Loading...
Item 4E CITY OF SOUTH LAKE Item 4E MEMORANDUM (December 6, 2016) To: Shana Yelverton, City Manager From: Rob Cohen, Public Works Director Subject: Approve Change Order No. 8 with Wilson Contractor Services, LLC for the Water and Sanitary Sewer Relocation Project for FM 1938 in the amount not to exceed $140,000 Action Requested: Approve Change Order No. 8 with Wilson Contractor Services, LLC for the Water and Sanitary Sewer Relocation Project for FM 1938 in the amount not to exceed $140,000. Background Information: Change Order No. 8 in the amount of $140,000 is for additional work required to install the remaining 8-inch water line along the FM 1938 corridor within the City of Keller. This segment of water line was scheduled to be completed by Wilson Contractor Services, LLC (WCC) in conjunction with TxDOT during the construction of the roadway widening project due to the amount of needed excavation. The trench in which the water line was placed required flowable backfill in lieu of compacted select fill due to the proximity of a retaining wall footing. This change order also includes additional work requested by the City of Keller to extend an 8-inch water line an additional 662 feet to the north. A retaining wall was added to the roadway project in the vicinity of this water line making it difficult to extend the water line after the completion of the roadway project. This water line extension is needed for the purpose of providing fire protection to this area of the City. The City of Keller will reimburse the City of Southlake as outlined in the Interlocal Agreement executed on July 17, 2013. The FM 1938 Phase II Roadway Widening Project from FM 1709 to the Randol Mill Bend required relocation of water and sanitary sewer. The Texas Department of Transportation (TxDOT) requires public infrastructure owned by the cities be relocated from underneath future pavement to the parkways. Wilson Contractor Services, LLC was awarded the contract to relocate these utilities. City Council awarded the construction contract to Wilson Contractor Services, LLC on August 20, 2013 in the amount of $1 ,845,378. These eight (8) change orders, totaling $598,594, have increased the contract amount to $2,443,972. The water and sanitary sewer Item 4E relocations within the City of Southlake were completed in December 2014. Summary of Change Orders: Original Contract Price $1,845,378.00 CO No. 1 Addition of W. Bob Jones Waterline Phase 1 $42,367.50 CO No. 2 Fawkes Lane RCP (City of Keller) $1,200.00 CO No. 3 Waterline Changes (City of Keller) $29,427.00 CO No. 4 Sanitary Sewer Bore to Bibbentuckers $20,435.85 CO No. 5 Lonesome Dove and W. Bob Jones Waterlines $273,222.37 CO No. 6 Florence Rd. 12-inch Waterline Lowering $44,975.00 CO No. 7 Fire Hydrant Adjustments $48,850.00 Change Order Subtotal: $460,477.72 CO No. 8 8-in Water Line Backfill and Extension (City of Keller) $138,116.74 Contract Price Including Change Orders:$2,443,972.46 Financial Considerations: This request is within the allocated amount funded from the Capital Improvement Program Utility Fund. The City of Keller will reimburse the City of Southlake for this change order amount as outlined in the Interlocal Agreement, Item 8. The previous change orders have been administered in this manner. Strategic Link: This project links to the City's strategy map relative to the focus area of Infrastructure within the perspective of Manage the Business by collaborating with select partners to implement service solutions. Citizen Input/ Board Review: N/A Legal Review: N/A Alternatives: The City Council may amend, approve or deny this request. Supporting Documents: Location Map Change Order No. 8 Interlocal Agreement with City of Keller Staff Recommendation: Approve Change Order No. 8 with Wilson Contractor Services, LLC to the Water and Sanitary Sewer Relocation Project for FM 1938 in the amount not to exceed $140,000 for services requested by the City of Keller. Staff Contact: Rob Cohen, Public Works Director Kyle D. Hogue, P.E., Deputy Director/City Engineer Alejandra Ayala, P.E., Civil Engineer Page 2 of 2 N a � x z rc Legend o r oe {LgNDOL MILL AVE t •jam 'k ! d �PROJECTLIMITS Z ORESTLN- i u DR- +4,F' h Y' •1 FL-R'LNGE z LL 4 F Qr z f J Q Zen yy 41T�, 13SOUTHLAKE CHANGE ORDER No. 8 Date: December 6, 2016 Project: Water and Sanitary Sewer Relocations for FM 1938 Owner: City of Southlake Contract: $1,845,378.00 Contract Date: October 15, 2013 To: Wilson Contractor Services,LLC Contractor You are directed to make the changes noted below in the subject contract for the dollar amount stated below including all labor, equipment,materials,overhead,and profit: Nature of changes: Replace native backfill with flowfill and haul off spoil and water line extension(Line C) Part 4-Waterline Improvements(City of Keller) Item Description Qty Unit Unit Price Total 1. 