Item 4F Memo Item 4F Page 1 of 2 M E M O R A N D U M (May 3, 2016) To: Shana Yelverton, City Manager From: Robert Cohen, P.E., Director of Public Works Subject: Approve Change Order No. 7 with Wilson Contractor Services, LLC for the Water and Sanitary Sewer Relocation Project for FM 1938 in the amount not to exceed $48,850 Action Requested: Approve Change Order No. 7 with Wilson Contractor Services, LLC for the Water and Sanitary Sewer Relocation Project for FM 1938 in the amount not to exceed $48,850 for fire hydrant adjustments. Background Information: Change Order No. 7 in the amount of $48,850 is for fire hydrant adjustments along the FM 1938 corridor. These fire hydrants were placed during the summer of 2014 by Wilson Contractor Services, LLC (WCC) to existing roadway elevations. These fire hydrants will have to be adjusted to the finished grade of the newly constructed roadway of FM 1938. There are 12 fire hydrants that will need to be adjusted. Along the southeast corner of the Southlake Boulevard/Davis Boulevard intersection, WCC will relocate 3 fire hydrants that are currently located within the construction limits of the FM 1938 Phase II Widening project. The FM 1938 Phase II Roadway Expansion Project from FM 1709 to the Randol Mill Bend requires relocation of water and sanitary sewer. The Texas Department of Transportation (TxDOT) requires public infrastructure owned by the cities be relocated from underneath the proposed FM 1938 pavement to the parkways. City Council awarded the construction contract to Wilson Contractor Services, LLC on August 20, 2013 in the amount of $1,845,378. Six (6) previous change orders have been approved which increased the contract amount to $2,257,005. The water and sanitary sewer relocation project was completed in December 2014 under budget. The remaining segment of water line within the city of Keller will be completed by Wilson Contractor Services, LLC in conjunction with TxDOT during the construction of the roadway. Item 4F Page 2 of 2 Summary of Change Orders: Original Contract Price $1,845,378.00 CO No. 1 Addition of W. Bob Jones Waterline Phase 1 $42,367.50 CO No. 2 Fawkes Lane RCP (City of Keller) $1,200.00 CO No. 3 Waterline Changes (City of Keller) $29,427.00 CO No. 4 Sanitary Sewer Bore to Bibbentuckers $20,435.85 CO No. 5 Lonesome Dove and W. Bob Jones Waterlines $273,222.37 CO No. 6 Florence Rd. 12-inch Waterline Lowering $44,975.00 Change Order Subtotal: $411,627.72 CO No. 7 Fire Hydrant Adjustments $48,850.00 Contract Price Including Change Orders: $2,305,855.72 Financial Considerations: These projects are within the allocated amounts funded from the Capital Improvement Program Utility Fund. Strategic Link: The lowering of the fire hydrants to the city’s strategy map relative to the focus areas of Infrastructure, Performance Management and Service Delivery by investing to provide and maintain high quality public assets and improve performance of delivery and operational processes. The Critical Business Outcome that is met by the construction of these improvements is CB05: Optimize resources through collaboration and partnerships to reduce costs and add service value. Citizen Input/ Board Review: N/A Legal Review: N/A Alternatives: The City Council may amend, approve or deny this request. Supporting Documents: Location Map Change Order No. 7 Staff Recommendation: Approve Change Order No. 7 with Wilson Contractor Services, LLC for the Water and Sanitary Sewer Relocation Project for FM 1938 in the amount not to exceed $48,850 for fire hydrant adjustments. Staff Contact: Robert Cohen, P.E., Public Works Director Alejandra Ayala, P.E., Civil Engineer Lo c a t i o n Ma p Project:Water and Sanitary Sewer Relocations for FM 1938 Owner:City of Southlake Contract: Contract Date: To:Wilson Contractor Services, LLC Contractor Nature of changes: Fire Hydrant Adjustments Part 3 - Waterline Improvements (City of Southlake) Item Qty Unit Unit Price Total 1. 