Item 11 - ZA16-012 - TIA TD AmeritradeTRAFFIC IMPACT ANALYSIS FOR
WILKS TRACT
OFFICE DEVELOPMENT
SOUTHLAKE, TEXAS
DeShazo Project No. 15140
Prepared for:
M P I
4949 Addison Circle
Addison, Texas75001
Prepared by:
DeShazo Group, Inc.
Texas Registered Engineering Firm F-3199
400 South Houston Street, Suite 330
Dallas, Texas 75202
214.748.5740
Revised
February 25, 2016
_ DeShazo Group
Wilks Tract Development TIA
DeShaz❑ Group
February 25, 2016
Table of Contents
EXECUTIVESUMMARY........................................................................................................................................................ i
Introduction.......................................................................................................................................................................... 1
Purpose.............................................................................................................................................................................. 1
ProjectDescription............................................................................................................................................................. 1
Roadwayand Accessibility................................................................................................................................................. 2
TrafficVolumes.................................................................................................................................................................... 2
ExistingTraffic Volumes..................................................................................................................................................... 3
Future Background Traffic Volumes.................................................................................................................................. 3
TripGeneration and Mode Split.......................................................................................................................................... 3
TripDistribution and Assignment....................................................................................................................................... 4
TrafficVolumes.................................................................................................................................................................. 4
Future Background and Site -Generated Traffic Volumes.................................................................................................. 4
AccessAssessment............................................................................................................................................................ 4
Access Point -to -Access Point Spacing.............................................................................................................................. 5
SightDistance Criteria....................................................................................................................................................... 5
AuxiliaryLane Assessment................................................................................................................................................ 5
Internal Storage (Stacking/Minimum Throat Length) Assessment..................................................................................... 5
TrafficImpact Analysis........................................................................................................................................................ 6
AnalysisMethodology........................................................................................................................................................ 6
Summaryof Results........................................................................................................................................................... 6
Existing(2015) Conditions................................................................................................................................................. 8
Phase I (Year 2017) Background Conditions..................................................................................................................... 8
Phase I (Year 2017) Buildout Conditions........................................................................................................................... 8
Phase II Background Conditions (Year 2022 — without Site)............................................................................................. 8
Phase II Site Buildout Conditions (Year 2022)................................................................................................................... 9
Phase III (Background Conditions (Year 2027 — without Site)........................................................................................... 9
Phase III Site Buildout Conditions (Year 2027).................................................................................................................. 9
Projected Horizon Conditions Without Site (Year 2032).................................................................................................... 9
Projected Horizon plus Site Conditions (Year 2032).......................................................................................................... 9
RoadwayLink Analysis..................................................................................................................................................... 10
AnalysisMethodology......................................................................................................................................................
10
Summary of Roadway Link Analysis Results...................................................................................................................
11
SUMMARY OF FINDINGS AND RECOMMENDATIONS
...................................................................................................11
Phase I — Recommended Improvements.........................................................................................................................
11
Phase11— Recommended Improvements........................................................................................................................
12
Phase III — Recommended Improvements.......................................................................................................................
12
Horizon— Recommended Improvements.........................................................................................................................
12
Wilks Tract Development TIA
Page 1
EXECUTIVE SUMMARY
The services of DeShazo Group, Inc. (DeShazo) were retained by MPI Architects to conduct a Traffic Impact
Analysis (TIA) for the proposed Wilks Tract office development (the "Project") located in the Solana Business
Park Campus, east of SH 114 and south of Kirkland Boulevard in Southlake, Texas. The Project will consist of
approximately 750,000 SF and is assumed to be constructed in three Phases and proposed to be fully built by
Year 2027. The site is currently vacant and zoned as NRPUD (Non-residential Planned Unit Development).
The purpose of this report is to summarize the traffic operational characteristics of the background conditions
within a specific study area and to measure the projected incremental impact related to the Project by phase
as determined by standardized engineering analyses. The study parameters used in this TIA are based upon
the requirements of the City of Southlake and TXDOT Fort Worth and are consistent with the standard industry
practices used in similar studies.
The following findings and recommendations are based upon proposed Phase of development of the subject
property in accordance with the development scenario outlined in the Project Description section of this report.
Phase I- Recommended Improvements
1 j Traffic signals at the SH 114/Kirkwood Boulevard frontage road intersections will be needed
concurrent with Phase 1 development of the project. The developers of Solana Business Park, with
the City of Southlake and City of Westlake along with TxDOT will need to coordinate to build the
traffic signals.
24—A traffic signal at Dove Road/Kirkwood Boulevard will be needed with Phase 1 development by
year 2017.
Site driveways #1 and #2 are full access driveways and will require right -turn and left -turn
deceleration lanes.
Site driveways #1 and #2 will require two outbound lanes at the intersection approach with
Kirkwood Boulevard.
Site Driveway #4 lines up with TW King Road and will have two inbound and two outbound
lanes.
Phase II- Recommended Improvements
1 j Kirkwood Boulevard, south of site between Tyler Street north and Stockton Drive will require a
four -lane divided section. The City of Southlake has planned to widen Kirkwood Boulevard to a
four -lane divided section by end of year 2016.
Phase III- Recommended Improvements
END
1 j A traffic signal at Kirkwood Boulevard/ T. W. King Road may be needed with full build out of
the development by year 2027. Horizon- Recommended Improvements
1 j If TxDOT, the City of Southlake, and the City of Westlake construct frontage roads and reverse
the NB off -ramp for SH 114 near the site by 2027, the recommended improvements at SH 114
and Dove Road may not be necessary.
Wilks Tract Development TIA
Page i
DeShazo Group
Traffic. Transportation Planning. Parking. Design.
Technical Memorandum
To: Randall G. Bauer, AIA MPI Architects
From: DeShazo Group, Inc.
Date: February 25, 2016
Re: A Traffic Impact Analysis for Wilks Tract, a proposed Office Development in Southlake, Texas
(DeShazo #15140)
Introduction
DeShazo Group is an engineering consulting firm providing licensed engineers skilled in the field of traffic and
transportation engineering. The services of DeShazo Group, Inc., were retained by MPI Architects, to conduct
a traffic impact analysis (TIA) for Wilks Tract, a proposed office development located on the western side of
Kirkwood Boulevard and the eastern side of the SH 114 between Kirkwood Boulevard and Dove Road in
Southlake, Texas (see site location map in Exhibit 1).
This study examines the potential traffic generated by the proposed development plan and determines the
general availability of access and roadway capacity available to serve it for the following scenarios.
• Existing conditions (2015)
• Phase I Project buildout (2017)
• Potential -Phase II Project buildout (2022)
• Potential Phase III/Site buildout of Project (2027)
• Horizon/Project Site buildout plus 5 years (2032)
Once completed, this report will be provided to City of Southlake staff (Staff) and TxDOT for review and to
fulfill the associated requirements of the local approval process.
Project Description
This proposed office development consists of approximately 750,000 total square feet of office space and is
assumed to be built in three phases for the purpose of this study. The overall project is assumed to be fully
developed by the end of 2027. Exhibit 2 offers a conceptual site plan for the Phase I development. Similar
office buildings are assumed to be constructed on both sides of the Phase I site for this study. The following
assumptions were included in the analysis of the project development.
Other commercial development (proposed by others and separate from this project), a 250-room hotel, in the
southeast corner of SH 114/Kirkwood Boulevard was assumed to be built by the year 2020 and was added to
the background 2022 conditions. Based on discussions with the City of Southlake Staff, the following
assumptions were made:
Wilks Tract Development TIA
Page 1
1) Kirkwood Boulevard's right-of-way to the east, north and south of the site has been dedicated to the
City of Southlake and the City concurrently will widen the existing two-lane section of Kirkwood
Boulevard to four -lane divided roadway by the end of year 2016.
2) The WB SH 114 frontage road adjacent to the site was not assumed to be built by year 2027.
3) The City of Westlake's proposed developments were not included in the analyses.
Roadways and Accessibility
The following existing roadways will provide access to the subject site and are included in the study area.
• SH 114 (classification: Freeway)
o Six -lane, divided freeway with auxiliary lanes and ramps for major intersections between Dove
Road and Kirkwood Boulevard
• Kirkwood Boulevard (classification: A4D — 100' Arterial)
o Six -lane, divided roadway east of SH 114 and west of TW King Road (The portion of roadway
west of SH 114 is called Solana Boulevard and is also a six -lane, divided roadway.)
o Four -lane, divided roadway from T.W. King Road to Tyler Street
o Two-lane, undivided roadway between Tyler Street and Stockton Drive
o Four -lane, divided roadway between Stockton Drive and Dove Road (The portion of Kirkwood
Boulevard south of Dove Road to White Chapel Boulevard has not been constructed.)
• SH 114 ramps
o The northbound SH 114 off -ramp at its intersection with Kirkwood Drive is a three -lane, one-
way roadway adjacent to the site and the southbound SH 114 off -ramp at the intersection is
also a three -lane, one-way roadway.
• T.W. King Road (classification: C2U- 70' Collector)
o Two-lane, undivided roadway east of SH 114 and north of Kirkwood Boulevard. The portion of
T.W. King Road at the approach with Kirkwood Boulevard is a four -lane, undivided roadway.
• Dove Road (classification: A4D- 88' Arterial)
o Four -lane, divided roadway east of SH 114 to Kirkwood Boulevard. The portion of Dove Road
east of Kirkwood Boulevard to White Chapel Boulevard is a two-lane, undivided roadway.
The following intersections were also included in the traffic impact analysis.
• SH 114 at Kirkwood Boulevard/Solana Boulevard (All -way STOP control)
• SH 114 at Dove Road (existing traffic signal)
• Kirkwood Boulevard at T.W. King Road / Future Site Access Driveway (All -way STOP control)
• Kirkwood Boulevard at Dove Road (Two-way STOP control)
• Kirkwood Boulevard east/south of Sabre Driveway at three site driveways - proposed Site driveways
1, 2 and 3 (Two-way STOP control)
• Kirkwood Boulevard west of Sabre Driveway at T.W. King Road, one site driveway — proposed site
driveway 4 (All -way STOP control).
Traffic Volumes
The TIA presented in this report analyzed the operational conditions for the peak hours and study area as
defined above using standardized analytical methodologies where applicable. It examined current traffic
conditions and projected future background traffic conditions, future traffic conditions with the proposed
project fully developed and operational, and a final scenario occurring five years after development is
complete. Once current traffic information was collected, future background volumes were developed by
Wilks Tract Development TIA
Page 2
applying an annual growth rate to the existing count data. The traffic generated by the proposed development
was then projected using the standard four -step approach: Trip Generation, Mode Split, Trip Distribution and
Traffic Assignment. The resulting traffic impact to operational conditions can be assessed by adding the site -
generated traffic to the future background traffic from which mitigation measures may be recommended.
Existing Traffic Volumes
Existing weekday peak -hour traffic volumes were collected in the study area on April 7, 2015. These volumes
are shown in Exhibits 3A-3B. Detailed traffic counts can be found in Appendix A. The AM peak traffic hour on
the adjacent roadway network occurs between 7:45 AM and 8:45 AM, and the PM peak traffic hour occurs
between 4:45 PM and 5:45 PM.
Future Background Traffic Volumes
The standard procedure for determining the future background or non -site -related traffic involves three steps.
The first step is to determine an average annual growth rate for the roadways in the study area. The next is to
determine a buildout (or horizon year) for the analysis. Finally, the existing traffic volumes are factored using
the assumed annual growth rate for the selected number of growth years. For this project, we assumed a 2017
Phase I buildout year, 2022 Phase II site buildout year, 2027 Phase III site buildout year and 2032 horizon year
and that an average annual growth rate of 3% would occur each year for the next 17 years. Also, the traffic
generated by the other commercial developments, located in the southeast corner of Kirkwood Boulevard/SH
114 was added to the 2022 background traffic. Applying the growth factors to the existing traffic volumes
yields the 2017, 2022, 2027 and 2032 AM and PM background volumes shown in Exhibits 4A, 413, 5A, 513, 6A,
6B, 7A & 7B, respectively.
Trip Generation and Mode Split
Trip generation for the Project was calculated using the Institute of Transportation Engineers (ITE) Trip
Generation (9" Edition). ITE Trip Generation is a compilation of actual traffic generation data by land use as
collected over several decades by creditable sources across the country and is accepted as the standard
methodology to determine trip generation volumes for various land uses where sufficient data exists. The
proposed Phase I development is planned to have a 300,000-square-foot office or 1,950 employees. Based
upon the information received from the Client, approximately 80 percent of the 1950 employees, which is
equal to 1560 employees would arrive/leave between 8 AM and 5 PM and the rest at either earlier or later in
the day, outside the peak hour. Similarly, the data used for the potential Phase II development with a 150,000-
square-foot building and with employee head count (Phase I plus Phase II combined) in the peak shift was
calculated to be 2,184 employees. A 250-room hotel is included in the background traffic volumes for Phase II.
The site buildout (Phase III) of the proposed development is- assumed to include an additional 300,000-square-
foot building. The combined employee count for the site buildout (Phase I, II & III) was calculated to be 3,432
employees. The developments adjacent to the site located on the SE corner of SH 114 and Kirkwood Boulevard
are being proposed by other land developers.
A summary of the site -related trips calculated for the proposed site development is provided in Table 1. The
appropriate Trip Generation (91" Edition) excerpts are provided in Appendix B.
Wilks Tract Development TIA
Page 3
TABLE 1
Wilks Tract plus Adjacent Tract Trip Generation
AM Peak
PM Peak
Phase
Quantity
Daily
Land Use
Hour
Hour
Traffic
In Out
In Out
710 — General
1,560
Phase 1
4,474
623 85
108 529
Office
Employees
Phase 11
710 — General
2,184
Office
Employees
5,935
832 114
148 720
310 — Hotel
(plus Phase I —General
Office)
(by others)
250 Rooms
1,864
78 55
77 73
Phase III -Site
Buildout (Phase I & II
710 — General
3,432
General Office &
Office
Employees
8,676
1,228 168
226 1,104
Hotel)
Trip Distribution and Assignment
Traffic generated by the proposed development at the site buildout conditions was distributed and assigned
to the study area roadway network using professional judgment to interpret the traffic orientation
characteristics of existing traffic volumes in the study area and a technical understanding of the available
roadway network. Exhibits 8A-8B, Exhibits 9A-9B and Exhibits 10A-10B illustrate the approach and departure
percentages assumed for site -generated traffic in this study during Phase I, Phase II and Phase 111, respectively.
Traffic Volumes
Determination of the traffic impact associated with the project is measured by comparing the change in
operational conditions before and after the site -related traffic is added to the roadway system. This involves
the development of traffic volumes that include both background and site -related traffic. The site -generated
traffic was calculated by multiplying the trip generation values (from Table 1) by the corresponding traffic
approach and departure orientations (Exhibits 8A-8B, 9A-9B and 10A-1013). The resulting AM and PM peak -
hour, site -generated traffic volumes for years 2017, 2022 and 2027 of the project are summarized in Exhibits
11A-11B, 12A-12B and 13A-13B, respectively.
Future Background and Site -Generated Traffic Volumes
Adding the new site -related traffic volumes in Exhibits 11A through 13B to the 2017, 2022, 2027 and 2032
background traffic volumes shown in Exhibits 4A-413, 5A-5B, 6A-613, respectively, yields the total AM and PM
peak periods traffic volumes at the project buildout years as shown in Exhibits 14A-14B, 15A-15B, 16A-16B
and 17A-17B, respectively.
Access Assessment
The access assessment portion of this study will examine the following three major areas.
1) The spacing between the proposed driveways and adjacent driveways
2) The spacing between proposed driveways and adjacent public street intersections
3) The need for acceleration/deceleration lanes based upon the projected turning movements at the
proposed driveways
Wilks Tract Development TIA
Page 4
Access Point -to -Access Point Spacing
The City of Southlake controls the access spacing for most of Kirkwood Boulevard with the exception of
Kirkwood Boulevard east of T.W. King Road to Tyler Street North. The City has plans to acquire the ROW for
the entire stretch of Kirkwood Boulevard by end of 2016. The City's Driveway Ordinance (No. 634) requires 250
feet between access points on an arterial facility such as Kirkwood Boulevard in the area of the proposed
development. The site plan (see Exhibit 2) shows that:
• Site Driveway 1 is proposed to be located approximately 300 feet from Tyler Street North and 450 feet
from the proposed Site Driveway 2,
• Site Driveway 2 is located approximately 600 feet from the proposed Site Driveway 3,
• Site Driveway 3 is located approximately 350 feet from the existing Sabre Driveway to the north and
will be constructed with Phase 3, final buildout phase of the site development.
• Site Driveway 4 is located approximately 850 feet east of the SH 114 NB frontage Road and lines up
with the SB approach of T.W. King Road.
Therefore, all driveway spacing distances meet the City's minimum driveway spacing requirements.
Sight Distance Criteria
DeShazo conducted sight distance analysis based upon AASHTO's Design Standards for Horizontal Sight
Distance and Vertical Sight Distance near the project vicinity. The vertical sight distance was not performed
since a field visit to the Project site found that Kirkwood Boulevard and the locations of the site driveways
appear to be on level grade and therefore adequate. The horizontal sight distance analysis determined that
the conceptual site driveways appear to intersect existing Kirkwood Boulevard at 90-degree angles to the
horizontal curvature.
All driveways appear to satisfy the AASHTO minimum horizontal sight distance requirements.
Auxiliary Lane Assessment
This portion of this study examines the need for auxiliary or turn lanes based upon the projected turning
movements at the proposed access points. The City of Southlake requires that auxiliary turn lanes be provided
if the right -turn ingress volume exceeds 50 vehicles in the design hour on an arterial street or if the speed limit
on the street exceeds 40 MPH and the right -turn ingress volume is at least 40 vehicles in the design hour (Refer
to Driveway Ordinance No. 634). Applying the volume threshold standards to the proposed site traffic (Exhibits
11A through 13B) shows that:
1) The projected southbound, right -turn traffic volumes on Kirkwood Boulevard at Site Driveway 1 exceed
the volume threshold for an auxiliary lane (right -turn lane is required);
2) The projected southbound, right -turn traffic volumes on Kirkwood Boulevard at Site Driveway 2 exceed
the volume threshold for an auxiliary lane (right -turn lane is required);
3) The projected southbound, right -turn traffic volumes on Kirkwood Boulevard at Site Driveway 3 exceed
the volume threshold for an auxiliary lane (right -turn lane is required);
4) The projected eastbound, right -turn traffic volumes on Kirkwood Boulevard at Site Driveway 4 exceed
the volume threshold for an auxiliary lane. There is an existing right -turn lane that is striped out, which
can be restriped to serve as a right -turn lane; and
5) Left -turn lanes are required to be built on Kirkwood Boulevard, a divided arterial street, at Site
Driveways 1, 2 and 3 (Refer to Driveway Ordinance No. 634).
Wilks Tract Development TIA
Page 5
Internal Storage (Stacking /Minimum Throat Length) Assessment
This portion of the study examines the site driveways for the internal storage criteria. The City of Southlake
Driveway Ordinance No. 634 (Table Two) states that the internal storage shall be based upon the average
number of parking spaces served per driveway (200+ category for Driveway 1, 2, 3, and 4) and the total number
of parking spaces (200+ category) for this project. Applying the parking threshold standard to the proposed
site plan shows that:
1) Site Driveway 1 as shown on the preliminary site plan on Exhibit 2 may meet the City's required
minimum storage length of 150 feet;
2) Site Driveway 2 as shown on the preliminary site plan on Exhibit 2 has an internal storage length
of approximately 190 feet from the curb and meets the City's required minimum internal storage
length of 150 feet;
3) Site Driveway 3 as shown on the preliminary site plan on Exhibit 2 has an internal storage length
of approximately 510 feet from the curb and meets the City's required minimum internal storage
length of 150 feet;
4) Site Driveway 4 as shown on the preliminary site plan on Exhibits 2 has an internal storage length
of approximately 860 feet from the curb and meets the City's required minimum internal storage
length of 150 feet.
All the outbound approaches at the Site Driveways show a minimum required continuous curb up to the front
right-of-way line.
Traffic Impact Analysis
Analysis Methodology
Traffic operational conditions for unsignalized and signalized roadway intersections are quantitatively
measured in terms of average delay through the intersection per vehicle in a one -hour period as a function of
roadway capacity and operational characteristics of the traffic signal. The standardized methodology applied
herein was developed by the Transportation Research Board as presented in the 2010 Highway Capacity
Manual (HCM). HCM also qualitatively rates the overall delay conditions in terms of "level of service" (LOS)
ranging from "A" (free -flowing conditions) to "F" (over -capacity conditions). Generally, LOS D or better is
considered an acceptable condition for intersections in urban and suburban areas.
Summary of Results
The intersection capacity analyses presented in this study were performed using the Synchro 9 software
package. Table 2 provide a summary of the intersection operational conditions during the peak periods under
the analysis conditions presented previously. Detailed software output is provided in Appendix C.
Wilks Tract Development TIA
Page 6
Table 2. Peak Hour Intersection Capacity Analysis Results
(Signalized Intersections)
DeShazo Group, Inc.
08/28/2015
Existing
Phase
I
Phase II
Phase III
Horizon
Signalized
2015
2017 Backeround
2017 Background
+ Site
2022 Background
2022 Background
+ Site
2027 Backeround'
2027 Background
+ Site '
2032 Horizon'''
2032 Horizon +Site'''
Intersections
AM PM
AM
PM
AM
PM
AM
PM
AM
PM
AM
PM
AM
PM
AM
PM
AM
PM
Dove Road at
SH 114 SB Off -Ramp
A (5.8) A (8.6)
A (Z I)
A (8.9)
A (8.9)
B (10.5)
B (11.7)
B (14.2)
B (12.4)
B (15.1)
B (15.7)
C (20.4)
B (1Z2)
C (20.4)
B (16.1)
C (29.3)
C (22.4)
E (56.7)
Dove Road at
SH 114 NB Off -Ramp
B (14.0) C (22.5)
B (13.9)
C (22.9)
B (14.3)
C (26.4)
B (17.5)
C (33.1)
B (17.7)
D (35.5)
B (19.8)
E (56.8)
C (21.1)
E (68.5)
B (IZ9)
E (72.3)
C (25.3)
F (>100)
With Roadway Improvements
B (19.3)
D (40.3)
C (20.5)
D (43.9)
B (16.5)
D (36.5)
C (22.0)
D (50.5)
Kirkwood Boulevard at
Dove Road (With Traffic Signal)
- - - -
A (ZO)
B (10.1)
B (10.4)
B (10.1)
B (13.8)
B (10.5)
B (16.5)
B (11.5)
B (20.0)
C (21.1)
C (27.4)
C (2Z5)
B (11.0)
C (22.3)
C (34.9)
C (29.2)
Kirkwood Boulevard at
SH 114 SB Off -Ramp (With Traffic Signal)
- - - -
B (14.8)
B (15.1)
B (16.7)
B (16.2)
B (18.8)
C (22.1)
B (19.4)
C (22.9)
C (24.9)
D (38.2)
C (2Z1)
D (41.7)
C (26.2)
D (45.8)
C (29.7)
D (50.7)
Kirkwood Boulevard at
SH 114 NB Off -Ramp (With Traffic Signal)
- - - -
B (17.6)
C (26.3)
C (11.7)
C (24.8)
C (23.2)
D (37.4)
C (23.8)
D (37.7)
C (28.4)
D (53.4)
C (29.8)
D (53.6)
C (28.3)
E (62.7)
D (42.4)
E (60.5)
Existing
Phase I
Phase II
Phase III
Horizon
Unsignalized
Traffic
2015
2017 Background
2017 Background
+ Site
2022 Background
2022 Background
+ Site
2027 Background'
2027 Background
+ Site '
2032 Horizon'''
2032 Horizon +Site'''
Intersections
Movement
AM
PM
AM
PM
AM
PM
AM
PM
AM
PM
AM
PM
AM
PM
AM PM
AM
PM
Dove Road at
Kirkwood Boulevard
EBL
A (9.1)
A (8.7)
A (9.2)
A (8.7)
B (11.8)
A (8.9)
- -
- -
- -
- -
- -
- -
- -
- -
- - - -
- -
- -
SBL
D (32.6)
C (19.2)
E (35.2)
C (20.1)
F (>100)
D (27.9)
- -
- -
- -
- -
- -
- -
- -
- -
- - - -
- -
- -
SBR
B(10.2)
B(12.6)
B(10.3)
B(12.9)
B(10.9)
C1'19.0)
--
--
--
--
--
--
--
--
-- --
--
--
Kirkwood Boulevard at
SH 114 SB Off -Ramp
EBT
B (12.7)
B (12.2)
B (13.0)
B (12.5)
C (18.4)
B (13.2)
- -
- -
- -
- -
- -
- -
- -
- -
- - - -
- -
- -
EBR
B(10.2)
D(28.1)
B(10.6)
D(33.7)
C(15.5)
E(43.8)
--
--
--
--
--
--
--
--
-- --
--
--
WBL
C (19.1)
F (51.7)
C (20.2)
F (60.4)
D (32.7)
F (70.5)
- -
- -
- -
- -
- -
- -
- -
- -
- - - -
- -
- -
WBT
C(18.0)
B(13.1)
C(20.2)
B(13.4)
D(32.7)
C(15.5)
--
--
--
--
--
--
--
--
-- --
--
--
SBL
B(12.7)
B(12.7)
B(13.0)
B(12.9)
C(21.8)
B(13.8)
--
--
--
--
--
--
--
--
-- --
--
--
SBLT
B(12.7)
B(12.7)
B(13.0)
B(12.9)
C(21.8)
B(13.8)
--
--
--
--
--
--
--
--
-- --
--
--
SBTR
B(10.4)
B(10.8)
B(10.6)
B(10.9)
B(11.4)
B(11.0)
--
--
--
--
--
--
--
--
-- --
--
--
Kirkwood Boulevard at
SH 114 NB Off -Ramp
EBL
C(16.7)
F(84.9)
C(IZ3)
F85..5
C(18.6)
F(89.7)
--
--
--
--
--
--
--
--
-- --
--
--
EBT
C(16.8)
B(14.2)
C(1Z5)
B(14.4)
F(50.4)
C(1Z1)
--
--
--
--
--
--
--
--
-- --
--
--
WBT
C (18.3)
D (26.9)
C (19.1)
D (28.6)
D (25.6)
E (42.3)
- -
- -
- -
- -
- -
- -
- -
- -
- - - -
- -
- -
WEIR
A(9.3)
C(19.3)
A(9.5)
B(14.4)
B(12.0)
F(68.4)
--
--
--
--
--
--
--
--
-- --
--
--
NBL
E (35.7)
C (23.0)
E (41.5)
C (24.3)
F (70.7)
D (28.4)
- -
- -
- -
- -
- -
- -
- -
- -
- - - -
- -
- -
NBLT
C(17.6)
F(70.7)
C(18.3)
F(71.0)
C(21.6)
F(73.9J
--
--
--
--
--
--
--
--
-- --
--
--
NBTR
E (41.3)
F (70.4)
E (48.2)
F (70.6)
F (68.1)
F (73.5)
- -
- -
- -
- -
- -
- -
- -
- -
- - - -
- -
- -
Kirkwood Boulevard at
T W King Road/ Site Driveway 4
EBL
A (9.5)
B (10.7)
A (9.6)
B (30.9)
A (10.0)
B (12.2)
B (30.4)
B (12.8)
B (10.6)
B (13.2)
B (11.1)
B (13.8)
B (11.4)
B (14.6)
- - - -
B (11.8)
C (15.4)
EBT
C (16.8)
A (9.4)
C (IZ7)
A (9.5)
D (29.3)
B (11.2)
E (48.7)
B (11.5)
F (65.1)
B (12.2)
F (66.6)
B (12.5)
F (68.0)
B (13.9)
- - - -
F (58.8)
B (14.3)
EBTR
- -
- -
B (10.1)
A (7.6)
C (16.2)
B (10.7)
C (19.6)
B (11.0)
D (26.0)
B (11.6)
E (36.1)
B (11.9)
F (66.7)
B (13.1)
- - - -
F (67.6)
B (13.5)
WBT
B(10.3)
C(18.2)
B(10.4)
C(19.3)
--
--
--
--
--
--
--
--
--
--
-- --
--
--
WBLT
- -
- -
- -
- -
B (11.6)
F (61.0)
B (12.4)
F (62.0)
B (12.8)
F (63.6)
B (13.4)
F (64.7)
B (14.5)
F (67.8)
- - - -
C (15.2)
F (69.0)
WBTR
B (10.6)
B (12.4)
B (10.1)
B (12.7)
B (11.0)
C (24.7)
B (11.7)
E (38.0)
B (12.0)
F (61.0)
B (12.5)
F (63.5)
B (13.3)
F (66.7)
- - - -
B (13.8)
F (6Z9)
NBLT
- -
- -
B (11.8)
B (13.4)
B (12.3)
B (13.8)
B (12.7)
C (15.4)
B (13.0)
C (15.9)
B (13.8)
C (20.7)
- - - -
B (14.2)
C (21.5)
NBRT
- -
- -
B (10.9)
B (10.8)
B (11.5)
B (11.0)
B (11.7)
B (11.3)
B (12.0)
B (11.5)
B (12.5)
B (11.9)
- - - -
B (12.8)
B (12.1)
SBL
B(10.6)
A(10.0)
B(10.8)
B(10.1)
--
--
--
--
--
--
--
--
--
-- --
--
--
SBLT
- -
- -
- -
- -
B (12.3)
B 1'11.4)
B (13.1)
B (11.6)
B (14.1)
B (12.0)
B (14.7)
B (12.2)
C (16.6)
B (12.9)
- - - -
C (17.6)
B (13.1)
SBR
B (14.0)
B (10.4)
B (14.6)
B (10.5)
C (17.2)
B (12.5)
C (22.7)
B (13.5)
C (24.9)
B (14.2)
E (36.5)
C (15.4)
E (43.0)
C (16.9)
- - - -
F (67.7)
C (18.9)
Kirkwood Boulevard at
Site Driveway 1
EBL
- -
- -
- -
- -
C (15.1)
C (IZ4)
C (15.4)
C (19.7)
C (16.4)
D (25.7)
C (16.9)
D (31.3)
C (19.5)
F (82.7)
- - - -
C (20.3)
F (>I00)
EBR
- -
- -
- -
- -
A (8.5)
B (10.5)
A (8.5)
B (10.8)
A (8.5)
B (11.2)
A (8.5)
B (11.5)
A (8.6)
B (12.9)
- - - -
A (8.6)
B (13.4)
NBL
- -
- -
- -
- -
A (Z6)
A (8.1)
A (Z6)
A (8.3)
A (Z6)
A (8.6)
A (Z 7)
A (8.8)
A (7.7)
A (9.3)
- - - -
A (Z 7)
A (9.5)
Kirkwood Boulevard at
Site Driveway 2
EBL
- -
- -
- -
- -
B (12.3)
C (15.9)
B (12.7)
C (17.7)
C (17.2)
D (25.6)
C (17.7)
D (31.7)
D (26.7)
F (55.2)
- - - -
D (2Z9)
F (81.0)
EBR
- -
- -
- -
- -
A (8.8)
A (9.6)
A (8.9)
A (9.8)
A (9.0)
B (10.5)
A (9.0)
B (10.8)
A (9.1)
B (11.8)
- - - -
A (9.1)
B (12.3)
NBL
- -
- -
- -
- -
A (7.7)
A (8.0)
A (7.7)
A (8.1)
A (8.0)
A (8.2)
A (8.0)
A (8.4)
A (8.4)
A (8.8)
- - - -
A (8.4)
A (9.0)
Kirkwood Boulevard at
Site Driveway 3
EBL
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
C (16.9)
D (33.6)
- - - -
C (1Z8)
E (45.1)
EBR
--
--
--
--
--
--
--
--
--
--
--
--
A(9.6)
B(10.7)
-- --
A(9.7)
B(11.0)
NBL
--
--
--
--
--
--
--
--
--
--
--
--
A(8.4)
A(8.4)
-- --
A(8.4)
A(8.6)
Kirkwood Boulevard at
Driveway 5 (By Others)
WBL
- -
- -
- -
- -
- -
- -
C (18.1)
A (8.9)
C (20.1)
A (9.0)
C (22.8)
A (9.0)
D (28.6)
A (9.3)
- - - -
- -
- -
NBLR
- -
- -
- -
- -
- -
- -
D (28.7)
B (13.8)
D (33.8)
B (14.7)
E (42.4)
C (15.7)
F (61.5)
C (20.9)
- - - -
- -
- -
Kirkwood Boulevard at
Driveway 6 (By Others)
WBL
- -
- -
- -
- -
- -
- -
C (18.8)
A (9.1)
C (20.9)
A (9.1)
C (23.7)
A (7.7)
D (29.7)
A (Z8)
- - - -
- -
- -
NBLR
- -
- -
- -
- -
- -
- -
D (31.3)
B (14.6)
E (36.9)
C (15.5)
E (47.2)
C (17.6)
F (69.3)
C (20.7)
- - - -
- -
- -
KEY.
A, B, C, D, E, F = Level -of -Service for each intersection approach
NB, SB, EB, WB = North-, South-, East-, Westbound approach
L, T, R = Left Through, Right Approach turning movement
AM = AM Peak Hour of Adjacent Street
PM = AM Peak Hour of Adjacent Street
1SH-114 NB Off -Ramp at Dove Road(Phase III Year 2027
- Added a WB channelized right -turn lane
1,2SH-114 NB Off -Ramp at Dove Road(Horizon Phase Year 2032):
- Added an additional NB left -turn lane
- Converted the NB shared through -right lane to separate through lane
- Converted the NB shared left -through lane to separate through lane
- Added an exclusive NB right -turn lane
NOTE: Signalized intersection operational parameters and operational results were obtained directly from the optimized software output
and may differ slightly from actual traffic signal operations.
Wilks Tract Development TIA
Page 7
The findings are as follows:
Existing (2015) Conditions
The following assumption was included as part of the existing conditions analysis.
• The traffic volumes collected April 7, 2015, are representative of average daily traffic levels.
As Table 2 indicates:
1) All signalized intersections operate acceptably during the AM and PM peak periods with 2015 traffic
volumes.
2) The Kirkwood Boulevard/SH 114 SB ramp interchange operates acceptably during the AM and only a
few approach movements operate with low LOS in the PM peak.
3) The Kirkwood Boulevard/SH 114 NB ramp interchange operates at acceptable LOS with the exception
of some approach movements that experience low LOS during the AM and PM peak hours.
Phase I (Year 2017) Background Conditions
The following assumptions were included as part of the future background conditions analysis.
• The traffic volumes collected April 7, 2015, were increased by 3% per year for two years to reflect the
normal growth in the study area and to represent average daily traffic levels for the year 2017.
As Table 2 indicates:
1) All signalized intersections will operate at LOS C or better during the AM and PM peak periods with
2017 traffic volumes.
2) The Kirkwood Boulevard/SH 114 interchange will generally operate at acceptable LOS with the
exception of some approach movements that experience low LOS during the AM and PM peak hours.
A Traffic Signal may be required even without any additional development.
3) A Traffic Signal at Dove Road/Kirkwood Boulevard may be required even without any additional
development. (City of Southlake has indicate that this traffic signal is planned.)
Phase I (Year 2017) Buildout Conditions
As Table 2 indicates:
1) A Traffic Signal at the intersection of Dove Road/Kirkwood Boulevard will be required to operate at
acceptable LOS with the proposed development.
2) The Kirkwood Boulevard/SH 114 interchange will experience low LOS during the AM and PM peak
hours. A Traffic Signal may be required to operate at acceptable LOS with the proposed Phase I
developments with the identified improvements. Refer to Exhibit 19 for details.
3) All other existing signalized intersections will operate at LOS C or better during the AM and PM peak
periods.
4) All other unsignalized intersections will operate at acceptable LOS during the AM and PM peak
periods with the proposed developments.
Phase II Background Conditions (Year 2022 — without Site)
The following assumptions were included as part of the future background conditions analysis.
The traffic volumes collected April 7, 2015, were increased by 3% per year for seven years to reflect
the normal growth in the study area and to represent average daily traffic levels for the year 2022.
A traffic signal at the SH 114/ Kirkwood Boulevard interchange was assumed to be in place for opening
day of Phase I development and operational by year 2017.
Wilks Tract Development TIA
Page 8
As Table 2 indicates:
1) All existing and new traffic signalized intersections will operate at LOS D or better during the AM
and PM peak periods.
2) All other unsignalized intersections are shown to operate at acceptable LOS during the AM and PM
peak periods.
Phase II Site Buildout Condition (Year 2022)
As Table 2 indicates:
1) All existing and new traffic signalized intersections will operate at LOS D or better during the AM
and PM peak periods with the identified improvements. Refer to Exhibit 20 for details.
2) Site driveways 1 and 2 are shown to operate with acceptable LOS during the AM and PM peak
periods.
3) Kirkwood Boulevard/T. W. King Road -Site driveways 4 will operate with acceptable LOS during the
AM and PM peak periods.
Phase III Background Conditions (Year 2027 - without Site)
The following assumptions were included as part of the future background conditions analysis.
• The traffic volumes collected April 7, 2015, were increased by 3% per year for 12 years to reflect the
normal growth in the study area and to represent average daily traffic levels for the year 2027.
As Table 2 indicates:
1) The SH 114/Dove Road interchange will operate acceptably during the AM peak period, however, it
operates at a low level of service for the PM period with the additional 2027 background traffic
volumes. A WB channelized right -turn lane at SH 114 NB frontage road and Dove Road is
recommended in order to improve the LOS.
2) All other signalized intersections will operate at LOS D or better during the AM and PM peak periods.
3) All other Site Driveways and unsignalized intersections will operate at an acceptable LOS during the
AM and PM peak periods.
Phase III Site Buildout Conditions (Year 2027)
As Table 2 indicates:
1) The SH 114/Dove Road interchange will operate acceptably during the AM and PM peak periods with
2027 background -plus -site traffic volumes.
2) The Kirkwood Boulevard/SH 114 interchange will operate at LOS D or better during the AM and PM
peak periods.
3) All other signalized intersections will operate at LOS D or better during the AM and PM peak periods
with the recommended improvements. Refer to Exhibit 21 for details.
4) Site driveways 1, 2 and 3 are shown to experience brief delays during the peak periods due to high
through background volumes on Kirkwood Boulevard.
Projected Horizon Conditions without Site (Year 2032)
The following assumptions were included as part of the future background conditions analysis.
• The traffic volumes collected April 7, 2015, were increased by 3% per year for 17 years to reflect the
normal growth in the study area and to represent average daily traffic levels for the year 2032.
Wilks Tract Development TIA
Page 9
As Table 2 indicates:
1) All signalized intersections will operate at LOS D or better during the AM and PM peak periods with
the recommended improvements. Refer to Exhibit 21 for details.
Projected Horizon plus Site Conditions (Year 2032)
As Table 2 indicates,
1) All signalized intersections will operate at LOS D or better during the AM and PM peak periods with
the recommended improvements.
2) Site driveways 1, 2, and 3 will experience brief delays during the peak periods due to high through
background volumes on Kirkwood Boulevard.
3) A Traffic Signal at Kirkwood Boulevard/T. W. King Road may be required to operate at acceptable
LOS with the proposed development and the other developments on T. W. King Road.
Roadway Link Analysis
Analysis Methodology
Roadway link analysis is an evaluation technique used to validate the regional roadway network. It is a
comparison of actual or forecasted traffic volumes to the theoretically optimum roadway capacity. Ideally,
the comprehensive thoroughfare system is designed to provide adequate local and regional mobility while
maintaining sufficient opportunities for property access without requiring excessive right-of-way. For this
study, DeShazo applied planning parameters developed by the NCTCOG (these parameters are provided in
Tables 3 and 4) and used the site buildout peak period traffic volumes for the year 2027. A summary of the
link capacity analysis is provided in Table 5.
A suburban residential area type and minor arterial functional classification were used in the analysis:
• Kirkwood Boulevard: 4-lane, divided arterial (adjacent to the site -A4D)
• Kirkwood Boulevard: 6-lane, undivided Collector (between the SH 114 NB frontage road and T.W. King
Road),
Table 3
Hourly Roadway Link Service Volumes (per lane)
XXX = Divided or One -Way Roads, (XXX) = Undivided Roads
Functional Class
Principal
Minor
Collector
Frontage
Area Type
Arterial
Arterial
Road
725
725
475
725
CBD
(650)
(650)
(425)
(650)
Outer Business
775
775
500
775
District
(725)
(725)
(450)
(725)
Urban
850
825
525
850
Residential
(775)
(750)
(475)
(750)
Suburban
925
900
575
900
Residential
(875)
(825)
(525)
(825)
Rural
1,025
975
600
975
(925)
(875)
(550)
(875)
Table 4
Wilks Tract Development TIA
Page 10
Roadway Link Level -of -Service Guidelines
(Derived from parameters used by North Central Texas Council of Governments)
Level -of-
Service
NCTCOG
Volume/Capacity Ratio
C or Better
X< 0.65
D or E
0.65<X<1
F
X>1.0
Table 5
Roadway Link Analysis
Hourly Volume
LOS
AM
PM
AM
PM
Roadway Link
Hourly
Capacity per
Year 2017
Year 2017
Year 2017
Yea 2017
Lane
Existing Plus Site
Existing Plus Site
Existing Plus Site
Existing Plus Site
(C)
(V) (V)
(V) (V)
NO (V/C)
(V/C) NO
Kirkwood
900 (x 4)
0.07 0.20
0.14 0.26
Blvd.(Adjacent
234 702
512 951
= 3,600
(C or better) (C or better)
(C or better) (C or better)
to site)
Kirkwood
Blvd.(Between
SH 114 NB
900 (x 6)
0.19 0.27
0.15 0.22
frontage road
= 5,400
1,011 1,431
819 1,191
(C or better) (C or better)
(C or better) (C or better)
and T.W. King
Road)
Summary of Roadway Link Analysis Results
The roadway Link analysis presented in Table 5 indicates the following:
• Kirkwood Boulevard, adjacent to site, to the east, will operate well with four -lane divided roadway
below capacity near the site.
• Kirkwood Boulevard, between SH 114 NB frontage road and T.W. King Road, will operate well below
capacity near the site.
SUMMARY OF FINDINGS AND RECOMMENDATIONS
This report examined the access and traffic impact of the Wilks Tract, a proposed office development in
Southlake, Texas, on the adjacent roadway system. The findings and recommendations are summarized below
by proposed Phase of development.
Phase I- Recommended Improvements
1) Traffic signals at the SH 114/Kirkwood Boulevard frontage road intersections will be needed
concurrent with Phase I development of the project. The developers of Solana Business Park, with
the City of Southlake and City of Westlake along with TxDOT will need to coordinate to build the
traffic signals.
Wilks Tract Development TIA
Page 11
2) A traffic signal at Dove Road/Kirkwood Boulevard will be needed with Phase I development by
year 2017. The City of Southlake has indicated that this traffic signal is planned already.
3) Site driveways #1 and #2, are full access driveways and will require right -turn and left -turn
deceleration lanes.
4) Site driveways #1 and #2, will require two -outbound lanes at the intersection approach with
Kirkwood Boulevard.
5) Site driveway #4 shown to lines up with T. W. King Road and will require a right -turn lane. An
existing EB merge lane is already available at Site Driveway #4 and can be striped to be an
exclusive right -turn lane.
Phase II- Recommended Improvements
1) Kirkwood Boulevard, south of site between Tyler Street north and Stockton Drive will a require
four -lane divided section. The City of Southlake has planned to widen Kirkwood Boulevard to a
four -lane divided section by end of year 2016.
Phase III- Recommended Improvements
1) Dove Road at the SH 114 NB frontage road will require a channelized right -turn lane in order to
improve the level of service to an acceptable level.
Horizon- Recommended Improvements
1) Consideration should be given to the following roadway improvements at SH 114 NB frontage
road and Dove Road in the Horizon Year 2032 to improve the level of service:
a. Construct an additional NB left -turn lane.
b. Convert the existing NB shared through -right lane to a separate through lane.
c. Convert the existing NB shared left -through lane to a separate through lane.
d. Construct an exclusive NB right -turn lane.
NOTE: Recommendations for public improvements within the study area presented in this report reflect the opinion of
DeShazo based solely upon technical analysis and professional judgment and are not intended to define, imply, or allocate
funding sources nor required improvements. Applicable legal precedent indicates that the Owner of a Project should only
be required to proportionately fund necessary infrastructure improvements that are directly attributable to
implementation of the Project. Such requirements will depend upon the individual circumstances of each project that may
be viewed differently by each particular agency/municipality.
►W►l►seJAMMAM
Wilks Tract Development TIA
Page 12
EXHIBITS
Not
to
Scale
4 e
M1:l
SITE LOCATION
Exhibit 3A. Existing AM Peak Hour Traffic Volumes
Plan North ^
Not to Scale
DeShazo Group, Inc
TIA for Wilks Tract Office Development in Southlake, Texas
Exhibit 3B. Existing PM Peak Hour Traffic Volumes
Plan North ^
Not to Scale
DeShazo Group, Inc
TIA for Wilks Tract Office Development in Southlake, Texas
Exhibit 4A. 2017 Background AM Peak Hour Traffic Volumes (Phase 1)
Plan North
Not to Scale
lawd
���
0 d
7f�9
p
�o-
DeShazo Group, Inc
TIA for Wilks Tract Office Development in Southlake, Texas
Exhibit 4B. 2017 Background PM Peak Hour Traffic Volumes (Phase 1)
Plan North
Not to Scale
F-29A �aK�°
sow Ewa 5 �k
0 d
7f�9
0
DeShazo Group, Inc
TIA for Wilks Tract Office Development in Southlake, Texas
Exhibit 5A. 2022 Background AM Peak Hour Traffic Volumes (Phase II)
Plan North
Not to Scale
DeShazo Group, Inc
TIA for Wilks Tract Office Development in Southlake, Texas
Exhibit 5B. 2022 Background PM Peak Hour Traffic Volumes (Phase II)
Plan North
Not to Scale
DeShazo Group, Inc
TIA for Wilks Tract Office Development in Southlake, Texas
Exhibit 6A. 2027 Background AM Peak Hour Traffic Volumes (Phase III)
Plan North ^
Not to Scale
DeShazo Group, Inc
TIA for Wilks Tract Office Development in Southlake, Texas
Exhibit 6B. 2027 Background PM Peak Hour Traffic Volumes (Phase III)
Plan North ^
Not to Scale
DeShazo Group, Inc
TIA for Wilks Tract Office Development in Southlake, Texas
Exhibit 7A. 2032 Horizon AM Peak Hour Traffic Volumes
Plan North
Not to Scale
DeShazo Group, Inc
TIA for Wilks Tract Office Development in Southlake, Texas
Exhibit 7B. 2032 Horizon PM Peak Hour Traffic Volumes
Plan North
Not to Scale
DeShazo Group, Inc
TIA for Wilks Tract Office Development in Southlake, Texas
ryrj I �
U�
��-� � r•' ® a - . ate.=
�\
DRIVEWAY 2
cti
ai
DRIVEWAY 1�
ce
.t _
tam— z3
ro 'a
L
rfh abin- _n
, kkn
J
NTS
f8.
I
l I ! Jfl
�.,
_ NTS
EM
c
lip
a
{ DRIVEWAY 2 rs"91
a ...'si•'j �
DRIVEWAY 1
44-
1.
J.cvP10
t v
12
LT
,cam
LL 'd r
F _
-J,
'�obin—n
,-E) rt h
M I
Oil
LL 0
m
DRIVEWAY 2® '
DRIVEWAY I-
IN
as
NTS
a vi
3 — �?
th
to In
NTS
'100 aria'
DRIVEWAY 2
DRIVEWAY I
Cw
O—e
CD
9
XHIBIT
) B
m NTS
IN
® 51100
aian PC9 DRIVEWAY 3
t' •;�s;., DRIVEWAY 2
low
� DRIVEWAY 1
- n G m
f] N u `
LL
earth ar;n-4n
Cr
o
NTS
I m
ul
F, J
n
oi3 M f DRIVEWAY 3 ° y
DRIVEWAY 2 I 61
lowy. a
DRIVEWAY 1
y.
Uall
- n rGI
LO
earth
Exhibit 11A. 2017 Site Generated AM Peak Hour Traffic Volumes (Phase 1)
Plan North
Not to Scale
Dove Rd
�'-� •
DrivewaY 2 9-
TIA for Wilks Tract Office Development in Southlake, Texas
DeShazo Group, Inc
Exhibit 11B. 2017 Site Generated PM Peak Hour Traffic Volumes (Phase 1)
Plan North
Not to Scale
Dove Rd
Nf-_
VT
- �a
Driveway 2 53-
TIA for Wilks Tract Office Development in Southlake, Texas
DeShazo Group, Inc
Exhibit 12A. 2022 Site Generated AM Peak Hour Traffic Volumes (Phase II)
Plan North ^
Not to Scale
TIA for Wilks Tract Office Development in Southlake, Texas
DeShazo Group, Inc
Exhibit 12B. 2022 Site Generated PM Peak Hour Traffic Volumes (Phase II)
Plan North ^
Not to Scale
TIA for Wilks Tract Office Development in Southlake, Texas
DeShazo Group, Inc
Exhibit 13A. 2027 Site Generated AM Peak Hour Traffic Volumes (Phase III)
Plan North ^
Not to Scale
TIA for Wilks Tract Office Development in Southlake, Texas
DeShazo Group, Inc
Exhibit 13B. 2027 Site Generated PM Peak Hour Traffic Volumes (Phase III)
Plan North ^
Not to Scale
TIA for Wilks Tract Office Development in Southlake, Texas
DeShazo Group, Inc
Exhibit 14A. 2017 Background Plus Site Generated AM Peak Hour Traffic Volumes (Phase 1)
Plan North
Not to Scale
DeShazo Group, Inc
TIA for Wilks Tract Office Development in Southlake, Texas
Exhibit 14B. 2017 Background Plus Site Generated PM Peak Hour Traffic Volumes (Phase 1)
Plan North
Not to Scale
DeShazo Group, Inc
TIA for Wilks Tract Office Development in Southlake, Texas
Exhibit 15A. 2022 Background Plus Site Generated AM Peak Hour Traffic Volumes (Phase II)
Plan North
Not to Scale
TIA for Wilks Tract Office Development in Southlake, Texas
DeShazo Group, Inc
Exhibit 15B. 2022 Background Plus Site Generated PM Peak Hour Traffic Volumes (Phase II)
Plan North
Not to Scale
DeShazo Group, Inc
TIA for Wilks Tract Office Development in Southlake, Texas
Exhibit 16A. 2027 Background Plus Site Generated AM Peak Hour Traffic Volumes (Phase III)
Plan North
Not to Scale
DeShazo Group, Inc
TIA for Wilks Tract Office Development in Southlake, Texas
Exhibit 16B. 2027 Background Plus Site Generated PM Peak Hour Traffic Volumes (Phase III)
Plan North
Not to Scale
DeShazo Group, Inc
TIA for Wilks Tract Office Development in Southlake, Texas
Exhibit 17A. 2032 Horizon Plus Site Generated AM Peak Hour Traffic Volumes
Plan North
Not to Scale
DeShazo Group, Inc
TIA for Wilks Tract Office Development in Southlake, Texas
Exhibit 17B. 2032 Background Plus Site Generated PM Peak Hour Traffic Volumes (Horizon)
Plan North
Not to Scale
DeShazo Group, Inc
TIA for Wilks Tract Office Development in Southlake, Texas
Exhibit 18. Existing Intersection Geometry and Traffic Control
Plan North
Not to Scale
DeShazo Group, Inc
TIA for Wilks Tract Office Development in Southlake, Texas
Exhibit 19. Recommended Phase I Intersection Geometry and Traffic Control
Plan North
Not to Scale
y-
DeShazo Group, Inc
TIA for Wilks Tract Office Development in Southlake, Texas
Exhibit 20. Recommended Phase II Intersection Geometry and Traffic Control
Plan North
Not to Scale
y-
DeShazo Group, Inc
TIA for Wilks Tract Office Development in Southlake, Texas
Exhibit 21. Recommended Phase III Intersection Geometry and Traffic Control
Plan North
Not to Scale
yW
DeShazo Group, Inc
TIA for Wilks Tract Office Development in Southlake, Texas
APPENDIX A. Traffic Volume Exhibits
Page I q f 6
Intersection Traffic Movements
DeShazo Group, Inc.
Location:
SH 114 SBFR at Dove Road
• City/State:
Southlake, Texas
Data Collector(s):
Camera
Day/Date:
Tuesday, April 7, 2015
Weather Conditions:
Mild/Normal Conditions
Project -ID #:
15035-01
Traffic
Control:
Signal►zed
Data Source:
CJ Hensch
Time of Northbound on Southbound on Eastbound on Westbound on
Count
SH 114 SBFR
SH 114 SBFR
Dove Road
Dove Road
Begin End
U
L T R
U
I L
T
R
U
L T
R
U-F
L T R
7:00 AM 7:15 AM
0
0
16
24
3
0
35
95
0
18 33
7:15 AM 7:30 AM
0
0
17
21
11
0
51
161
0
12 82
7:30 AM 7:45 AM
0
0
17
23
15
0
101
158
0
13 129
7:45 AM 8:00 AM
0
-
0
18
26
17
0
106
187
0
15 177
8:00 AM 8:15 AM
0
-
0
17
24
16
0
74
180
0
19 88
8:15 AM 8:30 AM
0
-
0
21
41
8
0
53
163
0
20 90
8:30 AM 8:45 AM
0
0
17
22
11
0
54
128
0
18 65
8:45 AM 9:00 AM
0
0
1 11
41
7
0
41
114
0
1 17 64
Intersection PHV:
0 0 0
73
114
56
0 334
688
67 484 0
PHF:
0.00 0.00 0.00
0.87
0.70
0.82
0.00 0.79
0.92
0.84 0.68 0.00
Intersection Peak Hour.' 7:30 AM - 8:30 AM
Intersection PHF.' 0.83
Study Area PHV:
0 0 0
73
113
52
0 287
658
72 420 0
PHF:
0.00 0.00 0.00
0.87
0.69
0.76
0.00 0.68
0.88
0.90 0.59 0.00
Study Peak Hour: 7:45 AM - 8:45 AM
Study Area PHF: 0.77
4:30 PM
4:45 PM
0
0
16
30
22
0
35
48
0
79 234
4:45 PM
5:00 PM
0
-
0
20
29
27
0
25
58
0
78 238
5:00 PM
5:15 PM
0
-
0
16
32
23
0
33
61
0
73 256
5:15 PM
5:30 PM
0
-
0
15
34
33
0
37
60
0
67 247
5:30 PM
5:45 PM
0
0
26
29
25
0
42
75
0
50 271
5:45 PM
6:00 PM
0
0
19
17
12
0
33
50
0
39 268
6:00 PM
6:15 PM
0
0
16
15
17
0
32
45
0
37 257
6:15 PM
6:30 PM
0
0
1 14
28
33
0
28
54
0
1 42 169
Intersection PHV.,
0
0
0
77
124
108
0
137
254
268 1,012
0
PHF:
0.00
0.00
0.00
0.74
0.91
0.82
0.00
0.82
0.85
0.86 0.93
0.00
Intersection Peak Hour:
4:45 PM
- 5:45 PM
Intersection PHF:
0.96
Study Area PHV:
0
0
0�=774
124
108
F-
0
137
254
268 1,0120PHF:
0.00
0.00
0.00
0.91
0.82
0.00
0.82
0.85
0.86 0.93
0.00
Study Peak Hour: 4:45 PM - 5:45 PM
Study Area PHF: 0.96
Observations:
Pile: C2X3HRS - 4L&12Mv PedSXLS
Page 2 q f 6
Intersection Traffic Movements
DeShazo Group, Inc.
