIAL Engineering Services involves providing the necessary Topographic Surveying
for the engineering design of the sewer line improvements.The scope of work for the Special Engineering
Services is more generally described as follows:
I. SURVEYING
A. Easements&Right-of-Way-Prepare legal description(Exhibit A)and exhibit(Exhibit B)for any
required Water Line Easement and/or Right-of-Way.
II. LIMITED CONSTRUCTION ADMINISTRATION
A. Represent the CITY in the non-resident administration of the PROJECT,as requested. In this
capacity,the ENGINEER shall have the authority to exercise whatever rights the CITY may
have to disapprove work and materials that fail to conform to the Contract Documents
when such failures are brought to the ENGINEER's attention.
This function of ENGINEER shall not be construed as supervision of the PROJECT and does
not include on-site activities other than occasional site visits to observe overall PROJECT
conditions or when specifically requested by CITY to visit on site for a particular matter. It
particularly does not involve periodic,exhaustive or continuous on-site inspection to check
the quality or quantity of the work or material; nor does it place any responsibility on the
ENGINEER for the techniques and sequences of construction or the safety precaution
incident thereto, and ENGINEER will not be responsible or liable in any degree for the
Contractor's failure to perform the construction work in accordance with the Contract
Documents.
Consult and advise the CITY;issue such instructions to the Contractor as in thejudgment of
the ENGINEER are necessary; and prepare routine change orders, if required.
B. Review samples,catalog data,schedules,shop drawings, laboratory,shop and mill tests of
material and equipment and other data which the Contractor is required to submit,onlyfor
conformance with the design concept of the PROJECT and compliance with the information
given by the Contract Documents;and assemble written guarantees which are required by
the Contract Documents.
III. Other Engineering Services
A. Assist w/Neighborhood Meeting to inform affected property owners; if requested.
ENGINEERING SERVICES FOR THE CITY OF SOUTHLAKE BY BAIRD,HAMPTON&BROWN,INC.
Whispering Dell Estates Water System Improvements (December 2016) Page 6 of 17
HOURLY AND/OR ADDITIONAL ENGINEERING SERVICES
for
WATER DISTRIBUTION SYSTEM IMPROVEMENTS
Whispering Lane&Whispering Dell Court
Whispering Dell Estates
City of Southlake
I. ADDITIONAL Engineering Services, not included in the scope of work, include those services that
may result from significant changes in the general scope,extent or character of the PROJECT or its
design including, but not limited to, changes in size, complexity, CITY's schedule, character of
construction or method of financing; and revising previously accepted studies, reports, design
documents or Contract Documents when such revisions are required by changes in laws, rules,
regulations, ordinances, codes or orders enacted subsequent to the preparation of such studies,
reports or documents, or are due to any other causes beyond ENGINEER's control.
II. ADDITIONAL Engineering Services not included in the scope of work,also include assistance to the
CITY in connection with bid protests, rebidding or renegotiating contracts for construction,
materials,equipment or service,or preparing to serve or serving as a consultant or witness for CITY
in any litigation, arbitration or other legal proceeding involving the PROJECT.
III. HOURLY and/or ADDITIONAL Engineering services in connection with the PROJECT and described
above, and including services which are to be furnished on an hourly basis or by the CITY, and
services not otherwise provided for in this Agreement, will be provided at the following rates:
ENGINEERING&LANDSCAPE ARCHITECTURE LAND SURVEYING SERVICES
Engineering&Management,
Principal $ 210.00 /hr Surveying Services,Senior RPLS $ 140.00 /hr
Project Management $ 165.00 /hr Surveying Services,RPLS $ 110.00 /hr
Engineering Services,Senior PE $ 150.00 /hr CAD/Technical Survey Services,Senior Tech. $ 95.00 /hr
Engineering Services-PE $ 110.00 /hr CAD/Technical Survey Services $ 85.00 /hr
Engineering Services-EIT $ 90.00 /hr Land Surveying Research $ 85.00 /hr
Design Services,Senior Designer $ 100.00 /hr Field Surveying-1 Person Crew $ 140.00 /hr
Design Services by Designer $ 85.00 /hr Field Surveying-2 Person Crew $ 160.00 /hr
CAD/Drafting Services $ 65.00 /hr GIS Technical Services $ 60.00 /hr
Landscape Architectural Services-
LA $ 110.00 /hr
Clerical Services $ 55.00 /hr
ENGINEERING SERVICES FOR THE CITY OF SOUTHLAKE BY BAIRD,HAMPTON&BROWN,INC.