2 Add - F&I 8" dia.C900 DRI 8 PVC water line by open cut 662 LF $56.70 $37,535.40 2. 6 Add - F&I 6"resilient seat gate valve with box,complete in place 2 EA $1,005.37 $2,010.74 3. 9 Add - F&I fire hydrant 2 EA $2,556.00 $5,112.00 4. 11 Add - F&I 1" service tap,complete in place 3 EA $420.00 $1,260.00 5. 12 Add - F&I 1" service line,complete in place 3 EA $15.20 $45.60 6. 13 Add - F&I 1"water meter&box,complete in place 3 EA $525.00 $1,575.00 7. CO8.1 Add - 1/2 of mobilize crew&excavator 1 LS $1,650.00 $1,650.00 8. CO82 Add - Remove existing fire hydrant&valve 1 EA $1,000.00 $1,000.00 9. CO83 Add - Abandon existing 8"water line 662 EA $1.50 $993.00 10. CO8.4 Add - Cut in Tee for new hydrant @ STA 35+21 includes shut down 1.5 Days $2,850.00 $4,275.00 coordination,franchise pot holing 11. CO8.1 Add - Back fill excavation with 3 sak flowfill. 146 CY+209 CY from CY 445 $110.00 $48,950.00 Charley's,90 CY from Last Chance Concrete 12. CO82 Add - Haull off spoil generated by backfill replacement(included CY 800 $13.50 $10,800.00 WCS loading/handling fees)(Estimated Qtys only,field qtys to be verified by Delivery Tickers) 13. CO83 Add - Dump Fees associated with construction debris removal(Hauled Load 45 $40.00 $1,800.00 by WCS,LLC&Burton Dump @ Airport Sand&Gravel) 14. CO8.4 Add - Added Removal of existing 12"Water line LF 540 $10.00 $5,400.00 15. CO8.5 Add - Fire hydrant meter rental(1,500+Est.usage$500),labor to LF 1 $2,450.00 $2,450.00 install meter and service line&connect($450)needed to serve residence during construction 16. CO8.6 Add - Labor and equipment needed relocate ABR spoil piles,and Day 1 $2,850.00 $2,850.00 excavate and relocate 3 conduit fiber duck runs 17. CO8.7 Add - Contract allowed General Overhead,administration and profit % 15% $69,400.00 $10,410.00 Total RFCO Part 4 $138,116.74 1 of 2 Change Order No.8 These changes result in the following adjustment of contract price and contract time: Contract Price Prior to this Change Order $2,305,855.72 Net Increase Resulting from this Change Order $138,116.74 Current Contract Price Including this Change Order $2,443,972.46 The above changes are approved: City ofSouthlake City By: Title: City Manager Date: Contract Time Prior to this Change 240 calendar days (Days or Date) Net Increase Resulting from this Change Order 120 calendar days (Days) Current Contract Time Including this Change Order 360 calendar days (Days or Date) The above changes are recommended: City of Keller City of Southlake City City By: By: Title: Project Manager Title: Project Manager Date: Date: City of Southlake City of Southlake City City By: By: Title: City Engineer Title: Director of Public Works Date: Date: Wilson Contractor Services,LLC Contractor By: Date: 2 of 2 o� Wilson Contractor Services,LLC 940-243-1174 Office 3985 Mingo Rd. 940-898-1175 Fax Denton,Texas 76208 www.WiisonContractorServices.com REQUEST FOR PRICING Owner Information Owner Name City of Southlake,TX Address 1400 Main St.Ste.270 Address Southlake,TX 76092 Phone (817)748-8400 Engineerinformation Name TranSystems Corporation Consultants Address 500 W.7th Street Suite 1100 Address Fort Worth,TX 76102 P.E.(Attu) Mr.Michael F.Brown,P.E. Phone (817)339-8950 Fax ()- Email MFBrown@TranSystems.com Job Information Job# 2013-012 Job Name WL B Embeddment Change(TXDOT)Station 16+70 to 22+85 Address Along FM1938 From FM 1709 N to Randol Mill Rd. Address Southlake&Keller,TX Date 11/17/2016 tem Description Conntract Unit Unit Item Bid Total Line Item Total Replace native backfill with flowfill and haul off spoil Back fill Excavation with 3 Salk Flowfill.146CY+ 1 209CY From Charley's,90CY from Last Chance CY 445 $110.00 $48,950.00 Concrete Haul Off Spoil Generated by backfill replacement 2 (included WCS loading/handling fees)(Estimated CY 800 $13.50 $10,800.00 Qtys Only,Field qtys to be verified by Delivery tickets) Dump Fees associated with construction debris 3 removal(Hauled by WCS,LLC&Burton dumped @ Load 45 $40.00 $1,800.00 Airport Sand&Gravel) 4 Added Removal of existing 12"Waterline LF 540 $10.00 $5,400.00 Fire Hydrant Meter Rental(1,500.00+Est usage 5 $500.00),Labor to install meter and service line& LS 1 $2,450.00 $2,450.00 connect($450.00)needed to serve residence during construction Labor and Equipment needed Relocate ABR spoil 6 piles,and Excavate and relocate 3 Conduit fiber duck Day 1 $2,850.00 $2,850.00 run. 7 Contract allowed General Overhead,Administration % 15.00% $69,400.00 $10,410.00 and Profit Water Line C Work Trans Systems Drawing Dated 11/2/2016 8 1/2 of Mobilize Crew&Excavator LS 1 $1,650.00 $1,650.00 9 8"DR18 PVc Waterline by Open Cut LF 662 $56.70 $37,535.40 10 Fire Hydrant Ea 2 $2,556.00 $5,112.00 11 6"Gate Valve&Box Ea 2 $1,005.37 $2,010.74 12 F&I 1"service tap, Ea 3 $420.00 $1,260.00 13 F&I 1"service line, Ea 3 $15.20 $45.60 14 F&11"water meter&box, Ea 3 $525.00 $1,575.00 15 Remove Existing Hydrant&Valve Ea 1 $1,000.00 $1,000.00 16 Abandon Existing 8"Waterline Ea 662 $1.50 $993.00 17 Cut In Tee for new Hydrant @ Station 35+21 Includes Days 1.5 $2,850.00 $4,275.00 Shut Down Coordination,Franchise Pot holing Total City of Keller. $138,116.74 11/17/2016 Prepared By: Date ORIGINAL DOCUMENT CITY OF SOUTHLAKE Council Action.