Location:
SH 114 NBFR at Dove Road
• City/State:
Southlake, Texas
Data Coliector(s):
Camera
Day/Date:
Tuesday, April 7, 2015
Weather Conditions:
Mild/Normal Conditions
Project -ID #:
15035-02
Traffic Control:
Signalized
Data Source:
CJ Hensch
Time of Northbound on Southbound on Eastbound on Westbound on
Count
SH 114 NBFR
SH 114 NBFR
Dove Road
Dove Road
Begin End
U
I L T
R
U
L T R
U-F
L T
R
U-F
L T
R
7:00 AM 7:15 AM
0
21 17
26
0
0
6 43
0
32
22
7:15 AM 7:30 AM
0
42 14
35
0
0
13 57
0
50
17
7:30 AM 7:45 AM
0
38 22
40
0
0
18 97
0
101
19
7:45 AM 8:00 AM
0
64 24
49
0
0
19 102
0
134
29
8:00 AM 8:15 AM
0
51 30
54
0
0
16 74
0
50
15
8:15 AM 8:30 AM
0
57 21
72
0
0
12 61
0
61
14
8:30 AM 8:45 AM
0
48 25
57
0
0
13 56
0
36
14
8:45 AM 9:00 AM
01
47 21
55
1 0
0
7 45
0
34
13
Intersection PHV:
210 97
215F
0 0 0
65 334
0
0 346
77
PHF:
0.82 0.81
0.75
0.00 0.00 0.00
0.86 0.82
0.00
0.00 0.65
0.66
Intersection Peak Hour.' 7:30 AM -
8:30 AM
Intersection PHF.
0.80
Study Area PHV:
220 100
232�=O
0 0
60 293
0
0 281
72
PHF:0.86
0.83
0.81
0.00 0.00
0.79 0.72
0.00
0.00 0.52
0.62
Study Peak Hour: 7:45 AM - 8:45 AM
Study Area PHF: 0.75
4:30 PM 4:45 PM
0
183
217
24
0
0
14
40
0
127
16
4:45 PM 5:00 PM
0
177
224
34
0
-
0
12
35
0
133
24
5:00 PM 5:15 PM
0
194
265
19
0
0
9
37
0
- 131
18
5:15 PM 5:30 PM
0
184
248
25
0
0
11
47
0
- 126
27
5:30 PM 5:45 PM
0
205
243
19
0
0
14
51
0
- 114
18
5:45 PM 6:00 PM
0
202
281
21
0
0
8
48
0
92
18
6:00 PM 6:15 PM
0
222
217
37
0
0
12
34
0
91
15
6:15 PM 6:30 PM
01
118
79
17
0
0
8
36
0
91
14
Intersection PHV.,
785
1,037
84
0
0
0
42
183
0
0 463
81
PHF:
0.96
0.92
0.84
0.00
0.00
0.00
0.75
0.90
0.00
0.00 0.88
0.75
Intersection Peak Hour:
5:00 PM
- 6:00 PM
Intersection PHF:
0.99
Study Area PHV:=0.93
760
980
97
0
0
0
46
170
0
0 504
87
PHF:
0.92
0.71F
0.00
0.00
0.00
0.82
0.83
0.00
0.00 0.95
0.81
Study Peak Hour: 4:45 PM - 5:45 PM
Study Area PHF: 0.98
Observations:
Pile: C2X3HRS - 4L&12Mv PedSXLS
Page 3 q f 6
Intersection Traffic Movements
DeShazo Group, Inc.
Location:
SH 114 SBFR at Kirkwood Blvd
• City/State:
Southlake, Texas
Data Collector(s):
Camera
Day/Date:
Tuesday, April 7, 2015
Weather Conditions:
Mild/Normal Conditions
Project -ID #:
15035-03
Traffic Control:
Unsiynalized
Data Source:
CJ Hensch
Description:
Minor -Street STOP
Controlled
Time of Northbound on Southbound on Eastbound on Westbound on
Count
SH 114 SBFR
SH 114 SBFR
Kirkwood Blvd
Kirkwood Blvd
Begin End
U
L T R
U
L
T
R
U
L T
R
U
L T R
7:00 AM 7:15 AM
0
0
19
1
11
0
23
32
0
64 99
7:15 AM 7:30 AM
0
0
17
0
10
0
41
78
0
69 118
7:30 AM 7:45 AM
0
0
29
1
15
0
44
68
0
91 109
7:45 AM 8:00 AM
0
-
0
36
1
11
0
59
76
0
83 137
8:00 AM 8:15 AM
0
-
0
39
0
12
0
57
52
0
60 127
8:15 AM 8:30 AM
0
0
51
0
15
0
64
59
0
66 166
8:30 AM 8:45 AM
0
0
45
0
20
0
53
47
0
59 148
8:45 AM 9:00 AM
0
0
36
1
17
0
43
53
0
48 126
Intersection PHV:
0 0 0
171
1
58
0 233
234
268 578 0
PHF:
0.00 0.00 0.00
0.84
0.25
0.73
0.00 0.91
0.77
0.81 0.87 0.00
Intersection Peak Hour.' 7:45 AM - 8:45 AM
Intersection PHF.' 0.92
Study Area PHV:
0 0 0
171
1
58
0 233
234
268 578 0
PHF:
E 0.00 0.00 0.00
0.84
0.25
0.73
0.00 0.91
0.77
0.81 0.87 0.00
Study Peak Hour: 7:45 AM - 8:45 AM
Study Area PHF: 0.92
4:30 PM 4:45 PM
0
0
27
4
13
0
49
132
6
80 55
4:45 PM 5:00 PM
0
0
26
1
10
0
-
46
111
11
94 80
5:00 PM 5:15 PM
0
-
0
30
1
15
0
-
67
184
12
94 83
5:15 PM 5:30 PM
0
-
0
34
0
4
0
-
54
167
13
118 67
5:30 PM 5:45 PM
0
0
25
0
14
0
47
103
15
84 63
5:45 PM 6:00 PM
0
0
36
0
10
0
41
101
18
68 79
6:00 PM 6:15 PM
0
0
21
1
5
0
41
126
9
62 89
6:15 PM 6:30 PM
0
0
1 30
0
9
0
27
93
4
1 62 87
Intersection PHV.,
0
0
0
117
6
42
0
216
594
386 285
0
PHF:
0.00
0.00
0.00
0.86
0.38
0.70
0.00
0.81
0.81
0.82 0.86
0.00
Intersection Peak Hour:
4:30 PM
- 5:30 PM
Intersection PHF:
0.87
Study Area PHV:
0
0
0
115
2
43
0
214
565
390 293
0
PHF:F
0.00
0.00
0.00
0.85
0.50
0.72
0.00
0.80
0.77
0.83 0.88
0.00
Study Peak Hour: 4:45 PM - 5:45 PM
Study Area PHF: 0.86
Observations:
Pile: C2X3HRS - 4L&12Mv PedSXLS
Page 4 q f 6
Intersection Traffic Movements
DeShazo Group, Inc.
Location:
SH 114 NBFR at Kirkwood Blvd
• City/State:
Southlake, Texas
Data Couector(s):
Camera
Day/Date:
Tuesday, April 7, 2015
Weather Conditions:
Mild/Normal Conditions
Project -ID #:
15035-04
Traffic Control:
Unsignalized
Data Source:
CJ Hensch
Description:
Minor -Street STOP
Controlled
Time of Northbound on Southbound on Eastbound on Westbound on
Count
SH 114 NBFR
SH 114 NBFR Kirkwood Blvd
Kirkwood Blvd
Begin End
U
L T
R
U
L T R
U-F
L T R
U
F L T
R
7:00 AM 7:15 AM
0
89 18
27
0
0
13 29
0
72
4
7:15 AM 7:30 AM
0
105 11
39
0
0
26 32
0
81
2
7:30 AM 7:45 AM
0
103 27
66
0
0
26 47
0
ill
2
7:45 AM 8:00 AM
0
122 27
79
0
0
26 70
0
90
2
8:00 AM 8:15 AM
0
127 32
95
0
0
38 61
0
68
0
8:15 AM 8:30 AM
0
152 31
110
0
0
25 87
0
79
1
8:30 AM 8:45 AM
0
134 24
122
0
0
31 67
0
75
3
8:45 AM 9:00 AM
0
121 29
100
0
0
21 60
0
56
3
Intersection PHV:
535 114
406
0 0 0
120 285 0
0 312
6
PHF:
0.88 0.89
0.83
0.00 0.00 0.00
0.79 0.82 0.00
0.00 0.87
0.50
Intersection Peak Hour.' 7:45 AM -
8:45 AM
Intersection PHF. 0.92
Study Area PHV:
535 114
406�=O
0 0
120 285 0
0 312
6
PHF:
0.88 0.89
0.83
0.00 0.00
0.79 0.82 0.00
0.00 0.87
0.50
Study Peak Hour: 7:45 AM - 8:45 AM
Study Area PHF: 0.92
4:30 PM 4:45 PM
0
48
230
6
0
0
77
6
0
100
57
4:45 PM 5:00 PM
0
73
211
10
0
-
0
75
8
0
108
62
5:00 PM 5:15 PM
0
72
199
11
0
0
88
16
0
- 123
65
5:15 PM 5:30 PM
0
69
198
7
0
0
92
16
0
- 126
85
5:30 PM 5:45 PM
0
56
212
4
0
0
80
5
0
- 100
73
5:45 PM 6:00 PM
0
71
214
3
0
0
86
10
0
93
73
6:00 PM 6:15 PM
0
87
244
9
0
0
68
8
0
76
57
6:15 PM 6:30 PM
01
71
248
9
0
0
1 56
7
0
78
16
Intersection PHV.,
268
823
25
0
0
0
346
47
0
0 442
296
PHF:
0.93
0.96
0.57
0.00
0.00
0.00
0.94
0.73
0.00
0.00 0.88
0.87
Intersection Peak Hour:
5:00 PM
- 6:00 PM
Intersection PHF:
=5
Study Area PHV:=0.92
270
820
32
0
0
0
335
45
0
0 457
285
PHF:
0.97
0.73
0.00
0.00
0.00
0.91
0.70
0.00
0.00 0.91
0.84
Study Peak Hour: 4:45 PM - 5:45 PM
Study Area PHF: 0.95
Observations:
Pile: C2X3HRS - 4L&12Mv PedSXLS
Page 5 q f 6
Intersection Traffic Movements
DeShazo Group, Inc.
Location:
Kirkwood Blvd at Dove Road
• City/State:
Southlake, Texas
Data Couector(s):
Camera
Day/Date:
Tuesday, April 7, 2015
Weather Conditions:
Mild/Normal Conditions
Project -ID #:
15035-05
Traffic Control:
Unsignalized
Data Source:
CJ Hensch
Description:
Minor -Street STOP
Controlled
Time of Northbound on Southbound on Eastbound on Westbound on
Count
Kirkwood Blvd
Kirkwood Blvd
Dove Road
Dove Road
Begin End
U
L T R
U
L
T R
U-F
L T R
U-F
L T
R
7:00 AM 7:15 AM
0
0
3
12
0
17 25
0
25
3
7:15 AM 7:30 AM
0
0
7
21
0
24 43
0
43
8
7:30 AM 7:45 AM
0
0
18
20
0
26 81
0
104
14
7:45 AM 8:00 AM
0
-
0
13
29
0
46 62
0
126
32
8:00 AM 8:15 AM
0
-
0
10
18
0
52 43
0
40
12
8:15 AM 8:30 AM
0
-
0
4
28
0
65 39
0
51
14
8:30 AM 8:45 AM
0
0
3
20
0
58 31
0
22
9
8:45 AM 9:00 AM
0
0
3
17
0
1 45 30
0
22
8
Intersection PHV:
0 0 0
45
0 95
189 225 0
0 321
72
PHF:
0.00 0.00 0.00
0.63
0.00 0.82
0.73 0.69 0.00
0.00 0.64
0.56
Intersection Peak Hour.' 7:30 AM - 8:30 AM
Intersection PHF.'
0.77
Study Area PHV:
0 0 0
30
0 95
221 175
0239
67
PHF:L
0.00 0.00 0.00
0.58
0.00 0.82
00
0.85 0.71 ::0
0.00 0.47
0.52
Study Peak Hour: 7:45 AM - 8:45 AM
Study Area PHF: 0.67
4:30 PM 4:45 PM
0
0
15
60
0
27
37
0
32
20
4:45 PM 5:00 PM
0
-
0
25
68
0
33
34
0
- 47
31
5:00 PM 5:15 PM
0
-
0
15
73
0
22
40
0
- 49
36
5:15 PM 5:30 PM
0
-
0
25
69
0
23
35
0
- 67
54
5:30 PM 5:45 PM
0
0
22
-
58
0
23
50
0
- 65
69
5:45 PM 6:00 PM
0
0
12
39
0
25
38
0
55
62
6:00 PM 6:15 PM
0
0
6
48
0
33
32
0
65
24
6:15 PM 6:30 PM
0
0
10
32
0
1 22
26
0
44
11
Intersection PHV.,
0
0
0
87
0
268
101
159
0
0 228
190
PHF:
0.00
0.00
0.00
0.87
0.00
0.92
0.77
0.80
0.00
0.00 0.85
0.69
Intersection Peak Hour:
4:45 PM
- 5:45 PM
Intersection PHF:
0.9E
Study Area PHV:
0
0
0
87
0
268�F-
101
159
0F
0 228
190
PHF:
0.00
0.00
0.00
0.87
0.00
0.92
0.77
0.80
0.00
0.00 0.85
0.69
Study Peak Hour: 4:45 PM - 5:45 PM
Study Area PHF: 0.90
Observations:
Pile: C2X3HRS - 4L&12Mv PedSXLS
Page 6 of 6
Intersection Traffic Movements
DeShazo Group, Inc.
Location:
TW King Road at Kirkwood Blvd
• City/State:
Southlake, Texas
Data Collector(s):
Camera
Day/Date:
Tuesday, April 7, 2015
Weather Conditions:
Mild/Normal Conditions
Project -ID #:
15035-06
Traffic Control:
Unsignalized
Data Source:
CJ Hensch
Description:
All -Way STOP Controlled
Time of Northbound on Southbound on Eastbound on Westbound on
Count
TW King Road
TW King Road Kirkwood Blvd
Kirkwood Blvd
Begin End
U__F
L T R
U
L
T R
U
I L T R
U
L T R
7:00 AM 7:15 AM
0
0
7
69
0
6 52
0
9 1
7:15 AM 7:30 AM
0
0
8
79
0
7 63
0
3 1
7:30 AM 7:45 AM
0
0
16
110
0
2 112
0
5 2
7:45 AM 8:00 AM
0
0
19
82
0
8 137
0
9 2
8:00 AM 8:15 AM
0
0
12
62
0
9 148
0
4 1
8:15 AM 8:30 AM
0
0
17
72
0
6 188
0
10 0
8:30 AM 8:45 AM
0
0
11
70
0
4 183
0
11 1
8:45 AM 9:00 AM
0
0
5
49
0
1 7 140
0
8 0
Intersection PHV:
0 0 0
59
0 286
27 656 0
0 34 4
PHF:
0.00 0.00 0.00
0.78
0.00 0.87
0.75 0.87 0.00
0.00 0.77 0.50
Intersection Peak Hour.' 7:45 AM - 8:45 AM
Intersection PHF.' 0.91
Study Area PHV:
0 0 0
59
0 286
27 656
0 34 4
PHF:
0.00 0.00 0.00
0.78
0.00 0.87
00
0.75 0.87::0
0.00 0.77 0.50
Study Peak Hour: 7:45 AM - 8:45 AM
Study Area PHF: 0.91
4:30 PM 4:45 PM
0
0
2
24
0
8
6
0
139
20
4:45 PM 5:00 PM
0
-
0
2
31
0
8
8
0
- 135
23
5:00 PM 5:15 PM
0
-
0
0
23
0
20
6
0
- 166
27
5:15 PM 5:30 PM
0
-
0
2
32
0
19
3
0
- 177
28
5:30 PM 5:45 PM
0
0
4
30
0
8
1
0
- 147
27
5:45 PM 6:00 PM
0
0
0
29
0
6
5
0
129
22
6:00 PM 6:15 PM
0
0
1
21
0
17
4
0
114
19
6:15 PM 6:30 PM
0
0
2
28
0
1 13
2
0
62
8
Intersection PHV.,
0
0
0
8
0
116
55
18
0
0 625
105
PHF:
0.00
0.00
0.00
0.50
0.00
0.91
0.69
0.56
0.00
0.00 0.88
0.94
Intersection Peak Hour:
4:45 PM
- 5:45 PM
Intersection PHF:
0.89
Study Area PHV:
0
0
0�=8
0
116
55
18
0F
0 625
105
PHF:F
0.00
0.00
0.00
0.00
0.91
0.69
0.56
0.00
0.00 0.88
0.94
Study Peak Hour: 4:45 PM - 5:45 PM
Study Area PHF: 0.89
Observations:
Pile: C2X3HRS - 4L&12Mv PedSXLS
Date Began:
4/7/2015
250
200
150
w
2
D
J
0
100
50
0
NB Kirkwood Boulevard South of Site
TIME 0:00 0:15 0:30 0:45 TOTAL
TOTAL: 1078
00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00
TIME
AM Peak Hour
221
AM Peak Hour
246
Date Began:
4/7/2015
300
250
200
100
50
0
SB Kirkwood Boulevard South of Site
TIME 0:00 0:15 0:30 0:45 TOTAL
TOTAL: 920
00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00
TIME
AM Peak Hour
13
PM Peak Hour
276
APPENDIX B. Trip Generation
Trip Generation Summary - Phase I
Average Weekday Driveway Volumes
Project: 15140
Open Date:
2/3/2016
Alternative: Phase I
Analysis
2/3/2016
AM
Peak Hour
PM Peak Hour
Average Daily
Trips
Adjacent Street Traffic
Adjacent Street Traffic
ITE Land Use
Enter
Exit
Total
Enter
Exit
Total
Enter
Exit
Total
710 OFFICEGENERAL 1
2237
2237
4474
623
85
708
108
529
637
1560 Employees
Unadjusted Driveway Volume
2237
2237
4474
623
85
708
108
529
637
Unadjusted Pass -By Trips
0
0
0
0
0
0
0
0
0
Internal Capture Trips
0
0
0
0
0
0
0
0
0
Adjusted Driveway Volume
2237
2237
4474
623
85
708
108
529
637
Adjusted Pass -By Trips
0
0
0
0
0
0
0
0
0
Adjusted Volume Added to Adjacent Streets
2237
2237
4474
623
85
708
108
529
637
Total AM Peak Hour Internal Capture = 0 Percent
Total PM Peak Hour Internal Capture = 0 Percent
Source: Institute of Transportation Engineers, Trip Generation Manual 9th Edition, 2012
TRIP GENERATION 2013, TRAFFICWARE, LLC 1
Trip Generation Summary - Phase II
Average Weekday Driveway Volumes
Project: 15140
Alternative: Phase II
Open Date: 2/3/2016
Analysis 2/3/2016
AM Peak Hour
PM Peak Hour
Average Daily Trips
Adjacent Street Traffic
Adjacent Street Traffic
ITE Land Use
Enter Exit Total
Enter Exit Total
Enter Exit Total
310 HOTEL 1
932 932 1864
78 55 133
77 73 150
250 Rooms
710 OFFICEGENERAL 1
2968 2967 5935
832 114 946
148 720 868
2184 Employees
Unadjusted Driveway Volume
3900
3899
7799
910
169
1079
225
793
1018
Unadjusted Pass -By Trips
0
0
0
0
0
0
0
0
0
Internal Capture Trips
0
0
0
25
25
50
0
0
0
Adjusted Driveway Volume
3900
3899
7799
885
144
1029
225
793
1018
Adjusted Pass -By Trips
0
0
0
0
0
0
0
0
0
Adjusted Volume Added to Adjacent Streets
3900
3899
7799
885
144
1029
225
793
1018
Total AM Peak Hour Internal Capture = 5 Percent
Total PM Peak Hour Internal Capture = 0 Percent
Source: Institute of Transportation Engineers, Trip Generation Manual 9th Edition, 2012
TRIP GENERATION 2013, TRAFFICWARE, LLC 1
Trip Generation Summary - Phase II
Average Weekday Driveway Volumes
Project: 15140
Open Date:
2/3/2016
Alternative: Phase III
Analysis
2/3/2016
AM
Peak Hour
PM Peak Hour
Average Daily
Trips
Adjacent Street Traffic
Adjacent Street Traffic
ITE Land Use
Enter
Exit
Total
Enter
Exit
Total
Enter
Exit Total
710 OFFICEGENERAL 1
4338
4338
8676
1228
168
1396
226
1104 1330
3432 Employees
Unadjusted Driveway Volume
4338
4338
8676
1228
168
1396
226
1104 1330
Unadjusted Pass -By Trips
0
0
0
0
0
0
0
0 0
Internal Capture Trips
0
0
0
0
0
0
0
0 0
Adjusted Driveway Volume
4338
4338
8676
1228
168
1396
226
1104 1330
Adjusted Pass -By Trips
0
0
0
0
0
0
0
0 0
Adjusted Volume Added to Adjacent Streets
4338
4338
8676
1228
168
1396
226
1104 1330
Total AM Peak Hour Internal Capture = 0 Percent
Total PM Peak Hour Internal Capture = 0 Percent
Source: Institute of Transportation Engineers, Trip Generation Manual 9th Edition, 2012
TRIP GENERATION 2013, TRAFFICWARE, LLC 1
APPENDIX C. Synchro Analysis Reports
16: Dove Rd & SH-114 SIB Off -Ramp
Existing
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: AM
-,,,
, -,*
F
4- T
l
Lane Group EBL
EST EBR
WBL
WBT
WBR NBL NBT NBR
SBL
Lane Configurations
tT+
+Tt
)
r{
Traffic Volume (vph) 0
287 658
72
420
0 0 0 0
73
113 52
Future Volume (vph) 0
287 658
72
420
0 0 0 0
73
113 52
Peak Hour Factor 0.83
0.83 0.83
0.83
0.83
0.83 0.83 0.83 0.83
0.83
0.83 0.83
Adj. Flow (vph) 0
346 793
87
506
0 0 0 0
88
136 63
Shared Lane Traffic (°!°)
10%
Lane Group Flow (vph) 0
1139 0
0
593
0 0 0 0
79
208 0
Turn Type
NA
pm+pt
NA
Perm
NA
Protected Phases
2
1
21
4
Permitted Phases
21
4
Detector Phase
2
1
21
4
4
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
Minimum Split (s)
22.5
9.5
22.5
22.5
Total Split (s)
30.0
15.0
25.0
25.0
Total Split (%)
42.9%
21.4 %
35.7 %
35.7%
Yellow Time (s)
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
Lead/Lag
Lag
Lead
Lead
Lead -Lag Optimize?
Yes
Yes
Yes
Recall Mode
C-Max
None
None
None
Act Effct Green (s)
39.7
47.4
9.1
9.1
Actuated g/C Ratio
0.57
0.68
0.13
0.13
v/c Ratio
0.54
0.33
0.38
0.44
Control Delay
5.0
1.7
32.2
21.7
Queue Delay
0.0
0.0
0.0
0.0
Total Delay
5.0
1.7
32.2
21.7
LOS
A
A
C
C
Approach Delay
5.0
1.7
24.6
Approach LOS
A
A
C
Queue Length 50th (ft)
46
2
35
31
Queue Length 95th (ft)
86
13
65
52
Internal Link Dist (ft)
224
394
1722
1376
Turn Bay Length (ft)
240
Base Capacity (vph)
2091
1942
471
990
Starvation Cap Reductn
0
0
0
0
Spillback Cap Reductn
0
0
0
0
Storage Cap Reductn
0
0
0
0
Reduced v/c Ratio
0.54
0.31
0.17
0.21
Intersection Summary
Cycle Length: 70
Actuated Cycle Length: 70
Offset: 0 (0%), Referenced to phase 2:EBWB
and 6:, Start of Green
Natural Cycle: 60
Control Type: Actuated -Coordinated
Maximum v/c Ratio: 0.54
2/7/2016 Synchro 9 Report
MS Page 1
16: Dove Rd & SH-114 SB Off -Ramp Existing
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Lane Group
o6 08
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
5 6 8
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
5.0 5.0 5.0
Minimum Split (s)
9.5 22.5 22.5
Total Split (s)
15.0 30.0 25.0
Total Split (%)
21 % 43 % 36%
Yellow Time (s)
3.5 3.5 3.5
All -Red Time (s)
1.0 1.0 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lag Lead
Lead -Lag Optimize?
Yes Yes
Recall Mode
None C-Min Max
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
2/7/2016 Synchro 9 Report
MS Page 2
16: Dove Rd & SH-114 SB Off -Ramp Existing
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Intersection Signal Delay: 6.8 Intersection LOS: A
Intersection Capacity Utilization 58.7 % ICU Level of Service B
Analysis Period (min)15
19: SH-114 NB Frontage Rd & Dove Rd
Existing
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: AM
Lane Group-
EBL
EST EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL SBT
SBR
Lane Configurations
+Tt
0
►j
q +
Traffic Volume (vph)
60
293 0
0
281
72
220
100
232
0 0
0
Future Volume (vph)
60
293 0
0
281
72
220
100
232
0 0
0
Peak Hour Factor
0.80
0.80 0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80 0.80
0.80
Adj. Flow (vph)
75
366 0
0
351
90
275
125
290
0 0
0
Shared Lane Traffic (%)
13%
Lane Group Flow (vph)
0
441 0
0
441
0
239
451
0
0 0
0
Turn Type
pm+pt
NA
NA
Perm
NA
Protected Phases
5
65
6
8
Permitted Phases
65
8
Detector Phase
5
65
6
8
8
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
Minimum Split (s)
9.5
22.5
22.5
22.5
Total Split (s)
15.0
30.0
25.0
25.0
Total Split (%)
21.4%
42.9°%
35.7%
35.7%
JIM
Yellow Time (s)
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
Lead/Lag
Lag
Lead
Lead
Lead -Lag Optimize?
Yes
Yes
Yes
-
Recall Mode
None
C-Min
Max
Max
Act Effct Green (s)
33.3
16.6
23.2
23.2
Actuated g/C Ratio
0.48
0.24
0.33
0.33
v/c Ratio
0.28
0.52
0.45
0.37
Control Delay
8.2
21.8
22.2
7.6
Queue Delay
0.0
0.0
0.0
0.0
-
Total Delay
8.2
21.8
22.2
7.6
LOS
A
C
C
A
-
Approach Delay
8.2
21.8
12.6
Approach LOS
A
C
B
Queue Length 50th (ft)
52
77
86
26
Queue Length 95th (ft)
49
86
139
48
Internal Link Dist (ft)
394
990
1769
1583
Turn Bay Length (ft)
Base Capacity (vph)
1728
1281
534
1206
Starvation Cap Reductn
0
0
0
0
Spillback Cap Reductn
0
0
0
0
Storage Cap Reductn
0
0
0
0
Reduced v/c Ratio
0.26
0.34
0.45
0.37
Intersection Summary
Cycle Length: 70
Actuated Cycle Length: 70
Offset: 0 (0%), Referenced to phase 2:EBWB and 6:, Start
of Green
Natural Cycle: 60
Control Type: Actuated -Coordinated
Maximum v/c Ratio: 0.54
2/7/2016 Synchro 9 Report 2/7/2016 Synchro 9 Report
MS Page 3 MS Page 4
19: SH-114 NB Frontage Rd & Dove Rd Existing
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Lane Group
of o2 o4
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic
Lane Group Flow (vph)
Turn Type
Protected Phases
1 2 4
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
5.0 5.0 5.0
Minimum Split (s)
9.5 22.5 22.5
Total Split (s)
15.0 30.0 25.0
Total Split (%)
21 % 43% 36%
Yellow Time (s)
3.5 3.5 3.5
All -Red Time (s)
1.0 1.0 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lag Lead
Lead -Lag Optimize?
Yes Yes
Recall Mode
None C-Max None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
2/7/2016 Synchro 9 Report
MS Page 5
19: SH-114 NB Frontage Rd & Dove Rd Existing
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Intersection Signal Delay: 14.0 Intersection LOS: B
Intersection Capacity Utilization 42.2 % ICU Level of Service A
Analysis Period (min)15
Splits and Phases: 19: SH-114 NB Frontage Rd & Dove Rd
#16 #16
#16
711
30 s
lS s
#19 19
F
19
Aq5
'Ipa �556 `Rl
2/7/2016
MS
Synchro 9 Report
Page 6
2: Kirkwood Blvd & T W King Rd
Existing
6: Solana Blvd/Kirkwood Blvd & SH-114 SB Off -Ramp
Existing
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: AM
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: AM
Intersection
Intersection
Intersection Delay, slveh
13.1
Intersection Delay, s/veh
14
Intersection LOS
B
Intersection LOS
B
Movement
EBU
EBL
EBT
WBU
WBT
WBR
SBU
SBL
SBR
Movement
EBU
EBL
EBT
EBR
WBU
WBL
WBT
WBR
NBU
NBL
NBT
NBR
Traffic Vol, veh/h
0
27
656
0
34
4
0
59
286
Traffic Vol, veh/h
0
0
233
234
0
268
578
0
0
0
0
0
Future Vol, veh/h
0
27
656
0
34
4
0
59
286
Future Vol, veh/h
0
0
233
234
0
268
578
0
0
0
0
0
Peak Hour Factor
0.92
0.91
0.91
0.92
0.91
0.91
0.92
0.91
0.91
Peak Hour Factor
0.92
0.92
0.92
0.92
0.92
0.92
0.92
0.92
0.92
0.92
0.92
0.92
Heavy Vehicles,%
2
2
2
2
2
2
2
2
2
Heavy Vehicles,%
2
2
2
2
2
2
2
2
2
2
2
2
Mvmt Flow
0
30
721
0
37
4
0
65
314
Mvmt Flow
0
0
253
254
0
291
628
0
0
0
0
0
Number of Lanes
0
1
2
0
2
0
0
1
1
Number of Lanes
0
0
2
1
0
1
2
0
0
0
0
0
Approach
WB
SB
Approach
Opposing Approach
WB
EB
Opposing Approach
WB
EB
Opposing Lanes
2
3
0
Opposing Lanes
3
3
Conflicting Approach Left
SB
WB
Conflicting Approach Left
SB
Conflicting Lanes Left
2
0
2
Conflicting Lanes Left
3
0
Conflicting Approach Right
SB
EB
Conflicting Approach Right
SB
Conflicting Lanes Right
0
2
3
Conflicting Lanes Right
0
3
HCM Control Delay
13.1
10.2
13.4
HCM Control Delay
11.4
16
HCM LOS
B
B
B
HCM LOS
B
C
Lane
EBLnl
EBLn2
EBLn3
WBLnl WBLn2
SBLnl
SBLn2
EBLn1
EBLn2
EBLn3 WBLnl
W3Ln2
WBLn3
SBLnl
SBLn2
SBLn3
Vol Left, %
100%
0%
0%
0%
0%
100%
0%
Vol Left, %
0%
0%
0%
100%
0%
0%
100%
99%
0%
Vol Thru, %
0%
100%
100%
100%
74%
0%
0%
Vol Thru, %
100%
100%
0%
0%
100%
100%
0%
1%
1%
Vol Right, %
0%
0%
0%
0%
26%
0%
100%
Vol Right, %
0%
0%
100%
0%
0%
0%
0%
0%
99%
Sign Control
Stop
Stop
Stop
Stop
Stop
Stop
Stop
Sign Control
Stop
Stop
Stop
Stop
Stop
Stop
Stop
Stop
Stop
Traffic Vol by Lane
27
328
328
23
15
59
286
Traffic Vol by Lane
117
117
234
268
289
289
86
86
59
LT Vol
27
0
0
0
0
59
0
LT Vol
0
0
0
268
0
0
86
85
0
Through Vol
0
328
328
23
11
0
0
Through Vol
117
117
0
0
289
289
0
1
1
RT Vol
0
0
0
0
4
0
286
FIT Vol
0
0
234
0
0
0
0
0
58
Lane Flow Rate
30
360
360
25
17
65
314
Lane Flow Rate
127
127
254
291
314
314
93
93
64
Geometry Grp
8
8
8
8
8
8
8
Geometry Grp
8
8
8
8
8
8
7
7
7
Degree ofUtil(X)
0.053
0.59
0.414
0.05
0.033
0.125
0.499
Degree ofUtil(X)
0.257
0.257
0.343
0.575
0.576
0,423
0.204
0.205
0.118
Departure Headway (Hd)
6.397
5.891
4.139
7.155
6.969
6.915
5.714
Departure Headway (Hd)
7.32
7.32
4.852
7.102
6.596
4.842
7.907
7.904
6.705
Convergence, YIN
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Convergence, YIN
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Cap
560
613
869
500
513
519
632
Cap
488
488
730
507
543
738
452
451
531
Service Time
4.132
3.626
1.873
4.911
4.724
4.649
3.448
Service Time
5.118
5.118
2.649
4.878
4.372
2.617
5.694
5.691
4.491
HCM Lane VIC Ratio
0.054
0.587
0.414
0.05
0.033
0.125
0.497
HCM Lane VIC Ratio
0.26
0.26
0.348
0.574
0.578
0.425
0.206
0.206
0.121
HCM Control Delay
9.5
16.8
9.8
10.3
10
10.6
14
HCM Control Delay
12.7
12.7
10.2
19.1
18
11.2
12.7
12.7
10.4
i
HCM Lane LOS
A
C
A
B
A
B
B
HCM Lane LOS
B
B
B
C
C
B
B
B
B
HCM 95th-tile Q
0.2
3.8
2.1
0.2
0.1
0.4
2.8
HCM 95th-tile Q
1
1
1.5
3.6
3.6
2.1
0.8
0.8
0.4
2/7/2016 Synchro 9 Report 2/7/2016 Synchro 9 Report
MS Page 1 MS Page 2
6: Solana Blvd/Kirkwood Blvd & SH-114 SIB Off -Ramp Existing
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
8: SH-114 NB Off -Ramp & Kirkwood Blvd Existing
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Intersection
Intersection
Intersection Delay, slveh
Intersection Delay, s/veh
27.3
Intersection LOS
Intersection LOS
D
Movement
SBU
SBL
SBT
SBR
Movement
EBU
EBL
EBT
EBR
WBU
WBL
WBT
WBR
NBU
NBL
NBT
NBR
Traffic Vol, veh/h
0
171
1
58
Traffic Vol, veh/h
0
120
285
0
0
0
312
6
0
535
114
406
Future Vol, veh/h
0
171
1
58
Future Vol, veh/h
0
120
285
0
0
0
312
6
0
535
114
406
Peak Hour Factor
0.92
0.92
0.92
0.92
Peak Hour Factor
0.92
0.92
0.92
0.92
0.92
0.92
0.92
0.92
0.92
0.92
0.92
0.92
Heavy Vehicles, %
2
2
2
2
Heavy Vehicles, %
2
2
2
2
2
2
2
2
2
2
2
2
Mvmt Flow
0
186
1
63
Mvmt Flow
0
130
310
0
0
0
339
7
0
582
124
441
Number of Lanes
0
1
2
0
Number of Lanes
0
1
2
0
0
0
2
1
0
1
2
0
Approach
Approach
18'
N$
Opposing Approach
Opposing Approach
WB
EB
Opposing Lanes
0
Opposing Lanes
3
3
0
Conflicting Approach Left
WB
Conflicting Approach Left
NB
EB
Conflicting Lanes Left
3
Conflicting Lanes Left
0
3
3
Conflicting Approach Right
EB
Conflicting Approach Right
NB
WB
Conflicting Lanes Right
3
Conflicting Lanes Right
3
0
3
HCM Control Delay
12.1
HCM Control Delay
15.4
18.1
34.6
HCM LOS
B
HCM LOS
C
C
D
Lane'
NBLn1 NBLn2 NBLn3 EBLnl EBLn2 EBLn3 WBLnl WBLn2 WBLn3
Vol Left,%
100%
75%
0%
100%
0%
0%
0%
0%
0%
Vol Thru, %
0%
25%
12%
0%
100%
100%
100%
100%
0%
Vol Right, %
0%
0%
88%
0%
0%
0%
0%
0%
100%
Sign Control
Stop
Stop
Stop
Stop
Stop
Stop
Stop
Stop
Stop
Traffic Vol by Lane
364
228
463
120
143
143
156
156
6
LT Vol
364
171
0
120
0
0
0
0
0
Through Vol
0
57
57
0
143
143
156
156
0
FIT Vol
0
0
406
0
0
0
0
0
6
Lane Flow Rate
395
248
503
130
155
155
170
170
7
Geometry Grp
7
7
7
8
8
8
8
8
8
Degree ofUtil(X)
0.824
0.509
0.893
0.336
0.377
0.301
0.424
0.424
0.012
Departure Headway (Hd)
7.506
7.381
6.387
9.285
8.771
6.988
9.002
9.002
6.498
Convergence, YIN
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Cap
482
489
569
387
410
513
400
400
548
Service Time
5.246
5.12
4.126
7.05
6.536
4.753
6.772
6.772
4.268
HCM Lane V/C Ratio
0.82
0.507
0.884
0.336
0.378
0.302
0.425
0.425
0.013
HCM Control Delay
36.7
17.6
41.3
16.7
16.8
12.8
18.3
18.3
9.3
HCM Lane LOS
E
C
E
C
C
B
C
C
A
HCM 95th-tile Q
8
2.8
10.5
1.5
1.7
1.3
2.1
2.1
0
2/7/2016 Synchro 9 Report 2/7/2016 Synchro 9 Report
MS Page 3 MS Page 4
8: SH-114 NB Off -Ramp & Kirkwood Blvd
Existing
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: AM
Intersection
Intersection Delay, s/veh
Intersection LOS
Movement SBU SBL SBT SBR
Traffic Vol, veh/h 0 0 0 0
Future Vol, veh/h 0 0 0 0
Peak Hour Factor 0.92 0.92 0.92 0.92
Heavy Vehicles, % 2 2 2 2
Mvmt Flow 0 0 0 0
Number of Lanes 0 0 0 0
Approach — —19
Opposing Approach
Opposing Lanes
Conflicting Approach Left
Conflicting Lanes Left
Conflicting Approach Right
Conflicting Lanes Right
HCM Control Delay
HCM LOS
Lane'
2/7/2016
Synchro 9 Report
MS
Page 5
22: Dove Rd & Kirkwood Blvd
Existing
TIA for Wilks Tract Development in
Southlake, Texas
Timing Plan: AM
Intersection
Int Delay, s/veh 4.8
Movement -1
EBL
EBT
WBT WBR
SBL
SBR
Traffic Vol, veh/h
221
175
239 67
30
95
Future Vol, veh/h
221
175
239 67
30
95
Conflicting Peds, #Ihr
0
0
0 0
0
0
Sign Control
Free
Free
Free Free
Stop
Stop
RT Channelized
-
None
None
-
None
Storage Length
100
-
0
0
Veh in Median Storage, #
-
0
0 -
1
-
Grade, %
-
0
0 -
0
-
Peak Hour Factor
77
77
77 77
77
77
Heavy Vehicles, %
2
2
2 2
2
2
Mvmt Flow
287
227
310 87
39
123
Major/Minor
Majorl
Major2
Minor2
Conflicting Flow All
397
0
0
1042
199
Stage 1
-
-
354
-
Stage 2
-
688
-
Critical Hdwy
4.14
6.84
6.94
Critical Hdwy Stg 1
-
5.84
-
Critical Hdwy Stg 2
5.84
-
Follow-up Hdwy
2.22
3.52
3.32
Pot Cap-1 Maneuver
1158
225
809
Stage 1
-
681
-
Stage 2
460
-
Platoon blocked,
Mov Cap-1 Maneuver
1158
169
809
Mov Cap-2 Maneuver
169
Stage 1
681
Stage 2
346
Approach
EB
WB
HCM Control Delay, s
5.1
0
15.6
HCM LOS
C
Minor Lane/Major Mvmt
EBL
EBT WBT WBR SBLnl SBLn2
Capacity (veh/h)
1158
169 809
HCM Lane VIC Ratio
0.248
0.231 0.153
HCM Control Delay (s)
9.1
32.6 10.2
HCM Lane LOS
A
D B
HCM 95th %tile Q(veh)
1
0.9 0.5
2/7/2016
Synchro 9 Report
MS
Page 1
16: SH-114 SB Frontage Rd/SH-114 SB Off -Ramp & Dove Rd
Existing
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: PM
-,,, ,
-,*
F
4- T
l
Lane Group =
EBL EST
EBR WBL
WBT
WBR NBL NBT
NBR SBL
SBT
SBR
Lane Configurations
tT+
+Tt
►j
+T +
Traffic Volume (vph)
0 137
254 268
1012
0 0 0
0 77
124
108
Future Volume (vph)
0 137
254 268
1012
0 0 0
0 77
124
108
Peak Hour Factor
0.96 0.96
0.96 0.96
0.96
0.96 0.96 0.96
0.96 0.96
0.96
0.96
Adj. Flow (vph)
0 143
265 279
1054
0 0 0
0 80
129
113
Shared Lane Traffic (°!°)
10%
Lane Group Flow (vph)
0 408
0 0
1333
0 0 0
0 72
250
0
Turn Type
NA
pm+pt
NA
Perm
NA
Protected Phases
2
1
12
4
Permitted Phases
12
4
Detector Phase
2
1
12
4
4
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
Minimum Split (s)
22.5
9.5
22.5
22.5
Total Split (s)
25.0
15.0
40.0
40.0
Total Split (%)
31.3%
18.8 %
50.0 %
50.0%
Yellow Time (s)
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
Lead/Lag
Lag
Lead
Lead
Lead -Lag Optimize?
Yes
Yes
Yes
Recall Mode
C-Max
None
None
None
Act Effct Green (s)
44.9
55.4
11.1
11.1
Actuated g/C Ratio
0.56
0.69
0.14
0.14
v/c Ratio
0.21
0.68
0.32
0.54
Control Delay
3.7
4.5
34.0
31.4
Queue Delay
0.0
0.0
0.0
0.0
Total Delay
3.7
4.5
34.0
31.4
LOS
A
A
C
C
Approach Delay
3.7
4.5
32.0
Approach LOS
A
A
C
Queue Length 50th (ft)
15
6
36
56
Queue Length 95th (ft)
41
156
73
87
Internal Link Dist (ft)
224
394
1722
1376
Turn Bay Length (ft)
240
Base Capacity (vph)
1911
1956
714
1418
Starvation Cap Reductn
0
0
0
0
Spillback Cap Reductn
0
0
0
0
Storage Cap Reductn
0
0
0
0
Reduced v/c Ratio
0.21
0.68
0.10
0.18
Intersection Summary
Cycle Length: 80
Actuated Cycle Length: 80
Offset: 0 (0%), Referenced to
phase 2:EBWB and 6:, Start of Green
Natural Cycle: 65
Control Type: Actuated -Coordinated
Maximum v/c Ratio: 0.75
2/7/2016 Synchro 9 Report
Ms Page 1
16: SH-114 SB Frontage Rd/SH-114 SB Off -Ramp & Dove Rd Existing
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Lane Grouper
06 e8
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
5 6 8
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
5.0 5.0 5.0
Minimum Split (s)
9.5 22.5 22.5
Total Split (s)
10.0 30.0 40.0
Total Split (%)
13% 38% 50%
Yellow Time (s)
3.5 3.5 3.5
All -Red Time (s)
1.0 1.0 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead Lag
Lead -Lag Optimize?
Yes Yes
Recall Mode
None C-Min Max
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
2/7/2016 Synchro 9 Report
MS Page 2
16: SH-114 SIB Frontage Rd/SH-114 SIB Off -Ramp & Dove Rd Existing
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Intersection Signal Delay: 8.6 Intersection LOS: A
Intersection Capacity Utilization 65.1 % ICU Level of Service C
Analysis Period (min)15
Splits and Phases: 16: SH-114 SIB Frontage Rd/SH-114 SB Off -Ramp & Dove Rd
#1I6 m 16
+ 1-1 -a2
#16
Y' 41
9os Ess
15s
-19
F
19
=19
Up6 `R'�
A3
�Ios
05
30 s
40 s I
11
19: SH-114 NB Frontage Rd/SH-114 NB On -Ramp & Dove Rd
Existing
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: PM
Lane Group-
EBL
EBT EBR WBL
WBT
WBR
NBL
NBT
NBR
SBL SBT
SBR
Lane Configurations
+Tt
0
)
4T+
Traffic Volume (vph)
46
170 0 0
504
87
760
980
97
0 0
0
Future Volume (vph)
46
170 0 0
504
87
760
980
97
0 0
0
Peak Hour Factor
0.99
0.99 0.99 0.99
0.99
0.99
0.99
0.99
0.99
0.99 0.99
0.99
Adj. Flow (vph)
46
172 0 0
509
88
768
990
98
0 0
0
Shared Lane Traffic (%)
21 %
Lane Group Flow (vph)
0
218 0 0
597
0
607
1249
0
0 0
0
Turn Type
pm+pt
NA
NA
Perm
NA
Protected Phases
5
56
6
8
Permitted Phases
56
8
Detector Phase
5
56
6
8
8
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
Minimum Split (s)
9.5
22.5
22.5
22.5
Total Split (s)
10.0
30.0
40.0
40.0
Total Split (%)
12.5 %
37.5 %
50.0%
50.0%
Yellow Time (s)
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
Lead/Lag
Lead
Lag
Lag
Lead -Lag Optimize?
Yes
Yes
Yes
Recall Mode
None
C-Min
Max
Max
Act Effct Green (s)
26.1
20.6
40.4
40.4
Actuated g/C Ratio
0.33
0.26
0.50
0.50
v/c Ratio
0.23
0.66
0.75
0.74
Control Delay
15.2
28.5
24.6
20.0
Queue Delay
0.0
0.0
0.0
0.0
-
Total Delay
15.2
28.5
24.6
20.0
LOS
B
C
C
B
Approach Delay
15.2
28.5
21.5
Approach LOS
B
C
C
-
Queue Length 50th (ft)
28
133
252
256
Queue Length 95th (ft)
49
172
#503
385
Internal Link Dist (ft)
394
990
1769
1583
Turn Bay Length (ft)
a
Base Capacity (vph)
1113
1120
813
1688
Starvation Cap Reductn
0
0
0
0
Spillback Cap Reductn
0
0
0
0
Storage Cap Reductn
0
0
0
0
Reduced v/c Ratio
0.20
0.53
0.75
0.74
Intersection Summary
Cycle Length: 80
Actuated Cycle Length: 80
Offset: 0 (0%), Referenced to phase 2:EBWB and 6:, Start of Green
Natural Cycle: 65
Control Type: Actuated -Coordinated
Maximum v/c Ratio: 0.75
2/7/2016 Synchro 9 Report 2/7/2016 Synchro 9 Report
MS Page 3 MS Page 4
19: SH-114 NB Frontage Rd/SH-114 NB On -Ramp & Dove Rd Existing
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Lane Group
01 o2 e4
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic
Lane Group Flow (vph)
Turn Type
Protected Phases
1 2 4
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
5.0 5.0 5.0
Minimum Split (s)
9.5 22.5 22.5
Total Split (s)
15.0 25.0 40.0
Total Split (%)
19% 31 % 50 %
Yellow Time (s)
3.5 3.5 3.5
All -Red Time (s)
1.0 1.0 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lag Lead
Lead -Lag Optimize?
Yes Yes
Recall Mode
None C-Max None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
19: SH-114 NB Frontage Rd/SH-114 NB On -Ramp & Dove Rd Existing
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Intersection Signal Delay: 22.5 Intersection LOS: C
Intersection Capacity Utilization 68.8 % ICU Level of Service C
Analysis Period (min)15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases: 19: SH-114 NB Frontage Rd/SH-114 NB On -Ramp & Dove Rd
=16 ik16 =1166
l 042 Y 41
40s 25s
19 79 m 19
F aM 1
2/7/2016 Synchro 9 Report 2/7/2016 Synchro 9 Report
MS Page 5 MS Page 6
2: Kirkwood Blvd & T W King Rd
Existing
6: SH-114 SB Frontage Rd/SH-114 SB Off -Ramp & Solana Blvd/Kirkwood Blvd
Existing
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: PM
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: PM
Intersection
Intersection
Intersection Delay, slveh
14.6
Intersection Delay, s/veh
27.1
Intersection LOS
B
Intersection LOS
D
Movement
EBU
EBL
EBT
WBU
WBT
WBR
SBU
SBL
SBR
Movement
EBU
EBL
EBT
EBR
WBU
WBL
WBT
WBR
NBU
NBL
NBT
NBR
Traffic Vol, veh/h
0
55
18
0
625
105
0
8
116
Traffic Vol, veh/h
0
0
214
565
0
390
293
0
0
0
0
0
Future Vol, veh/h
0
55
18
0
625
105
0
8
116
Future Vol, veh/h
0
0
214
565
0
390
293
0
0
0
0
0
Peak Hour Factor
0.92
0.89
0.89
0.92
0.89
0.89
0.92
0.89
0.89
Peak Hour Factor
0.92
0.87
0.87
0.87
0.92
0.87
0.87
0.87
0.92
0.87
0.87
0.87
Heavy Vehicles,%
2
2
2
2
2
2
2
2
2
Heavy Vehicles,%
2
2
2
2
2
2
2
2
2
2
2
2
Mvmt Flow
0
62
20
0
702
118
0
9
130
Mvmt Flow
0
0
246
649
0
448
337
0
0
0
0
0
Number of Lanes
0
1
2
0
2
0
0
1
1
Number of Lanes
0
0
2
1
0
1
2
0
0
0
0
0
Approach
WB
lllll�-
SB
Approach
EIS
Opposing Approach
WB
EB
Opposing Approach
WB
EB
Opposing Lanes
2
3
0
Opposing Lanes
3
3
Conflicting Approach Left
SB
WB
Conflicting Approach Left
SB
Conflicting Lanes Left
2
0
2
Conflicting Lanes Left
3
0
Conflicting Approach Right
SB
EB
Conflicting Approach Right
SB
Conflicting Lanes Right
0
2
3
Conflicting Lanes Right
0
3
HCM Control Delay
10.2
15.7
10.4
HCM Control Delay
23.7
34.4
HCM LOS
B
C
B
HCM LOS
C
D
Lane
EBLnl
EBLn2
EBLn3
WBLnl WBLn2
SBLnl
SBLn2
EBLn1
EBLn2
EBLn3 WBLnl W3Ln2
W13Ln3
SBLnt
SBLn2
SBLn3
Vol Left, %
100%
0%
0%
0%
0%
100%
0%
Vol Left, %
0%
0%
0%
100%
0%
0%
100%
98%
0%
Vol Thru, %
0%
100%
100%
100%
66%
0%
0%
Vol Thru, %
100%
100%
0%
0%
100%
100%
0%
2%
2%
Vol Right, %
0%
0%
0%
0%
34%
0%
100%
Vol Right, %
0%
0%
100%
0%
0%
0%
0%
0%
98%
Sign Control
Stop
Stop
Stop
Stop
Stop
Stop
Stop
Sign Control
Stop
Stop
Stop
Stop
Stop
Stop
Stop
Stop
Stop
Traffic Vol by Lane
55
9
9
417
313
8
116
Traffic Vol by Lane
107
107
565
390
147
147
58
59
44
LT Vol
55
0
0
0
0
8
0
LT Vol
0
0
0
390
0
0
58
58
0
Through Vol
0
9
9
417
208
0
0
Through Vol
107
107
0
0
147
147
0
1
1
RT Vol
0
0
0
0
105
0
116
FIT Vol
0
0
565
0
0
0
0
0
43
Lane Flow Rate
62
10
10
468
352
9
130
Lane Flow Rate
123
123
649
448
168
168
66
67
51
Geometry Grp
8
8
8
8
8
8
8
Geometry Grp
8
8
8
8
8
8
7
7
7
Degree ofUtil(X)
0.121
0.018
0.013
0.675
0.484
0,018
0.218
Degree ofUtil(X)
0.245
0.245
0.851
0.924
0.323
0.242
0.155
0.157
0.102
Departure Headway (Hd)
7.064
6.558
4.805
5.189
4.954
7.213
6.01
Departure Headway (Hd)
7.18
7.18
4.717
7.551
7.045
5.29
8.434
8.425
7.231
Convergence, YIN
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Convergence, YIN
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Cap
510
548
748
688
718
499
601
Cap
503
503
773
484
514
684
427
427
497
Service Time
4.773
4.267
2.513
2.976
2.74
4.916
3.713
Service Time
4.891
4.891
2.427
5.251
4.745
2.99
6.158
6.149
4.954
HCM Lane VIC Ratio
0.122
0.018
0.013
0.68
0.49
0.018
0.216
HCM Lane VIC Ratio
0.245
0.245
0.84
0.926
0.327
0.246
0.155
0.157
0.103
HCM Control Delay
10.7
9.4
7.6
18.2
12.4
10
10.4
HCM Control Delay
12.2
12.2
28.1
51.7
13.1
9.7
12.7
12.7
10.8
HCM Lane LOS
B
A
A
C
B
A
B
HCM Lane LOS
B
B
D
F
B
A
B
B
B
HCM 95th-tile Q
0.4
0.1
0
5.2
2.7
0.1
0.8
HCM 95th-tile Q
1
1
10
10.8
1.4
0.9
0.5
0.6
0.3
2/7/2016 Synchro 9 Report 2/7/2016 Synchro 9 Report
MS Page 1 MS Page 2
6: SH-114 SB Frontage Rd/SH-114 SB Off -Ramp & Solana Blvd/Kirkwood Blvd Existing
8: SH-114 NB Off-Ramp/SH-114 NB Frontage Rd & Kirkwood Blvd
Existing
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: PM
Intersection
Intersection
IF
Intersection Delay, slveh
Intersection Delay, s/veh
51
Intersection LOS
Intersection LOS
F
Movement
SBU SBL
SBT
SBR
Movement
EBU
EBL
EBT
EBR
WBU
WBL
WBT
WBR
NBU
NBL
NBT
NBR
Traffic Vol, veh/h
0 115
2
43
Traffic Vol, veh/h
0
335
45
0
0
0
457
285
0
270
820
32
Future Vol, veh/h
0 115
2
43
Future Vol, veh/h
0
335
45
0
0
0
457
285
0
270
820
32
Peak Hour Factor
0.92 0.87
0.87
0.87
Peak Hour Factor
0.92
0.95
0.95
0.95
0.92
0.95
0.95
0.95
0.92
0.95
0.95
0.95
Heavy Vehicles, %
2 2
2
2
Heavy Vehicles, %
2
2
2
2
2
2
2
2
2
2
2
2
Mvmt Flow
0 132
2
49
Mvmt Flow
0
353
47
0
0
0
481
300
0
284
863
34
Number of Lanes
0 1
2
0
Number of Lanes
0
1
2
0
0
0
2
1
0
1
2
0
Approach
Approach
tB
_
=3
Opposing Approach
Opposing Approach
WB
EB
Opposing Lanes
0
Opposing Lanes
3
3
0
Conflicting Approach Left
WB
Conflicting Approach Left
NB
EB
Conflicting Lanes Left
3
Conflicting Lanes Left
0
3
3
Conflicting Approach Right
EB
Conflicting Approach Right
NB
WB
Conflicting Lanes Right
3
Conflicting Lanes Right
3
0
3
HCM Control Delay
12.2
HCM Control Delay
76.4
24
60.3
HCM LOS
B
HCM LOS
F
C
F
NBLn1 NBLn2 NBLn3 EBLnl EBLn2 EBLn3 WBLnl WBLn2 WBLn3
Vol Left,%
100%
6%
0%
100%
0%
0%
0%
0%
0%
Vol Thru, %
0%
94%
93%
0%
100%
100%
100%
100%
0%
Vol Right, %
0%
0%
7%
0%
0%
0%
0%
0%
100%
Sign Control
Stop
Stop
Stop
Stop
Stop
Stop
Stop
Stop
Stop
Traffic Vol by Lane
243
437
442
335
23
23
229
229
285
LT Vol
243
27
0
335
0
0
0
0
0
Through Vol
0
410
410
0
23
23
229
229
0
FIT Vol
0
0
32
0
0
0
0
0
285
Lane Flow Rate
256
460
465
353
24
24
241
241
300
Geometry Grp
7
7
7
8
8
8
8
8
8
Degree ofUtil(X)
0.597
1
1
1
0.07
0.059
0.627
0.627
0.588
Departure Headway (Hd)
8.407
7.93
7.848
11.175
10.677
8.95
9.387
9.387
7.051
Convergence, YIN
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Cap
430
455
461
328
337
401
382
382
513
Service Time
6.175
5.71
5.629
8.898
8.401
6.674
7.187
7.187
4.761
HCM Lane VIC Ratio
0.595
1.011
1.009
1.076
0.071
0.06
0.631
0.631
0.585
HCM Control Delay
23
70.7
70.4
84.9
14.2
12.2
26.9
26.9
19.3
HCM Lane LOS
C
F
F
F
B
B
D
D
C
HCM 95th-tile Q
3.8
13
13
11
0.2
0.2
4.1
4.1
3.7
2/7/2016 Synchro 9 Report 2/7/2016 Synchro 9 Report
MS Page 3 MS Page 4
8: SH-114 NB Off-Ramp/SH-114 NB Frontage Rd & Kirkwood Blvd
Existing
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: PM
Intersection
Intersection Delay, s/veh
Intersection LOS
Movement
SBU SBL
SBT
SBR
Traffic Vol, veh/h
0 0
0
0
Future Vol, veh/h
0 0
0
0
Peak Hour Factor
0.92 0.95
0.95
0.95
Heavy Vehicles, %
2 2
2
2
Mvmt Flow
0 0
0
0
Number of Lanes
0 0
0
0
Approach —
_
Opposing Approach
Opposing Lanes
Conflicting Approach Left
Conflicting Lanes Left
Conflicting Approach Right
Conflicting Lanes Right
HCM Control Delay
HCM LOS
Lane'
2/7/2016
Synchro 9 Report
MS
Page 5
22: Dove Rd & Kirkwood Blvd
Existing
TIA for Wilks Tract Development in
Southlake, Texas
Timing Plan: PM
Intersection
Int Delay, s/veh 5.7
Movement -1
EBL
EBT
WBT WBR
SBL
SBR
Traffic Vol, veh/h
101
159
228 190
87
268
Future Vol, veh/h
101
159
228 190
87
268
Conflicting Peds, #Ihr
0
0
0 0
0
0
Sign Control
Free
Free
Free Free
Stop
Stop
RT Channelized
-
None
None
-
None
Storage Length
100
-
0
0
Veh in Median Storage, #
-
0
0 -
1
-
Grade, %
-
0
0 -
0
-
Peak Hour Factor
90
90
90 90
90
90
Heavy Vehicles, %
2
2
2 2
2
2
Mvmt Flow
112
177
253 211
97
298
Major/Minor
Majorl
Major2
Minor2
Conflicting Flow All
464
0
0
672
232
Stage 1
-
-
359
-
Stage 2
-
313
-
Critical Hdwy
4.14
6.84
6.94
Critical Hdwy Stg 1
-
5.84
-
Critical Hdwy Stg 2
-
5.84
-
Follow-up Hdwy
2.22
3.52
3.32
Pot Cap-1 Maneuver
1094
389
770
Stage 1
-
677
-
Stage 2
-
715
-
Platoon blocked,
Mov Cap-1 Maneuver
1094
349
770
Mov Cap-2 Maneuver
349
Stage 1
677
Stage 2
642
Approach
EB
WB
HCM Control Delay, s
3.4
0
14.2
HCM LOS
B
Minor Lane/Major Mvmt
EBL
EBT WBT WBR SBLnl SBLn2
Capacity (veh/h)
1094
349 770
HCM Lane VIC Ratio
0.103
0.277 0.387
HCM Control Delay (s)
8.7
19.2 12.6
HCM Lane LOS
A
C B
HCM 95th %tile Q(veh)
0.3
1.1 1.8
2/7/2016
Synchro 9 Report
MS
Page 1
16: Dove Rd & SH-114 SIB Off -Ramp
2017 Background
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: AM
Lane Group EBL
EST EBR
WBL
WBT
WBR NBL NBT NBR
SBL
Lane Configurations
tT+
+Tt
)
r{
Traffic Volume (vph) 0
296 678
74
433
0 0 0 0
75
116 54
Future Volume (vph) 0
296 678
74
433
0 0 0 0
75
116 54
Peak Hour Factor 0.83
0.83 0.83
0.83
0.83
0.83 0.83 0.83 0.83
0.83
0.83 0.83
Adj. Flow (vph) 0
357 817
89
522
0 0 0 0
90
140 65
Shared Lane Traffic (°!°)
10%
Lane Group Flow (vph) 0
1174 0
0
611
0 0 0 0
81
214 0
Turn Type
NA
pm+pt
NA
Perm
NA
Protected Phases
2
1
21
4
Permitted Phases
21
4
Detector Phase
2
1
21
4
4
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
Minimum Split (s)
22.5
9.5
22.5
22.5
Total Split (s)
30.0
15.0
25.0
25.0
Total Split (%)
42.9%
21.4 %
35.7 %
35.7%
Yellow Time (s)
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
Lead/Lag
Lag
Lead
Lead
Lead -Lag Optimize?