Whispering Dell Estates Water System Improvements (December 2016) Page 7 of 17
CITY PROVIDED INFORMATION/SERVICES
for
WATER DISTRIBUTION SYSTEM IMPROVEMENTS
Whispering Lane&Whispering Dell Court
Whispering Dell Estates
City of Southlake
The CITY will provide the following services to the ENGINEER in the performance of the PROJECT upon
request:
I. Provide any existing data the CITY has on file concerning the PROJECT, if available.
II. Provide any available Record Drawings for existing streets and drainage facilities, if available.
III. Provide any available Record Drawings for existing water and sanitary sewer mains, if available.
IV. Assist the ENGINEER, as necessary, in obtaining any required data and information from local
franchise utility companies.
V. Provide standard details in digital format.
VI. Assistthe ENGINEER by coordinating with the franchise utility companies and addressing potential
conflicts prior to construction.
VII. Assist the ENGINEER by requiring appropriate utility companies to expose underground utilities
within the Right-Of-Way, if/when required.
VIII. Give prompt written notice to ENGINEER whenever CITY observes or otherwise becomes aware of
any development that affects the scope or timing of the ENGINEER's services.
ENGINEERING SERVICES FOR THE CITY OF SOUTHLAKE BY BAIRD,HAMPTON&BROWN,INC.
Whispering Dell Estates Water System Improvements (December 2016) Page 8 of 17
EXHIBIT A
PROJECT LOCATION MAP
for
WATER DISTRIBUTION SYSTEM IMPROVEMENTS
Whispering Lane&Whispering Dell Court
Whispering Dell Estates
City of Southlake
i
T #.
T j
w
=�
t13M Lr. m
N
Whispering Ln ung Im c
iss ss s ss-ss-ss ss
01 w w w w w w
1
113m LF.
� I
y _
Vl
low
4.
ENGINEERING SERVICES FOR THE CITY OF SOUTHLAKE BY BAIRD,HAMPTON&BROWN,INC.
Whispering Dell Estates Water System Improvements (December 2016) Page 9 of 17
EXHIBIT B
OPINION OF PROBABLE CONSTRUCTION COST
for
WATER DISTRIBUTION SYSTEM IMPROVEMENTS
Whispering Lane&Whispering Dell Court
Whispering Dell Estates
City of Southlake
OPINION OF PROBABLE COST
From a budgetary perspective, and without the benefit a survey, we've prepared an Opinion of Probable
Construction Cost; see Exhibit B.This estimate will be refined as the project moves forward to the
Concept Report, Preliminary Plans and Final Plans phases.
Water Line Reconstruction w/in Whispering Dell Estate (2,670 LF) $430,000
Looping of Water System to Sunshine Lane (2,725 LF) $256,000
Asphaltic Pavement Overly(2,670 LF) $128.000
Project Total Opinion of Probable Construction Cost $814,000
Note:These Opinions of Probable Construction Cost do not include easement acquisition.
ENGINEERING SERVICES FOR THE CITY OF SOUTHLAKE BY BAIRD,HAMPTON&BROWN,INC.
Whispering Dell Estates Water System Improvements (December 2016) Page 10 of 17
EXH BIT C
PROJECT SCHEDULE
for
WATER DISTRIBUTION SYSTEM IMPROVEMENTS
Whispering Lane&Whispering Dell Court
Whispering Dell Estates
City of Southlake
PROJECT SCHEDULE
A detailed Project Schedule,which includes surveying, engineering, bidding and construction, has been
prepared and enclosed herewith.The schedule has been prepared with assumptions as to the
responsiveness of the franchise utility companies and the timeliness of city reviews.The schedule may
be summarized as follows:
Pre-Engineering&Surveying 35 working days
Concept Report Phase 65 "
Preliminary Engineering Plans 145"
Final Construction Plans 60 "
Bid &Award 70 "
Construction 120 working days
Total Project Schedule 375 working days-from 02/06/17 thru 07/13/18
Please Note:The above schedule provides for approximately six months for franchise utility adjustments and
easement acquisition—if needed.