(DN Ord./Res. No. INTERLOCAL AGREEMENTDate Approved 2013 STATE OF TEXAS § COUNTY OF TARRANT § This Agreement is made by and between the City of Southlake,Texas ("Southlake") and the City of Keller ("Keller"), acting herein by and through their duly authorized city managers, for the purpose of documenting the terms and conditions of an agreement whereby Southlake will administer the engineering design contract and the construction contract for the water line and sewer line relocations associated with the construction of FM 1938 to be known as the FM 1938 Water Line and Sanitary Sewer Relocation Project("Project")and the cities will apportion the local cost share for the design and construction of the Project as indicated in Exhibit A. WHEREAS, Chapter 791, Texas Government Code authorizes Interlocal Contracts between governmental entities to perform services either could undertake individually; and WHEREAS, Southlake and Keller desire to design and construct the FM 1938 Water Line and Sewer Line Relocation Project; and NOW, THEREFORE, WITNESSETH 1. Southlake shall provide administration for an engineering services agreement for design of the Project. 2. The cost for the engineering design of the Project is a lump sum basis in the amount of $208,500 for Basic Services and for Utility Coordination on an hourly basis plus expenses amount not to exceed $120,000 with a total not to exceed cost ceiling of$328,500. The share of the cost for the engineering design required from each city will be divided as indicated in Exhibit A. 3. The City of Keller shall reimburse their share of the engineering design fee in a lump sum payment to the City of Southlake prior to the start of construction. 4. Southlake shall provide contract administration for the construction of the Project. 5. The estimated construction cost for the Project is $3,219,238. Actual construction costs shall be paid in full by each responsible City for their share of the construction being completed within their respective city limits. 6. The City of Keller agrees to make payments to Southlake within a reasonable length of time estimated at 30 days after receipt of construction invoices. 7. In the event there are additional design costs or expenses involved in the engineering design contract,the parties agree to share such costs proportionally in the same manner as used for the initial design cost sharing identified in Exhibit A. Page 1 of 5 8. Each City shall pay any additional construction costs on their respective portion of the project and shall pay their respective percentage share per Exhibit A of any construction cost not specifically attributed to one City's improvements. Page 2 of 5 AGREED this/qday of ;DUn-e� , 2013. CITY OF SOUTHLAKE By: 0 (Z�� John Terrell, Mayor t� wTHLq�. ATTEST: 5 .••°"°•°• F '' V ^�• • n r Alicia Richardson, City S,ecrhwy,•.•••' APPROVED AS TO FORM, l LEGALITY: ak�::�g a - Attorney Page 3 of 5 AGREED this day of , 2013. CITY OF KELLER By: tev Polasek, City Manager ATTEST: Shei a Step ens, City Secr ary APPR D TO ORM AND LEGALITY: Y Page 4 of 5 EXHIBIT A FM 1938 WATER AND SANITARY SEWER RELOCATION PROJECT PARTICIPATION TranSystems Engineering Design Fee Basic Services $208,500.00 Utility Coordination $120,000.00 Total Design Fee $328,500.00 Estimated Construction Cost Amount City of Southlake Water Line $1,565,774.00 City of Southlake Sanitary Sewer $946,065.00 City of Southlake Total $2,511,839.00 City of Keller Water Line Total $707,399.00 Total for Design and Estimated Construction $3,547,738.00 Cost Share per City: City of Southlake Engineering Design Fee Share (78.03%)* $256,328.55 Estimated Construction Cost $2,511,839.00 City of Southlake Share Total $2,768,167.55 City of Keller Engineering Design Fee Share (21.97°/x)* $72,171.45** Estimated Construction Cost $707,399.00 City of Keller Share Total $779,570.45 * The percentages for apportioning the costs were based on the ratio of the estimated construction costs per city/total construction costs. ** City of Keller shall provide a lump sum payment to the City of Southlake prior to beginning construction. Page 5 of 5