Yes
Yes
Yes
Recall Mode
C-Max
None
None
None
Act Effct Green (s)
39.5
47.3
9.2
9.2
Actuated g/C Ratio
0.56
0.68
0.13
0.13
v/c Ratio
0.56
0.34
0.39
0.45
Control Delay
5.5
1.8
32.2
21.7
Queue Delay
0.0
0.0
0.0
0.0
Total Delay
5.5
1.8
32.2
21.7
LOS
A
A
C
c
Approach Delay
5.5
1.8
24.6
Approach LOS
A
A
C
Queue Length 50th (ft)
52
2
36
32
Queue Length 95th (ft)
97
14
65
53
Internal Link Dist (ft)
224
394
1722
1376
Turn Bay Length (ft)
240
Base Capacity (vph)
2082
1911
471
991
Starvation Cap Reductn
0
0
0
0
Spillback Cap Reductn
0
0
0
0
Storage Cap Reductn
0
0
0
0
Reduced v/c Ratio
0.56
0.32
0.17
0.22
Intersection Summary
Cycle Length: 70
Actuated Cycle Length: 70
Offset: 0 (0%), Referenced to phase 2:EBWB
and 6:, Start of Green
Natural Cycle: 60
Control Type: Actuated -Coordinated
Maximum v/c Ratio: 0.56
2/7/2016 Synchro 9 Report
MS Page 1
16: Dove Rd & SH-114 SB Off -Ramp 2017 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Lane Group
o6 08
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
5 6 8
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
5.0 5.0 5.0
Minimum Split (s)
9.5 22.5 22.5
Total Split (s)
15.0 30.0 25.0
Total Split (%)
21 % 43 % 36%
Yellow Time (s)
3.5 3.5 3.5
All -Red Time (s)
1.0 1.0 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lag Lead
Lead -Lag Optimize?
Yes Yes
Recall Mode
None C-Min Max
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
2/7/2016 Synchro 9 Report
MS Page 2
16: Dove Rd & SH-114 SIB Off -Ramp 2017 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Intersection Signal Delay: 7.1 Intersection LOS: A
Intersection Capacity Utilization 60.2 % ICU Level of Service B
Analysis Period (min)15
19: SH-114 NB Frontage Rd & Dove Rd
2017 Background
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: AM
-,*,-,*
r-
4-
T/,.
ti
1
-'
Lane Group-
EBL
EST EBR
WBL
WBT
WBR
NBL
NBT
NBR SBL
SBT
SBR
Lane Configurations
+Tt
0
►j
q +
Traffic Volume (vph)
62
302 0
0
289
74
227
103
239 0
0
0
Future Volume (vph)
62
302 0
0
289
74
227
103
239 0
0
0
Peak Hour Factor
0.80
0.80 0.80
0.80
0.80
0.80
0.80
0.80
0.80 0.80
0.80
0.80
Adj. Flow (vph)
78
378 0
0
361
93
284
129
299 0
0
0
Shared Lane Traffic (%)
13%
Lane Group Flow (vph)
0
456 0
0
454
0
247
465
0 0
0
0
Turn Type
pm+pt
NA
NA
Perm
NA
Protected Phases
5
65
6
8
Permitted Phases
65
8
Detector Phase
5
65
6
8
8
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
Minimum Split (s)
9.5
22.5
22.5
22.5
Total Split (s)
15.0
30.0
25.0
25.0
Total Split (%)
21.4%
42.9%
35.7%
35.7%
JIM
Yellow Time (s)
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
Lead/Lag
Lag
Lead
Lead
Lead -Lag Optimize?
Yes
Yes
Yes
-
Recall Mode
None
C-Min
Max
Max
Act Effct Green (s)
33.3
17.0
23.2
23.2
Actuated g/C Ratio
0.48
0.24
0.33
0.33
v/c Ratio
0.29
0.52
0.46
0.38
-
Control Delay
8.1
21.6
22.5
7.6
Queue Delay
0.0
0.0
0.0
0.0
-
Total Delay
8.1
21.6
22.5
7.6
LOS
A
C
C
A
-
Approach Delay
8.1
21.6
12.8
Approach LOS
A
C
B
Queue Length 50th (ft)
52
78
90
26
Queue Length 95th (ft)
49
88
143
49
Internal Link Dist (ft)
394
990
1769
1583
Turn Bay Length (ft)
a
Base Capacity (vph)
1716
1282
533
1210
Starvation Cap Reductn
0
0
0
0
Spillback Cap Reductn
0
0
0
0
Storage Cap Reductn
0
0
0
0
Reduced v/c Ratio
0.27
0.35
0.46
0.38
Intersection Summary
Cycle Length: 70
Actuated Cycle Length: 70
Offset: 0 (0%), Referenced to phase 2:EBWB and 6:, Start
of Green
Natural Cycle: 60
Control Type: Actuated -Coordinated
Maximum v/c Ratio: 0.56
2/7/2016 Synchro 9 Report 2/7/2016 Synchro 9 Report
MS Page 3 MS Page 4
19: SH-114 NB Frontage Rd & Dove Rd 2017 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Lane Group
of o2 o4
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic
Lane Group Flow (vph)
Turn Type
Protected Phases
1 2 4
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
5.0 5.0 5.0
Minimum Split (s)
9.5 22.5 22.5
Total Split (s)
15.0 30.0 25.0
Total Split (%)
21 % 43% 36%
Yellow Time (s)
3.5 3.5 3.5
All -Red Time (s)
1.0 1.0 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lag Lead
Lead -Lag Optimize?
Yes Yes
Recall Mode
None C-Max None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
2/7/2016 Synchro 9 Report
MS Page 5
19: SH-114 NB Frontage Rd & Dove Rd 2017 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Intersection Signal Delay: 13.9 Intersection LOS: B
Intersection Capacity Utilization 43.2 % ICU Level of Service A
Analysis Period (min)15
Splits and Phases: 19: SH-114 NB Frontage Rd & Dove Rd
#16 #16
#16
711
30 s
lS s
#19 19
F
19
Aq5
'Ipa �556 `Rl
2/7/2016
MS
Synchro 9 Report
Page 6
6: Solana Blvd/Kirkwood Blvd & SH-114 SB Off -Ramp 2017 Background(Signalized)
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: AM
Lane Grouf------'TBL
EST
EBR
WBL
WBT
WBR NBL NBT NBR
SBL
SBR
Lane Configurations
tt
r
)
tt
)
+T +
Traffic Volume (vph) 0
240
241
276
595
0 0 0 0
176
1 60
Future Volume (vph) 0
240
241
276
595
0 0 0 0
176
1 60
Peak Hour Factor 0.92
0.92
0.92
0.92
0.92
0.92 0.92 0.92 0.92
0.92
0.92 0.92
Adj. Flow (vph) 0
261
262
300
647
0 0 0 0
191
1 65
Shared Lane Traffic (%)
50%
Lane Group Flow (vph) 0
261
262
300
647
0 0 0 0
95
162 0
Turn Type
NA
Perm
pm+pt
NA
Perm
NA
Protected Phases
2
1
12
4
Permitted Phases
2
12
4
Detector Phase
2
2
1
12
4
4
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
5.0
Minimum Split (s)
22.5
22.5
9.5
22.5
22.5
Total Split (s)
27.4
27.4
15.6
47.0
47.0
Total Split (%)
30.4%
30.4 %
17.3 %
52.2 %
52.2%
Yellow Time (s)
3.5
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
4.5
4.5
Lead/Lag
Lag
Lag
Lead
Lead -Lag Optimize?
Yes
Yes
Yes
Recall Mode
C-Max
C-Max
None
None
None
Act Effct Green (s)
29.1
29.1
43.5
48.0
33.0
33.0
Actuated g/C Ratio
0.32
0.32
0.48
0.53
0.37
0.37
v/c Ratio
0.23
0.38
0.48
0.34
0.16
0.14
Control Delay
25.1
5.4
17.5
13.9
17.5
9.8
Queue Delay
0.0
0.0
0.0
0.0
0.0
0.0
Total Delay
25.1
5.4
17.5
13.9
17.5
9.8
LOS
C
A
B
B
B
A
Approach Delay
15.3
15.1
12.7
Approach LOS
B
B
B
Queue Length 50th (ft)
62
0
106
121
38
19
Queue Length 95th (ft)
96
58
163
162
62
34
Internal Link Dist (ft)
1214
327
422
836
Turn Bay Length (ft)
350
Base Capacity (vph)
1144
689
633
1852
760
1495
Starvation Cap Reductn
0
0
0
0
0
0
Spillback Cap Reductn
0
0
0
0
0
0
Storage Cap Reductn
0
0
0
0
0
0
Reduced v/c Ratio
0.23
0.38
0.47
0.35
0.13
0.11
Intersection Summary
Cycle Length: 90
Actuated Cycle Length: 90
Offset: 0 (0%), Referenced to phase 2:EBWB
and
6:, Start of Green
Natural Cycle: 55
Control Type: Actuated -Coordinated
Maximum v/c Ratio: 0.69
TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report
MS Page 1
6: Solana Blvd/Kirkwood Blvd & SH-114 SIB Off -Ramp 2017 Background(Signalized)
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Lane Group'
06
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
5 6 8
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
5.0 5.0 5.0
Minimum Split (s)
9.5 22.5 22.5
Total Split (s)
19.5 23.5 47.0
Total Split (%)
22% 26% 52%
Yellow Time (s)
3.5 3.5 3.5
All -Red Time (s)
1.0 1.0 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lag Lead
Lead -Lag Optimize?
Yes Yes
Recall Mode
None C-Max None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summer
TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report
MS Page 2
6: Solana Blvd/Kirkwood Blvd & SH-114 SIB Off -Ramp 2017 Background(Signalized)
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Intersection Signal Delay: 14.8 Intersection LOS: B
Intersection Capacity Utilization 48.8 % ICU Level of Service A
Analysis Period (min)15
Splits and Phases: 6: Solana Blvd/Kirkwood Blvd & SH-114 SB Off -Ramp
#6 6
�otz r
=6II
i 14
15.6s 1 127.4s
47s
F
�p6 `R'
AS
A9
23.5s
19.5s
47s
8: SH-114 NB Off -Ramp & Kirkwood Blvd
2017 Background(Signalized)
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: AM
-,*,-,*
r-
4-
T/,.
ti 1
-'
Lane Group -
EBL
EBT EBR WBL
WBT
WBR
NBL
NBT
NBR
SBL SBT
SBR
Lane Configurations
I
tt
tt
?I
Vi
+Tf+
Traffic Volume (vph)
124
294 0 0
321
6
551
117
418
0 0
0
Future Volume (vph)
124
294 0 0
321
6
551
117
418
0 0
0
Peak Hour Factor
0.92
0.92 0.92 0.92
0.92
0.92
0.92
0.92
0.92
0.92 0.92
0.92
Adj. Flow (vph)
135
320 0 0
349
7
599
127
454
0 0
0
Shared Lane Traffic (%)
32°%
Lane Group Flow (vph)
135
320 0 0
349
7
407
773
0
0 0
0
Turn Type
pm+pt
NA
NA
Free
Perm
NA
Protected Phases
5
56
6
8
Permitted Phases
56
Free
8
Detector Phase
5
56
6
8
8
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
Minimum Split (s)
9.5
22.5
22.5
22.5
Total Split (s)
19.5
23.5
47.0
47.0
Total Split (%)
21.7 %
26.1 %
52.2%
52.2%
Yellow Time (s)
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
4.5
Lead/Lag
Lag
Lead
Lead -Lag Optimize?
Yes
Yes
Recall Mode
None
C-Max
None
None
Act Effct Green (s)
43.5
48.0
28.5
90.0
33.0
33.0
Actuated g/C Ratio
0.48
0.53
0.32
1.00
0.37
0.37
v/c Ratio
0.23
0.17
0.31
0.00
0.69
0.56
-
Control Delay
14.0
11.9
26.4
0.0
29.5
10.5
Queue Delay
0.0
0.0
0.0
0.0
0.0
0.0
-
Total Delay
14.0
11.9
26.4
0.0
29.5
10.5
LOS
B
B
C
A
C
B
-
Approach Delay
12.5
25.9
17.1
Approach LOS
B
C
B
-
Queue Length 50th (ft)
34
43
80
0
208
78
Queue Length 95th (ft)
63
65
134
0
268
110
Internal Link Dist (ft)
327
247
1055
1095
Turn Bay Length (ft)
Base Capacity(vph)
586
1885
1119
1583
760
1662
Starvation Cap Reductn
0
0
0
0
0
0
Spillback Cap Reductn
0
0
0
0
0
0
Storage Cap Reductn
0
0 IIIIIIIII11M
0
0
0
0
-
Reduced v/c Ratio
0.23
0.17
0.31
0.00
0.54
0.47
Intersection Summary
Cycle Length: 90
Actuated Cycle Length: 90
Offset: 0 (0%), Referenced to phase 2:EBWB and 6:, Start of Green
Natural Cycle: 55
Control Type: Actuated -Coordinated
Maximum v/c Ratio: 0.69
TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report
MS Page 3 MS Page 4
8: SH-114 NB Off -Ramp & Kirkwood Blvd 2017 Background(Signalized)
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All -Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead -Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
5.0 5.0 5.0
9.5 22.5 22.5
15.6 27.4 47.0
17% 30% 52%
3.5 3.5 3.5
1.0 1.0 1.0
Lead Lag
Yes Yes
None C-Max None
TIA for Wilks Tract Development in Southlake, Texas
MS
Synchro 9 Report
Page 5
8: SH-114 NB Off -Ramp & Kirkwood Blvd 2017 Background(Signalized)
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Intersection Signal Delay: 17.6 Intersection LOS: B
Intersection Capacity Utilization 48.8 % ICU Level of Service A
Analysis Period (min)15
Splits and Phases: 8: SH-114 NB Off -Ramp & Kirkwood Blvd
=6 =6
741 �2
=6
j 04
15.6s 27.4s
47s
�8 8
F
�A6 R) RS
-8
23.5 s
47 s
TIA for Wilks Tract Development in Southlake, Texas
MS
Synchro 9 Report
Page 6
22: Dove Rd & Kirkwood Blvd
2017 Background(Signalized)
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: AM
*_
t
ti
r
Lane Grout-
EBL
EST
WBT
WBR
SBL
SBR
Lane Configurations
I
Tt
Tf+
Vi
?I
Traffic Volume (vph)
228
180
246
69
31
98
Future Volume (vph)
228
180
246
69
31
98
Peak Hour Factor
0.77
0.77
0.77
0.77
0.77
0.77
Adj. Flow (vph)
296
234
319
90
40
127
Shared Lane Traffic (%)
Lane Group Flow (vph)
296
234
409
0
40
127
Turn Type
pm+pt
NA
NA
Prot
Perm
Protected Phases
7
4
8
1
Permitted Phases
4
6
Detector Phase
7
4
8
1
6
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
5.0
Minimum Split (s)
9.5
22.5
22.5
9.5
9.5
Total Split (s)
35.2
57.8
22.6
12.2
12.2
Total Split(%)
50.3%
82.6%
32.3%
17.4% 17.4%
Yellow Time (s)
3.5
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
4.5
4.5
Lead/Lag
Lead
Lag
Lead -Lag Optimize?
Yes
Yes
Recall Mode
None
C-Max
C-Max
None
None
Act Effct Green (s)
56.3
57.2
43.3
6.8
6.7
Actuated g/C Ratio
0.80
0.82
0.62
0.10
0.10
v/c Ratio
0.37
0.08
0.19
0.23
0.48
Control Delay
5.1
3.0
6.3
32.3
12.8
Queue Delay
0.0
0.0
0.0
0.0
0.0
Total Delay
5.1
3.0
6.3
32.3
12.8
LOS
A
A
A
C
B
Approach Delay
4.2
6.3
17.5
Approach LOS
A
A
B
Queue Length 50th (ft)
64
20
34
16
0
Queue Length 95th (ft)
66
22
50
37
30
Internal Link Dist (ft)
990
172
351
Turn Bay Length (ft)
100
Base Capacity (vph)
1091
2892
2134
194
287
Starvation Cap Reductn
0
0
0
0
0
Spillback Cap Reductn
0
0
0
0
0
Storage Cap Reductn
0
0
0
0
0
Reduced v/c Ratio
0.27
0.08
0.19
0.21
0.44
Intersection Summary
Cycle Length: 70
Actuated Cycle Length: 70
Offset: 0 (0%), Referenced to phase 4:EBTL
and 8:WBT,
Start of Green
Natural Cycle: 45
Control Type: Actuated -Coordinated
Maximum v/c Ratio: 0.48
TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report
MS Page 7
22: Dove Rd & Kirkwood Blvd 2017 Background(Signalized)
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Intersection Signal Delay: 7.0 Intersection LOS: A
Intersection Capacity Utilization 37.1 % ICU Level of Service A
Analysis Period (min)15
iplits and Phases: 22: Dove Rd & Kirkwood Blvd
pl '�►04
pb 10A-p7 05 R1
2 22.6 s
TIA for Wilks Tract Development in Southlake, Texas
MS
Synchro 9 Report
Page 8
22: Dove Rd & Kirkwood Blvd
2017 Background
TIA for Wilks Tract Development in
Southlake, Texas
Timing Plan: AM
Intersection
Int Delay, s/veh 5
Movement -1
EBL
EBT
WBT WBR
SBL
SBR
Traffic Vol, veh/h
228
180
246 69
31
98
Future Vol, veh/h
228
180
246 69
31
98
Conflicting Peds, #Ihr
0
0
0 0
0
0
Sign Control
Free
Free
Free Free
Stop
Stop
RT Channelized
-
None
None
-
None
Storage Length
100
-
0
0
Veh in Median Storage, #
-
0
0 -
1
-
Grade, %
-
0
0 -
0
-
Peak Hour Factor
77
77
77 77
77
77
Heavy Vehicles, %
2
2
2 2
2
2
Mvmt Flow
296
234
319 90
40
127
Major/Minor
Majorl
Major2
Minor2
Conflicting Flow All
409
0
0
1073
205
Stage 1
-
-
-
364
-
Stage 2
-
709
-
Critical Hdwy
4.14
6.84
6.94
Critical Hdwy Stg 1
-
5.84
-
Critical Hdwy Stg 2
5.84
-
Follow-up Hdwy
2.22
3.52
3.32
Pot Cap-1 Maneuver
1146
215
802
Stage 1
-
673
-
Stage 2
449
-
Platoon blocked,
Mov Cap-1 Maneuver
1146
159
802
Mov Cap-2 Maneuver
159
Stage 1
673
Stage 2
333
Approach
EB
WB
HCM Control Delay, s
5.2
0
16.3
HCM LOS
C
Minor Lane/Major Mvmt
EBL
EBT WBT WBR SBLnl SBLn2
Capacity (veh/h)
1146
159 802
HCM Lane VIC Ratio
0.258
0.253 0.159
HCM Control Delay (s)
9.2
35.2 10.3
HCM Lane LOS
A
E B
HCM 95th %tile Q(veh)
1
1 0.6
2/7/2016
Synchro 9 Report
MS
Page 1
16: SH-114 SB Frontage Rd/SH-114 SB Off -Ramp & Dove Rd
2017 Background
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: PM
Lane Group = EBL
EST
EBR WBL
WBT
WBR NBL NBT
NBR SBL
Lane Configurations
tT+
+Tt
►j
+T +
Traffic Volume (vph) 0
141
262 276
1042
0 0 0
0 79
128 111
Future Volume (vph) 0
141
262 276
1042
0 0 0
0 79
128 111
Peak Hour Factor 0.96
0.96
0.96 0.96
0.96
0.96 0.96 0.96
0.96 0.96
0.96 0.96
Adj. Flow (vph) 0
147
273 288
1085
0 0 0
0 82
133 116
Shared Lane Traffic (%)
10%
Lane Group Flow (vph) 0
420
0 0
1373
0 0 0
0 74
257 0
Turn Type
NA
pm+pt
NA
Perm
NA
Protected Phases
2
1
12
4
Permitted Phases
12
4
Detector Phase
2
1
12
4
4
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
Minimum Split (s)
22.5
9.5
22.5
22.5
Total Split (s)
25.0
15.0
40.0
40.0
Total Split (%)
31.3%
18.8 %
50.0 %
50.0%
Yellow Time (s)
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
Lead/Lag
Lag
Lead
Lead
Lead -Lag Optimize?
Yes
Yes
Yes
Recall Mode
C-Max
None
None
None
Act Effct Green (s)
44.7
55.2
11.3
11.3
Actuated g/C Ratio
0.56
0.69
0.14
0.14
v/c Ratio
0.22
0.71
0.33
0.54
Control Delay
3.7
4.9
33.7
31.8
Queue Delay
0.0
0.0
0.0
0.0
Total Delay
3.7
4.9
33.7
31.8
LOS
A
A
C
C
Approach Delay
3.7
4.9
32.3
Approach LOS
A
A
C
Queue Length 50th (ft)
16
6
37
58
Queue Length 95th (ft)
42
170
74
90
Internal Link Dist (ft)
224
394
1722
1376
Turn Bay Length (ft)
240
Base Capacity (vph)
1903
1938
714
1416
Starvation Cap Reductn
0
0
0
0
Spillback Cap Reductn
0
0
0
0
Storage Cap Reductn
0
0
0
0
Reduced v/c Ratio
0.22
0.71
0.10
0.18
Intersection Summary
Cycle Length: 80
Actuated Cycle Length: 80
Offset: 0 (0%), Referenced to phase 2:EBWB
and 6:, Start of Green
Natural Cycle: 65
Control Type: Actuated -Coordinated
Maximum v/c Ratio: 0.77
2/7/2016 Synchro 9 Report
MS Page 1
16: SH-114 SB Frontage Rd/SH-114 SB Off -Ramp & Dove Rd 2017 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Lane Grouper
06 e8
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
5 6 8
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
5.0 5.0 5.0
Minimum Split (s)
9.5 22.5 22.5
Total Split (s)
10.0 30.0 40.0
Total Split (%)
13% 38% 50%
Yellow Time (s)
3.5 3.5 3.5
All -Red Time (s)
1.0 1.0 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead Lag
Lead -Lag Optimize?
Yes Yes
Recall Mode
None C-Min Max
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
2/7/2016 Synchro 9 Report
MS Page 2
16: SH-114 SIB Frontage Rd/SH-114 SIB Off -Ramp & Dove Rd 2017 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Intersection Signal Delay: 8.9 Intersection LOS: A
Intersection Capacity Utilization 66.7 % ICU Level of Service C
Analysis Period (min)15
Splits and Phases: 16: SH-114 SIB Frontage Rd/SH-114 SB Off -Ramp & Dove Rd
#1I6 m 16
+ 1-1 -a2
#16
Y' 41
9os Ess
15s
-19
F
19
=19
Up6 `R'�
A3
�Ios
05
30 s
40 s I
11
19: SH-114 NB Frontage Rd/SH-114 NB On -Ramp & Dove Rd
2017 Background
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: PM
-,*,-,*
r-
4-
T/,.
ti 1
-'
Lane Group-
EBL
EBT EBR WBL
WBT
WBR
NBL
NBT
NBR SBL SBT
SBR
Lane Configurations
+Tt
0
)
4T+
Traffic Volume (vph)
47
175 0 0
519
90
783
1009
100 0 0
0
Future Volume (vph)
47
175 0 0
519
90
783
1009
100 0 0
0
Peak Hour Factor
0.99
0.99 0.99 0.99
0.99
0.99
0.99
0.99
0.99 0.99 0.99
0.99
Adj. Flow (vph)
47
177 0 0
524
91
791
1019
101 0 0
0
Shared Lane Traffic (%)
21 %
Lane Group Flow (vph)
0
224 0 0
615
0
625
1286
0 0 0
0
Turn Type
pm+pt
NA
NA
Perm
NA
Protected Phases
5
56
6
8
Permitted Phases
56
8
Detector Phase
5
56
6
8
8
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
Minimum Split (s)
9.5
22.5
22.5
22.5
Total Split (s)
10.0
30.0
40.0
40.0
Total Split (%)
12.5 %
37.5 %
50.0%
50.0%
Yellow Time (s)
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
Lead/Lag
Lead
Lag
Lag
Lead -Lag Optimize?
Yes
Yes
Yes
Recall Mode
None
C-Min
Max
Max
Act Effct Green (s)
26.3
20.8
40.2
40.2
Actuated g/C Ratio
0.33
0.26
0.50
0.50
v/c Ratio
0.24
0.67
0.77
0.77
Control Delay
15.1
28.7
26.2
21.0
Queue Delay
0.0
0.0
0.0
0.0
Total Delay
15.1
28.7
26.2
21.0
LOS
B
C
C
C
Approach Delay
15.1
28.7
22.7
Approach LOS
B
C
C
Queue Length 50th (ft)
29
137
267
271
Queue Length 95th (ft)
50
177
#526
#420
Internal Link Dist (ft)
394
990
1769
1583
Turn Bay Length (ft)
Base Capacity (vph)
1101
1120
808
1677
Starvation Cap Reductn
0
0
0
0
Spillback Cap Reductn
0
0
0
0
Storage Cap Reductn
0
0
0
0
Reduced v/c Ratio
0.20
0.55
0.77
0.77
Intersection Summary
Cycle Length: 80
Actuated Cycle Length: 80
Offset: 0 (0%), Referenced to phase 2:EBWB and 6:, Start of Green
Natural Cycle: 65
Control Type: Actuated -Coordinated
Maximum v/c Ratio: 0.77
2/7/2016 Synchro 9 Report 2/7/2016 Synchro 9 Report
MS Page 3 MS Page 4
19: SH-114 NB Frontage Rd/SH-114 NB On -Ramp & Dove Rd 2017 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Lane Group
01 o2 e4
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic
Lane Group Flow (vph)
Turn Type
Protected Phases
1 2 4
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
5.0 5.0 5.0
Minimum Split (s)
9.5 22.5 22.5
Total Split (s)
15.0 25.0 40.0
Total Split (%)
19% 31 % 50 %
Yellow Time (s)
3.5 3.5 3.5
All -Red Time (s)
1.0 1.0 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lag Lead
Lead -Lag Optimize?
Yes Yes
Recall Mode
None C-Max None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
19: SH-114 NB Frontage Rd/SH-114 NB On -Ramp & Dove Rd 2017 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Intersection Signal Delay: 23.4 Intersection LOS: C
Intersection Capacity Utilization 70.6 % ICU Level of Service C
Analysis Period (min)15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases: 19: SH-114 NB Frontage Rd/SH-114 NB On -Ramp & Dove Rd
=16 ik16 =1166
l 042 Y 41
40s 25s
19 79 m 19
F aM 1
2/7/2016 Synchro 9 Report 2/7/2016 Synchro 9 Report
MS Page 5 MS Page 6
6: Kirkwood Blvd & SH-114 SB Off -Ramp
2017 Background(Signalized)
TIA for Wilks Tract Office Development in Southlake, Texas
Timing Plan: PM
Lane Group- EBL
EST
EBR
WBL
WBT
WBR NBL NBT NBR
SBL
Lane Configurations
tt
?I
)
tt
)
r{
Traffic Volume (vph) 0
220
582
402
302
0 0 0 0
118
2 44
Future Volume (vph) 0
220
582
402
302
0 0 0 0
118
2 44
Peak Hour Factor 0.87
0.87
0.87
0.87
0.87
0.87 0.87 0.87 0.87
0.87
0.87 0.87
Adj. Flow (vph) 0
253
669
462
347
0 0 0 0
136
2 51
Shared Lane Traffic (%)
50%
Lane Group Flow (vph) 0
253
669
462
347
0 0 0 0
68
121 0
Turn Type
NA
Perm
pm+pt
NA
Perm
NA
Protected Phases
2
1
12
4
Permitted Phases
2
12
4
Detector Phase
2
2
1
12
4
4
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
5.0
Minimum Split (s)
22.5
22.5
9.5
22.5
22.5
Total Split (s)
28.8
28.8
25.0
36.2
36.2
Total Split (%)
32.0%
32.0 %
27.8 %
40.2 %
40.2%
Yellow Time (s)
3.5
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
4.5
4.5
Lead/Lag
Lag
Lag
Lead
Lead -Lag Optimize?
Yes
Yes
Yes
Recall Mode
C-Max
C-Max
None
Max
Max
Act Effct Green (s)
25.8
25.8
44.8
49.3
31.7
31.7
Actuated g/C Ratio
0.29
0.29
0.50
0.55
0.35
0.35
v/c Ratio
0.25
0.72
0.68
0.18
0.12
0.11
Control Delay
26.0
7.4
24.4
9.7
20.5
12.2
Queue Delay
0.0
0.0
0.0
0.0
0.0
0.0
Total Delay
26.0
7.4
24.4
9.7
20.5
12.2
LOS
C
A
C
A
C
B
Approach Delay
12.5
18.1
15.2
Approach LOS
B
B
B
Queue Length 50th (ft)
59
0
152
46
28
14
Queue Length 95th (ft)
88
69
m237
m63
58
32
Internal Link Dist (ft)
1216
327
1036
836
Turn Bay Length (ft)
350
Base Capacity (vph)
1015
931
709
1914
567
1121
Starvation Cap Reductn
0
0
0
0
0
0
Spillback Cap Reductn
0
0
0
0
0
0
Storage Cap Reductn
0
0
0
0
0
0
Reduced v/c Ratio
0.25
0.72
0.65
0.18
0.12
0.11
Intersection Summary
Cycle Length: 90
Actuated Cycle Length: 90
Offset: 0 (0%), Referenced to phase 2:EBWB
and
6:, Start of Green
Natural Cycle: 55
Control Type: Actuated -Coordinated
Maximum v/c Ratio: 0.80
2/8/2016 Synchro 9 Report
MS Page 1
6: Kirkwood Blvd & SH-114 SB Off -Ramp 2017 Background(Signalized)
TIA for Wilks Tract Office Development in Southlake, Texas Timing Plan: PM
Lane Grouper
06
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
5 6 8
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
5.0 5.0 5.0
Minimum Split (s)
10.0 22.5 22.5
Total Split (s)
22.0 31.8 36.2
Total Split (%)
24% 35 % 40%
Yellow Time (s)
3.5 3.5 3.5
All -Red Time (s)
1.0 1.0 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead Lag
Lead -Lag Optimize?
Yes Yes
Recall Mode
Max C-Max Max
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
2/8/2016 Synchro 9 Report
MS Page 2
6: Kirkwood Blvd & SH-114 SIB Off -Ramp 2017 Background(Signalized)
TIA for Wilks Tract Office Development in Southlake, Texas Timing Plan: PM
Intersection Signal Delay: 15.1 Intersection LOS: B
Intersection Capacity Utilization 73.7 % ICU Level of Service D
Analysis Period (min)15
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases E Kirkwood Blvd & SH-114 58 Oft -Kamp
46 #6 #6
�-�
7A t 0 -002 �4
?Ss
'8 #8
�45 p6 y p8
as
8: SH-114 NB Off -Ramp & Kirkwood Blvd
2017 Background(Signalized)
TIA for Wilks Tract Office Development in Southlake, Texas
Timing Plan: PM
-,*,-,*
r-
4-
T/,.
ti 1
-'
Lane Group - - - - - -
- - E91.
EBT EBR WBL
WBT
WBR
NBL
NBT
NBR
SBL SBT
SBR
Lane Configurations
V1
tt
tt
?I
Vi
+Tf+
Traffic Volume (vph)
345
46 0 0
471
294
278
845
33
0 0
0
Future Volume (vph)
345
46 0 0
471
294
278
845
33
0 0
0
Peak Hour Factor
0.95
0.95 0.95 0.95
0.95
0.95
0.95
0.95
0.95
0.95 0.95
0.95
Adj. Flow (vph)
363
48 0 0
496
309
293
889
35
0 0
0
Shared Lane Traffic (%)
10°%
Lane Group Flow (vph)
363
48 0 0
496
309
264
953
0
0 0
0
Turn Type
pm+pt
NA
NA
Free
Perm
NA
Protected Phases
5
56
6
8
Permitted Phases
56
Free
8
Detector Phase
5
56
6
8
8
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
Minimum Split (s)
10.0
22.5
22.5
22.5
Total Split (s)
22.0
31.8
36.2
36.2
Total Split (%)
24.4%
35.3 %
40.2%
40.2%
Yellow Time (s)
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
4.5
Lead/Lag
Lead
Lag
Lead -Lag Optimize?
Yes
Yes
-
Recall Mode
Max
C-Max
Max
Max
Act Effct Green (s)
44.8
49.3
27.3
90.0
31.7
31.7
Actuated g/C Ratio
0.50
0.55
0.30
1.00
0.35
0.35
v/c Ratio
0.66
0.02
0.46
0.20
0.47
0.80
Control Delay
33.6
9.1
27.1
0.3
25.9
32.5
Queue Delay
0.0
0.0
0.0
0.0
0.0
0.0
-
Total Delay
33.6
9.1
27.1
0.3
25.9
32.5
LOS
C
A
C
A
C
C
Approach Delay
30.7
16.8
31.1
Approach LOS
C
B
C
Queue Length 50th (ft)
148
5
119
0
126
264
Queue Length 95th (ft)
239
12
166
0
205
346
Internal Link Dist (ft)
327
240
1055
1095
Turn Bay Length (ft)
a
Base Capacity(vph)
550
1938
1073
1583
567
1187
Starvation Cap Reductn
0
0
0
0
0
0
Spillback Cap Reductn
0
0
0
0
0
0
Storage Cap Reductn
0
0
0
0
0
0
Reduced v/c Ratio
0.66
0.02
0.46
0.20
0.47
0.80
Intersection Summary
Cycle Length: 90
Actuated Cycle Length: 90
Offset: 0 (0%), Referenced to phase 2:EBWB and 6:, Start of Green
Natural Cycle: 55
Control Type: Actuated -Coordinated
Maximum v/c Ratio: 0.80
2/8/2016 Synchro 9 Report 2/8/2016 Synchro 9 Report
MS Page 3 MS Page 4
8: SH-114 NB Off -Ramp & Kirkwood Blvd 2017 Background(Signalized)
TIA for Wilks Tract Office Development in Southlake, Texas Timing Plan: PM
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All -Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead -Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
5.0 5.0 5.0
9.5 22.5 22.5
25.0 28.8 36.2
28% 32% 40%
3.5 3.5 3.5
1.0 1.0 1.0
Lead Lag
Yes Yes
None C-Max Max
8: SH-114 NB Off -Ramp & Kirkwood Blvd 2017 Background(Signalized)
TIA for Wilks Tract Office Development in Southlake, Texas Timing Plan: PM
Intersection Signal Delay: 26.3 Intersection LOS: C
Intersection Capacity Utilization 73.7% ICU Level of Service D
Analysis Period (min)15
Splits and Phases: 8: SH-114 NB Off -Ramp & Kirkwood Blvd
=6 #6
7�tp2
=6
04
25 s
36.2 s
F
AS 06 LA3
gas
s6.zs
2/8/2016 Synchro 9 Report 2/8/2016
MS Page 5 MS
Synchro 9 Report
Page 6
22: Dove Rd & Kirkwood Blvd
2017 Background(Signalized)
TIA for Wilks Tract Office Development in Southlake, Texas Timing Plan: PM
*_
t
ti
r
Lane Grou
WBT
WBR
SBL
SBR
Lane Configurations
►j
Tt
Tf+
Vi
?I
Traffic Volume (vph)
104
164
235
196
90
276
Future Volume (vph)
104
164
235
196
90
276
Peak Hour Factor
0.90
0.90
0.90
0.90
0.90
0.90
Adj. Flow (vph)
116
182
261
218
100
307
Shared Lane Traffic
Lane Group Flow (vph)
116
182
479
0
100
307
Turn Type
pm+pt
NA
NA
Prot
Perm
Protected Phases
7
4
8
1
Permitted Phases
4
6
Detector Phase
7
4
8
1
6
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
5.0
Minimum Split (s)
9.5
22.5
22.5
9.5
22.5
Total Split (s)
16.0
43.0
27.0
37.0
37.0
Total Split(%)
20.0%
53.8%
33.8%
46.3%
46.3%
Yellow Time (s)
3.5
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
4.5
4.5
Lead/Lag
Lead
Lag
Lead -Lag Optimize?
Yes
Yes
Recall Mode
None
C-Max
C-Max
None
Max
Act Effct Green (s)
38.5
38.5
27.7
27.2
32.5
Actuated g/C Ratio
0.48
0.48
0.35
0.34
0.41
v/c Ratio
0.27
0.11
0.37
0.17
0.37
Control Delay
12.5
10.6
12.3
16.4
3.5
Queue Delay
0.0
0.0
0.0
0.0
0.0
Total Delay
12.5
10.6
12.3
16.4
3.5
LOS
B
B
B
B
A
Approach Delay
11.3
12.3
6.6
Approach LOS
B
B
A
Queue Length 50th (ft)
35
28
50
31
0
Queue Length 95th (ft)
m65
m49
94
61
45
Internal Link Dist (ft)
990
172
351
Turn Bay Length (ft)
100
Base Capacity (vph)
472
1703
1283
719
825
Starvation Cap Reductn
0
0
0
0
0
Spillback Cap Reductn
0
0
0
0
0
Storage Cap Reductn
0
0
0
0
0
Reduced v/c Ratio
0.25
0.11
0.37
0.14
0.37
Intersection Summary
Cycle Length: 80
Actuated Cycle Length: 80
Offset: 0 (0%), Referenced to phase 4:EBTL
and 8:WBT,
Start of Green
Natural Cycle: 55
Control Type: Actuated -Coordinated
Maximum v/c Ratio: 0.37
2/8/2016 Synchro 9 Report
MS Page 7
22: Dove Rd & Kirkwood Blvd 2017 Background(Signalized)
TIA for Wilks Tract Office Development in Southlake, Texas Timing Plan: PM
Intersection Signal Delay: 10.1 Intersection LOS: B
Intersection Capacity Utilization 37.4 % ICU Level of Service A
Analysis Period (min)15
m Volume for 95th percentile queue is metered by upstream signal.
iplits and Phases: 22: Dove Rd & Kirkwood Blvd
�pl -.04
06 07 08
37 s.
2/8/2016
MS
Synchro 9 Report
Page 8
2: Kirkwood Blvd & T W King Rd
2017 Background
TIA for Wilks Tract Development
in Southlake,
Texas
Timing Plan: AM
Intersection
Intersection Delay, s/veh
13.6
Intersection LOS
B
Movement
EBU
EBL
EBT
WBU
WBT
WBR
SBU
SBL
SBR
Traffic Vol, veh/h
0
28
676
0
35
4
0
61
295
Future Vol, veh/h
0
28
676
0
35
4
0
61
295
Peak Hour Factor
0.92
0.91
0.91
0.92
0.91
0.91
0.92
0.91
0.91
Heavy Vehicles, %
2
2
2
2
2
2
2
2
2
Mvmt Flow
0
31
743
0
38
4
0
67
324
Number of Lanes
0
1
2
0
2
0
0
1
1
Approach -
ff-
iWo
'SB
Opposing Approach
WB
EB
Opposing Lanes
2
3
0
Conflicting Approach Left
SIB
WB
Conflicting Lanes Left
2
0
2
Conflicting Approach Right
SB
EB
Conflicting Lanes Right
0
2
3
HCM Control Delay
13.7
10.3
13.9
HCM LOS
B
B
B
Lane
EBLnl
EBLn2
EBLn3
WBLnl WBLn2 SBLnl
SBLn2
Vol Left,%
100%
0%
0%
0%
0%
100%
0%
Vol Thru, %
0%
100%
100%
100%
74%
0%
0%
Vol Right, %
0%
0%
0%
0%
26%
0%
100%
Sign Control
Stop
Stop
Stop
Stop
Stop
Stop
Stop
Traffic Vol by Lane
28
338
338
23
16
61
295
LT Vol
28
0
0
0
0
61
0
Through Vol
0
338
338
23
12
0
0
RT Vol
0
0
0
0
4
0
295
Lane Flow Rate
31
371
371
26
17
67
324
Geometry Grp
8
8
8
8
8
8
8
Degree ofUtil(X)
0.055
0.613
0.432
0.052
0.034
0.13
0.52
Departure Headway (Hd)
6.447
5.941
4.188
7.247
7.064
6.974
5.773
Convergence, YIN
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Cap
555
609
858
493
505
515
626
Service Time
4.186
3.68
1.926
5.008
4.826
4.71
3.509
HCM Lane VIC Ratio
0.056
0.609
0.432
0.053
0.034
0.13
0.518
HCM Control Delay
9.6
17.7
10.1
10.4
10.1
10.8
14.6
HCM Lane LOS
A
C
B
B
B
B
B
HCM 95th-tile Q
0.2
4.2
2.2
0.2
0.1
0.4
3
2/7/2016
Synchro 9 Report
MS
Page 1
2: Kirkwood Blvd & T W King Rd
2017 Background
6: Solana Blvd/Kirkwood Blvd & SH-114 SIB Off -Ramp
2017 Background
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: PM
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: PM
Intersection
Intersection
Intersection Delay, slveh
15.2
Intersection Delay, s/veh
31.3
Intersection LOS
C
Intersection LOS
D
Movement
EBU
EBL
EBT
WBU
WBT
WBR
SBU
SBL
SBR
Movement
EBU
EBL
EBT
EBR
WBU
WBL
WBT
WBR
NBU
NBL
NBT
NBR
Traffic Vol, veh/h
0
57
19
0
644
108
0
8
119
Traffic Vol, veh/h
0
0
220
582
0
402
302
0
0
0
0
0
Future Vol, veh/h
0
57
19
0
644
108
0
8
119
Future Vol, veh/h
0
0
220
582
0
402
302
0
0
0
0
0
Peak Hour Factor
0.92
0.89
0.89
0.92
0.89
0.89
0.92
0.89
0.89
Peak Hour Factor
0.92
0.87
0.87
0.87
0.92
0.87
0.87
0.87
0.92
0.87
0.87
0.87
Heavy Vehicles,%
2
2
2
2
2
2
2
2
2
Heavy Vehicles,%
2
2
2
2
2
2
2
2
2
2
2
2
Mvmt Flow
0
64
21
0
724
121
0
9
134
Mvmt Flow
0
0
253
669
0
462
347
0
0
0
0
0
Number of Lanes
0
1
2
0
2
0
0
1
1
Number of Lanes
0
0
2
1
0
1
2
0
0
0
0
0
Approach
WB
SB
Approach
Opposing Approach
WB
EB
Opposing Approach
WB
EB
Opposing Lanes
2
3
0
Opposing Lanes
3
3
Conflicting Approach Left
SIB
WB
Conflicting Approach Left
SIB
Conflicting Lanes Left
2
0
2
Conflicting Lanes Left
3
0
Conflicting Approach Right
SIB
EB
Conflicting Approach Right
SB
Conflicting Lanes Right
0
2
3
Conflicting Lanes Right
0
3
HCM Control Delay
10.3
16.5
10.5
HCM Control Delay
27.9
39.5
HCM LOS
B
C
B
HCM LOS
D
E
Lane
EBLnl
EBLn2
EBLn3
WBLnl WBLn2
SBLnl
SBLn2
EBLn1
EBLn2
EBLn3 WBLnl W3Ln2
WBLn3
SBLnt
SBLn2
SBLn3
Vol Left, %
100%
0%
0%
0%
0%
100%
0%
Vol Left, %
0%
0%
0%
100%
0%
0%
100%
98%
0%
Vol Thru, %
0%
100%
100%
100%
67%
0%
0%
Vol Thru, %
100%
100%
0%
0%
100%
100%
0%
2%
2%
Vol Right, %
0%
0%
0%
0%
33%
0%
100%
Vol Right, %
0%
0%
100%
0%
0%
0%
0%
0%
98%
Sign Control
Stop
Stop
Stop
Stop
Stop
Stop
Stop
Sign Control
Stop
Stop
Stop
Stop
Stop
Stop
Stop
Stop
Stop
Traffic Vol by Lane
57
10
10
429
323
8
119
Traffic Vol by Lane
110
110
582
402
151
151
59
60
45
LT Vol
57
0
0
0
0
8
0
LT Vol
0
0
0
402
0
0
59
59
0
Through Vol
0
10
10
429
215
0
0
Through Vol
110
110
0
0
151
151
0
1
1
RT Vol
0
0
0
0
108
0
119
FIT Vol
0
0
582
0
0
0
0
0
44
Lane Flow Rate
64
11
11
482
363
9
134
Lane Flow Rate
126
126
669
462
174
174
68
69
52
Geometry Grp
8
8
8
8
8
8
8
Geometry Grp
8
8
8
8
8
8
7
7
7
Degree ofUtil(X)
0.127
0.02
0.014
0.698
0.501
0,018
0.225
Degree ofUtil(X)
0.256
0.256
0.894
0.964
0.338
0.253
0.161
0.163
0.105
Departure Headway (Hd)
7.123
6.617
4.862
5.211
4.976
7.274
6.071
Departure Headway (Hd)
7.276
7.276
4.811
7.648
7.141
5.385
8.538
8.529
7.333
Convergence, YIN
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Convergence, YIN
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Cap
506
544
739
685
714
495
595
Cap
496
496
756
476
507
672
421
422
490
Service Time
4.831
4.325
2.571
3.005
2.769
4.98
3.777
Service Time
4.985
4.985
2.52
5.348
4.841
3.085
6.265
6.256
5.059
HCM Lane VIC Ratio
0.126
0.02
0.015
0.704
0.508
0.018
0.225
HCM Lane VIC Ratio
0.254
0.254
0.885
0.971
0.343
0.259
0.162
0.164
0.106
HCM Control Delay
10.9
9.5
7.6
19.3
12.7
10.1
10.5
HCM Control Delay
12.5
12.5
33.7
60.4
13.4
9.9
12.9
12.9
10.9
i
HCM Lane LOS
B
A
A
C
B
B
B
HCM Lane LOS
B
B
D
F
B
A
B
B
B
HCM 95th-tile Q
0.4
0.1
0
5.7
2.8
0.1
0.9
HCM 95th-tile Q
1
1
11.6
12
1.5
1
0.6
0.6
0.3
2/7/2016 Synchro 9 Report 2/7/2016 Synchro 9 Report
MS Page 1 MS Page 2
6: Solana Blvd/Kirkwood Blvd & SH-114 SIB Off -Ramp 2017 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
8: SH-114 NB Off-Ramp/SH-114 NB Frontage Rd & Kirkwood Blvd 2017 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Intersection
Intersection
Intersection Delay, s/veh
Intersection Delay, s/veh
51.8
Intersection LOS
Intersection LOS
F
Movement
SBU
SBL
SBT
SBR
Movement
EBU
EBL
EBT
EBR
WBU
WBL
WBT
WBR
NBU
NBL
NBT
NBR
Traffic Vol, veh/h
0
118
2
44
Traffic Vol, veh/h
0
345
46
0
0
0
471
294
0
278
845
33
Future Vol, veh/h
0
118
2
44
Future Vol, veh/h
0
345
46
0
0
0
471
294
0
278
845
33
Peak Hour Factor
0.92
0.87
0.87
0.87
Peak Hour Factor
0.92
0.95
0.95
0.95
0.92
0.95
0.95
0.95
0.92
0.95
0.95
0.95
Heavy Vehicles, %
2
2
2
2
Heavy Vehicles, %
2
2
2
2
2
2
2
2
2
2
2
2
Mvmt Flow
0
136
2
51
Mvmt Flow
0
363
48
0
0
0
496
309
0
293
889
35
Number of Lanes
0
1
2
0
Number of Lanes
0
1
2
0
0
0
2
1
0
1
2
0
Approach
Approach
is
Opposing Approach
Opposing Approach
WB
EB
Opposing Lanes
0
Opposing Lanes
3
3
0
Conflicting Approach Left
WB
Conflicting Approach Left
NB
EB
Conflicting Lanes Left
3
Conflicting Lanes Left
0
3
3
Conflicting Approach Right
EB
Conflicting Approach Right
NB
WB
Conflicting Lanes Right
3
Conflicting Lanes Right
3
0
3
HCM Control Delay
12.4
HCM Control Delay
77
25.4
60.7
HCM LOS
B
HCM LOS
F
D
F
Larre,
NBLnl
NBLn2
NBLn3
EBLnl
EBLn2
EBLn3
WBLnl
WBLn2 WBLn3
Vol Left,%
100%
6%
0%
100%
0%
0%
0%
0%
0%
Vol Thru,%
0%
94%
93%
0%
100%
100%
100%
100%
0%
Vol Right, %
0%
0%
7%
0%
0%
0%
0%
0%
100%
Sign Control
Stop
Stop
Stop
Stop
Stop
Stop
Stop
Stop
Stop
Traffic Vol by Lane
250
450
456
345
23
23
236
236
294
LT Vol
250
28
0
345
0
0
0
0
0
Through Vol
0
422
423
0
23
23
236
236
0
FIT Vol
0
0
33
0
0
0
0
0
294
Lane Flow Rate
263
474
479
363
24
24
248
248
309
Geometry Grp
7
7
7
8
8
8
8
8
8
Degree ofUtil(X)
0.623
1
1
1
0.073
0.061
0,655
0.655
0.609
Departure Headway (Hd)
8.516
8.051
7.97
11.31
10.812
9.086
9.513
9.513
7.087
Convergence, YIN
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Cap
427
455
460
323
332
395
382
382
511
Service Time
6.233
5.768
5.687
9.057
8.56
6.833
7.226
7.226
4.8
HCM Lane VIC Ratio
0.616
1.042
1.041
1.124
0.072
0.061
0.649
0.649
0.605
HCM Control Delay
24.3
71
70.6
85.5
14.4
12.4
28.6
28.6
20.2
i
HCM Lane LOS
C
F
F
F
B
B
D
D
C
HCM 95th-tile Q
4.1
12.9
13
10.9
0.2
0.2
4.5
4.5
4
II-
2/7/2016 Synchro 9 Report 2/7/2016 Synchro 9 Report
MS Page 3 MS Page 4
8: SH-114 NB Off-Ramp/SH-114 NB Frontage Rd & Kirkwood Blvd
2017 Background
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: PM
Intersection
Intersection Delay, s/veh
Intersection LOS
Movement
SBU SBL
SBT
SBR
Traffic Vol, veh/h
0 0
0
0
Future Vol, veh/h
0 0
0
0
Peak Hour Factor
0.92 0.95
0.95
0.95
Heavy Vehicles, %
2 2
2
2
Mvmt Flow
0 0
0
0
Number of Lanes
0 0
0
0
Approach —
_
Opposing Approach
Opposing Lanes
Conflicting Approach Left
Conflicting Lanes Left
Conflicting Approach Right
Conflicting Lanes Right
HCM Control Delay
HCM LOS
Lane'
2/7/2016
Synchro 9 Report
MS
Page 5
22: Dove Rd & Kirkwood Blvd
2017 Background
TIA for Wilks Tract Development in
Southlake, Texas
Timing Plan: PM
Intersection
Int Delay, s/veh 5.9
Movement -1
EBL
EBT
WBT WBR
SBL
SBR
Traffic Vol, veh/h
104
164
235 196
90
276
Future Vol, veh/h
104
164
235 196
90
276
Conflicting Peds, #Ihr
0
0
0 0
0
0
Sign Control
Free
Free
Free Free
Stop
Stop
RT Channelized
-
None
None
-
None
Storage Length
100
-
0
0
Veh in Median Storage, #
0
0 -
1
-
Grade, %
0
0 -
0
-
Peak Hour Factor
90
90
90 90
90
90
Heavy Vehicles, %
2
2
2 2
2
2
Mvmt Flow
116
182
261 218
100
307
Major/Minor
Majorl
Major2
Minor2
Conflicting Flow All
479
0
0
692
239
Stage 1
-
370
-
Stage 2
-
322
-
Critical Hdwy
4.14
6.84
6.94
Critical Hdwy Stg 1
-
5.84
-
Critical Hdwy Stg 2
-
5.84
-
Follow-up Hdwy
2.22
3.52
3.32
Pot Cap-1 Maneuver
1080
378
762
Stage 1
-
669
-
Stage 2
-
707
-
Platoon blocked,
Mov Cap-1 Maneuver
1080
337
762
Mov Cap-2 Maneuver
337
Stage 1
669
Stage 2
631
Approach
EB
WB
HCM Control Delay, s
3.4
0
14.7
HCM LOS
B
Minor Lane/Major Mvmt
EBL
EBT WBT WBR SBLnl SBLn2
Capacity (veh/h)
1080
337 762
HCM Lane VIC Ratio
0.107
0.297 0.402
HCM Control Delay (s)
8.7
20.1 12.9
HCM Lane LOS
A
C B
HCM 95th %tile Q(veh)
0.4
1.2 2
2/7/2016
Synchro 9 Report
MS
Page 1
16: Dove Rd & SH-114 SIB Off -Ramp
2017 Background + Site
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: AM
Lane Group EBL
EST EBR
WBL
WBT
WBR NBL NBT NBR
SBL
Lane Configurations
tT+
+Tt
)
r{
Traffic Volume (vph) 0
358 678
87
441
0 0 0 0
137
116 54
Future Volume (vph) 0
358 678
87
441
0 0 0 0
137
116 54
Peak Hour Factor 0.83
0.83 0.83
0.83
0.83
0.83 0.83 0.83 0.83
0.83
0.83 0.83
Adj. Flow (vph) 0
431 817
105
531
0 0 0 0
165
140 65
Shared Lane Traffic (°!°)
25%
Lane Group Flow (vph) 0
1248 0
0
636
0 0 0 0
124
246 0
Turn Type
NA
pm+pt
NA
Perm
NA
Protected Phases
2
1
21
4
Permitted Phases
21
4
Detector Phase
2
1
21
4
4
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
Minimum Split (s)
22.5
9.5
22.5
22.5
Total Split (s)
30.0
15.0
25.0
25.0
Total Split (%)
42.9%
21.4 %
35.7 %
35.7%
Yellow Time (s)
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
Lead/Lag
Lag
Lead
Lead
Lead -Lag Optimize?
