Loading...
Item 7 - NarrativeNarrative Approved Development Regulations (ZA15-025) Legends of Southlake (ZA15-025) Proposed Permitted Uses and Development Regulations for “S-P-2” Zoning Revised 8/12/2014 Revised 4/15/15 Revised 5/26/15 1.1 Permitted Uses - This property is divided into 6 office lots, and a 60’ Right-of-way containing the proposed through street. All lots shall include the permitted uses as found in the I -1 Light Industrial District as described in Section 26 of the Comprehensive Zoning Ordinance. Permitted I-1 uses relative to this application consist of: a. Any use permitted in the I-1 District. 1.2 Development Regulations - This property shall be subject to the development regulations for the “I -1” Light Industrial District, and all other applicable regulations with the following exceptions: a. Parking agreements will be in place prior to permitting to satisfy the combined p arking requirements for the development. b. Cross access easements will be in place with the property to the south occupied by Variosystems. c. Vary building height and stories to allow for the construction of two-story buildings. d. Vary requirement for buffer yard along the south boundary to allow for parking, sidewalks, rights-of-way, loading zones and fire lanes. e. Vary from screen wall requirement along the north boundary line adjacent to residential to allow for a vegetative screen adjacent to lot 4 to be in stalled only when lot 4 develops. f. Vary from screen wall requirement and allow for a vegetated screen along the east boundary of lot 1. g. Allow for a 15’ pedestrian and loading access easement along the south boundary of lot 3. h. To facilitate a contiguous development, buffer yards will not be required along internal boundary lines. i. Street width requirement reduced to 31’ from curb back to curb back to reduce concrete, add turf area and eliminate on-street parking. Propose to fire lane the entire 30’ of drive. j. Reduced front yard setback to 25’ to provide flexibility in the orientation of buildings. k. Within 100’ of residential property vary building height limitation to 25’. (Lot 1 only) l. Vary exterior material residential adjacency requirements on lot 1 and on lot 4 to adherence with general City requirements for building masonry finishes. m. Allow Dean Way as a public street to dead -end at CISD property. In lieu of a round-a-bout a dedicated and permanent emergency access and common access easement will be platted in the drive aisles east of lot 6 and north of lots 5 and 6 to create a fire access loop. Dean Way will be gated at the property line of CISD and will be equipped with Knox Box access for emergency access. All gate access will be under the control of Southlake Public Safety and CISD only. It is anticipated that the gate will remain closed to ingress and egress by the public with the exception of event and game days at Dragon Stadium. n. In the case that the proposed 2-story building on Lot 5 is not developed as a 2-story building; Lot 5 shall have the flexibility to develop as a single -story building with the same footprint, number of parking spaces and articulation as currently proposed. 1.3 Use and Operation – The project overview is to provide a comprehensive office park similar in nature to Champions Crossing directly across Kimball. Current market trends show this product to be in high demand. Lots 1-6 – Comprised of office-use buildings that will maintain day-time hours consistent with other typical office locations. For this submittal Lots 1 and 2 will be site planned for approval. 1.4 Phasing Intent – It is the intent of the developer to move forward with construction documents immediately upon Zoning and Site Plan approval from Council. The entirety of all elements shown on Lot 1 and Lot 2 along with Dean Way road and utilities will be part of the construction package and bidding. Building 1 and 2 will be constructed as spec buildings. Site plan applications will be submitted on the remaining buildings as the developer is ready to move on with future construction. Building 1 is designed to 23,000sf and is parked at a ratio of 4 spaces/100sf. Building 2 is designed to 19,500sf and is parked at a ratio of 4 spaces/100sf. Required p arking for the two lots respectively are 92 spaces and 78 spaces. Provided parking for the two lots respectively are 92 spaces and 79 spaces. Currently the construction and development of Dean Way and Lots 1 and 2 are underway. Lot 3 is being proposed for a specific user with a need for approximately 30,000sf of office and production space housed within a two-story building. The remaining lots (4-6) will be brought to the City for site plan approval as each are put under contract. Lot 3 previously shown on the approved Concept Plan to have a 17,200sf building solely of office space and 71 parking spaces. The site plan being submitted on lot three shows approximately 30,000sf of which only half will be utilized for office with the other half being p roduction and storage. Parking shown on the site plan includes 86 spaces. Buildings 3,4,5, and 6 will all be constructed simultaneously as Phase 2 of the development. Buildings 3,4, and 6 will be completed by the EOY 2015, and building 5 will be complet ed end of Q1 2016.