Item 4ITD Ameritrade October 4, 2016 Adolfson & Peterson Construction Special Use Permit Extension for Temporary Construction Offices Southlake City Council Meeting October 4, 2016 1 Agenda City Council Resolution No. 16-022, (ZA16-037) on 06/07/16. Bridge Design Update Review Temporary Bypass Road Plan Plan Overview Traffic Control Schedule 2 Resolution No. 16-022, (ZA16-037) Approved on June 7, 2016 Immediately work toward obtaining Corp of Engineers approval necessary to complete the TW King Road Project. Close the current construction entrance by December 31, 2016. If the applicant is unable to construct T.W. King to a construction-useable state by December 31, 2016, the applicant will come back to Council for an extension of the SUP. 3 Bridge Design Update Corp of Engineer Contact made 6/14/16 Corp of Engineer Information Package sent on 6/15/16 and 6/21/16 Formal Submission to Corp of Engineer on 8/1/16 Meeting with Corp of Engineer 8/19/16 Revised Submission 8/30/16 Corp of Engineer review is under way Bridge Contractors have been engaged for budget and schedule input. Bridge construction duration, 8 to 9 Months after permits 4 Bridge Design Update 5 Temporary Bypass Road Solution Plan 6 TW King Construction Entrance Signage/Traffic 7 TW King Construction Entrance Timeline Current Schedule Serpentine Road tree protection and removal is complete. Serpentine Road excavation and rough grading is complete. Started underground utilities for the Entrance road started on 9/20/16. Scheduled to complete the Temporary Bypass Road and Entrance road paving on 01/31/17. Other Factors Weather Storm water discharge quality structures delivery date. 8 APPENDIX 9 Traffic Control Update Kirkwood Blvd. barricades and signage installed in accordance with City Council Resolution. Full time flagman provided at entrance to Kirkwood Blvd. barricades. Jersey barriers provided at job site entrance to eliminate possibility of right hand turns from the job site. “No Construction Traffic Allowed” signage added at SH114 & Dove Road, and at Dove Road & Kirkwood Blvd. Traffic flow requirements from SH114 & Kirkwood Blvd. are written into all Subcontracts. Traffic flow requirements from SH114 & Kirkwood Blvd. are addressed in all preconstruction meetings with Subcontractor Leadership. Traffic flow requirements from SH114 & Kirkwood Blvd. are addressed in all weekly Subcontractor Coordination Meetings with all on site Supervisors. Traffic flow requirements from SH114 & Kirkwood Blvd. are addressed in all weekly Job Wide Safety Meetings with all on site personnel. GPS coordinates provided to Subcontractors and Dispatch to guide traffic to SH114 & Kirkwood Blvd. Post incident meetings are held with Subcontractors, Truck Drivers, and Dispatch after every incident. Over a 99% success rate. 10 Resolution No. 16-022, (ZA16-037) Approved on June 7, 2016 The approval of this Specific Use Permit will expire December 31, 2016; The construction entrance will be a right-in / left-out only entrance; Access to site will be from the west bound lanes of Kirkwood Blvd.; Secondary screening fence will be located at the top of the hill at a height that would adequately screen the trailers from Kirkwood Boulevard; Screening fence will be constructed of wood. All traffic control devices represented by the applicant will be installed and utilized for the duration of the SUP; Council is approving the relocation of the shrubs that are required and depicted on tonight's presentation from surrounding the construction trailers and placing those instead at the construction entry area along the screening fence; Relocate the concrete washout stations and noting that none of those concrete washout stations will be located north of the northern most construction trailer; Move the casting beds to the north side of the parking garage; 11 Resolution No. 16-022, (ZA16-037) Approved on June 7, 2016, (Continued) Referencing the traffic pattern exhibits demonstrated tonight as part of the presentation; The applicant will have a designated communication liaison to work directly with the Kirkwood Hollow Homeowner's Association (HOA) representative and will be available to address concerns as necessary and will provide an update to the HOA representative no less than every two weeks; Construction work hours will be no earlier than 7:00 a.m. to no later than 7:00 p.m. for heavy equipment movement in and out of the site and requiring the applicant to be held to the Southlake noise ordinance with construction traffic to 7:00 a.m.-7:00 p.m. for traffic in and out of the site. The applicant to immediately work towards obtaining Corps of Engineer approval necessary to complete the T.W King project and is committed to closing the current construction entrance by December 31, 2016 and noting that if the applicant is unable to construct T.W. King to a construction-useable state by December 31, 2016, they will be required to come back to Council for an extension of the SUP but noting they can come directly to Council rather than through the normal process through the Planning and Zoning Commission; 12 Previous Site Plan 13 Temporary Access Road 14 Temporary Barricade Plan During Median Installation & Removal 15 Revised SWPPP Plan 16 Revised Tree Conservation 17 Revised Tree Conservation 18 Revised Tree Conservation 19