Yes
Yes
Yes
Recall Mode
C-Max
None
None
None
Act Effct Green (s)
37.4
45.4
11.1
11.1
Actuated g/C Ratio
0.53
0.65
0.16
0.16
v/c Ratio
0.62
0.40
0.49
0.44
Control Delay
7.3
3.0
32.4
21.0
Queue Delay
0.0
0.0
0.0
0.0
Total Delay
7.3
3.0
32.4
21.0
LOS
A
A
C
C
Approach Delay
7.3
3.0
24.8
Approach LOS
A
A
C
Queue Length 50th (ft)
72
2
54
39
Queue Length 95th (ft)
133
33
90
59
Internal Link Dist (ft)
224
394
1722
1376
Turn Bay Length (ft)
240
Base Capacity (vph)
2007
1711
471
991
Starvation Cap Reductn
0
0
0
0
Spillback Cap Reductn
0
0
0
0
Storage Cap Reductn
0
0
0
0
Reduced v/c Ratio
0.62
0.37
0.26
0.25
Intersection Summary
Cycle Length: 70
Actuated Cycle Length: 70
JIEEEEEW�
Offset: 0 (0%), Referenced to phase 2:EBWB
and 6:, Start of Green
Natural Cycle: 60
Control Type: Actuated -Coordinated
Maximum v/c Ratio: 0.62
TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report
MS Page 1
16: Dove Rd & SH-114 SB Off -Ramp 2017 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Lane Group
o6 08
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
5 6 8
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
5.0 5.0 5.0
Minimum Split (s)
9.5 22.5 22.5
Total Split (s)
15.0 30.0 25.0
Total Split (%)
21 % 43 % 36%
Yellow Time (s)
3.5 3.5 3.5
All -Red Time (s)
1.0 1.0 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lag Lead
Lead -Lag Optimize?
Yes Yes
Recall Mode
None C-Min Max
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summer
TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report
MS Page 2
16: Dove Rd & SH-114 SIB Off -Ramp 2017 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Intersection Signal Delay: 8.9 Intersection LOS: A
Intersection Capacity Utilization 63.7 % ICU Level of Service B
Analysis Period (min)15
19: SH-114 NB Frontage Rd & Dove Rd
2017 Background + Site
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: AM
-,*,-,*
r-
4-
T/,.
ti
1
-'
Lane Group
L
EST EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
Lane Configurations
+Tt
0
►j
q +
Traffic Volume (vph)
62
426 0
0
311
83
227
103
332
0
0
0
Future Volume (vph)
62
426 0
0
311
83
227
103
332
0
0
0
Peak Hour Factor
0.80
0.80 0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
Adj. Flow (vph)
78
533 0
0
389
104
284
129
415
0
0
0
Shared Lane Traffic (%)
10%
Lane Group Flow (vph)
0
611 0
0
493
0
256
572
0
0
0
0
Turn Type
pm+pt
NA
NA
Perm
NA
Protected Phases
5
65
6
8
Permitted Phases
65
8
Detector Phase
5
65
6
8
8
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
Minimum Split (s)
9.5
22.5
22.5
22.5
Total Split (s)
15.0
30.0
25.0
25.0
Total Split (%)
21.4%
42.9%
35.7%
35.7%
AN
Yellow Time (s)
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
Lead/Lag
Lag
Lead
Lead
Lead -Lag Optimize?
Yes
Yes
Yes
-
Recall Mode
None
C-Min
Max
Max
Act Effct Green (s)
33.6
19.4
22.9
22.9
Actuated g/C Ratio
0.48
0.28
0.33
0.33
v/c Ratio
0.39
0.50
0.49
0.49
-
Control Delay
9.2
19.8
23.2
10.9
Queue Delay
0.0
0.0
0.0
0.0
-
Total Delay
9.2
19.8
23.2
10.9
LOS
A
B
C
B
-
Approach Delay
9.2
19.8
14.7
Approach LOS
A
B
B
Queue Length 50th (ft)
70
82
96
50
Queue Length 95th (ft)
72
92
150
76
Internal Link Dist (ft)
394
990
1769
1583
Turn Bay Length (ft)
Base Capacity (vph)
1696
1282
527
1179
Starvation Cap Reductn
0
0
0
0
Spillback Cap Reductn
0
0
0
0
Storage Cap Reductn
0
0
0
0
Reduced v/c Ratio
0.36
0.38
0.49
0.49
Intersection Summary
Cycle Length: 70
Actuated Cycle Length: 70
Offset: 0 (0%), Referenced to phase 2:EBWB and 6:, Start
of Green
Natural Cycle: 60
Control Type: Actuated -Coordinated
Maximum v/c Ratio: 0.62
TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report
MS Page 3 MS Page 4
19: SH-114 NB Frontage Rd & Dove Rd 2017 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Lane Group
of o2 o4
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic
Lane Group Flow (vph)
Turn Type
Protected Phases
1 2 4
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
5.0 5.0 5.0
Minimum Split (s)
9.5 22.5 22.5
Total Split (s)
15.0 30.0 25.0
Total Split (%)
21 % 43% 36%
Yellow Time (s)
3.5 3.5 3.5
All -Red Time (s)
1.0 1.0 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lag Lead
Lead -Lag Optimize?
Yes Yes
Recall Mode
None C-Max None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
19: SH-114 NB Frontage Rd & Dove Rd 2017 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Intersection Signal Delay: 14.3 Intersection LOS: B
Intersection Capacity Utilization 49.5 % ICU Level of Service A
Analysis Period (min)15
Splits and Phases: 19: SH-114 NB Frontage Rd & Dove Rd
#16 #16
#16
711
30 s
lS s
#19 19
F
19
Aq5
'Ipa �556 `Rl
TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report
MS Page 5 MS Page 6
6: Solana Blvd/Kirkwood Blvd & SH-114 SIB Off -Ramp
2017 Background + Site
TIA for Wilks Tract Office Development in Southlake, Texas
Timing Plan: AM
Lane Grouf------'TBL
EST
EBR
WBL
WBT WBR NBL
NBT NBR
SBL
S`iBR
Lane Configurations
tt
r
)
tt
)
+TT+
Traffic Volume (vph) 0
302
241
280
604 0 0
0 0
425
1 60
Future Volume (vph) 0
302
241
280
604 0 0
0 0
425
1 60
Peak Hour Factor 0.92
0.92
0.92
0.92
0.92 0.92 0.92
0.92 0.92
0.92
0.92 0.92
Adj. Flow (vph) 0
328
262
304
657 0 0
0 0
462
1 65
Shared Lane Traffic (%)
50%
Lane Group Flow (vph) 0
328
262
304
657 0 0
0 0
231
297 0
Turn Type
NA
Perm
pm+pt
NA
Perm
NA
Protected Phases
2
1
12
4
Permitted Phases
2
12
4
Detector Phase
2
2
1
12
4
4
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
5.0
Minimum Split (s)
22.5
22.5
9.5
22.5
22.5
Total Split (s)
27.4
27.4
15.6
47.0
47.0
Total Split (%)
30.4%
30.4 %
17.3 %
52.2 %
52.2%
Yellow Time (s)
3.5
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
4.5
4.5
Lead/Lag
Lag
Lag
Lead
Lead -Lag Optimize?
Yes
Yes
Yes
Recall Mode
C-Max
C-Max
None
None
None
Act Effct Green (s)
28.6
28.6
42.9
47.4
33.6
33.6
Actuated g/C Ratio
0.32
0.32
0.48
0.53
0.37
0.37
v/c Ratio
0.29
0.38
0.52
0.35
0.38
0.25
Control Delay
26.0
5.5
19.0
14.6
21.1
15.2
Queue Delay
0.0
0.0
0.0
0.0
0.0
0.0
Total Delay
26.0
5.5
19.0
14.6
21.1
15.2
LOS
C
A
B
B
C
B
Approach Delay
16.9
16.0
17.8
Approach LOS
B
B
B
Queue Length 50th (ft)
80
0
113
130
102
50
Queue Length 95th (ft)
119
58
168
167
141
68
Internal Link Dist (ft)
1214
327
1036
836
Turn Bay Length (ft)
350
Base Capacity (vph)
1124
681
585
1827
760
1517
Starvation Cap Reductn
0
0
0
0
0
0
Spillback Cap Reductn
0
0
0
0
0
0
Storage Cap Reductn
0
0
0
0
0
0
Reduced v/c Ratio
0.29
0.38
0.52
0.36
0.30
0.20
Intersection Summary
Cycle Length: 90
Actuated Cycle Length: 90
Offset: 0 (0%), Referenced to phase 2:EBWB
and
6:, Start of Green
Natural Cycle: 55
Control Type: Actuated -Coordinated
Maximum v/c Ratio: 0.70
TIA for Wilks Tract Office Development in Southlake, Texas Synchro 9 Report
MS Page 1
6: Solana Blvd/Kirkwood Blvd & SH-114 SB Off -Ramp 2017 Background + Site
TIA for Wilks Tract Office Development in Southlake, Texas Timing Plan: AM
Lane Group
o6 08
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
5 6 8
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
5.0 5.0 5.0
Minimum Split (s)
9.5 22.5 22.5
Total Split (s)
19.5 23.5 47.0
Total Split (%)
22% 26% 52%
Yellow Time (s)
3.5 3.5 3.5
All -Red Time (s)
1.0 1.0 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lag Lead
Lead -Lag Optimize?
Yes Yes
Recall Mode
None C-Max None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summer
TIA for Wilks Tract Office Development in Southlake, Texas Synchro 9 Report
MS Page 2
6: Solana Blvd/Kirkwood Blvd & SH-114 SIB Off -Ramp 2017 Background + Site
TIA for Wilks Tract Office Development in Southlake, Texas Timing Plan: AM
Intersection Signal Delay: 16.7 Intersection LOS: B
Intersection Capacity Utilization 51.2 % ICU Level of Service A
Analysis Period (min)15
Splits and Phases: 6: Solana Blvd/Kirkwood Blvd & SH-114 SB Off -Ramp
#6 6
�otz r
=6II
i 14
15.6s 1 127.4s
47s
F
�p6 `R'
AS
A9
23.5s
19.5s
47sMMMEA
8: SH-114 NB Off -Ramp & Kirkwood Blvd
2017 Background + Site
TIA for Wilks Tract Office Development in Southlake, Texas
Timing Plan: AM
-,*,-,*
r-
4-
T/,.
ti 1
-'
Lane Group - - - - - -
- - ML
EBT EBR WBL
WBT
WBR
NBL
NBT
NBR
SBL SBT
SBR
Lane Configurations
V1
tt
tt
?I
Vi
+Tf+
Traffic Volume (vph)
124
605 0 0
334
40
551
117
449
0 0
0
Future Volume (vph)
124
605 0 0
334
40
551
117
449
0 0
0
Peak Hour Factor
0.92
0.92 0.92 0.92
0.92
0.92
0.92
0.92
0.92
0.92 0.92
0.92
Adj. Flow (vph)
135
658 0 0
363
43
599
127
488
0 0
0
Shared Lane Traffic (%)
30°%
Lane Group Flow (vph)
135
658 0 0
363
43
419
795
0
0 0
0
Turn Type
pm+pt
NA
NA
Free
Perm
NA
Protected Phases
5
56
6
8
Permitted Phases
56
Free
8
Detector Phase
5
56
6
8
8
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
Minimum Split (s)
9.5
22.5
22.5
22.5
Total Split (s)
19.5
23.5
47.0
47.0
Total Split (%)
21.7 %
26.1 %
52.2%
52.2%
Yellow Time (s)
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
4.5
Lead/Lag
Lag
Lead
Lead -Lag Optimize?
Yes
Yes
Recall Mode
None
C-Max
None
None
Act Effct Green (s)
42.9
47.4
27.9
90.0
33.6
33.6
Actuated g/C Ratio
0.48
0.53
0.31
1.00
0.37
0.37
v/c Ratio
0.24
0.35
0.33
0.03
0.70
0.65
-
Control Delay
18.4
17.2
27.0
0.0
29.4
20.5
Queue Delay
0.0
0.0
0.0
0.0
0.0
0.0
-
Total Delay
18.4
17.2
27.0
0.0
29.4
20.5
LOS
B
B
C
A
C
C
Approach Delay
17.4
24.2
23.6
Approach LOS
B
C
C
-
Queue Length 50th (ft)
47
130
84
0
214
162
Queue Length 95th (ft)
85
168
140
0
279
190
Internal Link Dist (ft)
327
247
1055
1095
Turn Bay Length (ft)
Base Capacity(vph)
571
1862
1095
1583
760
1513
Starvation Cap Reductn
0
0
0
0
0
0
Spillback Cap Reductn
0
0
0
0
0
0
Storage Cap Reductn
0
0
0
0
0
0
Reduced v/c Ratio
0.24
0.35
0.33
0.03
0.55
0.53
Intersection Summary
Cycle Length: 90
Actuated Cycle Length: 90
Offset: 0 (0%), Referenced to phase 2:EBWB and 6:, Start of Green
Natural Cycle: 55
Control Type: Actuated -Coordinated
Maximum v/c Ratio: 0.70
TIA for Wilks Tract Office Development in Southlake, Texas Synchro 9 Report TIA for Wilks Tract Office Development in Southlake, Texas Synchro 9 Report
MS Page 3 MS Page 4
8: SH-114 NB Off -Ramp & Kirkwood Blvd 2017 Background + Site
TIA for Wilks Tract Office Development in Southlake, Texas Timing Plan: AM
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All -Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead -Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
5.0 5.0 5.0
9.5 22.5 22.5
15.6 27.4 47.0
17% 30% 52%
3.5 3.5 3.5
1.0 1.0 1.0
Lead Lag
Yes Yes
None C-Max None
TIA for Wilks Tract Office Development in Southlake, Texas
MS
Synchro 9 Report
Page 5
8: SH-114 NB Off -Ramp & Kirkwood Blvd 2017 Background + Site
TIA for Wilks Tract Office Development in Southlake, Texas Timing Plan: AM
Intersection Signal Delay: 21.7 Intersection LOS: C
Intersection Capacity Utilization 51.2 % ICU Level of Service A
Analysis Period (min)15
Splits and Phases: 8: SH-114 NB Off -Ramp & Kirkwood Blvd
=6 =6
741 �2
=6
j 04
15.6s 27.4s
47s
�8 8
F
�A6 R) RS
-8
23.5 s
47 s
TIA for Wilks Tract Office Development in Southlake, Texas
MS
Synchro 9 Report
Page 6
22: Dove Rd & Kirkwood Blvd
2017 Background + Site
TIA for Wilks Tract Office Development in Southlake, Texas Timing Plan: AM
*_
t
ti
r
Lane Grou
WBT
WBR
SBL
SBR
Lane Configurations
►j
Tt
Tf+
Vi
?I
Traffic Volume (vph)
446
180
246
100
35
128
Future Volume (vph)
446
180
246
100
35
128
Peak Hour Factor
0.77
0.77
0.77
0.77
0.77
0.77
Adj. Flow (vph)
579
234
319
130
45
166
Shared Lane Traffic (%)
Lane Group Flow (vph)
579
234
449
0
45
166
Turn Type
pm+pt
NA
NA
Prot
Perm
Protected Phases
7
4
8
1
Permitted Phases
4
6
Detector Phase
7
4
8
1
6
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
5.0
Minimum Split (s)
9.5
22.5
22.5
9.5
9.5
Total Split (s)
35.2
57.8
22.6
12.2
12.2
Total Split(%)
50.3%
82.6%
32.3%
17.4%
17.4%
Yellow Time (s)
3.5
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
4.5
4.5
Lead/Lag
Lead
Lag
Lead -Lag Optimize?
Yes
Yes
Recall Mode
None
C-Max
C-Max
None
None
Act Effct Green (s)
54.3
54.3
34.2
6.9
6.7
Actuated g/C Ratio
0.78
0.78
0.49
0.10
0.10
v/c Ratio
0.70
0.09
0.26
0.26
0.55
Control Delay
10.7
2.8
10.6
32.8
13.1
Queue Delay
0.0
0.0
0.0
0.0
0.0
Total Delay
10.7
2.8
10.6
32.8
13.1
LOS
B
A
B
C
B
Approach Delay
8.5
10.6
17.3
Approach LOS
A
B
B
Queue Length 50th (ft)
143
15
42
18
0
Queue Length 95th (ft)
132
16
80
39
33
Internal Link Dist (ft)
990
172
351
Turn Bay Length (ft)
100
Base Capacity (vph)
1042
2743
1697
194
321
Starvation Cap Reductn
0
0
0
0
0
Spillback Cap Reductn
0
0
0
0
0
Storage Cap Reductn
0
0
0
0
0
Reduced v/c Ratio
0.56
0.09
0.26
0.23
0.52
Intersection Summary
Cycle Length: 70
Actuated Cycle Length: 70
Offset: 0 (0%), Referenced to phase 4:EBTL
and 8:WBT,
Start of Green
Natural Cycle: 50
Control Type: Actuated -Coordinated
Maximum v/c Ratio: 0.70
22: Dove Rd & Kirkwood Blvd 2017 Background + Site
TIA for Wilks Tract Office Development in Southlake, Texas Timing Plan: AM
Intersection Signal Delay: 10.4 Intersection LOS: B
Intersection Capacity Utilization 50.1 % ICU Level of Service A
Analysis Period (min)15
iplits and Phases: 22: Dove Rd & Kirkwood Blvd
pl '�►04
F
pb 1007 05 `R1
1211 z2.6 s
TIA for Wilks Tract Office Development in Southlake, Texas Synchro 9 Report TIA for Wilks Tract Office Development in Southlake, Texas Synchro 9 Report
MS Page 7 MS Page 8
2: Driveway 4/T W King Rd & Kirkwood Blvd 2017 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Intersection
Intersection Delay, s/veh
20.1
Intersection LOS
C
Movement
EBU
EBL
EBT
EBR
WBU
WBL
WBT
WBR
NBU
NBL
NBT
NBR
Traffic Vol, veh/h
0
28
617
93
0
0
69
8
0
13
0
0
Future Vol, veh/h
0
28
617
93
0
0
69
8
0
13
0
0
Peak Hour Factor
0.92
0.91
0.91
0.92
0.92
0.92
0.91
0.91
0.92
0.92
0.92
0.92
Heavy Vehicles, %
2
2
2
2
2
2
2
2
2
2
2
2
Mvmt Flow
0
31
678
101
0
0
76
9
0
14
0
0
Number of Lanes
0
1
2
0
0
0
2
0
0
0
2
0
Approach
T
t
Opposing Approach
WB
EB
SIB
Opposing Lanes
2
3
2
Conflicting Approach Left
SIB
NB
EB
Conflicting Lanes Left
2
2
3
Conflicting Approach Right
NB
SB
WB
Conflicting Lanes Right
2
2
2
HCM Control Delay
23.3
11.4
11.8
HCM LOS
C
B
B
Lane NBLn1 NBLn2 EBLnl E13Ln2 EBLn3 WBLnl WBLn2 SBLnl S13Ln2
Vol Left,%
100%
0%
100%
0%
0%
0%
0%
100%
0%
Vol Thru, %
0%
100%
0%
100%
69%
100%
74%
0%
0%
Vol Right, %
0%
0%
0%
0%
31%
0%
26%
0%
100%
Sign Control
Stop
Stop
Stop
Stop
Stop
Stop
Stop
Stop
Stop
Traffic Vol by Lane
13
0
28
411
299
46
31
92
295
LT Vol
13
0
28
0
0
0
0
92
0
Through Vol
0
0
0
411
206
46
23
0
0
RT Vol
0
0
0
0
93
0
8
0
295
Lane Flow Rate
14
0
31
452
327
51
34
101
324
Geometry Grp
8
8
8
8
8
8
8
8
8
Degree ofUtil(X)
0.034
0
0.058
0.794
0.554
0.11
0.072
0.211
0.569
Departure Headway (Hd)
8.747
8.237
6.829
6.322
6.101
7.801
7.615
7.529
6.323
Convergence, YIN
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Cap
412
0
523
570
589
456
467
475
567
Service Time
6.447
5.937
4.59
4.083
3,862
5.599
5.413
5.298
4.092
HCM Lane VIC Ratio
0.034
0
0.059
0.793
0.555
0.112
0.073
0.213
0.571
HCM Control Delay
11.8
10.9
10
29.3
16.2
11.6
11
12.3
17.2
HCM Lane LOS
B
N
A
D
C
B
B
B
C
HCM 95th-tile Q
0.1
0
0.2
7.6
3.4
0.4
0.2
0.8
3.5
TIA for Wilks Tract Development in Southlake, Texas
MS
2: Driveway 4/T W King Rd & Kirkwood Blvd 2017 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Intersection
Intersection Delay, s/veh
Intersection LOS
Movement
SBU
SBL
SBT
SB;
Traffic Vol, veh/h
0
92
0
295
Future Vol, veh/h
0
92
0
295
Peak Hour Factor
0.92
0.91
0.92
0.91
Heavy Vehicles, %
2
2
2
2
Mvmt Flow
0
101
0
324
Number of Lanes
0
0
1
1
Approach
SIB
Opposing Approach
NB
Opposing Lanes
2
Conflicting Approach Left
WB
Conflicting Lanes Left
2
Conflicting Approach Right
EB
Conflicting Lanes Right
3
HCM Control Delay
16
HCM LOS
C
Synchro 9 Report TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report
Page 1 MS Page 2
14: Kirkwood Blvd & Driveway 1 2017 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Intersection
Int Delay, s/veh 2.8
22: Dove Rd & Kirkwood Blvd 2017 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Intersection -Roomy"
Int Delay, s/veh 15.6
Movement -1
EBL
EBR
NBL
NBT
SBT
SBR
Movement �
EBL
EBT
WBT WBR
SBL
SBR i
Traffic Vol, veh/h
21
26
187
290
22
156
Traffic Vol, veh/h
446
180
246
100
35
128
Future Vol, veh/h
21
26
187
290
22
156
Future Vol, veh/h
446
180
246
100
35
128
Conflicting Peds, #Ihr
0
0
0
0
0
0
Conflicting Peds, #Ihr
0
0
0
0
0
0
Sign Control
Stop
Stop
Free
Free
Free
Free
Sign Control
Free
Free
Free
Free
Stop
Stop
RT Channelized
-
None
-
None
None
RT Channelized
-
None
None
-
None
Storage Length
0
100
150
-
-
150
Storage Length
100
-
0
0
Veh in Median Storage, #
0
-
-
0
0
-
Veh in Median Storage, #
-
0
0
1
-
Grade, %
0
-
-
0
0
-
Grade, %
-
0
0
0
-
Peak Hour Factor
92
92
92
92
92
92
Peak Hour Factor
77
77
77
77
77
77
Heavy Vehicles,%
2
2
2
2
2
2
Heavy Vehicles,%
2
2
2
2
2
2
Mvmt Flow
23
28
203
315
24
170
Mvmt Flow
579
234
319
130
45
166
Major/Minor
Minor2
Majorl
Major2
Major/Minor
Majort
Major2
Minor2
Conflicting Flow All
588
12
24
0
0
Conflicting Flow All
449
0
0
1659
225
Stage 1
24
-
-
-
-
Stage 1
-
-
-
384
-
Stage 2
564
-
-
Stage 2
-
1275
-
Critical Hdwy
6.84
6.94
4.14
Critical Hdwy
4.14
6.84
6.94
Critical Hdwy Stg 1
5.84
-
-
Critical Hdwy Stg 1
5.84
Critical Hdwy Stg 2
5.84
-
-
Critical Hdwy Stg 2
-
5,84
-
Follow-up Hdwy
3.52
3.32
2.22
Follow-up Hdwy
2.22
3.52
3.32
Pot Cap-1 Maneuver
440
1065
1589
Pot Cap-1 Maneuver
1108
88
778
Stage 1
995
-
-
Stage 1
-
658
-
Stage 2
533
-
-
Stage 2
-
226
-
Platoon blocked, %
Platoon blocked, %
Mov Cap-1 Maneuver
384
1065
1589
Mov Cap-1 Maneuver
1108
- 42
778
Mov Cap-2 Maneuver
384
-
-
Mov Cap-2 Maneuver
-
- 42
-
Stage 1
995
Stage 1
658
Stage 2
465
Stage 2
108
Approach
EB
NB
SB
Approach
EB
WB
Sl3
HCM Control Delay, s
11.4
3
0
HCM Control Delay, s
8.4
0
76.1
HCM LOS
B
HCM LOS
F
Minor Lane/MajorMvmt
NBL
NBTEBLn1EBLn2 SBT SBR
Capacity (veh/h)
1589
384 1065
HCM Lane V/C Ratio
0.128
0.059 0.027
HCM Control Delay (s)
7.6
15 8.5
HCM Lane LOS
A
C A
HCM 95th %tile Q(veh)
0.4
0.2 0.1
TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report
MS Page 1
Minor Lane/Major Mvmt
EBL
EBT WBT WBR SBLnl SBLn2
Capacity (veh/h)
1108
42 778
HCM Lane V/C Ratio
0.523
1.082 0.214
HCM Control Delay (s)
11.8
$ 314.4 10.9
HCM Lane LOS
B
F B
HCM 95th %tile Q(veh)
3.1
4.4 0.8
Notes
-: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined ': All major volume in platoon
TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report
MS Page 2
30: Kirkwood Blvd & Driveway 2
2017 Background + Site
TIA for Wilks Tract Development
in Southlake,
Texas
Timing Plan: AM
Intersection
Int Delay, s/veh 1.2
Movement -1
EBL
EBR
NBL
NBT
SBT
SBR
Traffic Vol, veh/h
17
9
62
249
169
125
Future Vol, veh/h
17
9
62
249
169
125
Conflicting Peds, #/hr
0
0
0
0
0
0
Sign Control
Stop
Stop
Free
Free
Free
Free
RT Channelized
-
None
-
None
None
Storage Length
0
100
150
-
150
Veh in Median Storage, #
0
-
-
0
0
-
Grade, %
0
-
-
0
0
-
Peak Hour Factor
92
92
92
92
92
92
Heavy Vehicles, %
2
2
2
2
2
2
Mvmt Flow
18
10
67
271
184
136
Major/Minor
Minor2
Majorl
Major2
Conflicting Flow All
454
92
184
0
0
Stage 1
184
-
-
-
-
Stage 2
270
-
-
Critical Hdwy
6.84
6.94
4.14
Critical Hdwy Stg 1
5.84
-
-
Critical Hdwy Stg 2
5.84
-
-
Follow-up Hdwy
3.52
3.32
2.22
Pot Cap-1 Maneuver
535
947
1388
Stage 1
829
-
-
Stage 2
751
-
-
Platoon blocked,
Mov Cap-1 Maneuver
509
947
1388
Mov Cap-2 Maneuver
509
-
-
Stage 1
829
Stage 2
715
Approach
EB
NB
SB
HCM Control Delay, s
11.1
1.5
0
HCM LOS
B
Minor Lane/MajorMvmt
NBL
NBTEBLn1EBLn2
SBT
SBR
Capacity (veh/h)
1388
509 947
HCM Lane V/C Ratio
0.049
0.036 0.01
HCM Control Delay (s)
7.7
12.3 8.8
HCM Lane LOS
A
B A
HCM 95th %tile Q(veh)
0.2
0.1 0
TIA for Wilks Tract Development in Southlake, Texas
Synchro 9 Report
MS
Page 3
16: SH-114 SB Frontage Rd/SH-114 SB Off -Ramp & Dove Rd 2017 Background + Site
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: PM
Lane Group = EBL
EST
EBR WBL
WBT
WBR NBL NBT NBR
SBL
Lane Configurations
tT+
+Tt
►j
r{
Traffic Volume (vph) 0
152
262 355
1095
0 0 0 0
90
128 111
Future Volume (vph) 0
152
262 355
1095
0 0 0 0
90
128 111
Peak Hour Factor 0.96
0.96
0.96 0.96
0.96
0.96 0.96 0.96 0.96
0.96
0.96 0.96
Adj. Flow (vph) 0
158
273 370
1141
0 0 0 0
94
133 116
Shared Lane Traffic (°!°)
10%
Lane Group Flow (vph) 0
431
0 0
1511
0 0 0 0
85
258 0
Turn Type
NA
pm+pt
NA
Perm
NA
Protected Phases
2
1
12
4
Permitted Phases
12
4
Detector Phase
2
1
12
4
4
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
Minimum Split (s)
22.5
9.5
22.5
22.5
Total Split (s)
25.0
15.0
40.0
40.0
Total Split (%)
31.3%
18.8 %
50.0 %
50.0%
Yellow Time (s)
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
Lead/Lag
Lag
Lead
Lead
Lead -Lag Optimize?
Yes
Yes
Yes
Recall Mode
C-Max
None
None
None
Act Effct Green (s)
44.5
55.0
11.5
11.5
Actuated g/C Ratio
0.56
0.69
0.14
0.14
v/c Ratio
0.23
0.80
0.37
0.54
Control Delay
3.9
7.2
34.6
32.4
Queue Delay
0.0
0.0
0.0
0.0
Total Delay
3.9
7.2
34.6
32.4
LOS
A
A
C
C
Approach Delay
3.9
7.2
32.9
Approach LOS
A
A
C
Queue Length 50th (ft)
17
7
42
59
Queue Length 95th (ft)
44
#171
83
92
Internal Link Dist (ft)
224
394
1722
1376
Turn Bay Length (ft)
240
Base Capacity (vph)
1903
1884
714
1415
Starvation Cap Reductn
0
0
0
0
Spillback Cap Reductn
0
0
0
0
Storage Cap Reductn
0
0
0
0
Reduced v/c Ratio
0.23
0.80
0.12
0.18
Intersection Summary
Cycle Length: 80
Actuated Cycle Length: 80
Offset: 0 (0%), Referenced to phase 2:EBWB
and 6:, Start of Green
Natural Cycle: 70
Control Type: Actuated -Coordinated
Maximum v/c Ratio: 0.85
2/8/2016 Synchro 9 Report
MS Page 1
16: SH-114 SB Frontage Rd/SH-114 SB Off -Ramp & Dove Rd 2017 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Lane Grouper
06 e8
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
5 6 8
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
5.0 5.0 5.0
Minimum Split (s)
9.5 22.5 22.5
Total Split (s)
10.0 30.0 40.0
Total Split (%)
13% 38% 50%
Yellow Time (s)
3.5 3.5 3.5
All -Red Time (s)
1.0 1.0 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead Lag
Lead -Lag Optimize?
Yes Yes
Recall Mode
None C-Min Max
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
2/8/2016 Synchro 9 Report
MS Page 2
16: SH-114 SIB Frontage Rd/SH-114 SIB Off -Ramp & Dove Rd 2017 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Intersection Signal Delay: 10.4 Intersection LOS: B
Intersection Capacity Utilization 70.9 % ICU Level of Service C
Analysis Period (min)15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases: 16: SH-114 SIB Frontage Rd/SH-114 SIB Off -Ramp & Dove Rd
#16 # 16 #16
I1 F I *�
=19
F
19: SH-114 NB Frontage Rd/SH-114 NB On -Ramp & Dove Rd
2017 Background + Site
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: PM
-'*,-,*
r-
4-
T/,.
ti 1
-'
Lane Group
L
EBT EBR WBL
WBT
WBR
NBL
NBT
NBR
SBL SBT
SBR
Lane Configurations
+Tt
0
)
4T+
Traffic Volume (vph)
47
197 0 0
651
143
783
1009
116
0 0
0
Future Volume (vph)
47
197 0 0
651
143
783
1009
116
0 0
0
Peak Hour Factor
0.99
0.99 0.99 0.99
0.99
0.99
0.99
0.99
0.99
0.99 0.99
0.99
Adj. Flow (vph)
47
199 0 0
658
144
791
1019
117
0 0
0
Shared Lane Traffic (%)
20°%
Lane Group Flow (vph)
0
246 0 0
802
0
633
1294
0
0 0
0
Turn Type
pm+pt
NA
NA
Perm
NA
Protected Phases
5
56
6
8
Permitted Phases
56
8
Detector Phase
5
56
6
8
8
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
Minimum Split (s)
9.5
22.5
22.5
22.5
Total Split (s)
10.0
30.0
40.0
40.0
Total Split (%)
12.5 %
37.5 %
50.0%
50.0%
JIM
Yellow Time (s)
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
Lead/Lag
Lead
Lag
Lag
Lead -Lag Optimize?
Yes
Yes
Yes
-
Recall Mode
None
C-Min
Max
Max
Act Effct Green (s)
29.3
23.8
37.2
37.2
Actuated g/C Ratio
0.37
0.30
0.46
0.46
v/c Ratio
0.25
0.77
0.85
0.83
-
Control Delay
13.6
29.8
32.6
25.1
Queue Delay
0.0
0.0
0.0
0.0
-
Total Delay
13.6
29.8
32.6
25.1
LOS
B
C
C
C
Approach Delay
13.6
29.8
27.6
Approach LOS
B
C
C
-
Queue Length 50th (ft)
30
176
306
307
Queue Length 95th (ft)
53
242
#537
#429
Internal Link Dist (ft)
394
990
1769
1583
Turn Bay Length (ft)
Base Capacity (vph)
1052
1120
749
1555
Starvation Cap Reductn
0
0
0
0
Spillback Cap Reductn
0
0
0
0
Storage Cap Reductn
0
0
0
0
Reduced v/c Ratio
0.23
0.72
0.85
0.83
Intersection Summary
Cycle Length: 80
Actuated Cycle Length: 80
Offset: 0 (0%), Referenced to phase 2:EBWB and 6:, Start of Green
Natural Cycle: 70
Control Type: Actuated -Coordinated
Maximum v/c Ratio: 0.85
2/8/2016 Synchro 9 Report 2/8/2016 Synchro 9 Report
MS Page 3 MS Page 4
19: SH-114 NB Frontage Rd/SH-114 NB On -Ramp & Dove Rd 2017 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Lane Group
01 o2 e4
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic
Lane Group Flow (vph)
Turn Type
Protected Phases
1 2 4
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
5.0 5.0 5.0
Minimum Split (s)
9.5 22.5 22.5
Total Split (s)
15.0 25.0 40.0
Total Split (%)
19% 31 % 50 %
Yellow Time (s)
3.5 3.5 3.5
All -Red Time (s)
1.0 1.0 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lag Lead
Lead -Lag Optimize?
Yes Yes
Recall Mode
None C-Max None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
19: SH-114 NB Frontage Rd/SH-114 NB On -Ramp & Dove Rd 2017 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Intersection Signal Delay: 27.0 Intersection LOS: C
Intersection Capacity Utilization 76.8 % ICU Level of Service D
Analysis Period (min)15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases: 19: SH-114 NB Frontage Rd/SH-114 NB On -Ramp & Dove Rd
=16 ik16 =1166
l 042 Y 41
40s 25s
19 79 m 19
F aM 1
2/8/2016 Synchro 9 Report 2/8/2016 Synchro 9 Report
MS Page 5 MS Page 6
6: SH-114 SB Frontage Rd/SH-114 SB Off -Ramp & Solana2BlYd oodr131AdSite(Signalized)
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Lane Grou(S LBL
EST
EBR
WBL
WBT
WBR NBL NBT
NBR
SBL
Lane Configurations
tt
?I
)
tt
r{
Traffic Volume (vph) 0
231
582
428
355
0 0 0
0
162
2
44
Future Volume (vph) 0
231
582
428
355
0 0 0
0
162
2
44
Peak Hour Factor 0.87
0.87
0.87
0.87
0.87
0.87 0.87 0.87
0.87
0.87
0.87
0.87
Adj. Flow (vph) 0
266
669
492
408
0 0 0
0
186
2
51
Shared Lane Traffic (%)
50%
Lane Group Flow (vph) 0
266
669
492
408
0 0 0
0
93
146
0
Turn Type
NA
Perm
pm+pt
NA
Perm
NA
Protected Phases
2
1
12
4
Permitted Phases
2
12
4
Detector Phase
2
2
1
12
4
4
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
5.0
Minimum Split (s)
22.5
22.5
9.5
22.5
22.5
Total Split (s)
28.8
28.8
25.0
36.2
36.2
Total Split (%)
32.0%
32.0 %
27.8 %
40.2 %
40.2%
Yellow Time (s)
3.5
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
4.5
4.5
Lead/Lag
Lag
Lag
Lead
Lead -Lag Optimize?
Yes
Yes
Yes
Recall Mode
C-Max
C-Max
None
Max
Max
Act Effct Green (s)
25.5
25.5
44.8
49.3
31.7
31.7
Actuated g/C Ratio
0.28
0.28
0.50
0.55
0.35
0.35
v/c Ratio
0.27
0.72
0.73
0.21
0.16
0.13
Control Delay
26.4
7.5
28.2
9.3
21.1
13.2
Queue Delay
0.0
0.0
0.0
0.0
0.0
0.0
Total Delay
26.4
7.5
28.2
9.3
21.1
13.2
LOS
C
A
C
A
C
B
Approach Delay
12.9
19.6
16.3
Approach LOS
B
B
B
Queue Length 50th (ft)
62
0
174
51
39
19
Queue Length 95th (ft)
92
69
m260
m67
74
39
Internal Link Dist (ft)
1216
327
1036
836
Turn Bay Length (ft)
350
Base Capacity (vph)
1001
927
699
1907
567
1129
Starvation Cap Reductn
0
0
0
0
0
0
Spillback Cap Reductn
0
0
0
0
0
0
Storage Cap Reductn
0
0
0
0
0
0
Reduced v/c Ratio
0.27
0.72
0.70
0.21
0.16
0.13
Intersection Summary
Cycle Length: 90
Actuated Cycle Length: 90
Offset: 0 (0%), Referenced to phase 2:EBWB
and
6:, Start of Green
Natural Cycle: 65
Control Type: Actuated -Coordinated
Maximum v/c Ratio: 0.81
2/8/2016 Synchro 9 Report
MS Page 1
6: SH-114 SB Frontage Rd/SH-114 SB Off -Ramp & Solana2?Bh/d odrEigvdSite(Signalized)
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Lane Group -
e5 o6 08
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
5 6 8
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
5.0 5.0 5.0
Minimum Split (s)
10.0 22.5 22.5
Total Split (s)
22.0 31.8 36.2
Total Split (%)
24% 35 % 40%
Yellow Time (s)
3.5 3.5 3.5
All -Red Time (s)
1.0 1.0 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead Lag
Lead -Lag Optimize?
Yes Yes
Recall Mode
Max C-Max Max
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
2/8/2016 Synchro 9 Report
MS Page 2
6: SH-114 SIB Frontage Rd/SH-114 SIB Off -Ramp & Solana2BIUH agaodr131vdSite(Signalized)
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Intersection Signal Delay: 16.2 Intersection LOS: B
Intersection Capacity Utilization 75.2 % ICU Level of Service D
Analysis Period (min)15
m Volume for 95th percentile queue is metered by upstream signal
Splits and Phases: 6: SH-114 SIB Frontage Rd/SH-114 SIB Off -Ramp & Solana Blvd/Kirkwood Blvd
46 1 #6
7A 1 '! p2
#6
■ 04
26 s
36.2 s
�45
p6
Ip8
22s
36.2
8: SH-114 NB Off-Ramp/SH-114 NB Frontage Rd & KirkwcW161ftbckground + Site(Signalized)
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
-,*,-,* r- 4- T/P. ti 1 -'
Lane Group ESL
EBT
EBR WBL
WBT
WBR
NBL
NBT
NBR
SBL SBT
SBR
Lane Configurations
V1
tt
tt
?I
Vi
+Tf+
Traffic Volume (vph)
345
100
0 0
550
505
278
845
38
0 0
0
Future Volume (vph)
345
100
0 0
550
505
278
845
38
0 0
0
Peak Hour Factor
0.95
0.95
0.95 0.95
0.95
0.95
0.95
0.95
0.95
0.95 0.95
0.95
Adj. Flow (vph)
363
105
0 0
579
532
293
889
40
0 0
0
Shared Lane Traffic (%)
10°%
Lane Group Flow (vph)
363
105
0 0
579
532
264
958
0
0 0
0
Turn Type
pm+pt
NA
NA
Free
Perm
NA
Protected Phases
5
56
6
8
Permitted Phases
56
Free
8
Detector Phase
5
56
6
8
8
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
Minimum Split (s)
10.0
22.5
22.5
22.5
Total Split (s)
22.0
31.8
36.2
36.2
Total Split (%)
24.4%
35.3 %
40.2%
40.2%
Js
Yellow Time (s)
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
4.5
Lead/Lag
Lead
Lag
Lead -Lag Optimize?
Yes
Yes
-
Recall Mode
Max
C-Max
Max
Max
Act Effct Green (s)
44.8
49.3
27.3
90.0
31.7
31.7
Actuated g/C Ratio
0.50
0.55
0.30
1.00
0.35
0.35
v/c Ratio
0.71
0.05
0.54
0.34
0.47
0.81
-
Control Delay
37.5
10.1
28.4
0.6
25.9
32.7
Queue Delay
0.0
0.0
0.0
0.0
0.0
0.0
-
Total Delay
37.5
10.1
28.4
0.6
25.9
32.7
LOS
D
B
C
A
C
C
Approach Delay
31.4
15.1
31.2
Approach LOS
C
B
C
Queue Length 50th (ft)
162
13
143
0
126
265
Queue Length 95th (ft)
251
25
195
0
205
348
Internal Link Dist (ft)
327
240
1055
1095
Turn Bay Length (ft)
Base Capacity(vph)
514
1938
1073
1583
567
1187
Starvation Cap Reductn
0
0
0
0
0
0
Spillback Cap Reductn
0
0
0
0
0
0
Storage Cap Reductn
0
0
0
0
0
0
Reduced v/c Ratio
0.71
0.05
0.54
0.34
0.47
0.81
Intersection Summary
Cycle Length: 90
Actuated Cycle Length: 90
AW
Offset: 0 (0%), Referenced to phase 2:EBWB and 6:, Start of Green
Natural Cycle: 65
Control Type: Actuated -Coordinated
Maximum v/c Ratio: 0.81
2/8/2016 Synchro 9 Report 2/8/2016 Synchro 9 Report
MS Page 3 MS Page 4
8: SH-114 NB Off-Ramp/SH-114 NB Frontage Rd & KirkwctM918bckground + Site(Signalized)
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic
Lane Group Flow (vph)
Turn Type
Protected Phases
1 2 4
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
5.0 5.0 5.0
Minimum Split (s)
9.5 22.5 22.5
Total Split (s)
25.0 28.8 36.2
Total Split (%)
28% 32 % 40 %
Yellow Time (s)
3.5 3.5 3.5
All -Red Time (s)
1.0 1.0 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead Lag
Lead -Lag Optimize?
Yes Yes
Recall Mode
None C-Max Max
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
8: SH-114 NB Off-Ramp/SH-114 NB Frontage Rd & KirkwcW161ftbckground + Site(Signalized)
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Intersection Signal Delay: 24.8 Intersection LOS: C
Intersection Capacity Utilization 75.2 % ICU Level of Service D
Analysis Period (min)15
M
and Phases: 8: SH-114 NB Off-Ramo/SH-114 NB Frontaae Rd & Kirkwood Blvd
2/8/2016 Synchro 9 Report 2/8/2016 Synchro 9 Report
MS Page 5 MS Page 6
16: SH-114 SB Frontage Rd/SH-114 SB Off -Ramp & Dove2W 7 Background + Site(Signalized)
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Lane Group
EBL
EST
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
Lane Configurations
tT+
+Tt
►j
+T +
Traffic Volume (vph)
0
152
262
355
1095
0
0
0
0
90
128 111
Future Volume (vph)
0
152
262
355
1095
0
0
0
0
90
128 111
Peak Hour Factor
0.96
0.96
0.96
0.96
0.96
0.96
0.96
0.96
0.96
0.96
0.96 0.96
Adj. Flow (vph)
0
158
273
370
1141
0
0
0
0
94
133 116
Shared Lane Traffic (°!°)
10%
Lane Group Flow (vph)
0
431
0
0
1511
0
0
0
0
85
258 0
Turn Type
NA
pm+pt
NA
Perm
NA
Protected Phases
2
1
12
4
Permitted Phases
12
4
Detector Phase
2
1
12
4
4
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
Minimum Split (s)
22.5
9.5
22.5
22.5
Total Split (s)
25.0
15.0
40.0
40.0
Total Split (%)
31.3%
18.8 %
50.0 %
50.0%
Yellow Time (s)
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
Lead/Lag
Lag
Lead
Lead
Lead -Lag Optimize?
Yes
Yes
Yes
Recall Mode
C-Max
None
None
None
Act Effct Green (s)
44.5
55.0
11.5
11.5
Actuated g/C Ratio
0.56
0.69
0.14
0.14
v/c Ratio
0.23
0.80
0.37
0.54
Control Delay
3.9
7.2
34.6
32.4
Queue Delay
0.0
0.0
0.0
0.0
Total Delay
3.9
7.2
34.6
32.4
LOS
A
A
C
C
Approach Delay
3.9
7.2
32.9
Approach LOS
A
A
C
Queue Length 50th (ft)
17
7
42
59
Queue Length 95th (ft)
44
#171
83
92
Internal Link Dist (ft)
224
394
1722
1376
Turn Bay Length (ft)
240
Base Capacity (vph)
1903
1884
714
1415
Starvation Cap Reductn
0
0
0
0
Spillback Cap Reductn
0
0
0
0
Storage Cap Reductn
0
0
0
0
Reduced v/c Ratio
0.23
0.80
0.12
0.18
Intersection Summary
Cycle Length: 80
Actuated Cycle Length: 80 .00000or-
Offset: 0 (0%), Referenced to phase 2:EBWB and 6:, Start of Green
Natural Cycle: 70
Control Type: Actuated -Coordinated
Maximum v/c Ratio: 0.85
2/8/2016 Synchro 9 Report
MS Page 7
16: SH-114 SB Frontage Rd/SH-114 SB Off -Ramp & Dove2W 7 Background + Site(Signalized)
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Lane Grouper
06
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
5 6 8
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
5.0 5.0 5.0
Minimum Split (s)
9.5 22.5 22.5
Total Split (s)
10.0 30.0 40.0
Total Split (%)
13% 38% 50%
Yellow Time (s)
3.5 3.5 3.5
All -Red Time (s)
1.0 1.0 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead Lag
Lead -Lag Optimize?
Yes Yes
Recall Mode
None C-Min Max
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
2/8/2016 Synchro 9 Report
MS Page 8
16: SH-114 SB Frontage Rd/SH-114 SB Off -Ramp & Dove2W 7 Background + Site(Signalized)
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Intersection Signal Delay: 10.5 Intersection LOS: B
Intersection Capacity Utilization 70.9 % ICU Level of Service C
Analysis Period (min)15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases: 16: SH-114 SB Frontage Rd/SH-114 SB Off -Ramp & Dove Rd
#16 # 16 #16
I1 F I *�
=19
F
19: SH-114 NB Frontage Rd/SH-114 NB On -Ramp & DOVe2Od7 Background + Site(Signalized)
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
-'*,-,* r- 4- T/P. ti 1 -'
Lane Group '�MIL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL SBT
SBR
Lane Configurations
+Tt
0
)
4T+
Traffic Volume (vph)
47
197
0
0
651
143
783
1009
116
0 0
0
Future Volume (vph)
47
197
0
0
651
143
783
1009
116
0 0
0
Peak Hour Factor
0.99
0.99
0.99
0.99
0.99
0.99
0.99
0.99
0.99
0.99 0.99
0.99
Adj. Flow (vph)
47
199
0
0
658
144
791
1019
117
0 0
0
Shared Lane Traffic (%)
20°%
Lane Group Flow (vph)
0
246
0
0
802
0
633
1294
0
0 0
0
Turn Type
pm+pt
NA
NA
Perm
NA
Protected Phases
5
56
6
8
Permitted Phases
56
8
Detector Phase
5
56
6
8
8
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
Minimum Split (s)
9.5
22.5
22.5
22.5
Total Split (s)
10.0
30.0
40.0
40.0
Total Split (%)
12.5 %
37.5 %
50.0%
50.0%
JIM
Yellow Time (s)
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
Lead/Lag
Lead
Lag
Lag
Lead -Lag Optimize?
Yes
Yes
Yes
-
Recall Mode
None
C-Min
Max
Max
Act Effct Green (s)
29.3
23.8
37.2
37.2
Actuated g/C Ratio
0.37
0.30
0.46
0.46
v/c Ratio
0.25
0.77
0.85
0.83
-
Control Delay
13.6
27.4
32.6
25.1
Queue Delay
0.0
0.0
0.0
0.0
-
Total Delay
13.6
27.4
32.6
25.1
LOS
B
C
C
C
Approach Delay
13.6
27.4
27.6
Approach LOS
B
C
C
-
Queue Length 50th (ft)
30
187
306
307
Queue Length 95th (ft)
53
215
#537
#429
Internal Link Dist (ft)
394
990
1769
1583
Turn Bay Length (ft)
Base Capacity (vph)
1052
1120
749
1555
Starvation Cap Reductn
0
0
0
0
Spillback Cap Reductn
0
0
0
0
Storage Cap Reductn
0
0
0
0
Reduced v/c Ratio
0.23
0.72
0.85
0.83
Intersection Summary
Cycle Length: 80
Actuated Cycle Length: 80
Offset: 0 (0%), Referenced to phase 2:EBWB and 6:, Start of Green
Natural Cycle: 70
Control Type: Actuated -Coordinated
Maximum v/c Ratio: 0.85
2/8/2016 Synchro 9 Report 2/8/2016 Synchro 9 Report
MS Page 9 MS Page 10
19: SH-114 NB Frontage Rd/SH-114 NB On -Ramp & Dove2Od7 Background + Site(Signalized)
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Lane Group
01 o2 e4
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic
Lane Group Flow (vph)
Turn Type
Protected Phases
1 2 4
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
5.0 5.0 5.0
Minimum Split (s)
9.5 22.5 22.5
Total Split (s)
15.0 25.0 40.0
Total Split (%)
19% 31 % 50 %
Yellow Time (s)
3.5 3.5 3.5
All -Red Time (s)
1.0 1.0 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lag Lead
Lead -Lag Optimize?
Yes Yes
Recall Mode
None C-Max None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
2/8/2016 Synchro 9 Report
MS Page 11
19: SH-114 NB Frontage Rd/SH-114 NB On -Ramp & Dove2Od7 Background + Site(Signalized)
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Intersection Signal Delay: 26.4 Intersection LOS: C
Intersection Capacity Utilization 76.8 % ICU Level of Service D
Analysis Period (min)15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases: 19: SH-114 NB Frontage Rd/SH-114 NB On -Ramp & Dove Rd
=16 ik16 =1166
l 042 Y 41
40s 25s
19 79 m 19
F aM 1
2/8/2016
MS
Synchro 9 Report
Page 12
22: Dove Rd & Kirkwood Blvd
2017 Background + Site(Signalized)
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: PM
*_
t
ti
r
Lane Grout-
EBL
EST
WBT
WBR
SBL
SBR
Lane Configurations
I
Tt
Tj+
Vi
?I
Traffic Volume (vph)
142
164
235
201
116
461
Future Volume (vph)
142
164
235
201
116
461
Peak Hour Factor
0.90
0.90
0.90
0.90
0.90
0.90
Adj. Flow (vph)
158
182
261
223
129
512
Shared Lane Traffic (%)
Lane Group Flow (vph)
158
182
484
0
129
512
Turn Type
pm+pt
NA
NA
Prot
Perm
Protected Phases
7
4
8
1
Permitted Phases
4
6
Detector Phase
7
4
8
1
6
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
5.0
Minimum Split (s)
9.5
22.5
22.5
9.5
22.5
Total Split (s)
16.0
43.0
27.0
37.0
37.0
Total Split(%)
20.0%
53.8%
33.8%
46.3% 46.3%
Yellow Time (s)
3.5
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
4.5
4.5
Lead/Lag
Lead
Lag
Lead -Lag Optimize?
Yes
Yes
Recall Mode
None
C-Max
C-Max
None
Max
Act Effct Green (s)
38.5
38.5
24.6
27.4
32.5
Actuated g/C Ratio
0.48
0.48
0.31
0.34
0.41
v/c Ratio
0.37
0.11
0.41
0.21
0.54
Control Delay
14.0
11.1
13.0
17.3
4.0
Queue Delay
0.0
0.0
0.0
0.0
0.0
Total Delay
14.0
11.1
13.0
17.3
4.0
LOS
B
B
B
B
A
Approach Delay
12.5
13.0
6.7
Approach LOS
B
B
A
Queue Length 50th (ft)
50
30
51
40
0
Queue Length 95th (ft)
m82
m47
95
76
56
Internal Link Dist (ft)
990
172
351
Turn Bay Length (ft)
100
Base Capacity (vph)
459
1703
1169
719
947
Starvation Cap Reductn
0
0
0
0
0
Spillback Cap Reductn
0
0
0
0
0
Storage Cap Reductn
0
0
0
0
0
Reduced v/c Ratio
0.34
0.11
0.41
0.18
0.54
Intersection Summary
Cycle Length: 80
Actuated Cycle Length: 80
Offset: 0 (0%), Referenced to phase 4:EBTL
and 8:WBT,
Start of Green
Natural Cycle: 55
Control Type: Actuated -Coordinated
Maximum v/c Ratio: 0.54
22: Dove Rd & Kirkwood Blvd 2017 Background + Site(Signalized)
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Intersection Signal Delay: 10.1 Intersection LOS: B
Intersection Capacity Utilization 49.0 % ICU Level of Service A
Analysis Period (min)15
m Volume for 95th percentile queue is metered by upstream signal.
iplits and Phases: 22: Dove Rd & Kirkwood Blvd
�pl -.04
06 07 08
37 s.