1 Add ~12 EA $1,100.00 $13,200.00 2. 2 Add ~4E A$1,100.00 $4,400.00 3. 3** Add ~8E A$2,850.00 $22,800.00 4. 4 Add ~2E A$550.00 $1,100.00 5. 5 Add ~2E A$3,675.00 $7,350.00 6. 6 Add ~1E A $0.00 $0.00 $48,850.00 These changes result in the following adjustment of contract price and contract time: Contract Price Prior to this Change Order Net Increase Resulting from this Change Order Current Contract Price Including this Change Order The above changes are approved: By: Title:City Manager Total RFCO Part 3 $2,257,005.72 $48,850.00 $2,305,855.72 City of Southlake City ***For each removed hydrant that can be salvaged and re-used $1,750 will be deducted from Item 3's price for that hydrant. Each hydrant in Item 3 that can be adjusted utilizing 2 each 6" DI fittings $1,050 will be deducted from Item 3's Cost. Excavate Disconnect and Deliver to Public Works Extra Bury Depth Hydrants Adjust Existing Standard Depth Fire Hydrants Supply and Install New Standard Depth Fire Hydrants Supply and Install 6" Hydrant Extensions Relocate Fire Hydant Assembly Remove and Replace Damaged Fire Hydrant CHANGE ORDER No. 7 Date: May 3, 2016 $1,845,378.00 October 15, 2013 You are directed to make the changes noted below in the subject contract for the dollar amount stated below including all labor, equipment, materials, overhead, and profit: Description 1 of 2 Change Order No. 6 Date: Contract Time Prior to this Change Net Increase Resulting from this Change Order Current Contract Time Including this Change Order The above changes are recommended: By: Title: Date: City By: By: Title: City Engineer Title: Date:Date: Contractor By: Date: City Director of Public Works Wilson Contractor Services, LLC (Days or Date) City of Southlake City Project Manager City of Southlake City of Southlake 240 calendar days (Days or Date) 120 calendar days (Days) 360 calendar days 2 of 2 RFCO #7 Date 3/11/2016 Item Unit Contract Qty Unit Item Bid Total Line Item Total 1 Ea 12 $1,100.00 $13,200.00 2 Ea 4 $1,100.00 $4,400.00 3**Ea 8 $2,850.00 $22,800.00 4 Ea 2 $550.00 $1,100.00 5 Ea 2 $3,675.00 $7,350.00 6 Ea 1 $0.00 $0.00 $0.00 $48,850.00 Remove and Replace Damaged Fire Hydrant C/O Request Total: Prepared By: 3/11/2016 Supply and Install New Standard Depth Fire Hydrant Date Address Southlake & Keller, TX Hydrant Relocations, lowering and repair Description Excavate Disconnect and Deliver to Public Works Extra Bury Depth Hydrants Supply and install 6" Hydrant Extensions ** Note: For each Removed Hydrant that can be salvaged and Re-used $1,750.00 will be deducted from Item 3's price for that Hydrant. For Each Hydrant in Item 3 that can be adjusted utilizing 2 each 6" DI fittings $1,050.00 will be deducted from Item 3's cost. (It is unknow the number of the Extra Depth Hydrants previously installed versus the standard depth that will need to be adjusted or if the Hydrant can be lowered with just fittings. Relocate Fire Hydrant Assembly Adjust Existing Standard Depth Fire Hydrant Job Information Job #2013-012 Job Name Water & Sewer Relocations for FM1938 Address Along FM1938 From FM 1709 N to Randol Mill Rd. Phone (817) 339-8950 Fax () - Email MFBrown@TranSystems.com Address 500 W. 7th Street Suite 1100 Address Fort Worth, TX 76102 P.E. (Attn)Mr. Michael F. Brown, P.E. Address Southlake, TX 76092 Phone (817) 748-8400 Engineer Information Name TranSystems Corporation Consultants REQUEST FOR CHANGE ORDER Owner Information Owner Name City of Southlake, TX Address 1400 Main St. Ste. 270 Wilson Contractor Services, LLC 940-243-1174 Office 3985 Mingo Rd.940-898-1175 Fax Denton, Texas 76208 www.WilsonContractorServices.com