ENGINEERING SERVICES FOR THE CITY OF SOUTHLAKE BY BAIRD,HAMPTON&BROWN,INC.
Whispering Dell Estates Water System Improvements (December 2016) Page 11 of 17
EXHIBIT D
COMPENSATION
for
WATER DISTRIBUTION SYSTEM IMPROVEMENTS
Whispering Lane&Whispering Dell Court
Whispering Dell Estates
City of Southlake
I. COMPENSATION
For and in consideration of the services to be rendered bythe ENGINEER,the CITY shall pay,and the
ENGINEER shall receive, the compensation hereinafter set forth for the Design and Construction
Phases of the work and additionallyfor Special Engineering Services and/or Additional Engineering
Services. All remittances by CITY of such compensation shall either be mailed or delivered to the
ENGINEER's office.
A. Compensation for the Basic Engineering Services(Surveying,Concept Report, Plans,Specs&
Estimates and limited Construction Support Services) shall be a lump sum fee of One
Hundred Nineteen Thousand Eight Hundred Forty-Five ($119,845.00) Dollars.
The Design phase portion of the Basic Engineering Services shall be computed at
approximately 90%of the total Basic Services Charge;and the Construction phase portion
of the Basic Engineering Services shall be computed at approximately 10%of the total Basic
Engineering Services Charge.
Payment for the Design phase portion of the Basic Engineering Services shall be due in
monthly installments in the proportion to that part of the services in the Design phase
which have been accomplished. Final payment for services authorized in the Design phase
shall be due at the completion of these services.
Payment for any requested Assistance, with Neighborhood Meetings or Construction
Support Services of the Special Services, shall be due in monthly installments and per the
contract hourly billing rates schedule.
B. Compensation for Special Engineering and Surveying Services not covered by the Basic
Engineering Services provided herein above shall be as follows:
Utility Easement Exhibits $1,595 per Each
Assist w/Neighborhood Meeting $2,130/ Hourly
Limited Construction Administration $6,325/ Hourly
Direct Costs (Printing, Reproduction, etc.)
Prints, Copies,Travel, Etc. At Cost Plus 10%
ENGINEERING SERVICES FOR THE CITY OF SOUTHLAKE BY BAIRD,HAMPTON&BROWN,INC.
Whispering Dell Estates Water System Improvements (December 2016) Page 12 of 17
C. Compensation for Additional Engineering Services not covered by Basic Engineering Services
or Special Engineering Services provided herein shall be as follows:
1. For all of ENGINEER's personnel time applied to the Additional Engineering Services
and not itemized above,the following hourly rates shall be used:
ENGINEERING& LANDSCAPE ARCHITECTURE
Engineering& Management, Principal $ 210.00 /hr
Project Management $ 165.00 /hr
Engineering Services,Senior PE $ 150.00 /hr
Engineering Services- PE $ 110.00 /hr
Engineering Services- EIT $ 90.00 /hr
Design Services,Senior Designer $ 100.00 /hr
Design Services by Designer $ 85.00 /hr
CAD/Drafting Services $ 65.00 /hr
Landscape Architectural Services- LA $ 110.00 /hr
Clerical Services $ 55.00 /hr
2. For all direct non-labor and/or subcontract expense, including mileage,travel and
living expenses at invoice or internal office cost times a multiplier of 1.10.
Payments to the ENGINEER for authorized Additional Engineering Services will be due
monthly, upon presentation of monthly statement by the ENGINEER for such services.
II. PAYMENT
Payments to the ENGINEER will be made as follows:
A. Invoice and Time of Payment
Monthly invoices will be issued by the ENGINEER for all work performed under this
Agreement, and shall be in proportion to the percent completion of the total work.
Invoices will be prepared in a format approved by the CITY; see format on the following
page; and are due and payable within 30 days.
ENGINEERING SERVICES FOR THE CITY OF SOUTHLAKE BY BAIRD,HAMPTON&BROWN,INC.