2/8/2016 Synchro 9 Report 2/8/2016 Synchro 9 Report
MS Page 13 MS Page 14
2: Driveway 4/T W King Rd & Kirkwood Blvd 2017 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Intersection
Intersection Delay, s/veh
36.9
Intersection LOS
E
Movement
EBU
EBL
EBT
EBR
WBU
WBL
WBT
WBR
NBU
NBL
NBT
NBR
Traffic Vol, veh/h
0
57
41
16
0
0
855
135
0
79
0
0
Future Vol, veh/h
0
57
41
16
0
0
855
135
0
79
0
0
Peak Hour Factor
0.92
0.89
0.89
0.92
0.92
0.92
0.89
0.89
0.92
0.92
0.92
0.92
Heavy Vehicles, %
2
2
2
2
2
2
2
2
2
2
2
2
Mvmt Flow
0
64
46
17
0
0
961
152
0
86
0
0
Number of Lanes
0
1
2
0
0
0
2
0
0
0
2
0
Approach
YVB
Opposing Approach
WB
EB
SIB
Opposing Lanes
2
3
2
Conflicting Approach Left
SIB
NB
EB
Conflicting Lanes Left
2
2
3
Conflicting Approach Right
NB
SB
WB
Conflicting Lanes Right
2
2
2
HCM Control Delay
11.4
44.9
13.3
HCM LOS
B
E
B
Lane NBLn1 NBLn2 EBLnl E13Ln2 EBLn3 WBLnl WBLn2 SBLnl S13Ln2
Vol Left,%
100%
0%
100%
0%
0%
0%
0%
100%
0%
Vol Thru, %
0%
100%
0%
100%
46%
100%
68%
0%
0%
Vol Right, %
0%
0%
0%
0%
54%
0%
32%
0%
100%
Sign Control
Stop
Stop
Stop
Stop
Stop
Stop
Stop
Stop
Stop
Traffic Vol by Lane
79
0
57
27
30
570
420
14
119
LT Vol
79
0
57
0
0
0
0
14
0
Through Vol
0
0
0
27
14
570
285
0
0
RT Vol
0
0
0
0
16
0
135
0
119
Lane Flow Rate
86
0
64
31
33
640
472
16
134
Geometry Grp
8
8
8
8
8
8
8
8
8
Degree ofUtil(X)
0.201
0
0.144
0.065
0.065
1
0.75
0.036
0.264
Departure Headway (Hd)
8.425
7.928
8.067
7.567
7.19
5.953
5.725
8.291
7.096
Convergence, YIN
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Cap
427
0
444
473
498
608
632
433
507
Service Time
6.166
5.669
5.814
5.314
4.936
3.692
3.464
6.027
4.832
HCM Lane VIC Ratio
0.201
0
0.144
0.066
0.066
1.053
0.747
0.037
0.264
HCM Control Delay
13.3
10.7
12.2
10.8
10A
60.6
23.7
11.3
12.4
HCM Lane LOS
B
N
B
B
B
F
C
B
B
HCM 95th-tile Q
0.7
0
0.5
0.2
0.2
15
6.7
0.1
1.1
2: Driveway 4/T W King Rd & Kirkwood Blvd 2017 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Intersection
Intersection Delay, s/veh
Intersection LOS
Movement
SBU
SBL
SBT
Traffic Vol, veh/h
0
14
0
119
Future Vol, veh/h
0
14
0
119
Peak Hour Factor
0.92
0.89
0.92
0.89
Heavy Vehicles, %
2
2
2
2
Mvmt Flow
0
16
0
134
Number of Lanes
0
0
1
1
Approach
S6
Opposing Approach
NB
Opposing Lanes
2
Conflicting Approach Left
WB
Conflicting Lanes Left
2
Conflicting Approach Right
EB
Conflicting Lanes Right
3
HCM Control Delay
12.3
HCM LOS
B
2/8/2016 Synchro 9 Report 2/8/2016 Synchro 9 Report
MS Page 1 MS Page 2
6: SH-114 SB Frontage Rd/SH-114 SB Off -Ramp & Solana Blvd/Kirkw(i BBdckground + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Intersection1
Intersection Delay, s/veh
36.7
Intersection LOS
E
Movement
EBU
EBL
EBT
EBR
WBU
WBL
WBT
WBR
NBU
NBL
NBT
NBR
Traffic Vol, veh/h
0
0
231
582
0
428
355
0
0
0
0
0
Future Vol, veh/h
0
0
231
582
0
428
355
0
0
0
0
0
Peak Hour Factor
0.92
0.87
0.87
0.87
0.92
0.87
0.87
0.87
0.92
0.87
0.87
0.87
Heavy Vehicles, %
2
2
2
2
2
2
2
2
2
2
2
2
Mvmt Flow
0
0
266
669
0
492
408
0
0
0
0
0
Number of Lanes
0
0
2
1
0
1
2
0
0
0
0
0
Approach
)
WB
Opposing Approach
WB
EB
Opposing Lanes
3
3
Conflicting Approach Left
SB
Conflicting Lanes Left
3
0
Conflicting Approach Right
SB
Conflicting Lanes Right
0
3
HCM Control Delay
35.1
44.6
HCM LOS
E
E
Lane EBLn1 EBLn2 EBLn3 WBLn1 WBLn2 WBLn3 SBLn1 SBLn2 SBLn3
Vol Left,%
0%
0%
0%
100%
0%
0%
100%
99%
0%
Vol Thru, %
100%
100%
0%
0%
100%
100%
0%
1%
2%
Vol Right, %
0%
0%
100%
0%
0%
0%
0%
0%
98%
Sign Control
Stop
Stop
Stop
Stop
Stop
Stop
Stop
Stop
Stop
Traffic Vol by Lane
116
116
582
428
178
178
81
82
45
LT Vol
0
0
0
428
0
0
81
81
0
Through Vol
116
116
0
0
178
178
0
1
1
RT Vol
0
0
582
0
0
0
0
0
44
Lane Flow Rate
133
133
669
492
204
204
93
94
52
Geometry Grp
8
8
8
8
8
8
7
7
7
Degree ofUtil(X)
0,277
0.277
0.944
1
0.422
0,323
0.221
0.224
0.106
Departure Headway (Hd)
7.505
7.505
5.078
7.963
7.455
5.693
8.551
8.545
7.376
Convergence, YIN
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Cap
477
477
709
458
486
635
418
418
483
Service Time
5.291
5.291
2.865
5.663
5,155
3.393
6.337
6.331
5.162
HCM Lane VIC Ratio
0.279
0.279
0.944
1.074
0.42
0.321
0.222
0.225
0.108
HCM Control Delay
13.2
13.2
43.8
70.5
15.5
11.1
13.8
13.8
11
HCM Lane LOS
B
B
E
F
C
B
B
B
B
HCM 95th-tile Q
1.1
1.1
13.5
13
2.1
1.4
0.8
0.8
0.4
6: SH-114 SB Frontage Rd/SH-114 SB Off -Ramp & Solana Blvd/KirkwiJi0j BBdckground + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Intersection
Intersection Delay, s/veh
Intersection LOS
Movement
SBU
SBL
SBT
SBR -
Traffic Vol, veh/h
0
162
2
44
Future Vol, veh/h
0
162
2
44
Peak Hour Factor
0.92
0.87
0.87
0.87
Heavy Vehicles, %
2
2
2
2
Mvmt Flow
0
186
2
51
Number of Lanes
0
1
2
0
Approach
S'
Opposing Approach
Opposing Lanes
0
Conflicting Approach Left
WB
Conflicting Lanes Left
3
Conflicting Approach Right
EB
Conflicting Lanes Right
3
HCM Control Delay
13.2
HCM LOS
B
2/8/2016 Synchro 9 Report 2/8/2016 Synchro 9 Report
MS Page 3 MS Page 4
8: SH-114 NB Off-Ramp/SH-114 NB Frontage Rd & Kirkwood Blvd 2017 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Intersection1
Intersection Delay, s/veh
61.8
Intersection LOS
F
Movement
EBU
EBL
EBT
EBR
WBU
WBL
WBT
WBR
NBU
NBL
NBT
NBR
Traffic Vol, veh/h
0
345
100
0
0
0
550
505
0
278
845
38
Future Vol, veh/h
0
345
100
0
0
0
550
505
0
278
845
38
Peak Hour Factor
0.92
0.95
0.95
0.95
0.92
0.95
0.95
0.95
0.92
0.95
0.95
0.95
Heavy Vehicles, %
2
2
2
2
2
2
2
2
2
2
2
2
Mvmt Flow
0
363
105
0
0
0
579
532
0
293
889
40
Number of Lanes
0
1
2
0
0
0
2
1
0
1
2
0
Approach
NB
Opposing Approach
WB
EB
Opposing Lanes
3
3
0
Conflicting Approach Left
NB
EB
Conflicting Lanes Left
0
3
3
Conflicting Approach Right
NB
WB
Conflicting Lanes Right
3
0
3
HCM Control Delay
73.1
54.8
63.9
HCM LOS
F
F
F
Lane NBLn1 NBLn2 NBLn3 EBLnl EBLn2 EBLn3 WBLnl WBLn2 WBLn3
Vol Left,%
100%
6%
0%
100%
0%
0%
0%
0%
0%
Vol Thru, %
0%
94%
92%
0%
100%
100%
100%
100%
0%
Vol Right, %
0%
0%
8%
0%
0%
0%
0%
0%
100%
Sign Control
Stop
Stop
Stop
Stop
Stop
Stop
Stop
Stop
Stop
Traffic Vol by Lane
250
450
461
345
50
50
275
275
505
LT Vol
250
28
0
345
0
0
0
0
0
Through Vol
0
422
423
0
50
50
275
275
0
RT Vol
0
0
38
0
0
0
0
0
505
Lane Flow Rate
263
474
485
363
53
53
289
289
532
Geometry Grp
7
7
7
8
8
8
8
8
8
Degree ofUtil(X)
0.668
1
1
1
0,173
0.148
0.798
0.798
1
Departure Headway (Hd)
9.129
8.663
8.575
12.351
11.852
10.124
9.919
9.919
7.493
Convergence, YIN
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Cap
398
422
427
298
304
355
368
368
489
Service Time
6.848
6.382
6.294
10.086
9.587
7.859
7.644
7.644
5.218
HCM Lane VIC Ratio
0.661
1.123
1.136
1.218
0.174
0.149
0.785
0.785
1.088
HCM Control Delay
28.4
73.9
73.5
89.7
17.1
14.6
42.3
42.3
68.4
HCM Lane LOS
D
F
F
F
C
B
E
E
F
HCM 95th-tile Q
4.7
12.5
12.5
10.4
0.6
0.5
6.8
6.8
13.4
8: SH-114 NB Off-Ramp/SH-114 NB Frontage Rd & Kirkwood Blvd 2017 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Intersection
Intersection Delay, s/veh
Intersection LOS
Movement
SBU
SBL
SBT
Traffic Vol, veh/h
0
0
0
0
Future Vol, veh/h
0
0
0
0
Peak Hour Factor
0.92
0.95
0.95
0.95
Heavy Vehicles, %
2
2
2
2
Mvmt Flow
0
0
0
0
Number of Lanes
0
0
0
0
Approach
Opposing Approach
Opposing Lanes
Conflicting Approach Left
Conflicting Lanes Left
Conflicting Approach Right
Conflicting Lanes Right
HCM Control Delay
HCM LOS
2/8/2016 Synchro 9 Report 2/8/2016 Synchro 9 Report
MS Page 5 MS Page 6
14: Kirkwood Blvd & Driveway 1 2017 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Intersection
Int Delay, s/veh 4.4
22: Dove Rd & Kirkwood Blvd 2017 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Intersection -Roomy"
Int Delay, s/veh 10.1
Movement -1
EBL
EBR
NBL
NBT
SBT
SBR
Movement �
EBL
EBT
WBT WBR
SBL
SBR -
Traffic Vol, veh/h
132
159
32
264
337
27
Traffic Vol, veh/h
142
164
235
201
116
461
Future Vol, veh/h
132
159
32
264
337
27
Future Vol, veh/h
142
164
235
201
116
461
Conflicting Peds, #Ihr
0
0
0
0
0
0
Conflicting Peds, #Ihr
0
0
0
0
0
0
Sign Control
Stop
Stop
Free
Free
Free
Free
Sign Control
Free
Free
Free
Free
Stop
Stop
RT Channelized
-
None
-
None
None
RT Channelized
-
None
None
-
None
Storage Length
0
100
150
-
-
150
Storage Length
100
-
0
0
Veh in Median Storage, #
0
-
-
0
0
-
Veh in Median Storage, #
-
0
0
1
-
Grade, %
0
-
-
0
0
-
Grade, %
-
0
0
0
-
Peak Hour Factor
92
92
92
92
92
92
Peak Hour Factor
90
90
90
90
90
90
Heavy Vehicles,%
2
2
2
2
2
2
Heavy Vehicles,%
2
2
2
2
2
2
Mvmt Flow
143
173
35
287
366
29
Mvmt Flow
158
182
261
223
129
512
Major/Minor
Minor2
Majorl
Majorl
Major/Minor
Majorl
Conflicting Flow All
579
183
366
0
0
Conflicting Flow All
484
0
-
0
780
242
Stage 1
366
-
-
-
-
Stage 1
-
-
373
-
Stage 2
213
-
-
Stage 2
-
407
-
Critical Hdwy
6.84
6.94
4.14
Critical Hdwy
4.14
6.84
6.94 -
Critical Hdwy Stg 1
5.84
-
-
Critical Hdwy Stg 1
5.84
-
Critical Hdwy Stg 2
5.84
-
-
Critical Hdwy Stg 2
-
5,84
-
Follow-up Hdwy
3.52
3.32
2.22
Follow-up Hdwy
2.22
3.52
3.32
Pot Cap-1 Maneuver
446
828
1189
Pot Cap-1 Maneuver
1075
332
759
Stage 1
672
-
-
Stage 1
-
666
-
Stage 2
802
-
-
Stage 2
-
641
-
Platoon blocked, %
Platoon blocked, %
Mov Cap-1 Maneuver
433
828
1189
Mov Cap-1 Maneuver
1075
283
759
Mov Cap-2 Maneuver
433
-
-
Mov Cap-2 Maneuver
-
283
Stage 1
672
Stage 1
666
Stage 2
778
Stage 2
547
Approach
EB
NB
SB
Approach
EB
WB
SEI
HCM Control Delay, s
13.6
0.9
0
HCM Control Delay, s
4.1
0
20.8
HCM LOS
B
HCM LOS
C
Minor Lane/Major Mvmt
NBL
NBT EBLnl EBLn2
SBT
SBR
Minor Lane/Major Mvmt
EBL
EBT WBT WBR SBLnl SBLn2
Capacity (veh/h)
1189
433 828
Capacity (veh/h)
1075
283 759
HCM Lane V/C Ratio
0.029
0.331 0.209
HCM Lane V/C Ratio
0.147
0.455 0.675
HCM Control Delay (s)
8.1
17.4 10.5
HCM Control Delay (s)
8.9
27.9 19
HCM Lane LOS
A
C B
HCM Lane LOS
A
D C
HCM 95th %tile Q(veh)
0.1
1.4 0.8
HCM 95th %tile Q(veh)
0.5
2.2 5.3
2/8/2016 Synchro 9 Report 2/8/2016 Synchro 9 Report
MS Page 1 MS Page 2
30: Kirkwood Blvd & Driveway 2
2017 Background + Site
TIA for Wilks Tract Development
in Southlake,
Texas
Timing Plan: PM
Intersection
Int Delay, s/veh 2.6
Movement -1
EBL
EBR
NBL
NBT
SBT
SBR
Traffic Vol, veh/h
106
53
11
386
311
22
Future Vol, veh/h
106
53
11
386
311
22
Conflicting Peds, #/hr
0
0
0
0
0
0
Sign Control
Stop
Stop
Free
Free
Free
Free
RT Channelized
-
None
-
None
None
Storage Length
0
100
150
-
-
150
Veh in Median Storage, #
0
-
-
0
0
-
Grade, %
0
-
-
0
0
-
Peak Hour Factor
92
92
92
92
92
92
Heavy Vehicles, %
2
2
2
2
2
2
Mvmt Flow
115
58
12
420
338
24
Major/Minor
Minor2
Majorl
Major2
Conflicting Flow All
572
169
338
0
0
Stage 1
338
-
-
-
-
Stage 2
234
-
-
Critical Hdwy
6.84
6.94
4.14
Critical Hdwy Stg 1
5.84
-
-
Critical Hdwy Stg 2
5.84
-
-
Follow-up Hdwy
3.52
3.32
2.22
Pot Cap-1 Maneuver
450
845
1218
Stage 1
694
-
-
Stage 2
783
-
-
Platoon blocked,
Mov Cap-1 Maneuver
446
845
1218
Mov Cap-2 Maneuver
446
-
-
Stage 1
694
Stage 2
775
Approach
EB
NB
SB
HCM Control Delay, s
13.8
0.2
0
HCM LOS
B
Minor Lane/MajorMvmt
NBL
NBTEBLn1EBLn2
SBT
SBR
Capacity (veh/h)
1218
446 845
HCM Lane V/C Ratio
0.01
0.258 0.068
HCM Control Delay (s)
8
15.9 9.6
HCM Lane LOS
A
C A
HCM 95th %tile Q(veh)
0
1 0.2
2/8/2016
Synchro 9 Report
MS
Page 3
6: Solana Blvd/Kirkwood Blvd & SH-114 SB Off -Ramp
2022 Background
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: AM
Lane Grouf------'TBL
EST
EBR
WBL
WBT
WBR NBL NBT NBR
SBL
SW--'SBR
Lane Configurations
tt
r
)
tt
)
+TT+
Traffic Volume (vph) 0
348
279
341
704
0 0 0 0
496
1 69
Future Volume (vph) 0
348
279
341
704
0 0 0 0
496
1 69
Peak Hour Factor 0.92
0.92
0.92
0.92
0.92
0.92 0.92 0.92 0.92
0.92
0.92 0.92
Adj. Flow (vph) 0
378
303
371
765
0 0 0 0
539
1 75
Shared Lane Traffic (%)
50%
Lane Group Flow (vph) 0
378
303
371
765
0 0 0 0
269
346 0
Turn Type
NA
Perm
pm+pt
NA
Perm
NA
Protected Phases
2
1
12
4
Permitted Phases
2
12
4
Detector Phase
2
2
1
12
4
4
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
5.0
Minimum Split (s)
22.5
22.5
9.5
22.5
22.5
Total Split (s)
27.4
27.4
15.6
47.0
47.0
Total Split (%)
30.4%
30.4 %
17.3 %
52.2 %
52.2%
Yellow Time (s)
3.5
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
4.5
4.5
Lead/Lag
Lag
Lag
Lead
Lead -Lag Optimize?
Yes
Yes
Yes
Recall Mode
C-Max
C-Max
None
None
None
Act Effct Green (s)
25.2
25.2
38.8
43.3
37.7
37.7
Actuated g/C Ratio
0.28
0.28
0.43
0.48
0.42
0.42
v/c Ratio
0.38
0.46
0.74
0.45
0.40
0.26
Control Delay
28.5
5.9
28.1
16.3
19.2
14.1
Queue Delay
0.0
0.0
0.0
0.4
0.0
0.0
Total Delay
28.5
5.9
28.1
16.7
19.2
14.1
LOS
C
A
C
B
B
B
Approach Delay
18.4
20.4
16.3
Approach LOS
B
C
B
Queue Length 50th (ft)
94
0
140
152
107
54
Queue Length 95th (ft)
136
62
#224
189
165
80
Internal Link Dist (ft)
1214
327
1036
836
Turn Bay Length (ft)
350
Base Capacity (vph)
989
660
503
1701
760
1515
Starvation Cap Reductn
0
0
0
441
0
0
Spillback Cap Reductn
0
0
0
0
0
0
Storage Cap Reductn
0
0
0
0
0
0
Reduced v/c Ratio
0.38
0.46
0.74
0.61
0.35
0.23
Intersection Summary
Cycle Length: 90
Actuated Cycle Length: 90
Offset: 0 (0%), Referenced to phase 2:EBWB
and
6:, Start of Green
Natural Cycle: 65
Control Type: Actuated -Coordinated
Maximum v/c Ratio: 0.74
TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report
MS Page 1
6: Solana Blvd/Kirkwood Blvd & SH-114 SIB Off -Ramp 2022 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Lane Group'
06
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
5 6 8
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
5.0 5.0 5.0
Minimum Split (s)
9.5 22.5 22.5
Total Split (s)
19.5 23.5 47.0
Total Split (%)
22% 26% 52%
Yellow Time (s)
3.5 3.5 3.5
All -Red Time (s)
1.0 1.0 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lag Lead
Lead -Lag Optimize?
Yes Yes
Recall Mode
None C-Max None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summer
TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report
MS Page 2
6: Solana Blvd/Kirkwood Blvd & SH-114 SIB Off -Ramp 2022 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Intersection Signal Delay: 18.8 Intersection LOS: B
Intersection Capacity Utilization 66.2 % ICU Level of Service C
Analysis Period (min)15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases: 6: Solana Blvd/Kirkwood Blvd & SH-114 SB Off -Ramp
#6 =6 #fi
►� F I
15.6 I J27.4s 447s
=s s s
F �
8: SH-114 NB Off -Ramp & Kirkwood Blvd
2022 Background
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: AM
-'*,-,*
r-
4-
T/,.
ti 1
-'
Lane Group - - - - - -
- - ML
EBT EBR WBL
WBT
WBR
NBL
NBT
NBR SBL SBT
SBR
Lane Configurations
V1
tt
tt
?I
Vi
+Tf+
Traffic Volume (vph)
143
703 0 0
407
71
639
136
539 0 0
0
Future Volume (vph)
143
703 0 0
407
71
639
136
539 0 0
0
Peak Hour Factor
0.92
0.92 0.92 0.92
0.92
0.92
0.92
0.92
0.92 0.92 0.92
0.92
Adj. Flow (vph)
155
764 0 0
442
77
695
148
586 0 0
0
Shared Lane Traffic (%)
28°%
Lane Group Flow (vph)
155
764 0 0
442
77
500
929
0 0 0
0
Turn Type
pm+pt
NA
NA
Free
Perm
NA
Protected Phases
5
56
6
8
Permitted Phases
56
Free
8
Detector Phase
5
56
6
8
8
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
Minimum Split (s)
9.5
22.5
22.5
22.5
Total Split (s)
19.5
23.5
47.0
47.0
Total Split (%)
21.7 %
26.1 %
52.2%
52.2%
Yellow Time (s)
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
4.5
Lead/Lag
Lag
Lead
Lead -Lag Optimize?
Yes
Yes
Recall Mode
None
C-Max
None
None
Act Effct Green (s)
38.8
43.3
23.8
90.0
37.7
37.7
-
Actuated g/C Ratio
0.43
0.48
0.26
1.00
0.42
0.42
v/c Ratio
0.32
0.45
0.47
0.05
0.74
0.85dr
-
Control Delay
21.7
19.6
31.3
0.1
28.8
21.4
Queue Delay
0.0
0.1
0.0
0.0
0.0
0.0
-
Total Delay
21.7
19.7
31.3
0.1
28.8
21.4
LOS
C
B
C
A
C
C
-
Approach Delay
20.0
26.7
24.0
Approach LOS
C
C
C
-
Queue Length 50th (ft)
56
154
116
0
240
194
Queue Length 95th (ft)
97
193
170
0
354
252
Internal Link Dist (ft)
327
247
1055
1095
Turn Bay Length (ft)
a
Base Capacity(vph)
484
1701
935
1583
760
1487
Starvation Cap Reductn
0
175
0
0
0
0
Spillback Cap Reductn
0
0
0
0
0
0
Storage Cap Reductn
0
0
0
0
0
0
Reduced v/c Ratio
0.32
0.50
0.47
0.05
0.66
0.62
Intersection Summary
Cycle Length: 90
Actuated Cycle Length: 90
Offset: 0 (0%), Referenced to phase 2:EBWB and 6:, Start of Green
Natural Cycle: 65
Control Type: Actuated -Coordinated
Maximum v/c Ratio: 0.74
TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report
MS Page 3 MS Page 4
8: SH-114 NB Off -Ramp & Kirkwood Blvd 2022 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All -Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead -Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
5.0 5.0 5.0
9.5 22.5 22.5
15.6 27.4 47.0
17% 30% 52%
3.5 3.5 3.5
1.0 1.0 1.0
Lead Lag
Yes Yes
None C-Max None
8: SH-114 NB Off -Ramp & Kirkwood Blvd 2022 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Intersection Signal Delay: 23.2 Intersection LOS: C
Intersection Capacity Utilization 66.2 % ICU Level of Service C
Analysis Period (min)15
dr Defacto Right Lane. Recode with 1 though lane as a right lane.
Splits and Phases: 8: SH-114 NB Off -Ramp & Kirkwood Blvd
#6 1#6
7�1 �2
-5I
+ p-0
47 s
F
;❑6 `R)
as
�a
23.5 s
19.51
47 s
TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report
MS Page 5 MS Page 6
16: Dove Rd & SH-114 SIB Off -Ramp
2022 Background
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: AM
Lane Group EBL
EST EBR
WBL
WBT
WBR NBL NBT NBR
SBL
Lane Configurations
tT+
+Tt
)
r{
Traffic Volume (vph) 0
413 786
99
510
0 0 0 0
149
135 68
Future Volume (vph) 0
413 786
99
510
0 0 0 0
149
135 68
Peak Hour Factor 0.83
0.83 0.83
0.83
0.83
0.83 0.83 0.83 0.83
0.83
0.83 0.83
Adj. Flow (vph) 0
498 947
119
614
0 0 0 0
180
163 82
Shared Lane Traffic (°!°)
21 %
Lane Group Flow (vph) 0
1445 0
0
733
0 0 0 0
142
283 0
Turn Type
NA
pm+pt
NA
Perm
NA
Protected Phases
2
1
21
4
Permitted Phases
21
4
Detector Phase
2
1
21
4
4
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
Minimum Split (s)
22.5
9.5
22.5
22.5
Total Split (s)
57.5
9.5
23.0
23.0
Total Split (%)
63.9%
10.6 %
25.6 %
25.6%
Yellow Time (s)
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
Lead/Lag
Lag
Lead
Lead
Lead -Lag Optimize?
Yes
Yes
Yes
Recall Mode
C-Max
None
None
None
Act Effct Green (s)
58.1
63.1
13.4
13.4
Actuated g/C Ratio
0.65
0.70
0.15
0.15
v/c Ratio
0.65
0.49
0.60
0.54
Control Delay
8.2
4.5
45.4
31.2
Queue Delay
0.0
0.0
0.0
0.0
Total Delay
8.2
4.5
45.4
31.2
LOS
A
A
D
C
Approach Delay
8.2
4.5
36.0
Approach LOS
A
A
D
Queue Length 50th (ft)
149
16
84
65
Queue Length 95th (ft)
211
54
128
90
Internal Link Dist (ft)
224
394
1722
1376
Turn Bay Length (ft)
240
Base Capacity (vph)
2226
1482
330
707
Starvation Cap Reductn
0
0
0
0
Spillback Cap Reductn
0
0
0
0
Storage Cap Reductn
0
0
0
0
Reduced v/c Ratio
0.65
0.49
0.43
0.40
Intersection Summary
Cycle Length: 90
Actuated Cycle Length: 90
Offset: 0 (0%), Referenced to phase 2:EBWB
and 6:, Start of Green
Natural Cycle: 60
Control Type: Actuated -Coordinated
Maximum v/c Ratio: 0.65
TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report
MS Page 7
16: Dove Rd & SH-114 SB Off -Ramp 2022 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Lane Group
o6 08
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
5 6 8
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
5.0 5.0 5.0
Minimum Split (s)
9.5 22.5 22.5
Total Split (s)
9.5 47.5 33.0
Total Split (%)
11 % 53% 37%
Yellow Time (s)
3.5 3.5 3.5
All -Red Time (s)
1.0 1.0 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lag Lead
Lead -Lag Optimize?
Yes Yes
Recall Mode
None C-Min Max
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summer
TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report
MS Page 8
16: Dove Rd & SH-114 SIB Off -Ramp 2022 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Intersection Signal Delay: 11.7 Intersection LOS: B
Intersection Capacity Utilization 71.8 % ICU Level of Service C
Analysis Period (min)15
19: SH-114 NB Frontage Rd & Dove Rd
2022 Background
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: AM
-,*,-,*
r-
4-
T/,.
ti
1
-'
Lane Group
L
EST EBR
WBL
WBT
WBR
NBL
NBT
NBR SBL
SBT
SBR
Lane Configurations
+Tt
0
►j
q +
Traffic Volume (vph)
79
474 0
0
357
94
263
119
370 0
0
0
Future Volume (vph)
79
474 0
0
357
94
263
119
370 0
0
0
Peak Hour Factor
0.80
0.80 0.80
0.80
0.80
0.80
0.80
0.80
0.80 0.80
0.80
0.80
Adj. Flow (vph)
99
593 0
0
446
118
329
149
463 0
0
0
Shared Lane Traffic (%)
10°%
Lane Group Flow (vph)
0
692 0
0
564
0
296
645
0 0
0
0
Turn Type
pm+pt
NA
NA
Perm
NA
Protected Phases
5
65
6
8
Permitted Phases
65
8
Detector Phase
5
65
6
8
8
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
Minimum Split (s)
9.5
22.5
22.5
22.5
Total Split (s)
9.5
47.5
33.0
33.0
Total Split (%)
10.6 %
52.8 %
36.7%
36.7%
AN
Yellow Time (s)
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
Lead/Lag
Lag
Lead
Lead
Lead -Lag Optimize?
Yes
Yes
Yes
-
Recall Mode
None
C-Min
Max
Max
Act Effct Green (s)
48.0
26.8
28.5
28.5
Actuated g/C Ratio
0.53
0.30
0.32
0.32
v/c Ratio
0.43
0.53
0.58
0.57
-
Control Delay
11.1
18.7
31.3
17.1
Queue Delay
0.0
0.0
0.0
0.0
-
Total Delay
11.1
18.7
31.3
17.1
LOS
B
B
C
B
-
Approach Delay
11.1
18.7
21.6
Approach LOS
B
B
C
Queue Length 50th (ft)
109
69
153
96
Queue Length 95th (ft)
91
60
210
123
Internal Link Dist (ft)
394
990
1769
1583
Turn Bay Length (ft)
Base Capacity (vph)
1754
1664
509
1131
Starvation Cap Reductn
0
0
0
0
Spillback Cap Reductn
0
0
0
0
Storage Cap Reductn
0
0
0
0
Reduced v/c Ratio
0.39
0.34
0.58
0.57
Intersection Summary
Cycle Length: 90
Actuated Cycle Length: 90
Offset: 0 (0%), Referenced to phase 2:EBWB and 6:, Start
of Green
Natural Cycle: 60
Control Type: Actuated -Coordinated
Maximum v/c Ratio: 0.65
TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report
MS Page 9 MS Page 10
19: SH-114 NB Frontage Rd & Dove Rd 2022 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Lane Group
of o2 o4
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic
Lane Group Flow (vph)
Turn Type
Protected Phases
1 2 4
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
5.0 5.0 5.0
Minimum Split (s)
9.5 22.5 22.5
Total Split (s)
9.5 57.5 23.0
Total Split (%)
11 % 64% 26 %
Yellow Time (s)
3.5 3.5 3.5
All -Red Time (s)
1.0 1.0 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lag Lead
Lead -Lag Optimize?
Yes Yes
Recall Mode
None C-Max None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
19: SH-114 NB Frontage Rd & Dove Rd 2022 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Intersection Signal Delay: 17.5 Intersection LOS: B
Intersection Capacity Utilization 54.7% ICU Level of Service A
Analysis Period (min)15
Splits and Phases: 19: SH-114 NB Frontage Rd & Dove Rd
#]jb
#16
#16
57.5 s
# 9 19
'Iqa *oa' rR1
=19
5
47. 4 s
TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report
MS Page 11 MS Page 12
22: Dove Rd & Kirkwood Blvd
2022 Background
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: AM
*_
t
ti
r
Lane Grout-
EBL
EST
WBT
WBR
SBL
SBR
Lane Configurations
I
Tt
Tj+
Vi
?I
Traffic Volume (vph)
482
209
285
115
43
143
Future Volume (vph)
482
209
285
115
43
143
Peak Hour Factor
0.77
0.77
0.77
0.77
0.77
0.77
Adj. Flow (vph)
626
271
370
149
56
186
Shared Lane Traffic (%)
Lane Group Flow (vph)
626
271
519
0
56
186
Turn Type
pm+pt
NA
NA
Prot
Perm
Protected Phases
7
4
8
1
Permitted Phases
4
6
Detector Phase
7
4
8
1
6
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
5.0
Minimum Split (s)
9.5
22.5
22.5
9.5
9.5
Total Split (s)
44.0
71.4
27.4
18.6
18.6
Total Split (%)
48.9%
79.3%
30.4 %
20.7% 20.7%
Yellow Time (s)
3.5
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
4.5
4.5
Lead/Lag
Lead
Lag
Lead -Lag Optimize?
Yes
Yes
Recall Mode
None
C-Max
C-Max
None
None
Act Effct Green (s)
72.5
72.5
45.2
8.5
8.5
Actuated g/C Ratio
0.81
0.81
0.50
0.09
0.09
v/c Ratio
0.74
0.10
0.30
0.34
0.59
Control Delay
14.5
4.3
14.8
42.6
13.8
Queue Delay
0.0
0.0
0.0
0.0
0.0
Total Delay
14.5
4.3
14.8
42.6
13.8
LOS
B
A
B
D
B
Approach Delay
11.4
14.8
20.5
Approach LOS
B
B
C
Queue Length 50th (ft)
191
28
72
30
0
Queue Length 95th (ft)
217
38
131
54
35
Internal Link Dist (ft)
990
172
351
Turn Bay Length (ft)
100
Base Capacity (vph)
1040
2850
1732
277
404
Starvation Cap Reductn
0
0
0
0
0
Spillback Cap Reductn
0
0
0
0
0
Storage Cap Reductn
0
0
0
0
0
Reduced v/c Ratio
0.60
0.10
0.30
0.20
0.46
Intersection Summary
Cycle Length: 90
Actuated Cycle Length: 90
Offset: 0 (0%), Referenced to phase 4:EBTL
and 8:WBT,
Start of Green
Natural Cycle: 55
Control Type: Actuated -Coordinated
Maximum v/c Ratio: 0.74
TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report
MS Page 13
22: Dove Rd & Kirkwood Blvd 2022 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Intersection Signal Delay: 13.8 Intersection LOS: B
Intersection Capacity Utilization 53.7% ICU Level of Service A
Analysis Period (min)15
Splits and Phases: 22: Dove Rd & Kirkwood Blvd
\4.01
1 --k4 `R' IF
71.
■ F
06
f , 05 `R',
TIA for Wilks Tract Development in Southlake, Texas
MS
Synchro 9 Report
Page 14
2: Driveway 4/T W King Rd & Kirkwood Blvd 2022 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Intersection
Intersection Delay, s/veh
29
Intersection LOS
D
Movement
EBU
EBL
EBT
EBR
WBU
WBL
WBT
WBR
NBU
NBL
NBT
NBR
Traffic Vol, veh/h
0
32
690
93
0
0
78
9
0
13
0
0
Future Vol, veh/h
0
32
690
93
0
0
78
9
0
13
0
0
Peak Hour Factor
0.92
0.91
0.91
0.92
0.92
0.92
0.91
0.91
0.92
0.92
0.92
0.92
Heavy Vehicles, %
2
2
2
2
2
2
2
2
2
2
2
2
Mvmt Flow
0
35
758
101
0
0
86
10
0
14
0
0
Number of Lanes
0
1
2
0
0
0
2
0
0
0
2
0
Approach -
-PR$
Opposing Approach
WB
EB
SIB
Opposing Lanes
2
3
2
Conflicting Approach Left
SIB
NB
EB
Conflicting Lanes Left
2
2
3
Conflicting Approach Right
NB
SB
WB
Conflicting Lanes Right
2
2
2
HCM Control Delay
35.7
12.1
12.3
HCM LOS
E
B
B
Lane NBLn1 NBLn2 EBLnl E13Ln2 EBLn3 WBLnl WBLn2 SBLnl S13Ln2
Vol Left,%
100%
0%
100%
0%
0%
0%
0%
100%
0%
Vol Thru, %
0%
100%
0%
100%
71%
100%
74%
0%
0%
Vol Right, %
0%
0%
0%
0%
29%
0%
26%
0%
100%
Sign Control
Stop
Stop
Stop
Stop
Stop
Stop
Stop
Stop
Stop
Traffic Vol by Lane
13
0
32
460
323
52
35
102
341
LT Vol
13
0
32
0
0
0
0
102
0
Through Vol
0
0
0
460
230
52
26
0
0
RT Vol
0
0
0
0
93
0
9
0
341
Lane Flow Rate
14
0
35
505
354
57
38
112
375
Geometry Grp
8
8
8
8
8
8
8
8
8
Degree ofUtil(X)
0.036
0
0.07
0.929
0.63
0.133
0.088
0.243
0.686
Departure Headway (Hd)
9.272
8.76
7.121
6.613
6.408
8.382
8.196
7.801
6.594
Convergence, YIN
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Cap
388
0
500
546
559
430
440
457
543
Service Time
6.98
6.468
4.905
4.397
4.192
6.082
5.896
5.595
4.387
HCM Lane VIC Ratio
0.036
0
0.07
0.925
0.633
0.133
0.086
0.245
0.691
HCM Control Delay
12.3
11.5
10.4
48.7
%6
12.4
11.7
13.1
22.7
HCM Lane LOS
B
N
B
E
C
B
B
B
C
HCM 95th-tile Q
0.1
0
0.2
11.5
4.4
0.5
0.3
0.9
5.2
TIA for Wilks Tract Development in Southlake, Texas
MS
2: Driveway 4/T W King Rd & Kirkwood Blvd 2022 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Intersection
Intersection Delay, s/veh
Intersection LOS
Movement
SBU
SBL
SBT
SBf
Traffic Vol, veh/h
0
102
0
341
Future Vol, veh/h
0
102
0
341
Peak Hour Factor
0.92
0.91
0.92
0.91
Heavy Vehicles, %
2
2
2
2
Mvmt Flow
0
112
0
375
Number of Lanes
0
0
1
1
Approach
Sb'
Opposing Approach
NB
Opposing Lanes
2
Conflicting Approach Left
WB
Conflicting Lanes Left
2
Conflicting Approach Right
EB
Conflicting Lanes Right
3
HCM Control Delay
20.5
HCM LOS
C
Synchro 9 Report TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report
Page 1 MS Page 2
14: Kirkwood Blvd & Driveway 1 2022 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Intersection
Int Delay, s/veh 2.6
30: Kirkwood Blvd & Driveway 2 2022 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Intersection
Int Delay, s/veh 1.2
Movement -1
EBL
EBR
NBL
NBT
SBT
SBR
Movement
EBL
Traffic Vol, veh/h
21
26
187
330
27
156
Traffic Vol, veh/h
17
9
62
289
174
125
Future Vol, veh/h
21
26
187
330
27
156
Future Vol, veh/h
17
9
62
289
174
125
Conflicting Peds, #Ihr
0
0
0
0
0
0
Conflicting Peds, #Ihr
0
0
0
0
0
0
Sign Control
Stop
Stop
Free
Free
Free
Free
Sign Control
Stop
Stop
Free
Free
Free
Free
RT Channelized
-
None
-
None
None
RT Channelized
-
None
-
None
None
Storage Length
0
100
150
-
150
Storage Length
0
100
150
-
-
150
Veh in Median Storage, #
0
-
-
0
0
-
Veh in Median Storage, #
0
-
-
0
0
-
Grade, %
0
-
-
0
0
-
Grade, %
0
-
-
0
0
-
Peak Hour Factor
92
92
92
92
92
92
Peak Hour Factor
92
92
92
92
92
92
Heavy Vehicles,%
2
2
2
2
2
2
Heavy Vehicles,%
2
2
2
2
2
2
Mvmt Flow
23
28
203
359
29
170
Mvmt Flow
18
10
67
314
189
136
Major/Minor
Minor2
Majorl
Major2
Major/Minor
Minot
Majorl
Major2
Conflicting Flow All
615
15
29
0
0
Conflicting Flow All
481
95
189
0
0
Stage 1
29
-
-
-
Stage 1
189
-
-
-
-
Stage 2
586
-
-
Stage 2
292
-
-
Critical Hdwy
6.84
6.94
4.14
Critical Hdwy
6.84
6.94
4.14
Critical Hdwy Stg 1
5.84
-
-
Critical Hdwy Stg 1
5.84
-
Critical Hdwy Stg 2
5.84
-
-
Critical Hdwy Stg 2
5.84
-
-
Follow-up Hdwy
3.52
3.32
2.22
Follow-up Hdwy
3.52
3.32
2.22
Pot Cap-1 Maneuver
423
1061
1582
Pot Cap-1 Maneuver
514
943
1382
Stage 1
990
-
-
Stage 1
824
-
-
Stage 2
519
-
-
Stage 2
732
-
-
Platoon blocked, %
Platoon blocked, %
Mov Cap-1 Maneuver
369
1061
1582
Mov Cap-1 Maneuver
489
943
1382
Mov Cap-2 Maneuver
441
-
-
Mov Cap-2 Maneuver
489
-
-
Stage 1
990
Stage 1
824
Stage 2
452
Stage 2
697
Approach
EB
NB
SB
Approach
EB
NB
SB
HCM Control Delay, s
10.8
2.8
0
HCM Control Delay, s
11.4
1.4
0
HCM LOS
B
HCM LOS
B
Minor Lane/MajorMvmt
NBL
NBTEBLn1EBLn2 SBT SBR
Capacity (veh/h)
1582
441 1061
HCM Lane V/C Ratio
0.128
0.052 0.027
HCM Control Delay (s)
7.6
13.6 8.5
HCM Lane LOS
A
B A
HCM 95th %tile Q(veh)
0.4
0.2 0.1
TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report
MS Page 1
Minor Lane/MajorMvmt
NBL
NBT EBLn I EBLn2 SBT SBR
Capacity (veh/h)
1382
489
943
HCM Lane V/C Ratio
0.049
0.038
0.01
HCM Control Delay (s)
7.7
12.7
8.9
HCM Lane LOS
A
B
A
HCM 95th %tile Q(veh)
0.2
0.1
0
TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report
MS Page 2
37: Driveway 5 & Kirkwood Blvd 2022 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Intersection _qqEIWr_
Int Delay, s/veh 0.5
40: Driveway 6 & Kirkwood Blvd 2022 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Intersection
Int Delay, s/veh 0.6
Movement :T�
EBT
EBR
WBL WBT
NBL
NBR
Movement
EBT
EBR
WBL WBT
NBL
Traffic Vol, veh/h
1169
35
2
430
25
2
Traffic Vol, veh/h
1203
39
2
454
28
1
Future Vol, veh/h
1169
35
2
430
25
2
Future Vol, veh/h
1203
39
2
454
28
1
Conflicting Peds, #Ihr
0
0
0
0
0
0
Conflicting Peds, #Ihr
0
0
0
0
0
0
Sign Control
Free
Free
Free
Free
Stop
Stop
Sign Control
Free
Free
Free
Free
Stop
Stop
RT Channelized
None
None
-
None
RT Channelized
None
-
None
-
None
Storage Length
-
0
Storage Length
100
-
0
Veh in Median Storage, #
0
0
0
Veh in Median Storage, #
0
-
0
0
Grade, %
0
0
0
-
Grade, %
0
-
0
0
-
Peak Hour Factor
92
92
92
92
92
92
Peak Hour Factor
92
92
92
92
92
92
Heavy Vehicles,%
2
2
2
2
2
2
Heavy Vehicles,%
2
2
2
2
2
2
Mvmt Flow
1271
38
2
467
27
2
Mvmt Flow
1308
42
2
493
30
1
Major/Minor
Majorl
Major2
Minorl
Major/Minor
Majorl
Minorl
Conflicting Flow All
0
0
1309
0
1481
654
Conflicting Flow All
0
0
1350
0
1531
675
Stage 1
-
-
-
-
1290
-
Stage 1
-
-
-
-
1329
-
Stage 2
-
191
-
Stage 2
-
202
-
Critical Hdwy
5.34
5.74
7.14
Critical Hdwy
5.34
5.74
7.14
Critical Hdwy Stg 1
-
6.64
-
Critical Hdwy Stg 1
6.64
Critical Hdwy Stg 2
-
6.04
-
Critical Hdwy Stg 2
-
6.04
-
Follow-up Hdwy
3.12
3.82
3.92
Follow-up Hdwy
3.12
3.82
3.92
Pot Cap-1 Maneuver
277
176
351
Pot Cap-1 Maneuver
264
166
340
Stage 1
-
160
-
Stage 1
-
152
-
Stage 2
-
756
-
Stage 2
-
746
-
Platoon blocked, %
Platoon blocked, %
Mov Cap-1 Maneuver
277
174
351
Mov Cap-1 Maneuver
264
165
340
Mov Cap-2 Maneuver
-
174
Mov Cap-2 Maneuver
-
165
-
Stage 1
160
Stage 1
152
Stage 2
748
Stage 2
740
Approach
EB
WB
Approach
EB
WB
NB
HCM Control Delay, s
0
0.2
28.7
HCM Control Delay, s
0
0.1
31.3
HCM LOS
D
HCM LOS
D
Minor Lane/Major Mvmt NBLnl EBT EBR WBL WBT
Capacity (veh/h)
181
277
HCM Lane V/C Ratio
0.162
0.008
HCM Control Delay (s)
28.7
18.1 0.1
HCM Lane LOS
D
C A
HCM 95th %tile Q(veh)
0.6
0 -
TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report
MS Page 3
Minor Lane/Major Mvmt
NBLn1
EBT EBR WBL WBT
Capacity (veh/h)
168
264
HCM Lane V/C Ratio
0.188
0.008
HCM Control Delay (s)
31.3
18.8
HCM Lane LOS
D
C
HCM 95th %tile Q(veh)
0.7
0
TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report
MS Page 4
6: Solana Blvd/Kirkwood Blvd & SH-114 SB Off -Ramp
2022 Background
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: PM
Lane Grouf------'TBL
EST
EBR
WBL
WBT
WBR NBL NBT NBR
SBL
Lane Configurations
tt
?I
)
tt
)
r{
Traffic Volume (vph) 0
274
675
514
410
0 0 0 0
223
2 51
Future Volume (vph) 0
274
675
514
410
0 0 0 0
223
2 51
Peak Hour Factor 0.87
0.87
0.87
0.87
0.87
0.87 0.87 0.87 0.87
0.87
0.87 0.87
Adj. Flow (vph) 0
315
776
591
471
0 0 0 0
256
2 59
Shared Lane Traffic (%)
50%
Lane Group Flow (vph) 0
315
776
591
471
0 0 0 0
128
189 0
Turn Type
NA
Perm
pm+pt
NA
Perm
NA
Protected Phases
2
1
12
4
Permitted Phases
2
12
4
Detector Phase
2
2
1
12
4
4
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
5.0
Minimum Split (s)
22.5
22.5
9.5
22.5
22.5
Total Split (s)
34.0
34.0
26.0
40.0
40.0
Total Split (%)
34.0%
34.0 %
26.0 %
40.0 %
40.0 %
Yellow Time (s)
3.5
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
4.5
4.5
Lead/Lag
Lag
Lag
Lead
Lead -Lag Optimize?
Yes
Yes
Yes
Recall Mode
C-Max
C-Max
None
Max
Max
Act Effct Green (s)
29.5
29.5
51.0
55.5
35.5
35.5
Actuated g/C Ratio
0.30
0.30
0.51
0.56
0.36
0.36
v/c Ratio
0.30
0.79
0.90
0.24
0.22
0.16
Control Delay
28.3
9.9
45.7
10.5
24.0
15.5
Queue Delay
0.0
0.0
0.0
0.0
0.0
0.0
Total Delay
28.3
9.9
45.7
10.5
24.0
15.5
LOS
C
A
D
B
C
B
Approach Delay
15.2
30.1
18.9
Approach LOS
B
C
B
Queue Length 50th (ft)
81
18
269
64
62
30
Queue Length 95th (ft)
114
117
m#401
m91
107
53
Internal Link Dist (ft)
1216
327
1036
836
Turn Bay Length (ft)
350
Base Capacity (vph)
1044
985
660
1964
571
1147
Starvation Cap Reductn
0
0
0
0
0
0
Spillback Cap Reductn
0
0
0
0
10
21
Storage Cap Reductn
0
0
0
0
0
0
Reduced v/c Ratio
0.30
0.79
0.90
0.24
0.23
0.17
Intersection Summary
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 0 (0%), Referenced to phase 2:EBWB
and
6:, Start of Green
Natural Cycle: 75
Control Type: Actuated -Coordinated
Maximum v/c Ratio: 0.95
2/8/2016 Synchro 9 Report
MS Page 1
6: Solana Blvd/Kirkwood Blvd & SH-114 SIB Off -Ramp 2022 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Lane Group'
06
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
5 6 8
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
5.0 5.0 5.0
Minimum Split (s)
10.0 22.5 22.5
Total Split (s)
25.0 35.0 40.0
Total Split (%)
25% 35 % 40%
Yellow Time (s)
3.5 3.5 3.5
All -Red Time (s)
1.0 1.0 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead Lag
Lead -Lag Optimize?
Yes Yes
Recall Mode
Max C-Max Max
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
2/8/2016 Synchro 9 Report
MS Page 2
6: Solana Blvd/Kirkwood Blvd & SH-114 SIB Off -Ramp 2022 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Intersection Signal Delay: 22.1 Intersection LOS: C
Intersection Capacity Utilization 87.0 % ICU Level of Service E
Analysis Period (min)15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases: 6: Solana Blvd/Kirkwood Blvd & SH-114 SB Off -Ramp
46 #6
7�t
❑6
26 s 34 s
9(7 s
} F
66
I 8
-
25s s
9os
8: SH-114 NB Off -Ramp & Kirkwood Blvd
2022 Background
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: PM
-'*,-,*
r-
4-
T/,.
ti 1
-'
Lane Group - - - - - -
- - ML
EBT EBR WBL
WBT
WBR
NBL
NBT
NBR SBL SBT
SBR
Lane Configurations
V1
tt
tt
?I
Vi
+Tf+
Traffic Volume (vph)
400
158 0 0
654
592
322
979
67 0 0
0
Future Volume (vph)
400
158 0 0
654
592
322
979
67 0 0
0
Peak Hour Factor
0.95
0.95 0.95 0.95
0.95
0.95
0.95
0.95
0.95 0.95 0.95
0.95
Adj. Flow (vph)
421
166 0 0
688
623
339
1031
71 0 0
0
Shared Lane Traffic (%)
10°%
Lane Group Flow (vph)
421
166 0 0
688
623
305
1136
0 0 0
0
Turn Type
pm+pt
NA
NA
Free
Perm
NA
Protected Phases
5
56
6
8
Permitted Phases
56
Free
8
Detector Phase
5
56
6
8
8
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
Minimum Split (s)
10.0
22.5
22.5
22.5
Total Split (s)
25.0
35.0
40.0
40.0
Total Split (%)
25.0%
35.0 %
40.0%
40.0%
Js
Yellow Time (s)
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
4.5
Lead/Lag
Lead
Lag
Lead -Lag Optimize?
Yes
Yes
-
Recall Mode
Max
C-Max
Max
Max
Act Effct Green (s)
51.0
55.5
30.5
100.0
35.5
35.5
-
Actuated g/C Ratio
0.51
0.56
0.30
1.00
0.36
0.36
v/c Ratio
0.86
0.08
0.64
0.39
0.53
0.95
-
Control Delay
55.7
12.0
33.2
0.7
29.9
48.6
Queue Delay
0.0
0.0
0.0
0.0
0.2
10.2
-
Total Delay
55.7
12.0
33.2
0.7
30.1
58.8
LOS
E
B
C
A
C
E
-
Approach Delay
43.3
17.8
52.7
Approach LOS
D
B
D
Queue Length 50th (ft)
228
25
198
0
168
381
Queue Length 95th (ft)
#353
43
260
0
261
#530
Internal Link Dist (ft)
327
240
1055
1095
Turn Bay Length (ft)
Base Capacity(vph)
490
1964
1079
1583
571
1195
Starvation Cap Reductn
0
0
0
0
0
0
Spillback Cap Reductn
0
0
0
0
33
69
Storage Cap Reductn
0
0
0
0
0
0
-
Reduced v/c Ratio
0.86
0.08
0.64
0.39
0.57
1.01
Intersection Summary
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 0 (0%), Referenced to phase 2:EBWB and 6:, Start of Green
Natural Cycle: 75
Control Type: Actuated -Coordinated
Maximum v/c Ratio: 0.95
2/8/2016 Synchro 9 Report 2/8/2016 Synchro 9 Report
MS Page 3 MS Page 4
8: SH-114 NB Off -Ramp & Kirkwood Blvd 2022 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All -Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead -Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
5.0 5.0 5.0
9.5 22.5 22.5
26.0 34.0 40.0
26 % 34% 40 %
3.5 3.5 3.5
1.0 1.0 1.0
Lead Lag
Yes Yes
None C-Max Max
8: SH-114 NB Off -Ramp & Kirkwood Blvd 2022 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Intersection Signal Delay: 37.4 Intersection LOS: D
Intersection Capacity Utilization 87.0 % ICU Level of Service E
Analysis Period (min)15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases: 8: SH-114 NB Off -Ramp & Kirkwood Blvd
=6
741
#6
�62
=6
j 14
26s
140S
=8
�45
#8
F
p6 `R'
=8
T48
25.
35 s
90 s
2/8/2016 Synchro 9 Report 2/8/2016 Synchro 9 Report
MS Page 5 MS Page 6
16: SH-114 SB Frontage Rd/SH-114 SB Off -Ramp & Dove Rd
2022 Background
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: PM
Lane Group = EBL
EST
EBR WBL
WBT
WBR NBL NBT
NBR SBL
Lane Configurations
tT+
+Tt
)
r{
Traffic Volume (vph) 0
182
303 399
1261
0 0 0
0 103
148
136
Future Volume (vph) 0
182
303 399
1261
0 0 0
0 103
148
136
Peak Hour Factor 0.96
0.96
0.96 0.96
0.96
0.96 0.96 0.96
0.96 0.96
0.96
0.96
Adj. Flow (vph) 0
190
316 416
1314
0 0 0
0 107
154
142
Shared Lane Traffic (°!°)
10%
Lane Group Flow (vph) 0
506
0 0
1730
0 0 0
0 96
307
0
Turn Type
NA
pm+pt
NA
Perm
NA
Protected Phases
2
1
12
4
Permitted Phases
12
4
Detector Phase
2
1
12
4
4
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
Minimum Split (s)
22.5
9.5
22.5
22.5
Total Split (s)
29.9
47.6
22.5
22.5
Total Split (%)
29.9%
47.6 %
22.5 %
22.5%
Yellow Time (s)
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
Lead/Lag
Lag
Lead
Lead
Lead -Lag Optimize?
