Loading...
Item 6F Presentation Site Plan for The Marq Southlake Champions Club Item 7 1 Applicant: City of Southlake (Design Firm: Barker Rinker Seacat Architecture) Owner: City of Southlake Request: Approval of a site plan to construct an approximately 86,000 square foot recreation facility. Location: 315, 275 & 285 Shady Oaks Dr. – Bicentennial Park ZA16-047 2 3 4 Aerial View – Bicentennial Park 5 Aerial View – Project Area 6 Site Plan 7 Landscape Plan North 8 Landscape Plan South 9 Tree Conservation Plan 10 Pedestrian Access and Fencing Plan 11 View from West off Shady Oaks 12 View from Southwest off Shady Oaks 13 View from Aria Amphitheater 14 View from Legends Hall Entrance 15 North A - Elevation 16 Northwest Elevation 17 South Elevation 18 Southeast Elevation 19 West A - Elevation 20 Variance – Stacking Depth Variance to driveway stacking depth under Driveway Ordinance No. 634, Section 5.2(d): A minimum stacking depth of 100 feet is required at this location. The proposed driveway off Shady Oaks drive onto the property proposes a stacking depth of approximately 27 ½ feet. Existing Main Entrance Secondary Entrance Existing Decel Lane Existing Entrances ± 27 ½ ft 21 Variance – Lighting Variance to lighting type under Lighting Ordinance No. 693-C, Section 4: Permitted lighting types shall be high pressured sodium lights or neutral or warm correlated color temperature Light Emitting Diode LED lights. The applicant is requesting to install metal halide or LED lights that exceed maximum allowed temperature range.   Variance to the intensity of illumination under Lighting Ordinance No. 693-C, Section 5: The maximum outdoor computed or measured illumination level on a property shall not exceed 20 foot candles outdoors at any point. The applicant is exceeding this threshold at the new sports fields being proposed. Musco Light-Structure Green Sports Field Lighting System: Bicentennial Park Southlake Tennis Center North Park Southlake Sports Complex 22 August 4, 2016; Approved (5-0) subject to the Staff Report dated July 29, 2016 and Site Plan Review Summary No. 3, dated July 28, 2016 and granting all variances requested. Planning & Zoning Commission 23 Questions? 24