Whispering Dell Estates Water System Improvements (December 2016) Page 13 of 17
Proposed Invoice Format
Contract Percent Amount Previoulsy Amount Due
Item/Task Description Amount Complete To Date Invoiced This Invoice
BASIC SERVICES(fixed fee amount) $119,845.00 0% $ - $ -
1 Surveying Services 24,730.00 0% $ - $ -
2 Alignment Study 10,285.00 0% $ - $ -
2 Concept Design Report 20,905.00 0% $ - $ -
3 Preliminary Plans& Estimates 23,065.00 0% $ - $ -
4 Final Plans, Specs&Estimates 26,920.00 0% $ - $ -
5 Limited Constr.Admin. Services 13,940.00 0% $ - $ -
SPECIAL SERVICES (Hourly) 10,050.00
Assistw/Neighborhood Meeting(Hourly) 2,130.00
Utility &Temp. Constr. Easements(Each) 1,595.00
Additional Constr. Admin. Support(Hourly) 6,325.00
Total for Professional Services $129,895.00
ENGINEERING SERVICES FOR THE CITY OF SOUTHLAKE BY BAIRD,HAMPTON&BROWN,INC.
Whispering Dell Estates Water System Improvements (December 2016) Page 14 of 17
CONFLICT OF INTEREST QUESTIONNAIRE
for
WATER DISTRIBUTION SYSTEM IMPROVEMENTS
Whispering Lane&Whispering Dell Court
Whispering Dell Estates
City of Southlake
[Conflict of Interest Questionnaire is on the following 2 pages.]
ENGINEERING SERVICES FOR THE CITY OF SOUTHLAKE BY BAIRD,HAMPTON&BROWN,INC.
Whispering Dell Estates Water System Improvements (December 2016) Page 15 of 17
CONFLICT OF INTEREST QUESTIONNAIRE FORM CIQ
For vendor or other person doing business with local governmental entity
This questionnaire is being filed in accordance with chapter 176 of the OFFICE USE ONLY
Local Government Code by a person doing business with the governmental
entity. Date Received
By law this questionnaire must be filed with the records administrator of
the local government not later than the 7t"business day after the date the
person becomes aware of facts that require the statement to be filed. See
Section 176.006, Local Government Code.
A person commits an offense if the person violates Section 176.006, Local
Government Code. An offense under this section is a Class C misdemeanor.
1
Name of person doing business with local governmental entity.
Konstantine Bakintas, PE
2 1 ❑
Check this box if you are filing an update to a previous filed questionnaire.
(The law requires that you file an updated completed questionnaire with the appropriate filing
authority not later than September 1 of the year for which an activity described in Section
176.006(a), Local Government Code, is pending and not later than the 7t"business day after the
date the originally filed questionnaire becomes incomplete or inaccurate.)
3
Describe each affiliation or business relationship with an employee or contractor of the local
governmental entity who makes recommendations to a local government officer of the local
governmental entity with respect to expenditure of money.
NONE
4
Describe each affiliation or business relationship with a person who is a local government officer and
who appoints or employs a local government officer of the local governmental entity that is the
subject of this questionnaire.
NONE
ENGINEERING SERVICES FOR THE CITY OF SOUTHLAKE BY BAIRD,HAMPTON&BROWN,INC.
Whispering Dell Estates Water System Improvements (December 2016) Page 16 of 17
CONFLICT OF INTEREST QUESTIONNAIRE FORM CIQ
For vendor or other person doing business with local governmental entity Page 2
5
Name of local government officer with whom filer has affiliation or business relationship. (Complete
this section only if the answer to A, B, or C is YES.)
This section, item 5 including subparts A, B, C& D, must be completed for each officer with whom the
filer has affiliation or business relationship. Attach additional pages to this Form CIQ as necessary.
A. Is the local government officer named in this section receiving or likely to receive taxable income
from the filer of the questionnaire?
❑YES ❑ NO
B. Is the filer of the questionnaire receiving or likely to receive taxable income from or at the
direction of the local government officer named in this section AND the taxable income is not from
the local government entity?
❑YES ❑ NO
C. Is the filer of this questionnaire affiliated with a corporation or other business entity that the local
government officer serves as an officer or director,or holds an ownership of 10 percent or more?
❑YES ❑ NO
D. Describe each affiliation or business relationship.
6
Describe any other affiliation or business relationship that might cause a conflict of interest.
NONE
7
i ( C 12/22/ 16
Signature of person doing business with the Date
governmental entity
ENGINEERING SERVICES FOR THE CITY OF SOUTHLAKE BY BAIRD,HAMPTON&BROWN,INC.
Whispering Dell Estates Water System Improvements (December 2016) Page 17 of 17