Yes
Yes
Yes
Recall Mode
C-Max
None
None
None
Act Effct Green (s)
30.9
74.0
12.5
12.5
Actuated g/C Ratio
0.31
0.74
0.12
0.12
v/c Ratio
0.42
0.78
0.48
0.64
Control Delay
11.6
8.9
47.7
34.3
Queue Delay
0.0
0.6
0.0
0.0
Total Delay
11.6
9.5
47.7
34.3
LOS
B
A
D
C
Approach Delay
11.6
9.5
37.5
Approach LOS
B
A
D
Queue Length 50th (ft)
46
54
63
70
Queue Length 95th (ft)
97
288
114
111
Internal Link Dist (ft)
224
394
1722
1376
Turn Bay Length (ft)
240
Base Capacity (vph)
1209
2206
289
645
Starvation Cap Reductn
0
173
0
0
Spillback Cap Reductn
0
0
0
0
Storage Cap Reductn
0
0
0
0
Reduced v/c Ratio
0.42
0.85
0.33
0.48
Intersection Summary
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 0 (0%), Referenced to phase 2:EBWB
and 6:, Start of Green
Natural Cycle: 90
Control Type: Actuated -Coordinated
Maximum v/c Ratio: 0.89
2/8/2016 Synchro 9 Report
MS Page 7
16: SH-114 SB Frontage Rd/SH-114 SB Off -Ramp & Dove Rd 2022 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Lane Grouper
06 e8
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
5 6 8
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
5.0 5.0 5.0
Minimum Split (s)
9.5 22.5 22.5
Total Split (s)
9.6 35.4 55.0
Total Split (%)
10% 35 % 55%
Yellow Time (s)
3.5 3.5 3.5
All -Red Time (s)
1.0 1.0 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead Lag
Lead -Lag Optimize?
Yes Yes
Recall Mode
None C-Min Max
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
2/8/2016 Synchro 9 Report
MS Page 8
16: SH-114 SB Frontage Rd/SH-114 SB Off -Ramp & Dove Rd 2022 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Intersection Signal Delay: 14.2 Intersection LOS: B
Intersection Capacity Utilization 80.1 % ICU Level of Service D
Analysis Period (min)15
and Phases: 16: SH-114 SB Frontage Rd/SH-114 SB Off -Ramp & Dove Rd
#16 1 #16
6s
4;19 #19=19
*
19: SH-114 NB Frontage Rd/SH-114 NB On -Ramp & Dove Rd
2022 Background
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: PM
-,*,-,*
r-
4-
T/,.
ti 1
-'
Lane Group-
EBL
EBT EBR WBL
WBT
WBR
NBL
NBT
NBR SBL SBT
SBR
Lane Configurations
+Tt
0
)
4T+
Traffic Volume (vph)
63
225 0 0
734
157
907
1170
132 0 0
0
Future Volume (vph)
63
225 0 0
734
157
907
1170
132 0 0
0
Peak Hour Factor
0.99
0.99 0.99 0.99
0.99
0.99
0.99
0.99
0.99 0.99 0.99
0.99
Adj. Flow (vph)
64
227 0 0
741
159
916
1182
133 0 0
0
Shared Lane Traffic (%)
20°%
Lane Group Flow (vph)
0
291 0 0
900
0
733
1498
0 0 0
0
Turn Type
pm+pt
NA
NA
Perm
NA
Protected Phases
5
56
6
8
Permitted Phases
56
8
Detector Phase
5
56
6
8
8
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
Minimum Split (s)
9.5
22.5
22.5
22.5
Total Split (s)
9.6
35.4
55.0
55.0
Total Split (%)
9.6 %
35.4 %
55.0%
55.0%
JIM
Yellow Time (s)
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
Lead/Lag
Lead
Lag
Lag
Lead -Lag Optimize?
Yes
Yes
Yes
Recall Mode
None
C-Min
Max
Max
Act Effct Green (s)
35.2
30.1
51.3
51.3
-
Actuated g/C Ratio
0.35
0.30
0.51
0.51
v/c Ratio
0.36
0.85
0.89
0.87
-
Control Delay
19.6
41.1
37.0
28.7
Queue Delay
0.0
0.0
0.3
0.1
-
Total Delay
19.6
41.1
37.3
28.8
LOS
B
D
D
C
Approach Delay
19.6
41.1
31.6
Approach LOS
B
D
C
Queue Length 50th (ft)
36
272
446
447
Queue Length 95th (ft)
79
351
#723
#570
Internal Link Dist (ft)
394
990
1769
1583
Turn Bay Length (ft)
Base Capacity (vph)
821
1082
826
1714
Starvation Cap Reductn
0
0
0
0
Spillback Cap Reductn
0
0
6
6
Storage Cap Reductn
0
0
0
0
Reduced v/c Ratio
0.35
0.83
0.89
0.88
Intersection Summary
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 0 (0%), Referenced to phase 2:EBWB and 6:, Start of Green
Natural Cycle: 90
Control Type: Actuated -Coordinated
Maximum v/c Ratio: 0.89
2/8/2016 Synchro 9 Report 2/8/2016 Synchro 9 Report
MS Page 9 MS Page 10
19: SH-114 NB Frontage Rd/SH-114 NB On -Ramp & Dove Rd 2022 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Lane Group
01 o2 e4
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic
Lane Group Flow (vph)
Turn Type
Protected Phases
1 2 4
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
5.0 5.0 5.0
Minimum Split (s)
9.5 22.5 22.5
Total Split (s)
47.6 29.9 22.5
Total Split (%)
48% 30% 23%
Yellow Time (s)
3.5 3.5 3.5
All -Red Time (s)
1.0 1.0 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lag Lead
Lead -Lag Optimize?
Yes Yes
Recall Mode
None C-Max None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
2/8/2016 Synchro 9 Report
MS Page 11
19: SH-114 NB Frontage Rd/SH-114 NB On -Ramp & Dove Rd 2022 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Intersection Signal Delay: 33.1 Intersection LOS: C
Intersection Capacity Utilization 86.5 % ICU Level of Service E
Analysis Period (min)15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases: 19: SH-114 NB Frontage Rd/SH-114 NB On -Ramp & Dove Rd
-16 =16 #1166
l 04 �2 ■ p1
22.5 s 129.9 s 47.6 s EMEA
19 =19 T 19
F * �
2/8/2016
MS
Synchro 9 Report
Page 12
100: Dove Rd & Kirkwood Blvd 2022 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
- t ti r
Lane Group'
EBL
EST
WBT
WBR
SBL
SBR
Lane Configurations
►1
Tt
Tf+
V1
?I
Traffic Volume (vph)
158
190
272
236
134
505
Future Volume (vph)
158
190
272
236
134
505
Peak Hour Factor
0.90
0.90
0.90
0.90
0.90
0.90
Adj. Flow (vph)
176
211
302
262
149
561
Shared Lane Traffic (%)
Lane Group Flow (vph)
176
211
564
0
149
561
Turn Type
pm+pt
NA
NA
Prot
Perm
Protected Phases
7
4
8
1
Permitted Phases
4
6
Detector Phase
7
4
8
1
6
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
5.0
Minimum Split (s)
9.5
22.5
22.5
9.5
22.5
Total Split (s)
16.0
44.0
28.0
36.0
36.0
Total Split(%)
20.0%
55.0%
35.0%
45.0%
45.0%
Yellow Time (s)
3.5
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
4.5
4.5
Lead/Lag
Lead
Lag
Lead -Lag Optimize?
Yes
Yes
Recall Mode
None
C-Max
C-Max
None
Max
Act Effct Green (s)
39.5
39.5
25.4
31.5
31.5
Actuated g/C Ratio
0.49
0.49
0.32
0.39
0.39
v/c Ratio
0.43
0.12
0.46
0.21
0.59
Control Delay
14.9
11.2
13.0
17.1
4.6
Queue Delay
0.0
0.0
0.0
0.0
0.0
Total Delay
14.9
11.2
13.0
17.1
4.6
LOS
B
B
B
B
A
Approach Delay
12.9
13.0
7.3
Approach LOS
B
B
A
Queue Length 50th (ft)
47
28
59
48
3
Queue Length 95th (ft)
83
46
107
89
63
Internal Link Dist (ft)
990
172
351
Turn Bay Length (ft)
100
Base Capacity (vph)
438
1747
1222
696
957
Starvation Cap Reductn
0
0
0
0
0
Spillback Cap Reductn
0
0
0
0
0
Storage Cap Reductn
0
0
0
0
0
Reduced v/c Ratio
0.40
0.12
0.46
0.21
0.59
Intersection Summary
Cycle Length: 80
Actuated Cycle Length: 80
Offset: 0 (0%), Referenced to phase 4:EBTL
and 8:WBT,
Start of Green
Natural Cycle: 55
Control Type: Actuated -Coordinated
Maximum v/c Ratio: 0.59
100: Dove Rd & Kirkwood Blvd 2022 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Intersection Signal Delay: 10.5 Intersection LOS: B
Intersection Capacity Utilization 53.9 % ICU Level of Service A
Analysis Period (min)15
Splits and Phases: 100: Dove Rd & Kirkwood Blvd
\4.61
--0'04'R'.,
44 s■
o6
f P7
2/8/2016 Synchro 9 Report 2/8/2016 Synchro 9 Report
MS Page 13 MS Page 14
2: Driveway 4/T W King Rd & Kirkwood Blvd 2022 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Intersection
Intersection Delay, s/veh
41.9
Intersection LOS
E
Movement
EBU
EBL
EBT
EBR
WBU
WBL
WBT
WBR
NBU
NBL
NBT
NBR
Traffic Vol, veh/h
0
66
68
%
0
0
962
152
0
79
0
0
Future Vol, veh/h
0
66
68
16
0
0
962
152
0
79
0
0
Peak Hour Factor
0.92
0.89
0.89
0.92
0.92
0.92
0.89
0.89
0.92
0.92
0.92
0.92
Heavy Vehicles, %
2
2
2
2
2
2
2
2
2
2
2
2
Mvmt Flow
0
74
76
17
0
0
1081
171
0
86
0
0
Number of Lanes
0
1
2
0
0
0
2
0
0
0
2
0
Approach
¢dl$
Opposing Approach
WB
EB
SIB
Opposing Lanes
2
3
2
Conflicting Approach Left
SIB
NB
EB
Conflicting Lanes Left
2
2
3
Conflicting Approach Right
NB
SB
WB
Conflicting Lanes Right
2
2
2
HCM Control Delay
11.9
51.8
13.8
HCM LOS
B
F
B
Lane NBLn1 NBLn2 EBLnl E13Ln2 EBLn3 WBLnl WBLn2 SBLnl S13Ln2
Vol Left,%
100%
0%
100%
0%
0%
0%
0%
100%
0%
Vol Thru, %
0%
100%
0%
100%
59%
100%
68%
0%
0%
Vol Right, %
0%
0%
0%
0%
41%
0%
32%
0%
100%
Sign Control
Stop
Stop
Stop
Stop
Stop
Stop
Stop
Stop
Stop
Traffic Vol by Lane
79
0
66
45
39
641
473
15
139
LT Vol
79
0
66
0
0
0
0
15
0
Through Vol
0
0
0
45
23
641
321
0
0
RT Vol
0
0
0
0
16
0
152
0
139
Lane Flow Rate
86
0
74
51
43
721
531
17
156
Geometry Grp
8
8
8
8
8
8
8
8
8
Degree ofUtil(X)
0,208
0
0.171
0.11
0.089
1
0,883
0.04
0.318
Departure Headway (Hd)
8.739
8.242
8.289
7.789
7.499
6.214
5.986
8.521
7.326
Convergence, YIN
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Cap
410
0
433
460
477
584
605
420
490
Service Time
6.493
5.996
6.041
5.541
5.252
3.958
3.73
6.268
5.073
HCM Lane VIC Ratio
0.21
0
0.171
0.111
0.09
1.235
0.878
0.04
0.318
HCM Control Delay
13.8
11
12.8
11.5
11
62
38
11.6
13.5
HCM Lane LOS
B
N
B
B
B
F
E
B
B
HCM 95th-tile Q
0.8
0
0.6
0.4
0.3
14.7
10.4
0.1
1.4
2: Driveway 4/T W King Rd & Kirkwood Blvd 2022 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Intersection
Intersection Delay, s/veh
Intersection LOS
Movement
SBU
SBL
SBT
Traffic Vol, veh/h
0
15
0
139
Future Vol, veh/h
0
15
0
139
Peak Hour Factor
0.92
0.89
0.92
0.89
Heavy Vehicles, %
2
2
2
2
Mvmt Flow
0
17
0
156
Number of Lanes
0
0
1
1
Approach
S6
Opposing Approach
NB
Opposing Lanes
2
Conflicting Approach Left
WB
Conflicting Lanes Left
2
Conflicting Approach Right
EB
Conflicting Lanes Right
3
HCM Control Delay
13.3
HCM LOS
B
2/8/2016 Synchro 9 Report 2/8/2016 Synchro 9 Report
MS Page 1 MS Page 2
14: Kirkwood Blvd & Driveway 1 2022 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Intersection
Int Delay, s/veh 4.4
30: Kirkwood Blvd & Driveway 2 2022 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Intersection
Int Delay, s/veh 2.5
Movement -1
EBL
EBR
NBL
NBT
SBT
SBR
Movement
EBL
Traffic Vol, veh/h
132
159
32
308
386
27
Traffic Vol, veh/h
106
53
11
430
360
22
Future Vol, veh/h
132
159
32
308
386
27
Future Vol, veh/h
106
53
11
430
360
22
Conflicting Peds, #Ihr
0
0
0
0
0
0
Conflicting Peds, #Ihr
0
0
0
0
0
0
Sign Control
Stop
Stop
Free
Free
Free
Free
Sign Control
Stop
Stop
Free
Free
Free
Free
RT Channelized
-
None
-
None
None
RT Channelized
-
None
-
None
None
Storage Length
0
100
150
-
-
150
Storage Length
0
100
150
-
150
Veh in Median Storage, #
0
-
-
0
0
-
Veh in Median Storage, #
0
-
-
0
0
-
Grade, %
0
-
-
0
0
-
Grade, %
0
-
-
0
0
-
Peak Hour Factor
92
92
92
92
92
92
Peak Hour Factor
92
92
92
92
92
92
Heavy Vehicles,%
2
2
2
2
2
2
Heavy Vehicles,%
2
2
2
2
2
2
Mvmt Flow
143
173
35
335
420
29
Mvmt Flow
115
58
12
467
391
24
Major/Minor
Minor2
Majorl
tvtaiv
Major/Minor
Minot
Majorl
Major2
Conflicting Flow All
657
210
420
0
0
Conflicting Flow All
649
196
391
0
0
Stage 1
420
-
-
-
-
Stage 1
391
-
-
-
Stage 2
237
-
-
Stage 2
258
-
-
Critical Hdwy
6.84
6.94
4.14
Critical Hdwy
6.84
6.94
4.14
Critical Hdwy Stg 1
5.84
-
-
Critical Hdwy Stg 1
5.84
-
Critical Hdwy Stg 2
5.84
-
-
Critical Hdwy Stg 2
5.84
-
-
Follow-up Hdwy
3.52
3.32
2.22
Follow-up Hdwy
3.52
3.32
2.22
Pot Cap-1 Maneuver
398
796
1136
Pot Cap-1 Maneuver
402
812
1164
Stage 1
631
-
-
Stage 1
653
-
-
Stage 2
780
-
-
Stage 2
761
-
-
Platoon blocked, %
Platoon blocked, %
Mov Cap-1 Maneuver
386
796
1136
Mov Cap-1 Maneuver
398
812
1164
Mov Cap-2 Maneuver
386
-
-
Mov Cap-2 Maneuver
398
-
-
Stage 1
631
Stage 1
653
Stage 2
756
Stage 2
753
Approach
EB
NB
SB
Approach
EB
NB
SB
HCM Control Delay, s
14.8
0.8
0
HCM Control Delay, s
15.1
0.2
0
HCM LOS
B
HCM LOS
C
Minor Lane/MajorMvmt
NBL
NBTEBLn1EBLn2
SBT
SBR
Minor Lane/MajorMvmt
NBL
NBT EBLn I EBLn2
SBT
SBR
Capacity (veh/h)
1136
386 796
Capacity (veh/h)
1164
398 812
HCM Lane V/C Ratio
0.031
0.372 0.217
HCM Lane V/C Ratio
0.01
0.289 0.071
HCM Control Delay (s)
8.3
19.7 10.8
HCM Control Delay (s)
8.1
17.7 9.8
HCM Lane LOS
A
C B
HCM Lane LOS
A
C A
HCM 95th %tile Q(veh)
0.1
1.7 0.8
HCM 95th %tile Q(veh)
0
1.2 0.2
2/8/2016 Synchro 9 Report 2/8/2016 Synchro 9 Report
MS Page 1 MS Page 2
37: Driveway 5 & Kirkwood Blvd 2022 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Intersection _qqEIWr_
Int Delay, s/veh 0.3
40: Driveway 6 & Kirkwood Blvd 2022 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Intersection
Int Delay, s/veh 0.4
Movement
EBT
EBR
WBL WBT
NBL
NBR
Movement
EBT
EBR
WBL WBT
NBL
Traffic Vol, veh/h
153
35
2 1178
33
2
Traffic Vol, veh/h
186
39
2 1210
37
1
Future Vol, veh/h
153
35
2 1178
33
2
Future Vol, veh/h
186
39
2 1210
37
1
Conflicting Peds, #Ihr
0
0
0 0
0
0
Conflicting Peds, #Ihr
0
0
0 0
0
0
Sign Control
Free
Free
Free Free
Stop
Stop
Sign Control
Free
Free
Free Free
Stop
Stop
RT Channelized
None
None
-
None
RT Channelized
None
- None
-
None
Storage Length
-
0
Storage Length
100 -
0
Veh in Median Storage, #
0
0
0
Veh in Median Storage, #
0
- 0
0
Grade, %
0
0
0
-
Grade, %
0
- 0
0
-
Peak Hour Factor
92
92
92 92
92
92
Peak Hour Factor
92
92
92 92
92
92
Heavy Vehicles,%
2
2
2 2
2
2
Heavy Vehicles,%
2
2
2 2
2
2
Mvmt Flow
166
38
2 1280
36
2
Mvmt Flow
202
42
2 1315
40
1
Major/Minor
Majorl
Major2
Minorl
Major/Minor
Majorl
Major2
Minorl
Conflicting Flow All
0
0
204 0
702
102
Conflicting Flow All
0
0
245 0
753
122
Stage 1
-
-
- -
185
-
Stage 1
-
-
-
223
-
Stage 2
-
517
-
Stage 2
-
530
-
Critical Hdwy
5.34
5.74
7.14
Critical Hdwy
5.34
5.74
7.14 -
Critical Hdwy Stg 1
6.64
-
Critical Hdwy Stg 1
6.64
Critical Hdwy Stg 2
-
6.04
-
Critical Hdwy Stg 2
-
6.04
-
Follow-up Hdwy
3.12
3.82
3.92
Follow-up Hdwy
3.12
3.82
3.92
Pot Cap-1 Maneuver
930
436
793
Pot Cap-1 Maneuver
890
412
770
Stage 1
-
738
-
Stage 1
-
701
-
Stage 2
-
514
-
Stage 2
-
506
-
Platoon blocked, %
Platoon blocked, %
Mov Cap-1 Maneuver
930
433
793
Mov Cap-1 Maneuver
890
411
770
Mov Cap-2 Maneuver
-
433
Mov Cap-2 Maneuver
-
411
-
Stage 1
738
Stage 1
701
Stage 2
510
Stage 2
505
Approach
EB
WB
Approach
EB
WB
NB
HCM Control Delay, s
0
0
13.8
HCM Control Delay, s
0
0
14.6
HCM LOS
B
HCM LOS
B
Minor Lane/Major Mvmt NBLnl EBT EBR WBL WBT
Capacity (veh/h)
445
930
HCM Lane V/C Ratio
0.085
0.002
HCM Control Delay (s)
13.8
8.9 0
HCM Lane LOS
B
A A
HCM 95th %tile Q(veh)
0.3
0 -
Minor Lane/Major Mvmt
NBLn1
EBT EBR WBL WBT
Capacity (veh/h)
416
890
HCM Lane V/C Ratio
0.099
0.002
HCM Control Delay (s)
14.6
9.1
HCM Lane LOS
B
A
HCM 95th %tile Q(veh)
0.3
0
2/8/2016 Synchro 9 Report 2/8/2016 Synchro 9 Report
MS Page 3 MS Page 4
6: Solana Blvd/Kirkwood Blvd & SH-114 SB Off -Ramp 2022 Background + Site
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: AM
Lane Grouf------'TBL
EST
EBR
WBL
WBT
WBR NBL NBT NBR
SBL
SBR
Lane Configurations
tt
r
)
tt
)
+T +
Traffic Volume (vph) 0
369
279
342
707
0 0 0 0
580
1 69
Future Volume (vph) 0
369
279
342
707
0 0 0 0
580
1 69
Peak Hour Factor 0.92
0.92
0.92
0.92
0.92
0.92 0.92 0.92 0.92
0.92
0.92 0.92
Adj. Flow (vph) 0
401
303
372
768
0 0 0 0
630
1 75
Shared Lane Traffic (%)
50%
Lane Group Flow (vph) 0
401
303
372
768
0 0 0 0
315
391 0
Turn Type
NA
Perm
pm+pt
NA
Perm
NA
Protected Phases
2
1
12
4
Permitted Phases
2
12
4
Detector Phase
2
2
1
12
4
4
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
5.0
Minimum Split (s)
22.5
22.5
9.5
22.5
22.5
Total Split (s)
27.4
27.4
15.6
47.0
47.0
Total Split (%)
30.4%
30.4 %
17.3 %
52.2 %
52.2%
Yellow Time (s)
3.5
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
4.5
4.5
Lead/Lag
Lag
Lag
Lead
Lead -Lag Optimize?
Yes
Yes
Yes
Recall Mode
C-Max
C-Max
None
None
None
Act Effct Green (s)
24.8
24.8
38.6
43.1
37.9
37.9
Actuated g/C Ratio
0.28
0.28
0.43
0.48
0.42
0.42
v/c Ratio
0.41
0.46
0.76
0.45
0.46
0.29
Control Delay
28.9
6.0
29.4
16.3
20.4
15.1
Queue Delay
0.0
0.0
0.0
0.4
0.0
0.0
Total Delay
28.9
6.0
29.4
16.7
20.4
15.1
LOS
C
A
C
B
C
B
Approach Delay
19.0
20.9
17.4
Approach LOS
B
C
B
Queue Length 50th (ft)
101
0
140
152
129
65
Queue Length 95th (ft)
144
62
#240
188
197
93
Internal Link Dist (ft)
1214
327
1036
836
Turn Bay Length (ft)
350
Base Capacity (vph)
975
655
490
1693
760
1515
Starvation Cap Reductn
0
0
0
442
0
0
Spillback Cap Reductn
0
0
0
0
0
0
Storage Cap Reductn
0
0
0
0
0
0
Reduced v/c Ratio
0.41
0.46
0.76
0.61
0.41
0.26
Intersection Summary
Cycle Length: 90
Actuated Cycle Length: 90
Offset: 0 (0%), Referenced to phase 2:EBWB
and
6:, Start of Green
Natural Cycle: 65
Control Type: Actuated -Coordinated
Maximum v/c Ratio: 0.76
TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report
MS Page 1
6: Solana Blvd/Kirkwood Blvd & SH-114 SIB Off -Ramp 2022 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Lane Group'
06
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
5 6 8
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
5.0 5.0 5.0
Minimum Split (s)
9.5 22.5 22.5
Total Split (s)
19.5 23.5 47.0
Total Split (%)
22% 26% 52%
Yellow Time (s)
3.5 3.5 3.5
All -Red Time (s)
1.0 1.0 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lag Lead
Lead -Lag Optimize?
Yes Yes
Recall Mode
None C-Max None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summer
TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report
MS Page 2
6: Solana Blvd/Kirkwood Blvd & SH-114 SIB Off -Ramp 2022 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Intersection Signal Delay: 19.4 Intersection LOS: B
Intersection Capacity Utilization 67.6 % ICU Level of Service C
Analysis Period (min)15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases: 6: Solana Blvd/Kirkwood Blvd & SH-114 SB Off -Ramp
#6 =6 #fi
►� F I
15.6 I J27.4s 447s
=s s 8
F �
8: SH-114 NB Off -Ramp & Kirkwood Blvd
2022 Background + Site
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: AM
-'*,-,*
r-
4-
T/,.
ti 1
-'
Lane Group -
EBL
EBT EBR WBL
WBT
WBR
NBL
NBT
NBR
SBL SBT
SBR
Lane Configurations
V1
tt
tt
?I
Vi
+Tf+
Traffic Volume (vph)
143
807 0 0
412
83
639
136
550
0 0
0
Future Volume (vph)
143
807 0 0
412
83
639
136
550
0 0
0
Peak Hour Factor
0.92
0.92 0.92 0.92
0.92
0.92
0.92
0.92
0.92
0.92 0.92
0.92
Adj. Flow (vph)
155
877 0 0
448
90
695
148
598
0 0
0
Shared Lane Traffic (%)
28°%
Lane Group Flow (vph)
155
877 0 0
448
90
500
941
0
0 0
0
Turn Type
pm+pt
NA
NA
Free
Perm
NA
Protected Phases
5
56
6
8
Permitted Phases
56
Free
8
Detector Phase
5
56
6
8
8
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
Minimum Split (s)
9.5
22.5
22.5
22.5
Total Split (s)
19.5
23.5
47.0
47.0
Total Split (%)
21.7 %
26.1 %
52.2%
52.2%
Yellow Time (s)
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
4.5
Lead/Lag
Lag
Lead
Lead -Lag Optimize?
Yes
Yes
Recall Mode
None
C-Max
None
None
Act Effct Green (s)
38.6
43.1
23.6
90.0
37.9
37.9
-
Actuated g/C Ratio
0.43
0.48
0.26
1.00
0.42
0.42
v/c Ratio
0.32
0.52
0.48
0.06
0.74
0.89dr
-
Control Delay
22.5
21.1
31.5
0.1
28.5
22.6
Queue Delay
0.0
0.1
0.0
0.0
0.0
0.0
-
Total Delay
22.5
21.2
31.5
0.1
28.5
22.6
LOS
C
C
C
A
C
C
-
Approach Delay
21.4
26.3
24.7
Approach LOS
C
C
C
-
Queue Length 50th (ft)
58
184
118
0
240
207
Queue Length 95th (ft)
100
226
172
0
354
265
Internal Link Dist (ft)
327
247
1055
1095
Turn Bay Length (ft)
Base Capacity(vph)
479
1693
927
1583
760
1471
Starvation Cap Reductn
0
147
0
0
0
0
Spillback Cap Reductn
0
0
0
0
0
0
Storage Cap Reductn
0
0
0
0
0
0
Reduced v/c Ratio
0.32
0.57
0.48
0.06
0.66
0.64
Intersection Summary
Cycle Length: 90
Actuated Cycle Length: 90
Offset: 0 (0%), Referenced to phase 2:EBWB and 6:, Start of Green
Natural Cycle: 65
Control Type: Actuated -Coordinated
Maximum v/c Ratio: 0.76
TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report
MS Page 3 MS Page 4
8: SH-114 NB Off -Ramp & Kirkwood Blvd 2022 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All -Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead -Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
5.0 5.0 5.0
9.5 22.5 22.5
15.6 27.4 47.0
17% 30% 52%
3.5 3.5 3.5
1.0 1.0 1.0
Lead Lag
Yes Yes
None C-Max None
8: SH-114 NB Off -Ramp & Kirkwood Blvd 2022 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Intersection Signal Delay: 23.8 Intersection LOS: C
Intersection Capacity Utilization 67.6% ICU Level of Service C
Analysis Period (min)15
dr Defacto Right Lane. Recode with 1 though lane as a right lane.
Splits and Phases: 8: SH-114 NB Off -Ramp & Kirkwood Blvd
#6 1#6
7�1 �2
-5I
+ p-0
47 s
F
;❑6 `R)
as
too
23.5 s
19.51
47 s
TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report
MS Page 5 MS Page 6
16: Dove Rd & SH-114 SIB Off -Ramp
2022 Background + Site
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: AM
Lane Group EBL
EST EBR
WBL
WBT
WBR NBL NBT NBR
SBL
Lane Configurations
tT+
+Tt
)
r{
Traffic Volume (vph) 0
434 786
103
513
0 0 0 0
170
135 68
Future Volume (vph) 0
434 786
103
513
0 0 0 0
170
135 68
Peak Hour Factor 0.83
0.83 0.83
0.83
0.83
0.83 0.83 0.83 0.83
0.83
0.83 0.83
Adj. Flow (vph) 0
523 947
124
618
0 0 0 0
205
163 82
Shared Lane Traffic (°!°)
26%
Lane Group Flow (vph) 0
1470 0
0
742
0 0 0 0
152
298 0
Turn Type
NA
pm+pt
NA
Perm
NA
Protected Phases
2
1
21
4
Permitted Phases
21
4
Detector Phase
2
1
21
4
4
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
Minimum Split (s)
22.5
9.5
22.5
22.5
Total Split (s)
57.5
9.5
23.0
23.0
Total Split (%)
63.9%
10.6 %
25.6 %
25.6%
Yellow Time (s)
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
Lead/Lag
Lag
Lead
Lead
Lead -Lag Optimize?
Yes
Yes
Yes
Recall Mode
C-Max
None
None
None
Act Effct Green (s)
57.7
62.7
13.8
13.8
Actuated g/C Ratio
0.64
0.70
0.15
0.15
v/c Ratio
0.66
0.51
0.62
0.56
Control Delay
8.7
4.8
46.0
32.6
Queue Delay
0.0
0.0
0.0
0.0
Total Delay
8.7
4.8
46.0
32.6
LOS
A
A
D
C
Approach Delay
8.7
4.8
37.1
Approach LOS
A
A
D
Queue Length 50th (ft)
160
23
90
71
Queue Length 95th (ft)
220
56
135
97
Internal Link Dist (ft)
224
394
1722
1376
Turn Bay Length (ft)
240
Base Capacity (vph)
2215
1445
330
702
Starvation Cap Reductn
0
0
0
0
Spillback Cap Reductn
0
0
0
0
Storage Cap Reductn
0
0
0
0
Reduced v/c Ratio
0.66
0.51
0.46
0.42
Intersection Summary
Cycle Length: 90
Actuated Cycle Length: 90
Offset: 0 (0%), Referenced to phase 2:EBWB
and 6:, Start of Green
Natural Cycle: 65
Control Type: Actuated -Coordinated
Maximum v/c Ratio: 0.66
TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report
MS Page 7
16: Dove Rd & SH-114 SB Off -Ramp 2022 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Lane Group
o6 08
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
5 6 8
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
5.0 5.0 5.0
Minimum Split (s)
9.5 22.5 22.5
Total Split (s)
9.5 47.5 33.0
Total Split (%)
11 % 53% 37%
Yellow Time (s)
3.5 3.5 3.5
All -Red Time (s)
1.0 1.0 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lag Lead
Lead -Lag Optimize?
Yes Yes
Recall Mode
None C-Min Max
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summer
TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report
MS Page 8
16: Dove Rd & SH-114 SIB Off -Ramp 2022 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Intersection Signal Delay: 12.4 Intersection LOS: B
Intersection Capacity Utilization 73.0 % ICU Level of Service C
Analysis Period (min)15
19: SH-114 NB Frontage Rd & Dove Rd
2022 Background + Site
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: AM
-,*,-,*
r-
4-
T/,.
ti
1
-'
Lane Group-
EBL
EST EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
Lane Configurations
+Tt
0
►j
q +
Traffic Volume (vph)
79
516 0
0
364
97
263
119
402
0
0
0
Future Volume (vph)
79
516 0
0
364
97
263
119
402
0
0
0
Peak Hour Factor
0.80
0.80 0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
Adj. Flow (vph)
99
645 0
0
455
121
329
149
503
0
0
0
Shared Lane Traffic (%)
10°%
Lane Group Flow (vph)
0
744 0
0
576
0
296
685
0
0
0
0
Turn Type
pm+pt
NA
NA
Perm
NA
Protected Phases
5
65
6
8
Permitted Phases
65
8
Detector Phase
5
65
6
8
8
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
Minimum Split (s)
9.5
22.5
22.5
22.5
Total Split (s)
9.5
47.5
33.0
33.0
Total Split (%)
10.6 %
52.8 %
36.7%
36.7%
AN
Yellow Time (s)
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
Lead/Lag
Lag
Lead
Lead
Lead -Lag Optimize?
Yes
Yes
Yes
-
Recall Mode
None
C-Min
Max
Max
Act Effct Green (s)
48.0
29.2
28.5
28.5
Actuated g/C Ratio
0.53
0.32
0.32
0.32
v/c Ratio
0.46
0.50
0.58
0.62
Control Delay
11.7
16.1
31.3
19.8
Queue Delay
0.0
0.0
0.0
0.0
-
Total Delay
11.7
16.1
31.3
19.8
LOS
B
B
C
B
-
Approach Delay
11.7
16.1
23.3
Approach LOS
B
B
C
Queue Length 50th (ft)
121
66
153
119
Queue Length 95th (ft)
104
55
210
146
Internal Link Dist (ft)
394
990
1769
1583
Turn Bay Length (ft)
Base Capacity (vph)
1719
1663
509
1108
Starvation Cap Reductn
0
0
0
0
Spillback Cap Reductn
0
0
0
0
Storage Cap Reductn
0
0
0
0
Reduced v/c Ratio
0.43
0.35
0.58
0.62
Intersection Summary
Cycle Length: 90
Actuated Cycle Length: 90
Offset: 0 (0%), Referenced to phase 2:EBWB and 6:, Start
of Green
Natural Cycle: 65
Control Type: Actuated -Coordinated
Maximum v/c Ratio: 0.66
TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report
MS Page 9 MS Page 10
19: SH-114 NB Frontage Rd & Dove Rd 2022 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Lane Group
of o2 o4
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic
Lane Group Flow (vph)
Turn Type
Protected Phases
1 2 4
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
5.0 5.0 5.0
Minimum Split (s)
9.5 22.5 22.5
Total Split (s)
9.5 57.5 23.0
Total Split (%)
11 % 64% 26 %
Yellow Time (s)
3.5 3.5 3.5
All -Red Time (s)
1.0 1.0 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lag Lead
Lead -Lag Optimize?
Yes Yes
Recall Mode
None C-Max None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
19: SH-114 NB Frontage Rd & Dove Rd 2022 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Intersection Signal Delay: 17.7 Intersection LOS: B
Intersection Capacity Utilization 56.9 % ICU Level of Service B
Analysis Period (min)15
Splits and Phases: 19: SH-114 NB Frontage Rd & Dove Rd
#]jb
#16
#16
57.5 s
# 9 � 19
'Iqa *oa' rR1
=19
5
47. 4 s
TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report
MS Page 11 MS Page 12
22: Dove Rd & Kirkwood Blvd
2022 Background + Site
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: AM
*_
t
ti
r
Lane Grout-
EBL
EST
WBT
WBR
SBL
SBR
Lane Configurations
I
Tt
Tf+
Vi
?I
Traffic Volume (vph)
555
209
285
126
44
153
Future Volume (vph)
555
209
285
126
44
153
Peak Hour Factor
0.77
0.77
0.77
0.77
0.77
0.77
Adj. Flow (vph)
721
271
370
164
57
199
Shared Lane Traffic (%)
Lane Group Flow (vph)
721
271
534
0
57
199
Turn Type
pm+pt
NA
NA
Prot
Perm
Protected Phases
7
4
8
1
Permitted Phases
4
6
Detector Phase
7
4
8
1
6
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
5.0
Minimum Split (s)
9.5
22.5
22.5
9.5
9.5
Total Split (s)
47.0
73.0
26.0
17.0
17.0
Total Split(%)
52.2%
81.1%
28.9%
18.9% 18.9%
Yellow Time (s)
3.5
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
4.5
4.5
Lead/Lag
Lead
Lag
Lead -Lag Optimize?
Yes
Yes
Recall Mode
None
C-Max
C-Max
None
None
Act Effct Green (s)
72.4
72.4
37.8
8.6
8.6
Actuated g/C Ratio
0.80
0.80
0.42
0.10
0.10
v/c Ratio
0.80
0.10
0.37
0.34
0.60
Control Delay
18.2
3.5
19.1
42.6
13.8
Queue Delay
0.0
0.0
0.0
0.0
0.0
Total Delay
18.2
3.5
19.1
42.6
13.8
LOS
B
A
B
D
B
Approach Delay
14.2
19.1
20.2
Approach LOS
B
B
C
Queue Length 50th (ft)
244
22
92
31
0
Queue Length 95th (ft)
282
32
142
55
35
Internal Link Dist (ft)
990
172
351
Turn Bay Length (ft)
100
Base Capacity (vph)
1052
2848
1460
245
391
Starvation Cap Reductn
0
0
0
0
0
Spillback Cap Reductn
0
0
0
0
0
Storage Cap Reductn
0
0
0
0
0
Reduced v/c Ratio
0.69
0.10
0.37
0.23
0.51
Intersection Summary
Cycle Length: 90
Actuated Cycle Length: 90
Offset: 0 (0%), Referenced to phase 4:EBTL
and 8:WBT,
Start of Green
Natural Cycle: 60
Control Type: Actuated -Coordinated
Maximum v/c Ratio: 0.80
TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report
MS Page 13
22: Dove Rd & Kirkwood Blvd 2022 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Intersection Signal Delay: 16.5 Intersection LOS: B
Intersection Capacity Utilization 58.1 % ICU Level of Service B
Analysis Period (min)15
iplits and Phases: 22: Dove Rd & Kirkwood Blvd
\101 A4
■ F
o6 J 07 08 rR)
17s 26s
TIA for Wilks Tract Development in Southlake, Texas
MS
Synchro 9 Report
Page 14
2: Driveway 4/T W King Rd & Kirkwood Blvd 2022 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Intersection
_
Intersection Delay, s/veh
36.5
Intersection LOS
E
Movement
EBU
EBL
EBT
EBR
WBU
WBL
WBT
WBR
NBU
NBL
NBT
NBR
Traffic Vol, veh/h
0
32
746
125
0
0
90
10
0
17
1
0
Future Vol, veh/h
0
32
746
125
0
0
90
10
0
17
1
0
Peak Hour Factor
0.92
0.91
0.91
0.92
0.92
0.92
0.91
0.91
0.92
0.92
0.92
0.92
Heavy Vehicles, %
2
2
2
2
2
2
2
2
2
2
2
2
Mvmt Flow
0
35
820
136
0
0
99
11
0
18
1
0
Number of Lanes
0
1
2
0
0
0
2
0
0
0
2
0
Approach -
T -_
IV
-!l
Opposing Approach
WB
EB
SIB
Opposing Lanes
2
3
2
Conflicting Approach Left
SIB
NB
EB
Conflicting Lanes Left
2
2
3
Conflicting Approach Right
NB
SB
WB
Conflicting Lanes Right
2
2
2
HCM Control Delay
47
12.5
12.7
HCM LOS
E
B
B
Lane NBLn1 NBLn2 EBLnl E13Ln2 EBLn3 WBLnl WBLn2 SBLnl S13Ln2
Vol Left,%
98%
0%
100%
0%
0%
0%
0%
93%
0%
Vol Thru, %
2%
100%
0%
100%
67%
100%
75%
7%
0%
Vol Right, %
0%
0%
0%
0%
33%
0%
25%
0%
100%
Sign Control
Stop
Stop
Stop
Stop
Stop
Stop
Stop
Stop
Stop
Traffic Vol by Lane
17
1
32
497
374
60
40
120
341
LT Vol
17
0
32
0
0
0
0
112
0
Through Vol
0
1
0
497
249
60
30
8
0
RT Vol
0
0
0
0
125
0
10
0
341
Lane Flow Rate
19
1
35
547
409
66
44
132
375
Geometry Grp
8
8
8
8
8
8
8
8
8
Degree ofUtil(X)
0.05
0.002
0.071
1
0.742
0.156
0.102
0.294
0.714
Departure Headway (Hd)
9.475
8.972
7.277
6.77
6.532
8.517
8.337
8.035
6.858
Convergence, YIN
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Cap
381
401
489
530
548
423
432
449
528
Service Time
7.16
6.673
5.07
4.563
4.325
6.228
6.053
5.74
4.583
HCM Lane VIC Ratio
0.05
0.002
0.072
1.032
0.746
0.156
0.102
0.294
0.71
HCM Control Delay
12.7
11.7
10.6
65.1
26
12.8
12
14.1
24.9
HCM Lane LOS
B
B
B
F
D
B
B
B
C
HCM 95th-tile Q
0.2
0
0.2
14
6.3
0.5
0.3
1.2
5.7
TIA for Wilks Tract Development in Southlake, Texas
MS
2: Driveway 4/T W King Rd & Kirkwood Blvd 2022 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Intersection
Intersection Delay, s/veh
Intersection LOS
Movement
SBU
SBL
SBT
SBF
Traffic Vol, veh/h
0
112
8
341
Future Vol, veh/h
0
112
8
341
Peak Hour Factor
0.92
0.91
0.92
0.91
Heavy Vehicles, %
2
2
2
2
Mvmt Flow
0
123
9
375
Number of Lanes
0
0
1
1
Approach
S'
Opposing Approach
NB
Opposing Lanes
2
Conflicting Approach Left
WB
Conflicting Lanes Left
2
Conflicting Approach Right
EB
Conflicting Lanes Right
3
HCM Control Delay
22.1
HCM LOS
C
Synchro 9 Report TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report
Page 1 MS Page 2
14: Kirkwood Blvd & Driveway 1 2022 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Intersection
Int Delay, s/veh 2.2
30: Kirkwood Blvd & Driveway 2 2022 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Intersection
Int Delay, s/veh 2.1
Movement -1
EBL
EBR
NBL
NBT
SBT
SBR
Movement
EBL
Traffic Vol, veh/h
23
23
183
418
41
183
Traffic Vol, veh/h
29
23
150
291
201
191
Future Vol, veh/h
23
23
183
418
41
183
Future Vol, veh/h
29
23
150
291
201
191
Conflicting Peds, #Ihr
0
0
0
0
0
0
Conflicting Peds, #Ihr
0
0
0
0
0
0
Sign Control
Stop
Stop
Free
Free
Free
Free
Sign Control
Stop
Stop
Free
Free
Free
Free
RT Channelized
-
None
-
None
None
RT Channelized
-
None
-
None
None
Storage Length
0
100
150
-
-
150
Storage Length
0
100
150
-
-
150
Veh in Median Storage, #
0
-
-
0
0
-
Veh in Median Storage, #
0
-
-
0
0
-
Grade, %
0
-
-
0
0
-
Grade, %
0
-
-
0
0
-
Peak Hour Factor
92
92
92
92
92
92
Peak Hour Factor
92
92
92
92
92
92
Heavy Vehicles,%
2
2
2
2
2
2
Heavy Vehicles,%
2
2
2
2
2
2
Mvmt Flow
25
25
199
454
45
199
Mvmt Flow
32
25
163
316
218
208
Major/Minor
Minor2
Majorl
Major2
Major/Minor
Minot
Majorl
Major2
Conflicting Flow All
670
22
45
0
0
Conflicting Flow All
702
109
218
0
0
Stage 1
45
-
-
-
-
Stage 1
218
-
-
-
Stage 2
625
-
-
Stage 2
484
-
-
Critical Hdwy
6.84
6.94
4.14
Critical Hdwy
6.84
6.94
4.14
Critical Hdwy Stg 1
5.84
-
-
Critical Hdwy Stg 1
5.84
-
Critical Hdwy Stg 2
5.84
-
-
Critical Hdwy Stg 2
5.84
-
-
Follow-up Hdwy
3.52
3.32
2.22
Follow-up Hdwy
3.52
3.32
2.22
Pot Cap-1 Maneuver
390
1050
1561
Pot Cap-1 Maneuver
372
924
1349
Stage 1
972
-
-
Stage 1
797
-
-
Stage 2
496
-
-
Stage 2
585
-
-
Platoon blocked, %
Platoon blocked, %
Mov Cap-1 Maneuver
340
1050
1561
Mov Cap-1 Maneuver
327
924
1349
Mov Cap-2 Maneuver
340
-
-
Mov Cap-2 Maneuver
327
-
-
Stage 1
972
Stage 1
797
Stage 2
433
Stage 2
514
Approach
EB
NB
SB
Approach
EB
NB
SB
HCM Control Delay, s
12.5
2.3
0
HCM Control Delay, s
13.6
2.7
0
HCM LOS
B
HCM LOS
B
Minor Lane/MajorMvmt
NBL
NBTEBLn1EBLn2 SBT SBR
Capacity (veh/h)
1561
340 1050
HCM Lane V/C Ratio
0.127
0.074 0.024
HCM Control Delay (s)
7.6
16.4 8.5
HCM Lane LOS
A
C A
HCM 95th %tile Q(veh)
0.4
0.2 0.1
TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report
MS Page 1
Minor Lane/MajorMvmt
NBL
NBT EBLn I EBLn2 SBT SBR
Capacity (veh/h)
1349
327 924
HCM Lane V/C Ratio
0.121
0.096 0.027
HCM Control Delay (s)
8
17.2 9
HCM Lane LOS
A
C A
HCM 95th %tile Q(veh)
0.4
0.3 0.1
TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report
MS Page 2
37: Driveway 5 & Kirkwood Blvd 2022 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Intersection _qqEIWr_
Int Delay, s/veh 0.6
40: Driveway 6 & Kirkwood Blvd 2022 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Intersection
Int Delay, s/veh 0.6
Movement
EBT
EBR
WBL WBT
NBL
NBR
Movement
EBT
EBR
WBL WBT
NBL
Traffic Vol, veh/h
1284
35
2
446
25
2
Traffic Vol, veh/h
1318
39
2
470
28
1
Future Vol, veh/h
1284
35
2
446
25
2
Future Vol, veh/h
1318
39
2
470
28
1
Conflicting Peds, #Ihr
0
0
0
0
0
0
Conflicting Peds, #Ihr
0
0
0
0
0
0
Sign Control
Free
Free
Free
Free
Stop
Stop
Sign Control
Free
Free
Free
Free
Stop
Stop
RT Channelized
None
None
-
None
RT Channelized
None
-
None
-
None
Storage Length
-
0
Storage Length
100
-
0
Veh in Median Storage, #
0
0
0
Veh in Median Storage, #
0
-
0
0
Grade, %
0
0
0
-
Grade, %
0
-
0
0
-
Peak Hour Factor
92
92
92
92
92
92
Peak Hour Factor
92
92
92
92
92
92
Heavy Vehicles,%
2
2
2
2
2
2
Heavy Vehicles,%
2
2
2
2
2
2
Mvmt Flow
1396
38
2
485
27
2
Mvmt Flow
1433
42
2
511
30
1
Major/Minor
Majorl
Major2
Minorl
Major/Minor
Majorl
Major2
Minorl
Conflicting Flow All
0
0
1434
0
1613
717
Conflicting Flow All
0
0
1475
0
1663
738
Stage 1
-
-
-
-
1415
-
Stage 1
-
-
-
-
1454
-
Stage 2
-
198
-
Stage 2
-
209
-
Critical Hdwy
5.34
5.74
7.14
Critical Hdwy
5.34
5.74
7.14 -
Critical Hdwy Stg 1
-
6.64
-
Critical Hdwy Stg 1
6.64
Critical Hdwy Stg 2
-
6.04
-
Critical Hdwy Stg 2
-
6.04
-
Follow-up Hdwy
3.12
3.82
3.92
Follow-up Hdwy
3.12
3.82
3.92
Pot Cap-1 Maneuver
240
150
319
Pot Cap-1 Maneuver
229
142
309
Stage 1
-
134
-
Stage 1
-
127
-
Stage 2
-
750
-
Stage 2
-
740
-
Platoon blocked, %
Platoon blocked, %
Mov Cap-1 Maneuver
240
148
319
Mov Cap-1 Maneuver
229
141
309
Mov Cap-2 Maneuver
-
148
Mov Cap-2 Maneuver
-
141
-
Stage 1
134
Stage 1
127
Stage 2
742
Stage 2
734
Approach
EB
WB
Approach
EB
WB
INS
HCM Control Delay, s
0
0.2
33.8
HCM Control Delay, s
0
0.1
36.9
HCM LOS
D
HCM LOS
E
Minor Lane/Major Mvmt NBLnl EBT EBR WBL WBT
Capacity (veh/h)
154
240
HCM Lane V/C Ratio
0.191
0.009
HCM Control Delay (s)
33.8
20.1 0.1
HCM Lane LOS
D
C A
HCM 95th %tile Q(veh)
0.7
0 -
TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report
MS Page 3
Minor Lane/Major Mvmt
NBLn1
EBT EBR WBL WBT
Capacity (veh/h)
144
229
HCM Lane V/C Ratio
0.219
0.009
HCM Control Delay (s)
36.9
20.9
HCM Lane LOS
E
C
HCM 95th %tile Q(veh)
0.8
0
TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report
MS Page 4
6: Solana Blvd/Kirkwood Blvd & SH-114 SB Off -Ramp 2022 Background + Site
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: PM
LaneGroul- EBL
EST
EBR
WBL
WBT
WBR NBL NBT NBR
SBL
Sk
Lane Configurations
tt
?I
)
tt
)
+j +
Traffic Volume (vph) 0
278
675
524
429
0 0 0 0
239
2 51
Future Volume (vph) 0
278
675
524
429
0 0 0 0
239
2 51
Peak Hour Factor 0.87
0.87
0.87
0.87
0.87
0.87 0.87 0.87 0.87
0.87
0.87 0.87
Adj. Flow (vph) 0
320
776
602
493
0 0 0 0
275
2 59
Shared Lane Traffic (%)
50%
Lane Group Flow (vph) 0
320
776
602
493
0 0 0 0
137
199 0
Turn Type
NA
Perm
pm+pt
NA
Perm
NA
Protected Phases
2
1
12
4
Permitted Phases
2
12
4
Detector Phase
2
2
1
12
4
4
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
5.0
Minimum Split (s)
22.5
22.5
9.5
22.5
22.5
Total Split (s)
34.0
34.0
26.0
40.0
40.0
Total Split (%)
34.0%
34.0 %
26.0 %
40.0 %
40.0 %
Yellow Time (s)
3.5
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
4.5
4.5
Lead/Lag
Lag
Lag
Lead
Lead -Lag Optimize?
Yes
Yes
Yes
Recall Mode
C-Max
C-Max
None
Max
Max
Act Effct Green (s)
29.5
29.5
51.0
55.5
35.5
35.5
Actuated g/C Ratio
0.30
0.30
0.51
0.56
0.36
0.36
v/c Ratio
0.31
0.79
0.91
0.25
0.24
0.17
Control Delay
28.3
10.1
48.4
10.7
24.2
15.9
Queue Delay
0.0
0.0
0.0
0.0
0.0
0.0
Total Delay
28.3
10.1
48.4
10.7
24.2
15.9
LOS
C
B
D
B
C
B
Approach Delay
15.4
31.4
19.3
Approach LOS
B
C
B
Queue Length 50th (ft)
83
20
277
65
67
32
Queue Length 95th (ft)
116
120
m#419
m98
114
56
Internal Link Dist (ft)
1216
327
1036
836
Turn Bay Length (ft)
350
Base Capacity (vph)
1044
983
658
1964
571
1149
Starvation Cap Reductn
0
0
0
0
0
0
Spillback Cap Reductn
0
0
0
0
14
30
Storage Cap Reductn
0
0
0
0
0
0
Reduced v/c Ratio
0.31
0.79
0.91
0.25
0.25
0.18
Intersection Summary
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 0 (0%), Referenced to phase 2:EBWB
and
6:, Start of Green
Natural Cycle: 80
Control Type: Actuated -Coordinated
Maximum v/c Ratio: 0.95
2/8/2016 Synchro 9 Report
MS Page 1
6: Solana Blvd/Kirkwood Blvd & SH-114 SIB Off -Ramp 2022 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Lane Group'
06
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
5 6 8
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
5.0 5.0 5.0
Minimum Split (s)
10.0 22.5 22.5
Total Split (s)
25.0 35.0 40.0
Total Split (%)
25% 35 % 40%
Yellow Time (s)
3.5 3.5 3.5
All -Red Time (s)
1.0 1.0 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead Lag
Lead -Lag Optimize?
Yes Yes
Recall Mode
Max C-Max Max
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
2/8/2016 Synchro 9 Report
MS Page 2
6: Solana Blvd/Kirkwood Blvd & SH-114 SIB Off -Ramp 2022 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Intersection Signal Delay: 22.9 Intersection LOS: C
Intersection Capacity Utilization 87.8 % ICU Level of Service E
Analysis Period (min)15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases: 6: Solana Blvd/Kirkwood Blvd & SH-114 SB Off -Ramp
46 #6
7�t
❑6
26 s 34 s
9(7 s
=3 =3
F
�5 66
=8
8
-
25s s
9os
8: SH-114 NB Off -Ramp & Kirkwood Blvd
2022 Background + Site
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: PM
-'*,-,*
r-
4-
T/,.
ti 1
-'
Lane Group - - - - - -
- - ML
EBT EBR WBL
WBT
WBR
NBL
NBT
NBR
SBL SBT
SBR
Lane Configurations
V1
tt
tt
?I
Vi
+Tf+
Traffic Volume (vph)
400
178 0 0
683
668
322
979
69
0 0
0
Future Volume (vph)
400
178 0 0
683
668
322
979
69
0 0
0
Peak Hour Factor
0.95
0.95 0.95 0.95
0.95
0.95
0.95
0.95
0.95
0.95 0.95
0.95
Adj. Flow (vph)
421
187 0 0
719
703
339
1031
73
0 0
0
Shared Lane Traffic (%)
10°%
Lane Group Flow (vph)
421
187 0 0
719
703
305
1138
0
0 0
0
Turn Type
pm+pt
NA
NA
Free
Perm
NA
Protected Phases
5
56
6
8
Permitted Phases
56
Free
8
Detector Phase
5
56
6
8
8
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
Minimum Split (s)
10.0
22.5
22.5
22.5
Total Split (s)
25.0
35.0
40.0
40.0
Total Split (%)
25.0%
35.0 %
40.0%
40.0%
Js
Yellow Time (s)
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
4.5
Lead/Lag
Lead
Lag
Lead -Lag Optimize?
Yes
Yes
Recall Mode
Max
C-Max
Max
Max
Act Effct Green (s)
51.0
55.5
30.5
100.0
35.5
35.5
Actuated g/C Ratio
0.51
0.56
0.30
1.00
0.36
0.36
v/c Ratio
0.88
0.10
0.67
0.44
0.53
0.95
Control Delay
58.9
12.3
33.9
0.9
29.9
49.0
Queue Delay
0.0
0.0
0.0
0.0
0.3
12.2
-
Total Delay
58.9
12.3
33.9
0.9
30.1
61.3
LOS
E
B
C
A
C
E
-
Approach Delay
44.6
17.6
54.7
Approach LOS
D
B
D
Queue Length 50th (ft)
234
30
209
0
168
382
Queue Length 95th (ft)
#369
48
274
0
261
#532
Internal Link Dist (ft)
327
240
1055
1095
Turn Bay Length (ft)
Base Capacity(vph)
479
1964
1079
1583
571
1194
Starvation Cap Reductn
0
0
0
0
0
0
Spillback Cap Reductn
0
0
0
0
36
75
Storage Cap Reductn
0
0
0
0
0
0
Reduced v/c Ratio
0.88
0.10
0.67
0.44
0.57
1.02
Intersection Summary
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 0 (0%), Referenced to phase 2:EBWB and 6:, Start of Green
Natural Cycle: 80
Control Type: Actuated -Coordinated
Maximum v/c Ratio: 0.95
2/8/2016 Synchro 9 Report 2/8/2016 Synchro 9 Report
MS Page 3 MS Page 4
8: SH-114 NB Off -Ramp & Kirkwood Blvd 2022 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All -Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead -Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
5.0 5.0 5.0
9.5 22.5 22.5
26.0 34.0 40.0
26 % 34% 40 %
3.5 3.5 3.5
1.0 1.0 1.0
Lead Lag
Yes Yes
None C-Max Max
8: SH-114 NB Off -Ramp & Kirkwood Blvd 2022 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Intersection Signal Delay: 37.7 Intersection LOS: D
Intersection Capacity Utilization 87.8 % ICU Level of Service E
Analysis Period (min)15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases: 8: SH-114 NB Off -Ramp & Kirkwood Blvd
=6
741
#6
�62
=6
j 14
26s
140S
=8
A,p6
#8
F
`R'�
=8
T48
25.
35 s 190
s
2/8/2016 Synchro 9 Report 2/8/2016 Synchro 9 Report
MS Page 5 MS Page 6
16: SH-114 SB Frontage Rd/SH-114 SB Off -Ramp & Dove Rd 2022 Background + Site
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: PM
Lane Group = EBL
EST
EBR WBL
WBT
WBR NBL NBT NBR
SBL
S
Lane Configurations
tT+
+Tt
)
+TT+
Traffic Volume (vph) 0
186
303 428
1280
0 0 0 0
107
148 136
Future Volume (vph) 0
186
303 428
1280
0 0 0 0
107
148 136
Peak Hour Factor 0.96
0.96
0.96 0.96
0.96
0.96 0.96 0.96 0.96
0.96
0.96 0.96
Adj. Flow (vph) 0
194
316 446
1333
0 0 0 0
111
154 142
Shared Lane Traffic (%)
10%
Lane Group Flow (vph) 0
510
0 0
1779
0 0 0 0
100
307 0
Turn Type
NA
pm+pt
NA
Perm
NA
Protected Phases
2
1
12
4
Permitted Phases
12
4
Detector Phase
2
1
12
4
4
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
Minimum Split (s)
22.5
9.5
22.5
22.5
Total Split (s)
29.9
47.6
22.5
22.5
Total Split (%)
29.9%
47.6 %
22.5 %
22.5%
Yellow Time (s)
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
Lead/Lag
Lag
Lead
Lead
Lead -Lag Optimize?
Yes
Yes
Yes
Recall Mode
C-Max
None
None
None
Act Effct Green (s)
30.8
73.9
12.6
12.6
Actuated g/C Ratio
0.31
0.74
0.13
0.13
v/c Ratio
0.42
0.81
0.50
0.64
Control Delay
11.8
10.0
48.3
34.7
Queue Delay
0.0
0.8
0.0
0.0
Total Delay
11.8
10.8
48.3
34.7
LOS
B
B
D
C
Approach Delay
11.8
10.8
38.0
Approach LOS
B
B
D
Queue Length 50th (ft)
47
52
67
71
Queue Length 95th (ft)
98
339
117
112
Internal Link Dist (ft)
224
394
1722
1376
Turn Bay Length (ft)
240
Base Capacity (vph)
1207
2197
289
643
Starvation Cap Reductn
0
174
0
0
Spillback Cap Reductn
0
0
0
0
Storage Cap Reductn
0
0
0
0
Reduced v/c Ratio
0.42
0.88
0.35
0.48
Intersection Summary
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 0 (0%), Referenced to phase 2:EBWB
and 6:, Start of Green
Natural Cycle: 90
Control Type: Actuated -Coordinated
Maximum v/c Ratio: 0.90
2/8/2016 Synchro 9 Report
MS Page 7
16: SH-114 SB Frontage Rd/SH-114 SB Off -Ramp & Dove Rd 2022 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Lane Grouper
06 e8
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
5 6 8
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
5.0 5.0 5.0
Minimum Split (s)
9.5 22.5 22.5
Total Split (s)
9.6 35.4 55.0
Total Split (%)
10% 35 % 55%
Yellow Time (s)
3.5 3.5 3.5
All -Red Time (s)
1.0 1.0 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead Lag
Lead -Lag Optimize?
Yes Yes
Recall Mode
None C-Min Max
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
2/8/2016 Synchro 9 Report
MS Page 8
16: SH-114 SB Frontage Rd/SH-114 SB Off -Ramp & Dove Rd 2022 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Intersection Signal Delay: 15.1 Intersection LOS: B
Intersection Capacity Utilization 81.7 % ICU Level of Service D
Analysis Period (min)15
and Phases: 16: SH-114 SB Frontage Rd/SH-114 SB Off -Ramp & Dove Rd
#16 1 #16
6s
4;19 #19=19
*
19: SH-114 NB Frontage Rd/SH-114 NB On -Ramp & Dove Rd
2022 Background + Site
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: PM
-,*,-,*
r-
4-
T/,.
ti 1
-'
Lane Group-
EBL
EBT EBR WBL
WBT
WBR
NBL
NBT
NBR
SBL SBT
SBR
Lane Configurations
+Tt
0
)
4T+
Traffic Volume (vph)
63
233 0 0
782
176
907
1170
138
0 0
0
Future Volume (vph)
63
233 0 0
782
176
907
1170
138
0 0
0
Peak Hour Factor
0.99
0.99 0.99 0.99
0.99
0.99
0.99
0.99
0.99
0.99 0.99
0.99
Adj. Flow (vph)
64
235 0 0
790
178
916
1182
139
0 0
0
Shared Lane Traffic (%)
20°%
Lane Group Flow (vph)
0
299 0 0
968
0
733
1504
0
0 0
0
Turn Type
pm+pt
NA
NA
Perm
NA
Protected Phases
5
56
6
8
Permitted Phases
56
8
Detector Phase
5
56
6
8
8
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
Minimum Split (s)
9.5
22.5
22.5
22.5
Total Split (s)
9.6
35.4
55.0
55.0
Total Split (%)
9.6 %
35.4 %
55.0%
55.0%
JIM
Yellow Time (s)
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
Lead/Lag
Lead
Lag
Lag
Lead -Lag Optimize?
Yes
Yes
Yes
Recall Mode
None
C-Min
Max
Max
Act Effct Green (s)
35.8
30.7
50.7
50.7
Actuated g/C Ratio
0.36
0.31
0.51
0.51
v/c Ratio
0.37
0.90
0.90
0.89
Control Delay
19.6
44.9
38.4
30.0
Queue Delay
0.0
0.0
1.6
0.3
Total Delay
19.6
44.9
40.0
30.3
LOS
B
D
D
C
Approach Delay
19.6
44.9
33.5
Approach LOS
B
D
C
-
Queue Length 50th (ft)
37
301
446
451
Queue Length 95th (ft)
81
#420
#723
#580
Internal Link Dist (ft)
394
990
1769
1583
Turn Bay Length (ft)
a
Base Capacity (vph)
807
1082
817
1693
Starvation Cap Reductn
0
0
0
0
Spillback Cap Reductn
0
0
23
23
Storage Cap Reductn
0
0
0
0
Reduced v/c Ratio
0.37
0.89
0.92
0.90
Intersection Summary
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 0 (0%), Referenced to phase 2:EBWB and 6:, Start of Green
Natural Cycle: 90
Control Type: Actuated -Coordinated
Maximum v/c Ratio: 0.90
2/8/2016 Synchro 9 Report 2/8/2016 Synchro 9 Report
MS Page 9 MS Page 10
19: SH-114 NB Frontage Rd/SH-114 NB On -Ramp & Dove Rd 2022 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Lane Group
01 o2 e4
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic
Lane Group Flow (vph)
Turn Type
Protected Phases
1 2 4
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
5.0 5.0 5.0
Minimum Split (s)
9.5 22.5 22.5
Total Split (s)
47.6 29.9 22.5
Total Split (%)
48% 30% 23%
Yellow Time (s)
3.5 3.5 3.5
All -Red Time (s)
1.0 1.0 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lag Lead
Lead -Lag Optimize?
Yes Yes
Recall Mode
None C-Max None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
2/8/2016 Synchro 9 Report
MS Page 11
19: SH-114 NB Frontage Rd/SH-114 NB On -Ramp & Dove Rd 2022 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Intersection Signal Delay: 35.5 Intersection LOS: D
Intersection Capacity Utilization 88.8 % ICU Level of Service E
Analysis Period (min)15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases: 19: SH-114 NB Frontage Rd/SH-114 NB On -Ramp & Dove Rd
-16 =16 #1166
l 04 �2 ■ p1
22.5 s 129.9 s 47.6 s EMEA
19 =19 T 19
F * �
2/8/2016
MS
Synchro 9 Report
Page 12
22: Dove Rd & Kirkwood Blvd
2022 Background + Site
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: PM
*_
t
ti
r
Lane Grout-
EBL
EST
WBT
WBR
SBL
SBR
Lane Configurations
I
Tt
Tf+
Vi
?I
Traffic Volume (vph)
172
190
272
238
144
572
Future Volume (vph)
172
190
272
238
144
572
Peak Hour Factor
0.90
0.90
0.90
0.90
0.90
0.90
Adj. Flow (vph)
191
211
302
264
160
636
Shared Lane Traffic (%)
Lane Group Flow (vph)
191
211
566
0
160
636
Turn Type
pm+pt
NA
NA
Prot
Perm
Protected Phases
7
4
8
1
Permitted Phases
4
6
Detector Phase
7
4
8
1
6
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
5.0
Minimum Split (s)
9.5
22.5
22.5
9.5
22.5
Total Split (s)
17.0
43.0
26.0
37.0
37.0
Total Split(%)
21.3%
53.8%
32.5%
46.3% 46.3%
Yellow Time (s)
3.5
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
4.5
4.5
Lead/Lag
Lead
Lag
Lead -Lag Optimize?
Yes
Yes
Recall Mode
None
C-Max
C-Max
None
Max
Act Effct Green (s)
38.5
38.5
23.7
32.5
32.5
Actuated g/C Ratio
0.48
0.48
0.30
0.41
0.41
v/c Ratio
0.48
0.12
0.49
0.22
0.65
Control Delay
16.4
11.7
13.9
16.6
6.4
Queue Delay
0.0
0.0
0.0
0.0
0.0
Total Delay
16.4
11.7
13.9
16.6
6.4
LOS
B
B
B
B
A
Approach Delay
13.9
13.9
8.5
Approach LOS
B
B
A
Queue Length 50th (ft)
53
28
61
51
23
Queue Length 95th (ft)
93
47
112
92
109
Internal Link Dist (ft)
990
172
351
Turn Bay Length (ft)
100
Base Capacity (vph)
437
1703
1162
719
976
Starvation Cap Reductn
0
0
0
0
0
Spillback Cap Reductn
0
0
0
0
0
Storage Cap Reductn
0
0
0
0
0
Reduced v/c Ratio
0.44
0.12
0.49
0.22
0.65
Intersection Summary
Cycle Length: 80
Actuated Cycle Length: 80
Offset: 0 (0%), Referenced to phase 4:EBTL
and 8:WBT,
Start of Green
Natural Cycle: 55
Control Type: Actuated -Coordinated
Maximum v/c Ratio: 0.65
22: Dove Rd & Kirkwood Blvd 2022 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Intersection Signal Delay: 11.5 Intersection LOS: B
Intersection Capacity Utilization 58.1 % ICU Level of Service B
Analysis Period (min)15
iplits and Phases: 22: Dove Rd & Kirkwood Blvd
\161 --1'04
■ F
o6 f 07 08 `R1
37 s 26 s
2/8/2016 Synchro 9 Report 2/8/2016 Synchro 9 Report
MS Page 13 MS Page 14
2: Driveway 4/T W King Rd & Kirkwood Blvd 2022 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Intersection
Intersection Delay, s/veh
49.4
Intersection LOS
E
Movement
EBU
EBL
EBT
EBR
WBU
WBL
WBT
WBR
NBU
NBL
NBT
NBR
Traffic Vol, veh/h
0
66
84
22
0
0
1038
161
0
108
7
0
Future Vol, veh/h
0
66
84
22
0
0
1038
161
0
108
7
0
Peak Hour Factor
0.92
0.89
0.89
0.92
0.92
0.92
0.89
0.89
0.92
0.92
0.92
0.92
Heavy Vehicles, %
2
2
2
2
2
2
2
2
2
2
2
2
Mvmt Flow
0
74
94
24
0
0
1166
181
0
117
8
0
Number of Lanes
0
1
2
0
0
0
2
0
0
0
2
0
Approach)$
Opposing Approach
WB
EB
SIB
Opposing Lanes
2
3
2
Conflicting Approach Left
SIB
NB
EB
Conflicting Lanes Left
2
2
3
Conflicting Approach Right
NB
SB
WB
Conflicting Lanes Right
2
2
2
HCM Control Delay
12.4
62.5
15.2
HCM LOS
B
F
C
Lane NBLn1 NBLn2 EBLnl E13Ln2 EBLn3 WBLnl WBLn2 SBLnl SBLn2
Vol Left,%
98%
0%
100%
0%
0%
0%
0%
94%
0%
Vol Thru, %
2%
100%
0%
100%
56%
100%
68%
6%
0%
Vol Right, %
0%
0%
0%
0%
44%
0%
32%
0%
100%
Sign Control
Stop
Stop
Stop
Stop
Stop
Stop
Stop
Stop
Stop
Traffic Vol by Lane
110
5
66
56
50
692
507
18
139
LT Vol
108
0
66
0
0
0
0
17
0
Through Vol
2
5
0
56
28
692
346
1
0
RT Vol
0
0
0
0
22
0
161
0
139
Lane Flow Rate
120
5
74
63
55
778
570
20
156
Geometry Grp
8
8
8
8
8
8
8
8
8
Degree ofUtil(X)
0,297
0.012
0.177
0.141
0.12
1
0.994
0.049
0.331
Departure Headway (Hd)
8.923
8.436
8.589
8.089
7.781
6.507
6.281
8.8
7.635
Convergence, YIN
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Cap
402
423
417
442
459
560
575
406
470
Service Time
6.694
6.208
6.36
5.861
5.553
4.268
4,042
6.568
5.403
HCM Lane VIC Ratio
0.299
0.012
0.177
0.143
0.12
1.389
0.991
0.049
0.332
HCM Control Delay
15.4
11.3
13.2
12.2
11.6
63.6
61
12
14.2
HCM Lane LOS
C
B
B
B
B
F
F
B
B
HCM 95th-tile Q
1.2
0
0.6
0.5
0.4
14.3
14.3
0.2
1.4
2: Driveway 4/T W King Rd & Kirkwood Blvd 2022 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Intersection
Intersection Delay, s/veh
Intersection LOS
Movement
SBU
SBL
SBT
Traffic Vol, veh/h
0
17
1 139
Future Vol, veh/h
0
17
1 139
Peak Hour Factor
0.92
0.89
0.92 0.89
Heavy Vehicles, %
2
2
2 2
Mvmt Flow
0
19
1 156
Number of Lanes
0
0
1 1
Approach
SIB
Opposing Approach
NB
Opposing Lanes
2
Conflicting Approach Left
WB
Conflicting Lanes Left
2
Conflicting Approach Right
EB
Conflicting Lanes Right
3
HCM Control Delay
13.9
HCM LOS
B
2/8/2016 Synchro 9 Report 2/8/2016 Synchro 9 Report
MS Page 1 MS Page 2
14: Kirkwood Blvd & Driveway 1 2022 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Intersection
Int Delay, s/veh 4.9
30: Kirkwood Blvd & Driveway 2 2022 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Intersection
Int Delay, s/veh 5.3
Movement -1
EBL
EBR
NBL
NBT
SBT
SBR
Movement
EBL
Traffic Vol, veh/h
144
144
33
324
477
33
Traffic Vol, veh/h
180
144
27
442
366
34
Future Vol, veh/h
144
144
33
324
477
33
Future Vol, veh/h
180
144
27
442
366
34
Conflicting Peds, #Ihr
0
0
0
0
0
0
Conflicting Peds, #Ihr
0
0
0
0
0
0
Sign Control
Stop
Stop
Free
Free
Free
Free
Sign Control
Stop
Stop
Free
Free
Free
Free
RT Channelized
-
None
-
None
None
RT Channelized
-
None
-
None
None
Storage Length
0
100
150
-
-
150
Storage Length
0
100
150
-
-
150
Veh in Median Storage, #
0
-
-
0
0
-
Veh in Median Storage, #
0
-
-
0
0
-
Grade, %
0
-
-
0
0
-
Grade, %
0
-
-
0
0
-
Peak Hour Factor
92
92
92
92
92
92
Peak Hour Factor
92
92
92
92
92
92
Heavy Vehicles,%
2
2
2
2
2
2
Heavy Vehicles,%
2
2
2
2
2
2
Mvmt Flow
157
157
36
352
518
36
Mvmt Flow
196
157
29
480
398
37
Major/Minor
Minor2
Majorl
Major2
Major/Minor
Minot
Majorl
Major2
Conflicting Flow All
766
259
518
0
0
Conflicting Flow All
697
199
398
0
0
Stage 1
518
-
-
-
-
Stage 1
398
-
-
-
-
Stage 2
248
-
-
Stage 2
299
-
-
Critical Hdwy
6.84
6.94
4.14
Critical Hdwy
6.84
6.94
4.14
Critical Hdwy Stg 1
5.84
-
-
Critical Hdwy Stg 1
5.84
-
Critical Hdwy Stg 2
5.84
-
-
Critical Hdwy Stg 2
5.84
-
-
Follow-up Hdwy
3.52
3.32
2.22
Follow-up Hdwy
3.52
3.32
2.22
Pot Cap-1 Maneuver
339
740
1044
Pot Cap-1 Maneuver
375
809
1157
Stage 1
563
-
-
Stage 1
647
-
-
Stage 2
770
-
-
Stage 2
726
-
-
Platoon blocked, %
Platoon blocked, %
Mov Cap-1 Maneuver
327
740
1044
Mov Cap-1 Maneuver
366
809
1157
Mov Cap-2 Maneuver
327
-
-
Mov Cap-2 Maneuver
366
-
-
Stage 1
563
Stage 1
647
Stage 2
743
Stage 2
708
Approach
EB
NB
SB
Approach
- EB
NB
SB
HCM Control Delay, s
18.5
0.8
0
HCM Control Delay, s
18.9
0.5
0
HCM LOS
C
HCM LOS
C
Minor Lane/MajorMvmt
NBL
NBTEBLn1EBLn2
SBT
SBR
Minor Lane/MajorMvmt
NBL
NBT EBLn I EBLn2
SBT
SBR
Capacity (veh/h)
1044
327 740
Capacity (veh/h)
1157
366 809
HCM Lane V/C Ratio
0.034
0.479 0.212
HCM Lane V/C Ratio
0.025
0.535 0.193
HCM Control Delay (s)
8.6
25.7 11.2
HCM Control Delay (s)
8.2
25.6 10.5
HCM Lane LOS
A
D B
HCM Lane LOS
A
D B
HCM 95th %tile Q(veh)
0.1
2.5 0.8
HCM 95th %tile Q(veh)
0.1
3 0.7
2/8/2016 Synchro 9 Report 2/8/2016 Synchro 9 Report
MS Page 1 MS Page 2
37: Driveway 5 & Kirkwood Blvd 2022 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Intersection _qqEIWr_
Int Delay, s/veh 0.3
40: Driveway 6 & Kirkwood Blvd 2022 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Intersection
Int Delay, s/veh 0.4
Movement
EBT
EBR
WBL WBT
I NBL
NBR
Movement
EBT
EBR
WBL WBT
NBL
Traffic Vol, veh/h
175
35
2 1284
33
2
Traffic Vol, veh/h
208
39
2 1315
37
1
Future Vol, veh/h
175
35
2 1284
33
2
Future Vol, veh/h
208
39
2 1315
37
1
Conflicting Peds, #Ihr
0
0
0 0
0
0
Conflicting Peds, #Ihr
0
0
0 0
0
0
Sign Control
Free
Free
Free Free
Stop
Stop
Sign Control
Free
Free
Free Free
Stop
Stop
RT Channelized
None
None
-
None
RT Channelized
None
- None
-
None
Storage Length
-
0
Storage Length
100 -
0
Veh in Median Storage, #
0
0
0
Veh in Median Storage, #
0
- 0
0
Grade, %
0
0
0
-
Grade, %
0
- 0
0
-
Peak Hour Factor
92
92
92 92
92
92
Peak Hour Factor
92
92
92 92
92
92
Heavy Vehicles,%
2
2
2 2
2
2
Heavy Vehicles,%
2
2
2 2
2
2
Mvmt Flow
190
38
2 1396
36
2
Mvmt Flow
226
42
2 1429
40
1
Major/Minor
Majorl
Major2
Minorl
Major/Minor
Majorl
! ` "
Minorl
Conflicting Flow All
0
0
228 0
772
114
Conflicting Flow All
0
0
268 0
823
134
Stage 1
-
-
- -
209
-
Stage 1
-
-
- -
247
-
Stage 2
-
563
-
Stage 2
-
576
-
Critical Hdwy
5.34
5.74
7.14
Critical Hdwy
5.34
5.74
7.14 -
Critical Hdwy Stg 1
6.64
-
Critical Hdwy Stg 1
6.64
Critical Hdwy Stg 2
-
6.04
-
Critical Hdwy Stg 2
-
6.04
-
Follow-up Hdwy
3.12
3.82
3.92
Follow-up Hdwy
3.12
3.82
3.92
Pot Cap-1 Maneuver
907
403
779
Pot Cap-1 Maneuver
869
380
757
Stage 1
-
715
-
Stage 1
-
679
-
Stage 2
-
487
-
Stage 2
-
479
-
Platoon blocked, %
Platoon blocked, %
Mov Cap-1 Maneuver
907
399
779
Mov Cap-1 Maneuver
869
379
757
Mov Cap-2 Maneuver
-
399
Mov Cap-2 Maneuver
-
379
-
Stage 1
715
Stage 1
679
Stage 2
482
Stage 2
478
Approach
EB
WB
Approach
EB
WB
HCM Control Delay, s
0
0
14.7
HCM Control Delay, s
0
0
15.5
HCM LOS
B
HCM LOS
C
Minor Lane/Major Mvmt NBLnl EBT EBR WBL WBT
Capacity (veh/h)
410
907
HCM Lane V/C Ratio
0.093
0.002
HCM Control Delay (s)
14.7
9 0
HCM Lane LOS
B
A A
HCM 95th %tile Q(veh)
0.3
0 -
Minor Lane/Major Mvmt
NBLn1
EBT EBR WBL WBT
Capacity (veh/h)
384
869
HCM Lane V/C Ratio
0.108
0.003
HCM Control Delay (s)
15.5
9.2
HCM Lane LOS
C
A
HCM 95th %tile Q(veh)
0.4
0
2/8/2016 Synchro 9 Report 2/8/2016 Synchro 9 Report
MS Page 3 MS Page 4
6: Solana Blvd/Kirkwood Blvd & SH-114 SB Off -Ramp
2027 Background
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: AM
Lane Grouf------'TBL
EST
EBR
WBL
WBT
WBR NBL NBT NBR
SBL
SBR
Lane Configurations
tt
r
)
tt
)
+T +
Traffic Volume (vph) 0
414
324
393
817
0 0 0 0
612
1 80
Future Volume (vph) 0
414
324
393
817
0 0 0 0
612
1 80
Peak Hour Factor 0.92
0.92
0.92
0.92
0.92
0.92 0.92 0.92 0.92
0.92
0.92 0.92
Adj. Flow (vph) 0
450
352
427
888
0 0 0 0
665
1 87
Shared Lane Traffic (%)
50%
Lane Group Flow (vph) 0
450
352
427
888
0 0 0 0
332
421 0
Turn Type
NA
Perm
pm+pt
NA
Perm
NA
Protected Phases
2
1
12
4
Permitted Phases
2
12
4
Detector Phase
2
2
1
12
4
4
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
5.0
Minimum Split (s)
22.5
22.5
9.5
22.5
22.5
Total Split (s)
30.0
30.0
18.0
52.0
52.0
Total Split (%)
30.0%
30.0 %
18.0 %
52.0 %
52.0%
Yellow Time (s)
3.5
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
4.5
4.5
Lead/Lag
Lag
Lag
Lead
Lead -Lag Optimize?
Yes
Yes
Yes
Recall Mode
C-Max
C-Max
None
None
None
Act Effct Green (s)
25.5
25.5
41.6
46.1
44.9
44.9
Actuated g/C Ratio
0.26
0.26
0.42
0.46
0.45
0.45
v/c Ratio
0.50
0.53
0.93
0.54
0.46
0.29
Control Delay
34.1
6.5
48.7
20.3
21.0
15.8
Queue Delay
0.0
0.0
0.0
1.4
0.0
0.0
Total Delay
34.1
6.5
48.7
21.7
21.0
15.8
LOS
C
A
D
C
C
B
Approach Delay
22.0
30.5
18.1
Approach LOS
C
C
B
Queue Length 50th (ft)
128
0
-201
197
148
76
Queue Length 95th (ft)
178
69
m#351
298
229
111
Internal Link Dist (ft)
1214
327
1036
836
Turn Bay Length (ft)
350
Base Capacity (vph)
902
665
457
1633
764
1522
Starvation Cap Reductn
0
0
0
510
0
0
Spillback Cap Reductn
0
0
0
0
0
0
Storage Cap Reductn
0
0
0
0
0
0
Reduced v/c Ratio
0.50
0.53
0.93
0.79
0.43
0.28
Intersection Summary
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 0 (0%), Referenced to phase 2:EBWB
and
6:, Start of Green
Natural Cycle: 75
Control Type: Actuated -Coordinated
Maximum v/c Ratio: 0.93
TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report
MS Page 1
6: Solana Blvd/Kirkwood Blvd & SH-114 SIB Off -Ramp 2027 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Lane Group'
06
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
5 6 8
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
5.0 5.0 5.0
Minimum Split (s)
9.5 22.5 22.5
Total Split (s)
22.4 25.6 52.0
Total Split (%)
22% 26% 52%
Yellow Time (s)
3.5 3.5 3.5
All -Red Time (s)
1.0 1.0 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lag Lead
Lead -Lag Optimize?
Yes Yes
Recall Mode
None C-Max None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summer
TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report
MS Page 2
6: Solana Blvd/Kirkwood Blvd & SH-114 SIB Off -Ramp 2027 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Intersection Signal Delay: 24.9 Intersection LOS: C
Intersection Capacity Utilization 76.9 % ICU Level of Service D
Analysis Period (min)15
- Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases: 6: Solana Blvd/Kirkwood Blvd & SH-114 SB Off -Ramp
a6 6
1 91 �42 R
#6I
■ 14
18 s 1 130S
52 s
F
�OS
TAB
�A5 �R
25.6 s
22.4 s
52 s
8: SH-114 NB Off -Ramp & Kirkwood Blvd
2027 Background
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: AM
-'*,-,*
r-
4-
T/,.
ti 1
-'
Lane Group -
EBL
EBT EBR WBL
WBT
WBR
NBL
NBT
NBR SBL SBT
SBR
Lane Configurations
V1
tt
tt
?I
Vi
+Tf+
Traffic Volume (vph)
166
861 0 0
471
84
741
158
627 0 0
0
Future Volume (vph)
166
861 0 0
471
84
741
158
627 0 0
0
Peak Hour Factor
0.92
0.92 0.92 0.92
0.92
0.92
0.92
0.92
0.92 0.92 0.92
0.92
Adj. Flow (vph)
180
936 0 0
512
91
805
172
682 0 0
0
Shared Lane Traffic (%)
28°%
Lane Group Flow (vph)
180
936 0 0
512
91
580
1079
0 0 0
0
Turn Type
pm+pt
NA
NA
Perm
Perm
NA
Protected Phases
5
56
6
8
Permitted Phases
56
6
8
Detector Phase
5
56
6
6
8
8
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
5.0
Minimum Split (s)
9.5
22.5
22.5
22.5
22.5
Total Split (s)
22.4
25.6
25.6
52.0
52.0
Total Split (%)
22.4%
25.6°%
25.6 %
52.0%
52.0%
Yellow Time (s)
3.5
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
4.5
4.5
Lead/Lag
Lag
Lead
Lead
Lead -Lag Optimize?
Yes
Yes
Yes
-
Recall Mode
None
C-Max
C-Max
None
None
Act Effct Green (s)
41.6
46.1
23.7
23.7
44.9
44.9
Actuated g/C Ratio
0.42
0.46
0.24
0.24
0.45
0.45
v/c Ratio
0.41
0.57
0.61
0.20
0.80
0.96dr
-
Control Delay
28.1
24.3
38.5
8.4
33.2
25.9
Queue Delay
0.0
0.2
0.2
0.0
0.0
0.0
-
Total Delay
28.1
24.5
38.7
8.4
33.2
25.9
LOS
C
C
D
A
C
C
-
Approach Delay
25.1
34.1
28.5
Approach LOS
C
C
C
-
Queue Length 50th (ft)
74
213
159
0
321
278
Queue Length 95th (ft)
121
255
216
40
481
363
Internal Link Dist (ft)
327
247
1055
1095
Turn Bay Length (ft)
Base Capacity(vph)
444
1633
840
445
764
1474
Starvation Cap Reductn
0
136
0
0
0
0
Spillback Cap Reductn
0
0
45
0
0
0
Storage Cap Reductn
0
0
0
0
0
0
Reduced v/c Ratio
0.41
0.63
0.64
0.20
0.76
0.73
Intersection Summary
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 0 (0%), Referenced to phase 2:EBWB and 6:, Start of Green
Natural Cycle: 75
Control Type: Actuated -Coordinated
Maximum v/c Ratio: 0.93
TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report
MS Page 3 MS Page 4
8: SH-114 NB Off -Ramp & Kirkwood Blvd 2027 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All -Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead -Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
5.0 5.0 5.0
9.5 22.5 22.5
18.0 30.0 52.0
18% 30% 52%
3.5 3.5 3.5
1.0 1.0 1.0
Lead Lag
Yes Yes
None C-Max None
8: SH-114 NB Off -Ramp & Kirkwood Blvd 2027 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Intersection Signal Delay: 28.4 Intersection LOS: C
Intersection Capacity Utilization 76.9 % ICU Level of Service D
Analysis Period (min)15
dr Defacto Right Lane. Recode with 1 though lane as a right lane.
Splits and Phases: 8: SH-114 NB Off -Ramp & Kirkwood Blvd
#6 #6
#6
A
52 s
s .._.:�q6
=s
=a
22.45
52s
TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report
MS Page 5 MS Page 6
16: Dove Rd & SH-114 SIB Off -Ramp
2027 Background
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: AM
Lane Group EBL
EST EBR
WBL
WBT
WBR NBL NBT NBR
SBL
Lane Configurations
tT+
+Tt
)
r{
Traffic Volume (vph) 0
488 911
117
593
0 0 0 0
184
156 77
Future Volume (vph) 0
488 911
117
593
0 0 0 0
184
156 77
Peak Hour Factor 0.83
0.83 0.83
0.83
0.83
0.83 0.83 0.83 0.83
0.83
0.83 0.83
Adj. Flow (vph) 0
588 1098
141
714
0 0 0 0
222
188 93
Shared Lane Traffic (°!°)
24%
Lane Group Flow (vph) 0
1686 0
0
855
0 0 0 0
169
334 0
Turn Type
NA
pm+pt
NA
Perm
NA
Protected Phases
2
1
21
4
Permitted Phases
21
4
Detector Phase
2
1
21
4
4
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
Minimum Split (s)
22.5
9.5
22.5
22.5
Total Split (s)
66.5
9.5
24.0
24.0
Total Split (%)
66.5%
9.5 %
24.0 %
24.0%
Yellow Time (s)
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
Lead/Lag
Lag
Lead
Lead
Lead -Lag Optimize?
Yes
Yes
Yes
Recall Mode
C-Max
None
None
None
Act Effct Green (s)
65.8
70.8
15.7
15.7
Actuated g/C Ratio
0.66
0.71
0.16
0.16
v/c Ratio
0.92dr
0.63
0.67
0.62
Control Delay
11.8
6.9
52.6
38.3
Queue Delay
0.0
0.0
0.0
0.0
Total Delay
11.8
6.9
52.6
38.3
LOS
B
A
D
D
Approach Delay
11.8
6.9
43.1
Approach LOS
B
A
D
Queue Length 50th (ft)
276
57
110
93
Queue Length 95th (ft)
328
61
165
123
Internal Link Dist (ft)
224
394
1722
1376
Turn Bay Length (ft)
240
Base Capacity (vph)
2232
1352
313
665
Starvation Cap Reductn
0
0
0
0
Spillback Cap Reductn
0
0
0
0
Storage Cap Reductn
0
0
0
0
Reduced v/c Ratio
0.76
0.63
0.54
0.50
Intersection Summary
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 0 (0%), Referenced to phase 2:EBWB
and 6:, Start of Green
Natural Cycle: 75
Control Type: Actuated -Coordinated
Maximum v/c Ratio: 0.76
TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report
MS Page 7
16: Dove Rd & SH-114 SB Off -Ramp 2027 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Lane Group
o6 08
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
5 6 8
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
5.0 5.0 5.0
Minimum Split (s)
9.5 22.5 22.5
Total Split (s)
9.5 50.7 38.2
Total Split (%)
10% 51% 38%
Yellow Time (s)
3.5 3.5 3.5
All -Red Time (s)
1.0 1.0 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lag Lead
Lead -Lag Optimize?
Yes Yes
Recall Mode
None C-Min Max
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summer
TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report
MS Page 8
16: Dove Rd & SH-114 SIB Off -Ramp 2027 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Intersection Signal Delay: 15.6 Intersection LOS: B
Intersection Capacity Utilization 82.0 % ICU Level of Service D
Analysis Period (min)15
dr Defacto Right Lane. Recode with 1 though lane as a right lane.
19: SH-114 NB Frontage Rd & Dove Rd
2027 Background
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: AM
-,*,-,*
r-
4-
T/,.
ti
1
-'
Lane Group-
EBL
EST EBR
WBL
WBT
WBR
NBL
NBT
NBR SBL
SBT
SBR
Lane Configurations
+Tt
0
►j
q +
Traffic Volume (vph)
91
572 0
0
417
111
305
138
446 0
0
0
Future Volume (vph)
91
572 0
0
417
111
305
138
446 0
0
0
Peak Hour Factor
0.80
0.80 0.80
0.80
0.80
0.80
0.80
0.80
0.80 0.80
0.80
0.80
Adj. Flow (vph)
114
715 0
0
521
139
381
173
558 0
0
0
Shared Lane Traffic (%)
10°%
Lane Group Flow (vph)
0
829 0
0
660
0
343
769
0 0
0
0
Turn Type
pm+pt
NA
NA
Perm
NA
Protected Phases
5
65
6
8
Permitted Phases
65
8
Detector Phase
5
65
6
8
8
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
Minimum Split (s)
9.5
22.5
22.5
22.5
Total Split (s)
9.5
50.7
38.2
38.2
Total Split (%)
9.5 %
50.7°%
38.2%
38.2%
JIM
Yellow Time (s)
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
Lead/Lag
Lag
Lead
Lead
Lead -Lag Optimize?
Yes
Yes
Yes
-
Recall Mode
None
C-Min
Max
Max
Act Effct Green (s)
52.8
37.4
33.7
33.7
Actuated g/C Ratio
0.53
0.37
0.34
0.34
v/c Ratio
0.57
0.50
0.63
0.88dr
-
Control Delay
15.0
13.7
34.2
24.3
Queue Delay
0.0
0.0
0.0
0.0
-
Total Delay
15.0
13.7
34.2
24.3
LOS
B
B
C
C
-
Approach Delay
15.0
13.7
27.3
Approach LOS
B
B
C
-
Queue Length 50th (ft)
153
65
201
172
Queue Length 95th (ft)
140
66
262
197
Internal Link Dist (ft)
394
990
1769
1583
Turn Bay Length (ft)
a
Base Capacity (vph)
1519
1607
542
1144
Starvation Cap Reductn
7
0
0
0
Spillback Cap Reductn
0
0
0
0
Storage Cap Reductn
0
0
0
0
Reduced v/c Ratio
0.55
0.41
0.63
0.67
Intersection Summary
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 0 (0%), Referenced to phase 2:EBWB and 6:, Start
of Green
Natural Cycle: 75
Control Type: Actuated -Coordinated
Maximum v/c Ratio: 0.76
TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report
Ms Page 9 MS Page 10
19: SH-114 NB Frontage Rd & Dove Rd 2027 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Lane Group
of o2 o4
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic
Lane Group Flow (vph)
Turn Type
Protected Phases
1 2 4
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
5.0 5.0 5.0
Minimum Split (s)
9.5 22.5 22.5
Total Split (s)
9.5 66.5 24.0
Total Split (%)
10% 67% 24 %
Yellow Time (s)
3.5 3.5 3.5
All -Red Time (s)
1.0 1.0 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lag Lead
Lead -Lag Optimize?
Yes Yes
Recall Mode
None C-Max None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
19: SH-114 NB Frontage Rd & Dove Rd 2027 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Intersection Signal Delay: 19.9 Intersection LOS: B
Intersection Capacity Utilization 62.8 % ICU Level of Service B
Analysis Period (min)15
dr Defacto Right Lane. Recode with 1 though lane as a right lane.
iplits and Phases: 19: SH-114 NB Frontage Rd & Dove Rd
#16 #16 =t166
1 11 �2 ■ 11
24 s 9.5 s
=19 =19 =19
t" 6'R, �05
38.2s 150.75 9.Ss
TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report
MS Page 11 MS Page 12
22: Dove Rd & Kirkwood Blvd
2027 Background
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: AM
*_
t
ti
r
Lane Grout-
EBL
EST
WBT
WBR
SBL
SBR
Lane Configurations
►j
Tt
Tf+
Vi
?I
Traffic Volume (vph)
597
242
331
138
50
171
Future Volume (vph)
597
242
331
138
50
171
Peak Hour Factor
0.77
0.77
0.77
0.77
0.77
0.77
Adj. Flow (vph)
775
314
430
179
65
222
Shared Lane Traffic (%)
Lane Group Flow (vph)
775
314
609
0
65
222
Turn Type
pm+pt
NA
NA
Prot
Perm
Protected Phases
7
4
8
1
Permitted Phases
4
6
Detector Phase
7
4
8
1
6
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
5.0
Minimum Split (s)
9.5
22.5
22.5
9.5
9.5
Total Split (s)
54.0
83.0
29.0
17.0
17.0
Total Split (%)
54.0 %
83.0%
29.0 %
17.0 % 17.0%
Yellow Time (s)
3.5
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
4.5
4.5
Lead/Lag
Lead
Lag
Lead -Lag Optimize?
Yes
Yes
Recall Mode
None
C-Max
C-Max
None
None
Act Effct Green (s)
82.0
82.0
37.8
9.0
9.0
Actuated g/C Ratio
0.82
0.82
0.38
0.09
0.09
v/c Ratio
0.84
0.11
0.46
0.41
0,65
Control Delay
22.2
3.6
25.1
49.8
15.1
Queue Delay
0.0
0.0
0.0
0.0
0.0
Total Delay
22.2
3.6
25.1
49.8
15.1
LOS
C
A
C
D
B
Approach Delay
16.8
25.1
22.9
Approach LOS
B
C
C
Queue Length 50th (ft)
341
28
141
40
0
Queue Length 95th (ft)
334
35
186
68
37
Internal Link Dist (ft)
990
172
351
Turn Bay Length (ft)
100
Base Capacity (vph)
1050
2901
1316
221
392
Starvation Cap Reductn
0
0
0
0
0
Spillback Cap Reductn
0
0
0
0
0
Storage Cap Reductn
0
0
0
0
0
Reduced v/c Ratio
0.74
0.11
0.46
0.29
0.57
Intersection Summary
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 0 (0%), Referenced to
phase 4:EBTL
and 8:WBT,
Start of Green
Natural Cycle: 70
Control Type: Actuated -Coordinated
Maximum v/c Ratio: 0.84
TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report
MS Page 13
22: Dove Rd & Kirkwood Blvd 2027 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Intersection Signal Delay: 20.2 Intersection LOS: C
Intersection Capacity Utilization 62.1 % ICU Level of Service B
Analysis Period (min)15
iplits and Phases: 22: Dove Rd & Kirkwood Blvd
tT
4
■ F
f 07 43 `R1
54 s 29 s
TIA for Wilks Tract Development in Southlake, Texas
MS
Synchro 9 Report
Page 14
19: SH-114 NB Frontage Rd & Dove Rd 2027 Background(With Improvements)
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Lane Group
EBL
EST
EBR
WBL
WBT
WBR
NBL
NBT
NBR SBL SBT M
Lane Configurations
0
tt
?I
)
+T T+
Traffic Volume (vph)
91
572
0
0
417
111
305
138
446 0 0 0
Future Volume (vph)
91
572
0
0
417
111
305
138
446 0 0 0
Peak Hour Factor
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80 0.80 0.80 0.80
Adj. Flow (vph)
114
715
0
0
521
139
381
173
558 0 0 0
Shared Lane Traffic (%)
10%
Lane Group Flow (vph)
0
829
0
0
521
139
343
769
0 0 0 0
Turn Type
pm+pt
NA
NA
Perm
Perm
NA
Protected Phases
5
65
6
8
Permitted Phases
65
6
8
Detector Phase
5
65
6
6
8
8
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
5.0
Minimum Split (s)
9.5
22.5
22.5
22.5
22.5
Total Split (s)
9.5
51.3
51.3
39.2
39.2
Total Split (%)
9.5%
51.3 %
51.3%
39.2%
39.2%
Yellow Time (s)
3.5
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
4.5
Lead/Lag
Lag
Lag
Lead
Lead
Lead -Lag Optimize?
Yes
Yes
Yes
Yes
Recall Mode
None
C-Min
C-Min
Max
Max
Act Effct Green (s)
51.8
36.3
36.3
34.7
34.7
Actuated g/C Ratio
0.52
0.36
0.36
0.35
0.35
v/c Ratio
0.55
0.41
0.21
0.61
0.87dr
Control Delay
14.9
15.4
1.3
32.8
23.9
Queue Delay
0.0
0.0
0.0
0.0
0.0
Total Delay
14.9
15.4
1.3
32.8
23.9
LOS
B
B
A
C
C
Approach Delay
14.9
12.4
26.7
Approach LOS
B
B
C
Queue Length 50th (it)
159
63
0
197
173
Queue Length 95th (ft)
145
61
3
258
198
Internal Link Dist (it)
394
990
1769
1583
Turn Bay Length (ft)
200
Base Capacity (vph)
1583
1656
814
558
1164
Starvation Cap Reductn
28
0
0
0
0
Spillback Cap Reductn
0
0
0
0
0
Storage Cap Reductn
0
0
0
0
0
Reduced v/c Ratio
0.53
0.31
0.17
0.61
0.66
Intersection Summary
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 0 (0%), Referenced to
phase 2:EBWB and 6:, Start of Green
Natural Cycle: 75
Control Type: Actuated -Coordinated
Maximum v/c Ratio: 0.76
TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report
MS Page 1
19: SH-114 NB Frontage Rd & Dove Rd 2027 Background(With Improvements)
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Lane Group-
e1 o2 o4
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
1 2 4
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
5.0 5.0 5.0
Minimum Split (s)
9.5 22.5 22.5
Total Split (s)
9.5 66.5 24.0
Total Split (%)
10% 67% 24%
Yellow Time (s)
3.5 3.5 3.5
All -Red Time (s)
1.0 1.0 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lag Lead
Lead -Lag Optimize?
Yes Yes
Recall Mode
None C-Max None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (it)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summer
TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report
MS Page 2
19: SH-114 NB Frontage Rd & Dove Rd 2027 Background(With Improvements)
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Intersection Signal Delay: 19.3 Intersection LOS: B
Intersection Capacity Utilization 59.3 % ICU Level of Service B
Analysis Period (min)15
dr Defacto Right Lane. Recode with 1 though lane as a right lane.
SDlits and Phases: 19: SH-114 NB Frontage Rd & Dove Rd
=16 #16
=16
1 14 :p2
■ 1I
24s Ss
9.5s
=19 =19
=19
F
4.1
QB �p6 `R'-
39.2s 151.3s
9.5s
TIA for Wilks Tract Development in Southlake, Texas
MS
Synchro 9 Report
Page 3
2: Driveway 4/T W King Rd & Kirkwood Blvd 2027 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Intersection
Intersection Delay, s/veh
42.4
Intersection LOS
E
Movement
EBU
EBL
EBT
EBR
WBU
WBL
WBT
WBR
NBU
NBL
NBT
NBR
Traffic Vol, veh/h
0
37
829
125
0
0
97
11
0
17
1
0
Future Vol, veh/h
0
37
829
125
0
0
97
11
0
17
1
0
Peak Hour Factor
0.92
0.91
0.91
0.92
0.92
0.92
0.91
0.91
0.92
0.92
0.92
0.92
Heavy Vehicles, %
2
2
2
2
2
2
2
2
2
2
2
2
Mvmt Flow
0
41
911
136
0
0
107
12
0
18
1
0
Number of Lanes
0
1
2
0
0
0
2
0
0
0
2
0
Approach -
NB
Opposing Approach
WB
EB
SB
Opposing Lanes
2
3
2
Conflicting Approach Left
SB
NB
EB
Conflicting Lanes Left
2
2
3
Conflicting Approach Right
NB
SB
WB
Conflicting Lanes Right
2
2
2
HCM Control Delay
52.2
13
13
HCM LOS
F
B
B
Lane NBLn1 NBLn2 EBLnl E13Ln2 EBLn3 WBLnl WBLn2 SBLnl S13Ln2
Vol Left,%
98%
0%
100%
0%
0%
0%
0%
94%
0%
Vol Thru, %
2%
100%
0%
100%
69%
100%
75%
6%
0%
Vol Right, %
0%
0%
0%
0%
31%
0%
25%
0%
100%
Sign Control
Stop
Stop
Stop
Stop
Stop
Stop
Stop
Stop
Stop
Traffic Vol by Lane
17
1
37
553
401
65
43
131
396
LT Vol
17
0
37
0
0
0
0
123
0
Through Vol
0
1
0
553
276
65
32
8
0
RT Vol
0
0
0
0
125
0
11
0
396
Lane Flow Rate
19
1
41
607
440
71
48
144
435
Geometry Grp
8
8
8
8
8
8
8
8
8
Degree ofUtil(X)
0.051
0.002
0.086
1
0.839
0.173
0.114
0.324
0.84
Departure Headway (Hd)
9.721
9.233
7.599
7.091
6.87
8.783
8.605
8.111
6.951
Convergence, YIN
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Cap
367
386
471
510
527
407
415
443
522
Service Time
7.512
7.025
5.357
4.849
4.627
6.566
6.388
5.861
4.701
HCM Lane VIC Ratio
0.052
0.003
0.087
1.19
0.835
0.174
0.116
0.325
0.833
HCM Control Delay
13
12
11.1
66.6
36.1
13.4
12.5
14.7
36.5
HCM Lane LOS
B
B
B
F
E
B
B
B
E
HCM 95th-tile Q
0.2
0
0.3
13.7
8.6
0.6
0.4
1.4
8.6
TIA for Wilks Tract Development in Southlake, Texas
MS
2: Driveway 4/T W King Rd & Kirkwood Blvd 2027 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Intersection
Intersection Delay, s/veh
Intersection LOS
Movement
SBU
SBL
SBT
SB:
Traffic Vol, veh/h
0
123
8
396
Future Vol, veh/h
0
123
8
396
Peak Hour Factor
0.92
0.91
0.92
0.91
Heavy Vehicles, %
2
2
2
2
Mvmt Flow
0
135
9
435
Number of Lanes
0
0
1
1
Approach
SB
Opposing Approach
NB
Opposing Lanes
2
Conflicting Approach Left
WB
Conflicting Lanes Left
2
Conflicting Approach Right
EB
Conflicting Lanes Right
3
HCM Control Delay
31.1
HCM LOS
D
Synchro 9 Report TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report
Page 1 MS Page 2
14: Kirkwood Blvd & Driveway 1 2027 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Intersection
Int Delay, s/veh 2.2
30: Kirkwood Blvd & Driveway 2 2027 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Intersection
Int Delay, s/veh 2.1
Movement -1
EBL
EBR
NBL
NBT
SBT
SBR
Movement
EBL
Traffic Vol, veh/h
23
23
183
460
44
183
Traffic Vol, veh/h
29
23
150
333
204
191
Future Vol, veh/h
23
23
183
460
44
183
Future Vol, veh/h
29
23
150
333
204
191
Conflicting Peds, #Ihr
0
0
0
0
0
0
Conflicting Peds, #Ihr
0
0
0
0
0
0
Sign Control
Stop
Stop
Free
Free
Free
Free
Sign Control
Stop
Stop
Free
Free
Free
Free
RT Channelized
-
None
-
None
None
RT Channelized
-
None
-
None
None
Storage Length
0
100
150
-
-
150
Storage Length
0
100
150
-
-
150
Veh in Median Storage, #
0
-
-
0
0
-
Veh in Median Storage, #
0
-
-
0
0
-
Grade, %
0
-
-
0
0
-
Grade, %
0
-
-
0
0
-
Peak Hour Factor
92
92
92
92
92
92
Peak Hour Factor
92
92
92
92
92
92
Heavy Vehicles,%
2
2
2
2
2
2
Heavy Vehicles,%
2
2
2
2
2
2
Mvmt Flow
25
25
199
500
48
199
Mvmt Flow
32
25
163
362
222
208
Major/Minor
Minor2
Majorl
Major2
Major/Minor
Minot
Majorl
Major2
Conflicting Flow All
696
24
48
0
0
Conflicting Flow All
729
ill
222
0
0
Stage 1
48
-
-
-
-
Stage 1
222
-
-
Stage 2
648
-
-
Stage 2
507
-
-
Critical Hdwy
6.84
6.94
4.14
Critical Hdwy
6.84
6.94
4.14
Critical Hdwy Sig 1
5.84
-
-
Critical Hdwy Sig 1
5.84
-
-
Critical Hdwy Sig 2
5.84
-
-
Critical Hdwy Sig 2
5.84
-
-
Follow-up Hdwy
3.52
3.32
2.22
Follow-up Hdwy
3.52
3.32
2.22
Pot Cap-1 Maneuver
376
1047
1557
Pot Cap-1 Maneuver
358
921
1344
Stage 1
968
-
-
Stage 1
794
-
-
Stage 2
483
-
-
Stage 2
570
-
-
Platoon blocked, %
Platoon blocked, %
Mov Cap-1 Maneuver
328
1047
1557
Mov Cap-1 Maneuver
315
921
1344
Mov Cap-2 Maneuver
328
-
-
Mov Cap-2 Maneuver
315
-
-
Stage 1
968
Stage 1
794
Stage 2
421
Stage 2
501
Approach
EB
NB
SB
Approach
EB
NB
SB
HCM Control Delay, s
12.7
2.2
0
HCM Control Delay, s
13.9
2.5
0
HCM LOS
B
HCM LOS
B
Minor Lane/MajorMvmt
NBL
NBTEBLn1EBLn2 SBT SBR
Capacity (veh/h)
1557
328 1047
HCM Lane V/C Ratio
0.128
0.076 0.024
HCM Control Delay (s)
7.7
16.9 8.5
HCM Lane LOS
A
C A
HCM 95th %tile Q(veh)
0.4
0.2 0.1
TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report
MS Page 1
Minor Lane/MajorMvmt
NBL
NBT EBLn I EBLn2 SBT SBR
Capacity (veh/h)
1344
315 921
HCM Lane V/C Ratio
0.121
0.1 0.027
HCM Control Delay (s)
8
17.7 9
HCM Lane LOS
A
C A
HCM 95th %tile Q(veh)
0.4
0.3 0.1
TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report
MS Page 2
37: Driveway 5 & Kirkwood Blvd 2027 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Intersection _qqEIWr_
Int Delay, s/veh 0.6
40: Driveway 6 & Kirkwood Blvd 2027 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Intersection
Int Delay, s/veh 0.7
Movement
EBT
EBR
WBL WBT
NBL
NBR
Movement
EBT
EBR
WBL WBT
NBL
Traffic Vol, veh/h
1415
35
2
507
25
2
Traffic Vol, veh/h
1449
39
2
530
28
1
Future Vol, veh/h
1415
35
2
507
25
2
Future Vol, veh/h
1449
39
2
530
28
1
Conflicting Peds, #Ihr
0
0
0
0
0
0
Conflicting Peds, #Ihr
0
0
0
0
0
0
Sign Control
Free
Free
Free
Free
Stop
Stop
Sign Control
Free
Free
Free
Free
Stop
Stop
RT Channelized
None
None
-
None
RT Channelized
None
-
None
-
None
Storage Length
-
0
Storage Length
100
-
0
Veh in Median Storage, #
0
0
0
Veh in Median Storage, #
0
-
0
0
Grade, %
0
0
0
-
Grade, %
0
-
0
0
-
Peak Hour Factor
92
92
92
92
92
92
Peak Hour Factor
92
92
92
92
92
92
Heavy Vehicles,%
2
2
2
2
2
2
Heavy Vehicles,%
2
2
2
2
2
2
Mvmt Flow
1538
38
2
551
27
2
Mvmt Flow
1575
42
2
576
30
1
Major/Minor
Majorl
Major2
Minorl
Major/Minor
Majorl
Minorl
Conflicting Flow All
0
0
1576
0
1782
788
Conflicting Flow All
0
0
1617
0
1831
809
Stage 1
-
-
-
-
1557
-
Stage 1
-
-
-
-
1596
-
Stage 2
-
225
-
Stage 2
-
235
-
Critical Hdwy
5.34
5.74
7.14
Critical Hdwy
5.34
5.74
7.14 -
Critical Hdwy Stg 1
6.64
-
Critical Hdwy Stg 1
6.64
Critical Hdwy Stg 2
-
6.04
-
Critical Hdwy Stg 2
-
6.04
-
Follow-up Hdwy
3.12
3.82
3.92
Follow-up Hdwy
3.12
3.82
3.92
Pot Cap-1 Maneuver
204
122
287
Pot Cap-1 Maneuver
195
115
278
Stage 1
-
109
-
Stage 1
-
103
-
Stage 2
-
726
-
Stage 2
-
718
-
Platoon blocked, %
Platoon blocked, %
Mov Cap-1 Maneuver
204
120
287
Mov Cap-1 Maneuver
195
114
278
Mov Cap-2 Maneuver
-
120
Mov Cap-2 Maneuver
-
114
-
Stage 1
109
Stage 1
103
Stage 2
716
Stage 2
711
Approach
EB
WB
Approach
EB
WB
NB
HCM Control Delay, s
0
0.2
42.4
HCM Control Delay, s
0
0.1
47.2
HCM LOS
E
HCM LOS
E
Minor Lane/Major Mvmt NBLnl EBT EBR WBL WBT
Capacity (veh/h)
125
204
HCM Lane V/C Ratio
0.235
0.011
HCM Control Delay (s)
42.4
22.8 0.1
HCM Lane LOS
E
C A
HCM 95th %tile Q(veh)
0.9
0 -
TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report
MS Page 3
Minor Lane/Major Mvmt
NBLnl
EBT EBR WBL WBT
Capacity (veh/h)
116
195
HCM Lane V/C Ratio
0.272
0.011
HCM Control Delay (s)
47.2
23.7
HCM Lane LOS
E
C
HCM 95th %tile Q(veh)
1
0
TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report
MS Page 4
6: Solana Blvd/Kirkwood Blvd & SH-114 SB Off -Ramp
2027 Background
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: PM
Lane Grouf------'TBL
EST
EBR
WBL
WBT
WBR NBL NBT NBR
SBL
Sk
Lane Configurations
tt
?I
)
tt
)
r{�
Traffic Volume (vph) 0
319
782
598
485
0 0 0 0
261
3 60
Future Volume (vph) 0
319
782
598
485
0 0 0 0
261
3 60
Peak Hour Factor 0.87
0.87
0.87
0.87
0.87
0.87 0.87 0.87 0.87
0.87
0.87 0.87
Adj. Flow (vph) 0
367
899
687
557
0 0 0 0
300
3 69
Shared Lane Traffic (%)
50%
Lane Group Flow (vph) 0
367
899
687
557
0 0 0 0
150
222 0
Turn Type
NA
Perm
pm+pt
NA
Perm
NA
Protected Phases
2
1
12
4
Permitted Phases
2
12
4
Detector Phase
2
2
1
12
4
4
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
5.0
Minimum Split (s)
22.5
22.5
9.5
22.5
22.5
Total Split (s)
32.9
32.9
27.1
40.0
40.0
Total Split (%)
32.9%
32.9 %
27.1 %
40.0 %
40.0 %
Yellow Time (s)
3.5
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
4.5
4.5
Lead/Lag
Lag
Lag
Lead
Lead -Lag Optimize?
Yes
Yes
Yes
Recall Mode
C-Max
C-Max
None
Max
Max
Act Effct Green (s)
28.4
28.4
51.0
55.5
35.5
35.5
Actuated g/C Ratio
0.28
0.28
0.51
0.56
0.36
0.36
v/c Ratio
0.37
0.95
1.07
0.28
0.26
0.19
Control Delay
29.9
28.8
85.9
15.0
24.5
15.7
Queue Delay
0.0
0.0
0.0
0.0
0.1
0.0
Total Delay
29.9
28.8
85.9
15.0
24.6
15.7
LOS
C
C
F
B
C
B
Approach Delay
29.1
54.2
19.3
Approach LOS
C
D
B
Queue Length 50th (ft)
97
150
-407
97
73
35
Queue Length 95th (ft)
134
#414
m#497
m133
123
60
Internal Link Dist (ft)
1216
327
1036
836
Turn Bay Length (ft)
350
Base Capacity (vph)
1005
946
641
1964
571
1153
Starvation Cap Reductn
0
0
0
0
0
0
Spillback Cap Reductn
0
0
0
0
50
100
Storage Cap Reductn
0
0
0
0
0
0
Reduced v/c Ratio
0.37
0.95
1.07
0.28
0.29
0.21
Intersection Summary
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 0 (0%), Referenced to phase 2:EBWB
and
6:, Start of Green
Natural Cycle: 100
Control Type: Actuated -Coordinated
Maximum v/c Ratio:1.10
2/8/2016 Synchro 9 Report
MS Page 1
6: Solana Blvd/Kirkwood Blvd & SH-114 SIB Off -Ramp 2027 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Lane Group'
06
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
5 6 8
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
5.0 5.0 5.0
Minimum Split (s)
10.0 22.5 22.5
Total Split (s)
29.0 31.0 40.0
Total Split (%)
29% 31% 40%
Yellow Time (s)
3.5 3.5 3.5
All -Red Time (s)
1.0 1.0 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead Lag
Lead -Lag Optimize?
Yes Yes
Recall Mode
Max C-Max Max
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
2/8/2016 Synchro 9 Report
MS Page 2
6: Solana Blvd/Kirkwood Blvd & SH-114 SIB Off -Ramp 2027 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Intersection Signal Delay: 38.7 Intersection LOS: D
Intersection Capacity Utilization 99.2 % ICU Level of Service F
Analysis Period (min)15
- Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases: 6: Solana Blvd/Kirkwood Blvd & SH-114 SB Off -Ramp
�6 #6
1 91 Z
=6I
■ 14
�7.1 s
9I7 s
�8 #8
4" O6
�8
193
29s
40s
8: SH-114 NB Off -Ramp & Kirkwood Blvd
2027 Background
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: PM
-'*,-,*
r-
4-
T/,.
ti 1
-'
Lane Group - - - - - -
- - ML
EBT EBR WBL
WBT
WBR
NBL
NBT
NBR SBL SBT
SBR
Lane Configurations
V1
tt
tt
?I
Vi
+Tf+
Traffic Volume (vph)
464
186 0 0
770
723
374
1135
75 0 0
0
Future Volume (vph)
464
186 0 0
770
723
374
1135
75 0 0
0
Peak Hour Factor
0.95
0.95 0.95 0.95
0.95
0.95
0.95
0.95
0.95 0.95 0.95
0.95
Adj. Flow (vph)
488
196 0 0
811
761
394
1195
79 0 0
0
Shared Lane Traffic (%)
10°%
Lane Group Flow (vph)
488
196 0 0
811
761
355
1313
0 0 0
0
Turn Type
pm+pt
NA
NA
Free
Perm
NA
Protected Phases
5
56
6
8
Permitted Phases
56
Free
8
Detector Phase
5
56
6
8
8
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
Minimum Split (s)
10.0
22.5
22.5
22.5
Total Split (s)
29.0
31.0
40.0
40.0
Total Split (%)
29.0%
31.0 %
40.0%
40.0%
Js
Yellow Time (s)
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
4.5
Lead/Lag
Lead
Lag
Lead -Lag Optimize?
Yes
Yes
-
Recall Mode
Max
C-Max
Max
Max
Act Effct Green (s)
51.0
55.5
26.5
100.0
35.5
35.5
Actuated g/C Ratio
0.51
0.56
0.26
1.00
0.36
0.36
v/c Ratio
0.96
0.10
0.87
0.48
0.62
1.10
-
Control Delay
75.8
12.0
46.2
1.0
32.5
89.1
Queue Delay
0.0
0.0
0.0
0.0
3.1
1.7
-
Total Delay
75.8
12.0
46.2
1.0
35.5
90.8
LOS
E
B
D
A
D
F
-
Approach Delay
57.5
24.3
79.1
Approach LOS
E
C
E
-
Queue Length 50th (ft)
297
30
259
0
203
-524
Queue Length 95th (ft)
#478
48
#361
0
312
#667
Internal Link Dist (ft)
327
240
1055
1095
Turn Bay Length (ft)
a
Base Capacity(vph)
508
1964
937
1583
571
1195
Starvation Cap Reductn
0
0
0
0
0
0
Spillback Cap Reductn
0
0
0
0
127
265
Storage Cap Reductn
0
0
0
0
0
0
Reduced v/c Ratio
0.96
0.10
0.87
0.48
0.80
1.41
Intersection Summary
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 0 (0%), Referenced to phase 2:EBWB and 6:, Start of Green
Natural Cycle: 100
Control Type: Actuated -Coordinated
Maximum v/c Ratio:1.10
2/8/2016 Synchro 9 Report 2/8/2016 Synchro 9 Report
MS Page 3 MS Page 4
8: SH-114 NB Off -Ramp & Kirkwood Blvd 2027 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All -Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead -Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
5.0 5.0 5.0
9.5 22.5 22.5
27.1 32.9 40.0
27% 33% 40%
3.5 3.5 3.5
1.0 1.0 1.0
Lead Lag
Yes Yes
None C-Max Max
8: SH-114 NB Off -Ramp & Kirkwood Blvd 2027 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Intersection Signal Delay: 53.4 Intersection LOS: D
Intersection Capacity Utilization 99.2 % ICU Level of Service F
Analysis Period (min)15
- Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases: 8: SH-114 NB Off -Ramp & Kirkwood Blvd
#6 #6
=6
to s
#2 #8
05 11W0600148
=8
4o s
2/8/2016 Synchro 9 Report 2/8/2016
MS Page 5 MS
Synchro 9 Report
Page 6
16: SH-114 SB Frontage Rd/SH-114 SB Off -Ramp & Dove Rd
2027 Background
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: PM
Lane Group = EBL
EST
EBR WBL
WBT
WBR NBL NBT
NBR SBL
Lane Configurations
tT+
+Tt
)
r{
Traffic Volume (vph) 0
212
352 479
1473
0 0 0
0 121
172 157
Future Volume (vph) 0
212
352 479
1473
0 0 0
0 121
172 157
Peak Hour Factor 0.96
0.96
0.96 0.96
0.96
0.96 0.96 0.96
0.96 0.96
0.96 0.96
Adj. Flow (vph) 0
221
367 499
1534
0 0 0
0 126
179 164
Shared Lane Traffic (°!°)
10%
Lane Group Flow (vph) 0
588
0 0
2033
0 0 0
0 113
356 0
Turn Type
NA
pm+pt
NA
Perm
NA
Protected Phases
2
1
12
4
Permitted Phases
12
4
Detector Phase
2
1
12
4
4
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
Minimum Split (s)
22.5
9.5
22.5
22.5
Total Split (s)
39.0
68.0
23.0
23.0
Total Split (%)
30.0%
52.3 %
17.7 %
17.7%
Yellow Time (s)
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
Lead/Lag
Lag
Lead
Lead
Lead -Lag Optimize?
Yes
Yes
Yes
Recall Mode
C-Max
None
None
None
Act Effct Green (s)
37.4
100.6
15.9
15.9
Actuated g/C Ratio
0.29
0.77
0.12
0.12
v/c Ratio
0.51
0.89
0.58
0.76
Control Delay
19.5
10.4
65.3
51.1
Queue Delay
0.0
2.4
0.0
0.0
Total Delay
19.5
12.8
65.3
51.1
LOS
B
B
E
D
Approach Delay
19.5
12.8
54.5
Approach LOS
B
B
D
Queue Length 50th (ft)
100
251
98
117
Queue Length 95th (ft)
161
m303
168
173
Internal Link Dist (ft)
224
394
1722
1376
Turn Bay Length (ft)
240
Base Capacity (vph)
1145
2294
229
529
Starvation Cap Reductn
0
157
0
0
Spillback Cap Reductn
0
0
0
0
Storage Cap Reductn
0
0
0
0
Reduced v/c Ratio
0.51
0.95
0.49
0.67
Intersection Summary
Cycle Length: 130
Actuated Cycle Length:130
Offset: 0 (0%), Referenced to phase 2:EBWB
and 6:, Start of Green
Natural Cycle:120
Control Type: Actuated -Coordinated
Maximum v/c Ratio:1.01
2/8/2016 Synchro 9 Report
MS Page 7
16: SH-114 SB Frontage Rd/SH-114 SB Off -Ramp & Dove Rd 2027 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Lane Grouper
06 e8
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
5 6 8
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
5.0 5.0 5.0
Minimum Split (s)
9.5 22.5 22.5
Total Split (s)
9.8 48.2 72.0
Total Split (%)
8% 37% 55%
Yellow Time (s)
3.5 3.5 3.5
All -Red Time (s)
1.0 1.0 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lag Lead
Lead -Lag Optimize?
Yes Yes
Recall Mode
None C-Min Max
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
2/8/2016 Synchro 9 Report
MS Page 8
16: SH-114 SIB Frontage Rd/SH-114 SIB Off -Ramp & Dove Rd 2027 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Intersection Signal Delay: 20.4 Intersection LOS: C
Intersection Capacity Utilization 91.9 % ICU Level of Service F
Analysis Period (min)15
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases: 16: SH-114 SIB Frontage Rd/SH-114 SB Off -Ramp & Dove Rd
=16 #16 #16
i01 2 r01
23 s
-19 1#19
TAB
-19
-4p5
.
72 s
9.8 s
19: SH-114 NB Frontage Rd/SH-114 NB On -Ramp & Dove Rd
2027 Background
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: PM
-,*,-,*
r-
4-
T/,.
ti 1
-'
Lane Group-
EBL
EBT EBR WBL
WBT
WBR
NBL
NBT
NBR SBL SBT
SBR
Lane Configurations
+Tt
0
►j
q +
Traffic Volume (vph)
71
265 0 0
878
192
1052
1357
156 0 0
0
Future Volume (vph)
71
265 0 0
878
192
1052
1357
156 0 0
0
Peak Hour Factor
0.99
0.99 0.99 0.99
0.99
0.99
0.99
0.99
0.99 0.99 0.99
0.99
Adj. Flow (vph)
72
268 0 0
887
194
1063
1371
158 0 0
0
Shared Lane Traffic (%)
20°%
Lane Group Flow (vph)
0
340 0 0
1081
0
850
1742
0 0 0
0
Turn Type
pm+pt
NA
NA
Perm
NA
Protected Phases
5
56
6
8
Permitted Phases
56
8
Detector Phase
5
56
6
8
8
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
Minimum Split (s)
9.5
22.5
22.5
22.5
Total Split (s)
9.8
48.2
72.0
72.0
Total Split (%)
7.5 %
37.1 %
55.4%
55.4%
JIM
Yellow Time (s)
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
Lead/Lag
Lag
Lead
Lead
Lead -Lag Optimize?
Yes
Yes
Yes
-
Recall Mode
None
C-Min
Max
Max
Act Effct Green (s)
48.8
43.4
67.7
67.7
Actuated g/C Ratio
0.38
0.33
0.52
0.52
v/c Ratio
0.45
0.93
1.01
1.00
Control Delay
48.7
48.9
66.1
53.5
Queue Delay
0.0
6.2
1.4
0.7
-
Total Delay
48.7
55.1
67.5
54.2
LOS
D
E
E
D
-
Approach Delay
48.7
55.1
58.6
Approach LOS
D
E
E
-
Queue Length 50th (ft)
141
406
-830
-796
Queue Length 95th (ft)
194
#574
#1104
#988
Internal Link Dist (ft)
394
990
1769
1583
Turn Bay Length (ft)
a
Base Capacity (vph)
763
1172
838
1736
Starvation Cap Reductn
0
0
0
0
Spillback Cap Reductn
0
70
4
5
Storage Cap Reductn
0
0
0
0
Reduced v/c Ratio
0.45
0.98
1.02
1.01
Intersection Summary
Cycle Length: 130
Actuated Cycle Length: 130
Offset: 0 (0%), Referenced to phase 2:EBWB and 6:, Start of Green
Natural Cycle:120
Control Type: Actuated -Coordinated
Maximum v/c Ratio: 1.01
2/8/2016 Synchro 9 Report 2/8/2016 Synchro 9 Report
MS Page 9 MS Page 10
19: SH-114 NB Frontage Rd/SH-114 NB On -Ramp & Dove Rd 2027 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Lane Group
01 o2 e4
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic
Lane Group Flow (vph)
Turn Type
Protected Phases
1 2 4
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
5.0 5.0 5.0
Minimum Split (s)
9.5 22.5 22.5
Total Split (s)
68.0 39.0 23.0
Total Split (%)
52 % 30% 18%
Yellow Time (s)
3.5 3.5 3.5
All -Red Time (s)
1.0 1.0 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lag Lead
Lead -Lag Optimize?
Yes Yes
Recall Mode
None C-Max None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
2/8/2016 Synchro 9 Report
MS Page 11
19: SH-114 NB Frontage Rd/SH-114 NB On -Ramp & Dove Rd 2027 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Intersection Signal Delay: 56.8 Intersection LOS: E
Intersection Capacity Utilization 99.7% ICU Level of Service F
Analysis Period (min)15
- Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
and Phases: 19: SH-114 NB Frontage Rd/SH-114 NB On -Ramp & Dove Rd
2/8/2016
MS
�19
Synchro 9 Report
Page 12
22: Dove Rd & Kirkwood Blvd
2027 Background
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: PM
*_
t
ti
r
Lane Grout-
EBL
EST
WBT
WBR
SBL
SBR
Lane Configurations
I
Tt
Tj+
Vi
?I
Traffic Volume (vph)
192
220
316
274
160
623
Future Volume (vph)
192
220
316
274
160
623
Peak Hour Factor
0.90
0.90
0.90
0.90
0.90
0.90
Adj. Flow (vph)
213
244
351
304
178
692
Shared Lane Traffic (%)
Lane Group Flow (vph)
213
244
655
0
178
692
Turn Type
pm+pt
NA
NA
Prot
Perm
Protected Phases
7
4
8
1
Permitted Phases
4
6
Detector Phase
7
4
8
1
6
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
5.0
Minimum Split (s)
9.5
22.5
22.5
9.5
22.5
Total Split (s)
25.0
67.0
42.0
63.0
63.0
Total Split (%)
19.2 %
51.5%
32.3 %
48.5 % 48.5%
Yellow Time (s)
3.5
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
4.5
4.5
Lead/Lag
Lead
Lag
Lead -Lag Optimize?
Yes
Yes
Recall Mode
None
C-Max
C-Max
None
Max
Act Effct Green (s)
62.5
62.5
43.2
58.5
58.5
Actuated g/C Ratio
0.48
0.48
0.33
0.45
0.45
v/c Ratio
0.59
0.14
0.54
0.22
0.69
Control Delay
36.0
19.3
28.2
22.8
10.1
Queue Delay
0.0
0.0
0.0
0.0
0.0
Total Delay
36.0
19.3
28.2
22.8
10.1
LOS
D
B
C
C
B
Approach Delay
27.1
28.2
12.7
Approach LOS
C
C
B
Queue Length 50th (ft)
107
46
174
90
93
Queue Length 95th (ft)
m154
m73
251
141
240
Internal Link Dist (ft)
990
172
351
Turn Bay Length (ft)
100
Base Capacity (vph)
417
1701
1205
796
1003
Starvation Cap Reductn
0
0
0
0
0
Spillback Cap Reductn
0
0
0
0
0
Storage Cap Reductn
0
0
0
0
0
Reduced v/c Ratio
0.51
0.14
0.54
0.22
0.69
Intersection Summary
Cycle Length: 130
Actuated Cycle Length:130
Offset: 0 (0%), Referenced to
phase 4:EBTL
and 8:WBT,
Start of Green
Natural Cycle: 60
Control Type: Actuated -Coordinated
Maximum v/c Ratio: 0.69
22: Dove Rd & Kirkwood Blvd 2027 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Intersection Signal Delay: 21.1 Intersection LOS: C
Intersection Capacity Utilization 63.6 % ICU Level of Service B
Analysis Period (min)15
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases: 22: Dove Rd & Kirkwood Blvd
63s1 167S
F
06
4? A8 `R)
163s. 1 125s I I42s 1 1
2/8/2016 Synchro 9 Report 2/8/2016 Synchro 9 Report
MS Page 13 MS Page 14
19: SH-114 NB Frontage Rd & Dove Rd
2027 Background(With Improvements)
TIA for Wilks Heritage in Southlake, Texas
Timing Plan: PM
Lane GroupOMMMMr"L
EST EBR
WBL
WBT
WBR
NBL
NBT
NBR SBL
Lane Configurations
tt
?I
Vi
+T +
Traffic Volume (vph)
71
265 0
0
878
192
1052
1357
156 0 0 0
Future Volume (vph)
71
265 0
0
878
192
1052
1357
156 0 0 0
Peak Hour Factor
0.99
0.99 0.99
0.99
0.99
0.99
0.99
0.99
0.99 0.99 0.99 0.99
Adj. Flow (vph)
72
268 0
0
887
194
1063
1371
158 0 0 0
Shared Lane Traffic (%)
20%
Lane Group Flow (vph)
0
340 0
0
887
194
850
1742
0 0 0 0
Turn Type
pm+pt
NA
NA
Perm
Perm
NA
Protected Phases
5
56
6
8
Permitted Phases
56
6
8
Detector Phase
5
56
6
6
8
8
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
5.0
Minimum Split (s)
9.5
22.5
22.5
22.5
22.5
Total Split (s)
9.6
39.0
39.0
71.4
71.4
Total Split (%)
8.0%
32.5 %
32.5%
59.5%
59.5%
Yellow Time (s)
3.5
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
4.5
Lead/Lag
Lag
Lag
Lead
Lead
Lead -Lag Optimize?
Yes
Yes
Yes
Yes
Recall Mode
None
Min
Min
C-Max
C-Max
Act Effct Green (s)
39.6
34.0
34.0
66.9
66.9
Actuated g/C Ratio
0.33
0.28
0.28
0.56
0.56
v/c Ratio
0.48
0.89
0.36
0.95
0.94
Control Delay
48.7
47.4
10.9
45.7
35.6
Queue Delay
0.0
0.2
0.0
0.0
0.0
Total Delay
48.7
47.5
10.9
45.7
35.6
LOS
D
D
B
D
D
Approach Delay
48.7
40.9
38.9
Approach LOS
D
D
D
Queue Length 50th (ft)
130
353
18
647
652
Queue Length 95th (ft)
181
#456
m65
#980
#863
Internal Link Dist (ft)
394
990
1769
1583
Turn Bay Length (ft)
200
Base Capacity (vph)
710
1017
552
897
1858
Starvation Cap Reductn
0
0
0
0
0
Spillback Cap Reductn
0
6
0
0
0
Storage Cap Reductn
0
0
0
0
0
Reduced v/c Ratio
0.48
0.88
0.35
0.95
0.94
Intersection Summary
Cycle Length: 120
Actuated Cycle Length:120
Offset: 0 (0%), Referenced to
phase 1:WBTL and 8:, Start of Green
Natural Cycle: 90
Control Type: Actuated -Coordinated
Maximum v/c Ratio: 0.95
2/8/2016 Synchro 9 Report
MS Page 1
19: SH-114 NB Frontage Rd & Dove Rd 2027 Background(With Improvements)
TIA for Wilks Heritage in Southlake, Texas Timing Plan: PM
Lane Group
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
1 2 4
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
5.0 5.0 5.0
Minimum Split (s)
9.5 22.5 22.5
Total Split (s)
65.4 32.0 22.6
Total Split (%)
55% 27% 19%
Yellow Time (s)
3.5 3.5 3.5
All -Red Time (s)
1.0 1.0 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lag Lead
Lead -Lag Optimize?
Yes Yes
Recall Mode
C-Max Max None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
2/8/2016 Synchro 9 Report
MS Page 2
19: SH-114 NB Frontage Rd & Dove Rd 2027 Background(With Improvements)
TIA for Wilks Heritage in Southlake, Texas Timing Plan: PM
Intersection Signal Delay: 40.3 Intersection LOS: D
Intersection Capacity Utilization 93.6 % ICU Level of Service F
Analysis Period (min)15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases: 19: SH-114 NB Frontage Rd & Dove Rd
#16 #16 #16
i14 2 7q1
22.6 s
=19 19 =19
F
"5 `R' i66 v5
71.4s 39s 9,6s
218I2016
MS
Synchro 9 Report
Page 3
2: Driveway 4/T W King Rd & Kirkwood Blvd 2027 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Intersection
Intersection Delay, s/veh
51.1
Intersection LOS
F
Movement
EBU
EBL
EBT
EBR
WBU
WBL
WBT
WBR
NBU
NBL
NBT
NBR
Traffic Vol, veh/h
0
76
88
22
0
0
1157
181
0
108
7
0
Future Vol, veh/h
0
76
88
22
0
0
1157
181
0
108
7
0
Peak Hour Factor
0.92
0.89
0.89
0.92
0.92
0.92
0.89
0.89
0.92
0.92
0.92
0.92
Heavy Vehicles, %
2
2
2
2
2
2
2
2
2
2
2
2
Mvmt Flow
0
85
99
24
0
0
1300
203
0
117
8
0
Number of Lanes
0
1
2
0
0
0
2
0
0
0
2
0
Approach -
W13
N
Opposing Approach
WB
EB
SIB
Opposing Lanes
2
3
2
Conflicting Approach Left
SIB
NB
EB
Conflicting Lanes Left
2
2
3
Conflicting Approach Right
NB
SB
WB
Conflicting Lanes Right
2
2
2
HCM Control Delay
12.9
64.2
15.7
HCM LOS
B
F
C
Lane NBLn1 NBLn2 EBLnl E13Ln2 EBLn3 WBLnl WBLn2 SBLnl SBLn2
Vol Left,%
98%
0%
100%
0%
0%
0%
0%
95%
0%
Vol Thru, %
2%
100%
0%
100%
57%
100%
68%
5%
0%
Vol Right, %
0%
0%
0%
0%
43%
0%
32%
0%
100%
Sign Control
Stop
Stop
Stop
Stop
Stop
Stop
Stop
Stop
Stop
Traffic Vol by Lane
110
5
76
59
51
771
567
19
161
LT Vol
108
0
76
0
0
0
0
18
0
Through Vol
2
5
0
59
29
771
386
1
0
RT Vol
0
0
0
0
22
0
181
0
161
Lane Flow Rate
120
5
85
66
57
867
637
21
181
Geometry Grp
8
8
8
8
8
8
8
8
8
Degree of Util (X)
0.305
0.012
0.208
0.151
0.126
1
1
0.053
0.391
Departure Headway (Hd)
9.162
8.674
8.768
8.268
7.968
6.711
6.484
8.948
7.778
Convergence, YIN
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Cap
393
413
410
434
450
546
560
401
463
Service Time
6.904
6.416
6.512
6.012
5.712
4.473
4.246
6.684
5.513
HCM Lane VIC Ratio
0.305
0.012
0.207
0.152
0.127
1.588
1.137
0.052
0.391
HCM Control Delay
15.9
11.5
13.8
12.5
11.9
64.7
63.5
12.2
15.4
HCM Lane LOS
C
B
B
B
B
F
F
B
C
HCM 95th-tile Q
1.3
0
0.8
0.5
0.4
14.1
14.4
0.2
1.8
2: Driveway 4/T W King Rd & Kirkwood Blvd 2027 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Intersection
Intersection Delay, s/veh
Intersection LOS
Movement
SBU
SBL
SBT
Traffic Vol, veh/h
0
18
1 161
Future Vol, veh/h
0
18
1 161
Peak Hour Factor
0.92
0.89
0.92 0.89
Heavy Vehicles, %
2
2
2 2
Mvmt Flow
0
20
1 181
Number of Lanes
0
0
1 1
Approach
SIB
Opposing Approach
NB
Opposing Lanes
2
Conflicting Approach Left
WB
Conflicting Lanes Left
2
Conflicting Approach Right
EB
Conflicting Lanes Right
3
HCM Control Delay
15.1
HCM LOS
C
2/8/2016 Synchro 9 Report 2/8/2016 Synchro 9 Report
MS Page 1 MS Page 2
14: Kirkwood Blvd & Driveway 1 2027 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Intersection
Int Delay, s/veh 5.1
30: Kirkwood Blvd & Driveway 2 2027 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Intersection
Int Delay, s/veh 5.8
Movement -1
EBL
EBR
NBL
NBT
SBT
SBR
Movement
EBL
Traffic Vol, veh/h
144
144
33
371
530
33
Traffic Vol, veh/h
180
144
27
488
418
34
Future Vol, veh/h
144
144
33
371
530
33
Future Vol, veh/h
180
144
27
488
418
34
Conflicting Peds, #Ihr
0
0
0
0
0
0
Conflicting Peds, #Ihr
0
0
0
0
0
0
Sign Control
Stop
Stop
Free
Free
Free
Free
Sign Control
Stop
Stop
Free
Free
Free
Free
RT Channelized
-
None
-
None
None
RT Channelized
-
None
-
None
None
Storage Length
0
100
150
-
-
150
Storage Length
0
100
150
-
150
Veh in Median Storage, #
0
-
-
0
0
-
Veh in Median Storage, #
0
-
-
0
0
-
Grade, %
0
-
-
0
0
-
Grade, %
0
-
-
0
0
-
Peak Hour Factor
92
92
92
92
92
92
Peak Hour Factor
92
92
92
92
92
92
Heavy Vehicles,%
2
2
2
2
2
2
Heavy Vehicles,%
2
2
2
2
2
2
Mvmt Flow
157
157
36
403
576
36
Mvmt Flow
196
157
29
530
454
37
Major/Minor
Minor2
Majorl
Major2
Major/Minor
Minot
Majorl
Major2
Conflicting Flow All
849
288
576
0
0
Conflicting Flow All
778
227
454
0
0
Stage 1
576
-
-
-
-
Stage 1
454
-
-
-
Stage 2
273
-
-
Stage 2
324
-
-
Critical Hdwy
6.84
6.94
4.14
Critical Hdwy
6.84
6.94
4.14
Critical Hdwy Stg 1
5.84
-
-
Critical Hdwy Stg 1
5.84
-
Critical Hdwy Stg 2
5.84
-
-
Critical Hdwy Stg 2
5.84
-
-
Follow-up Hdwy
3.52
3.32
2.22
Follow-up Hdwy
3.52
3.32
2.22
Pot Cap-1 Maneuver
300
709
993
Pot Cap-1 Maneuver
333
776
1103
Stage 1
525
-
-
Stage 1
606
-
-
Stage 2
748
-
-
Stage 2
705
-
-
Platoon blocked, %
Platoon blocked, %
Mov Cap-1 Maneuver
289
709
993
Mov Cap-1 Maneuver
324
776
1103
Mov Cap-2 Maneuver
289
-
-
Mov Cap-2 Maneuver
324
-
-
Stage 1
525
Stage 1
606
Stage 2
721
Stage 2
686
Approach
EB
NB
SB
Approach
EB
NB
SB
HCM Control Delay, s
21.4
0.7
0
HCM Control Delay, s
22.4
0.4
0
HCM LOS
C
HCM LOS
C
Minor Lane/MajorMvmt
NBL
NBTEBLn1EBLn2
SBT
SBR
Minor Lane/MajorMvmt
NBL
NBT EBLn I EBLn2
SBT
SBR
Capacity (veh/h)
993
289 709
Capacity (veh/h)
1103
324 776
HCM Lane V/C Ratio
0.036
0.542 0.221
HCM Lane V/C Ratio
0.027
0.604 0.202
HCM Control Delay (s)
8.8
31.3 11.5
HCM Control Delay (s)
8.4
31.7 10.8
HCM Lane LOS
A
D B
HCM Lane LOS
A
D B
HCM 95th %tile Q(veh)
0.1
3 0.8
HCM 95th %tile Q(veh)
0.1
3.7 0.8
2/8/2016 Synchro 9 Report 2/8/2016 Synchro 9 Report
MS Page 1 MS Page 2
37: Driveway 5 & Kirkwood Blvd 2027 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Intersection _qqEIWr_
Int Delay, s/veh 0.3
40: Driveway 6 & Kirkwood Blvd 2027 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Intersection
Int Delay, s/veh 0.4
Movement
EBT
EBR
WBL WBT
I NBL
NBR
Movement
EBT
EBR
WBL WBT
NBL
Traffic Vol, veh/h
189
35
2 1425
33
2
Traffic Vol, veh/h
223
39
2 1456
37
1
Future Vol, veh/h
189
35
2 1425
33
2
Future Vol, veh/h
223
39
2 1456
37
1
Conflicting Peds, #Ihr
0
0
0 0
0
0
Conflicting Peds, #Ihr
0
0
0 0
0
0
Sign Control
Free
Free
Free Free
Stop
Stop
Sign Control
Free
Free
Free Free
Stop
Stop
RT Channelized
None
None
-
None
RT Channelized
None
- None
-
None
Storage Length
-
0
Storage Length
0
100 -
0
Veh in Median Storage, #
0
0
0
Veh in Median Storage, #
0
-
- 0
0
Grade, %
0
0
0
-
Grade, %
0
-
- 0
0
-
Peak Hour Factor
92
92
92 92
92
92
Peak Hour Factor
92
92
92 92
92
92
Heavy Vehicles,%
2
2
2 2
2
2
Heavy Vehicles,%
2
2
2 2
2
2
Mvmt Flow
205
38
2 1549
36
2
Mvmt Flow
242
42
2 1583
40
1
Major/Minor
Majorl
Major2
Minorl
Major/Minor
Majorl
Major2
Minorl
Conflicting Flow All
0
0
243 0
848
122
Conflicting Flow All
0
0
242 0
879
121
Stage 1
-
-
- -
224
-
Stage 1
-
-
- -
242
Stage 2
-
624
-
Stage 2
-
637
Critical Hdwy
5.34
5.74
7.14
Critical Hdwy
4.14
6.29
6.94
Critical Hdwy Stg 1
6.64
Critical Hdwy Stg 1
-
5.84
-
Critical Hdwy Stg 2
-
6.04
-
Critical Hdwy Stg 2
-
6,04
-
Follow-up Hdwy
3.12
3.82
3.92
Follow-up Hdwy
2.22
3.67
3.32
Pot Cap-1 Maneuver
892
370
770
Pot Cap-1 Maneuver
1322
320
908
Stage 1
-
700
-
Stage 1
-
748
-
Stage 2
-
452
-
Stage 2
-
458
-
Platoon blocked, %
Platoon blocked, %
Mov Cap-1 Maneuver
892
364
770
Mov Cap-1 Maneuver
1322
320
908
Mov Cap-2 Maneuver
-
364
Mov Cap-2 Maneuver
-
320
-
Stage 1
700
Stage 1
748
Stage 2
445
Stage 2
457
Approach
EB
WB
Approach
EB
WB
INS
HCM Control Delay, s
0
0
15.7
HCM Control Delay, s
0
0
17.6
HCM LOS
C
HCM LOS
C
Minor Lane/Major Mvmt NBLnl EBT EBR WBL WBT
Capacity (veh/h)
375
892
HCM Lane V/C Ratio
0.101
0.002
HCM Control Delay (s)
15.7
9 0
HCM Lane LOS
C
A A
HCM 95th %tile Q(veh)
0.3
0 -
Minor Lane/Major Mvmt
NBLn1
EBT EBR WBL WBT
Capacity (veh/h)
326
1322
HCM Lane V/C Ratio
0.127
0.002
HCM Control Delay (s)
17.6
7.7
HCM Lane LOS
C
A
HCM 95th %tile Q(veh)
0.4
0
2/8/2016 Synchro 9 Report 2/8/2016 Synchro 9 Report
MS Page 3 MS Page 4
6: Solana Blvd/Kirkwood Blvd & SH-114 SB Off -Ramp 2027 Background + Site
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: AM
Lane Grouf------'TBL
EST
EBR
WBL
WBT
WBR NBL NBT NBR
SBL
SBR
Lane Configurations
tt
r
)
tt
)
+T +
Traffic Volume (vph) 0
453
324
396
822
0 0 0 0
771
1 80
Future Volume (vph) 0
453
324
396
822
0 0 0 0
771
1 80
Peak Hour Factor 0.92
0.92
0.92
0.92
0.92
0.92 0.92 0.92 0.92
0.92
0.92 0.92
Adj. Flow (vph) 0
492
352
430
893
0 0 0 0
838
1 87
Shared Lane Traffic (%)
50%
Lane Group Flow (vph) 0
492
352
430
893
0 0 0 0
419
507 0
Turn Type
NA
Perm
pm+pt
NA
Perm
NA
Protected Phases
2
1
12
4
Permitted Phases
2
12
4
Detector Phase
2
2
1
12
4
4
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
5.0
Minimum Split (s)
22.5
22.5
9.5
22.5
22.5
Total Split (s)
30.0
30.0
18.0
52.0
52.0
Total Split (%)
30.0%
30.0 %
18.0 %
52.0 %
52.0%
Yellow Time (s)
3.5
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
4.5
4.5
Lead/Lag
Lag
Lag
Lead
Lead -Lag Optimize?
Yes
Yes
Yes
Recall Mode
C-Max
C-Max
None
None
None
Act Effct Green (s)
25.5
25.5
41.3
45.8
45.2
45.2
Actuated g/C Ratio
0.26
0.26
0.41
0.46
0.45
0.45
v/c Ratio
0.55
0.53
0.99
0.55
0.58
0.35
Control Delay
34.9
6.5
61.2
20.3
23.6
17.0
Queue Delay
0.0
0.0
0.0
1.6
0.0
0.0
Total Delay
34.9
6.5
61.2
21.9
23.6
17.0
LOS
C
A
E
C
C
B
Approach Delay
23.1
34.7
20.0
Approach LOS
C
C
B
Queue Length 50th (ft)
143
0
-187
198
201
99
Queue Length 95th (ft)
195
69
m#377
296
304
139
Internal Link Dist (ft)
1214
327
1036
836
Turn Bay Length (ft)
350
Base Capacity (vph)
902
665
433
1620
764
1522
Starvation Cap Reductn
0
0
0
511
0
0
Spillback Cap Reductn
0
0
0
0
6
10
Storage Cap Reductn
0
0
0
0
0
0
Reduced v/c Ratio
0.55
0.53
0.99
0.81
0.55
0.34
Intersection Summary
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 0 (0%), Referenced to phase 2:EBWB
and
6:, Start of Green
Natural Cycle: 75
Control Type: Actuated -Coordinated
Maximum v/c Ratio: 0.99
TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report
MS Page 1
6: Solana Blvd/Kirkwood Blvd & SH-114 SIB Off -Ramp 2027 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Lane Group'
06
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
5 6 8
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
5.0 5.0 5.0
Minimum Split (s)
9.5 22.5 22.5
Total Split (s)
22.4 25.6 52.0
Total Split (%)
22% 26% 52%
Yellow Time (s)
3.5 3.5 3.5
All -Red Time (s)
1.0 1.0 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lag Lead
Lead -Lag Optimize?
Yes Yes
Recall Mode
None C-Max None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summer
TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report
MS Page 2
6: Solana Blvd/Kirkwood Blvd & SH-114 SIB Off -Ramp 2027 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Intersection Signal Delay: 27.1 Intersection LOS: C
Intersection Capacity Utilization 80.6 % ICU Level of Service D
Analysis Period (min)15
- Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases: 6: Solana Blvd/Kirkwood Blvd & SH-114 SB Off -Ramp
a6 6
1 91 �42 R
#6I
■ 14
18 s 1 130S
52 s
F
�OS
TAB
�A5 �R
25.6 s
22.4 s
52 s
8: SH-114 NB Off -Ramp & Kirkwood Blvd
2027 Background + Site
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: AM
-'*,-,*
r-
4-
T/,.
ti 1
-'
Lane Group - - - - - -
- - ML
EBT EBR WBL
WBT
WBR
NBL
NBT
NBR SBL SBT
SBR
Lane Configurations
V1
tt
tt
if
)
+Tf+
Traffic Volume (vph)
166
1059 0 0
479
106
741
158
647 0 0
0
Future Volume (vph)
166
1059 0 0
479
106
741
158
647 0 0
0
Peak Hour Factor
0.92
0.92 0.92 0.92
0.92
0.92
0.92
0.92
0.92 0.92 0.92
0.92
Adj. Flow (vph)
180
1151 0 0
521
115
805
172
703 0 0
0
Shared Lane Traffic (%)
27°%
Lane Group Flow (vph)
180
1151 0 0
521
115
588
1092
0 0 0
0
Turn Type
pm+pt
NA
NA
Perm
Perm
NA
Protected Phases
5
56
6
8
Permitted Phases
56
6
8
Detector Phase
5
56
6
6
8
8
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
5.0
Minimum Split (s)
9.5
22.5
22.5
22.5
22.5
Total Split (s)
22.4
25.6
25.6
52.0
52.0
Total Split (%)
22.4%
25.6°%
25.6 %
52.0%
52.0%
Yellow Time (s)
3.5
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
4.5
4.5
Lead/Lag
Lag
Lead
Lead
Lead -Lag Optimize?
Yes
Yes
Yes
Recall Mode
None
C-Max
C-Max
None
None
Act Effct Green (s)
41.3
45.8
23.4
23.4
45.2
45.2
Actuated g/C Ratio
0.41
0.46
0.23
0.23
0.45
0.45
v/c Ratio
0.41
0.71
0.63
0.25
0.81
1.01dr
-
Control Delay
30.0
27.9
39.1
7.9
33.4
27.2
Queue Delay
0.0
0.4
0.3
0.0
0.0
0.0
-
Total Delay
30.0
28.3
39.4
7.9
33.4
27.2
LOS
C
C
D
A
C
C
-
Approach Delay
28.5
33.7
29.4
Approach LOS
C
C
C
-
Queue Length 50th (ft)
79
277
163
0
329
293
Queue Length 95th (ft)
131
330
220
45
491
380
Internal Link Dist (ft)
327
247
1055
1095
Turn Bay Length (ft)
a
Base Capacity(vph)
437
1620
827
458
764
1455
Starvation Cap Reductn
0
122
0
0
0
0
Spillback Cap Reductn
0
0
45
0
0
0
Storage Cap Reductn
0
0
0
0
0
0
Reduced v/c Ratio
0.41
0.77
0.67
0.25
0.77
0.75
Intersection Summary
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 0 (0%), Referenced to phase 2:EBWB and 6:, Start of Green
Natural Cycle: 75
Control Type: Actuated -Coordinated
Maximum v/c Ratio: 0.99
TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report
MS Page 3 MS Page 4
8: SH-114 NB Off -Ramp & Kirkwood Blvd 2027 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All -Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead -Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
5.0 5.0 5.0
9.5 22.5 22.5
18.0 30.0 52.0
18% 30% 52%
3.5 3.5 3.5
1.0 1.0 1.0
Lead Lag
Yes Yes
None C-Max None
8: SH-114 NB Off -Ramp & Kirkwood Blvd 2027 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Intersection Signal Delay: 29.8 Intersection LOS: C
Intersection Capacity Utilization 80.6 % ICU Level of Service D
Analysis Period (min)15
dr Defacto Right Lane. Recode with 1 though lane as a right lane.
Splits and Phases: 8: SH-114 NB Off -Ramp & Kirkwood Blvd
#6 #6
#6
A
52 s
s .._.:�q6
=s
=a
22.45
52s
TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report
MS Page 5 MS Page 6
16: Dove Rd & SH-114 SIB Off -Ramp
2027 Background + Site
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: AM
Lane Group EBL
EST EBR
WBL
WBT
WBR NBL NBT NBR
SBL
Lane Configurations
tT+
+Tt
)
r{
Traffic Volume (vph) 0
528 911
125
598
0 0 0 0
224
156 77
Future Volume (vph) 0
528 911
125
598
0 0 0 0
224
156 77
Peak Hour Factor 0.83
0.83 0.83
0.83
0.83
0.83 0.83 0.83 0.83
0.83
0.83 0.83
Adj. Flow (vph) 0
636 1098
151
720
0 0 0 0
270
188 93
Shared Lane Traffic (°!°)
32%
Lane Group Flow (vph) 0
1734 0
0
871
0 0 0 0
184
367 0
Turn Type
NA
pm+pt
NA
Perm
NA
Protected Phases
2
1
21
4
Permitted Phases
21
4
Detector Phase
2
1
21
4
4
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
Minimum Split (s)
22.5
9.5
22.5
22.5
Total Split (s)
66.5
9.5
24.0
24.0
Total Split (%)
66.5%
9.5 %
24.0 %
24.0%
Yellow Time (s)
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
Lead/Lag
Lag
Lead
Lead
Lead -Lag Optimize?
Yes
Yes
Yes
Recall Mode
C-Max
None
None
None
Act Effct Green (s)
65.2
70.2
16.3
16.3
Actuated g/C Ratio
0.65
0.70
0.16
0.16
v/c Ratio
0.93dr
0.87dl
0.70
0.66
Control Delay
12.9
7.9
53.8
40.6
Queue Delay
0.0
0.0
0.0
0.0
Total Delay
12.9
7.9
53.8
40.6
LOS
B
A
D
D
Approach Delay
12.9
7.9
45.0
Approach LOS
B
A
D
Queue Length 50th (ft)
306
71
120
107
Queue Length 95th (ft)
351
72
179
139
Internal Link Dist (ft)
224
394
1722
1376
Turn Bay Length (ft)
240
Base Capacity (vph)
2219
1308
313
658
Starvation Cap Reductn
0
0
0
0
Spillback Cap Reductn
0
0
0
0
Storage Cap Reductn
0
0
0
0
Reduced v/c Ratio
0.78
0.67
0.59
0.56
Intersection Summary
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 0 (0%), Referenced to phase 2:EBWB
and 6:, Start of Green
Natural Cycle: 80
Control Type: Actuated -Coordinated
Maximum v/c Ratio: 0.78
TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report
MS Page 7
16: Dove Rd & SH-114 SB Off -Ramp 2027 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Lane Group
o6 08
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
5 6 8
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
5.0 5.0 5.0
Minimum Split (s)
9.5 22.5 22.5
Total Split (s)
9.5 50.7 39.8
Total Split (%)
10% 51% 40%
Yellow Time (s)
3.5 3.5 3.5
All -Red Time (s)
1.0 1.0 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lag Lead
Lead -Lag Optimize?
Yes Yes
Recall Mode
None C-Min Max
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summer
TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report
MS Page 8
16: Dove Rd & SH-114 SIB Off -Ramp 2027 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Intersection Signal Delay: 17.2 Intersection LOS: B
Intersection Capacity Utilization 84.2 % ICU Level of Service E
Analysis Period (min)15
dl Defacto Left Lane. Recode with 1 though lane as a left lane.
dr Defacto Right Lane. Recode with 1 though lane as a right lane.
Splits and Phases: 16: Dove Rd & SH-114 SB Off -Ramp
#116
■ i4
#16
1y32
#16
Y' 16i t
24 s
66.5 s
9.5 s.
=19 =19
F
43 `R1
r 19
45
39.8s 1 150.7.
9.Ss
19: SH-114 NB Frontage Rd & Dove Rd
2027 Background + Site
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: AM
-,*,-,*
r-
4-
T/,.
ti 1
-'
Lane Group-
EBL
EBT EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL SBT
SBR
Lane Configurations
+Tt
0
)
4T+
Traffic Volume (vph)
91
651 0
0
431
116
305
138
505
0 0
0
Future Volume (vph)
91
651 0
0
431
116
305
138
505
0 0
0
Peak Hour Factor
0.80
0.80 0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80 0.80
0.80
Adj. Flow (vph)
114
814 0
0
539
145
381
173
631
0 0
0
Shared Lane Traffic (%)
10°%
Lane Group Flow (vph)
0
928 0
0
684
0
343
842
0
0 0
0
Turn Type
pm+pt
NA
NA
Perm
NA
Protected Phases
5
65
6
8
Permitted Phases
65
8
Detector Phase
5
65
6
8
8
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
Minimum Split (s)
9.5
22.5
22.5
22.5
Total Split (s)
9.5
50.7
39.8
39.8
Total Split (%)
9.5 %
50.7°%
39.8%
39.8%
JIM
Yellow Time (s)
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
Lead/Lag
Lag
Lead
Lead
Lead -Lag Optimize?
Yes
Yes
Yes
-
Recall Mode
None
C-Min
Max
Max
Act Effct Green (s)
51.2
41.3
35.3
35.3
Actuated g/C Ratio
0.51
0.41
0.35
0.35
v/c Ratio
0.68
0.47
0.60
1.02dr
Control Delay
18.3
10.8
32.0
27.8
Queue Delay
0.1
0.0
0.0
0.0
-
Total Delay
18.4
10.8
32.0
27.8
LOS
B
B
C
C
-
Approach Delay
18.4
10.8
29.0
Approach LOS
B
B
C
-
Queue Length 50th (ft)
191
50
195
214
Queue Length 95th (ft)
177
73
256
240
Internal Link Dist (ft)
394
990
1769
1583
Turn Bay Length (ft)
Base Capacity (vph)
1411
1607
568
1149
Starvation Cap Reductn
30
0
0
0
Spillback Cap Reductn
0
0
0
0
Storage Cap Reductn
0
0
0
0
Reduced v/c Ratio
0.67
0.43
0.60
0.73
Intersection Summary
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 0 (0%), Referenced to phase 2:EBWB and 6:, Start
of Green
Natural Cycle: 80
Control Type: Actuated -Coordinated
Maximum v/c Ratio: 0.78
TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report
MS Page 9 MS Page 10
19: SH-114 NB Frontage Rd & Dove Rd 2027 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Lane Group
of o2 o4
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic
Lane Group Flow (vph)
Turn Type
Protected Phases
1 2 4
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
5.0 5.0 5.0
Minimum Split (s)
9.5 22.5 22.5
Total Split (s)
9.5 66.5 24.0
Total Split (%)
10% 67% 24 %
Yellow Time (s)
3.5 3.5 3.5
All -Red Time (s)
1.0 1.0 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lag Lead
Lead -Lag Optimize?
Yes Yes
Recall Mode
None C-Max None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
19: SH-114 NB Frontage Rd & Dove Rd 2027 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Intersection Signal Delay: 21.1 Intersection LOS: C
Intersection Capacity Utilization 66.8 % ICU Level of Service C
Analysis Period (min)15
dr Defacto Right Lane. Recode with 1 though lane as a right lane.
Splits and Phases: 19: SH-114 NB Frontage Rd & Dove Rd
#16 #16
1 A� �2
=1166
■ Al
24 s
9.5 s
=19 # 19
TA, '�06
==:
=19
4"
39.8 s
9.5 s
TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report
MS Page 11 MS Page 12
22: Dove Rd & Kirkwood Blvd
2027 Background + Site
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: AM
*_
t
ti
r
Lane Grout-
EBL
EST
WBT
WBR
SBL
SBR
Lane Configurations
►j
Tt
Tf+
Vi
?I
Traffic Volume (vph)
736
242
331
158
53
190
Future Volume (vph)
736
242
331
158
53
190
Peak Hour Factor
0.77
0.77
0.77
0.77
0.77
0.77
Adj. Flow (vph)
956
314
430
205
69
247
Shared Lane Traffic (%)
Lane Group Flow (vph)
956
314
635
0
69
247
Turn Type
pm+pt
NA
NA
Prot
Perm
Protected Phases
7
4
8
1
Permitted Phases
4
6
Detector Phase
7
4
8
1
6
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
5.0
Minimum Split (s)
9.5
22.5
22.5
9.5
9.5
Total Split (s)
59.0
86.0
27.0
14.0
14.0
Total Split (%)
59.0 %
86.0%
27.0 %
14.0 % 14.0%
Yellow Time (s)
3.5
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
4.5
4.5
Lead/Lag
Lead
Lag
Lead -Lag Optimize?
Yes
Yes
Recall Mode
None
C-Max
C-Max
None
None
Act Effct Green (s)
82.7
82.7
26.3
8.3
8.3
Actuated g/C Ratio
0.83
0.83
0.26
0.08
0.08
v/c Ratio
0.93
0.11
0.68
0.47
0,69
Control Delay
31.9
2.3
34.5
54.0
16.6
Queue Delay
0.0
0.0
0.0
0.0
0.0
Total Delay
31.9
2.3
34.5
54.0
16.6
LOS
C
A
C
D
B
Approach Delay
24.6
34.5
24.8
Approach LOS
C
C
C
Queue Length 50th (ft)
454
22
178
42
0
Queue Length 95th (ft)
483
21
196
73
39
Internal Link Dist (ft)
990
172
351
Turn Bay Length (ft)
100
Base Capacity (vph)
1063
2926
939
168
373
Starvation Cap Reductn
0
0
0
0
0
Spillback Cap Reductn
0
0
0
0
0
Storage Cap Reductn
0
0
0
0
0
Reduced v/c Ratio
0,90
0.11
0.68
0.41
0.66
Intersection Sunl
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 0 (0%), Referenced to
phase 4:EBTL
and 8:WBT,
Start of Green
Natural Cycle: 90
Control Type: Actuated -Coordinated
Maximum v/c Ratio: 0.93
22: Dove Rd & Kirkwood Blvd 2027 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Intersection Signal Delay: 27.4 Intersection LOS: C
Intersection Capacity Utilization 70.4 % ICU Level of Service C
Analysis Period (min)15
iplits and Phases: 22: Dove Rd & Kirkwood Blvd
\4.61 4
F
o6 07 os R)
14s 27s
TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report
MS Page 13 MS Page 14
19: SH-114 NB Frontage Rd & Dove Rd 2027 Background + Site(With Improvements)
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Lane Group
EBL
EST
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
S13T W
Lane Configurations
0
tt
?I
)
+T T+
Traffic Volume (vph)
91
651
0
0
431
116
305
138
505
0
0 0
Future Volume (vph)
91
651
0
0
431
116
305
138
505
0
0 0
Peak Hour Factor
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80 0.80
Adj. Flow (vph)
114
814
0
0
539
145
381
173
631
0
0 0
Shared Lane Traffic (%)
10%
Lane Group Flow (vph)
0
928
0
0
539
145
343
842
0
0
0 0
Turn Type
pm+pt
NA
NA
Perm
Perm
NA
Protected Phases
5
65
6
8
Permitted Phases
65
6
8
Detector Phase
5
65
6
6
8
8
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
5.0
Minimum Split (s)
9.5
22.5
22.5
22.5
22.5
Total Split (s)
9.5
51.3
51.3
39.2
39.2
Total Split (%)
9.5%
51.3 %
51.3%
39.2%
39.2%
Yellow Time (s)
3.5
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
4.5
Lead/Lag
Lag
Lag
Lead
Lead
Lead -Lag Optimize?
Yes
Yes
Yes
Yes
Recall Mode
None
C-Min
C-Min
Max
Max
Act Effct Green (s)
51.8
39.6
39.6
34.7
34.7
Actuated g/C Ratio
0.52
0.40
0.40
0.35
0.35
v/c Ratio
0.62
0.39
0.20
0.61
1.03dr
Control Delay
16.4
12.4
1.2
32.8
28.5
Queue Delay
0.1
0.0
0.0
0.0
0.0
Total Delay
16.5
12.4
1.2
32.8
28.5
LOS
B
B
A
C
C
Approach Delay
16.5
10.0
29.7
Approach LOS
B
B
C
Queue Length 50th (ft)
186
51
0
197
216
Queue Length 95th (ft)
174
63
5
258
241
Internal Link Dist (ft)
394
990
1769
1583
Turn Bay Length (ft)
200
Base Capacity (vph)
1555
1656
817
558
1133
Starvation Cap Reductn
56
0
0
0
0
Spillback Cap Reductn
0
0
0
0
0
Storage Cap Reductn
0
0
0
0
0
Reduced v/c Ratio
0.62
0.33
0.18
0.61
0.74
Intersection Summary
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 0 (0%), Referenced to phase 2:EBWB and 6:, Start of Green
Natural Cycle: 80
Control Type: Actuated -Coordinated
Maximum v/c Ratio: 0.78
TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report
MS Page 1
19: SH-114 NB Frontage Rd & Dove Rd 2027 Background + Site(With Improvements)
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Lane Group-
of o2 o4
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
1 2 4
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
5.0 5.0 5.0
Minimum Split (s)
9.5 22.5 22.5
Total Split (s)
9.5 66.5 24.0
Total Split (%)
10% 67% 24%
Yellow Time (s)
3.5 3.5 3.5
All -Red Time (s)
1.0 1.0 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lag Lead
Lead -Lag Optimize?
Yes Yes
Recall Mode
None C-Max None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summer
TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report
MS Page 2
19: SH-114 NB Frontage Rd & Dove Rd 2027 Background + Site(With Improvements)
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Intersection Signal Delay: 20.5 Intersection LOS: C
Intersection Capacity Utilization 63.1 % ICU Level of Service B
Analysis Period (min)15
dr Defacto Right Lane. Recode with 1 though lane as a right lane.
SDlits and Phases: 19: SH-114 NB Frontage Rd & Dove Rd
=16 #16
=16
1 14 :p2
Ir. I
24sWass
9.5s
=19 =19
=19
F
4.1
QB �p6 `R'-
39.2s 151.3s
9.5s
TIA for Wilks Tract Development in Southlake, Texas
MS
Synchro 9 Report
Page 3
2: Driveway 4/T W King Rd & Kirkwood Blvd 2027 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Intersection
Intersection Delay, s/veh
52.3
Intersection LOS
F
Movement
EBU
EBL
EBT
EBR
WBU
WBL
WBT
WBR
NBU
NBL
NBT
NBR
Traffic Vol, veh/h
0
37
935
184
0
0
118
14
0
25
2
0
Future Vol, veh/h
0
37
935
184
0
0
118
14
0
25
2
0
Peak Hour Factor
0.92
0.91
0.91
0.92
0.92
0.92
0.91
0.91
0.92
0.92
0.92
0.92
Heavy Vehicles, %
2
2
2
2
2
2
2
2
2
2
2
2
Mvmt Flow
0
41
1027
200
0
0
130
15
0
27
2
0
Number of Lanes
0
1
2
0
0
0
2
0
0
0
2
0
ADoroach -
Opposing Approach
WB
EB
SIB
Opposing Lanes
2
3
2
Conflicting Approach Left
SIB
NB
EB
Conflicting Lanes Left
2
2
3
Conflicting Approach Right
NB
SIB
WB
Conflicting Lanes Right
2
2
2
HCM Control Delay
65.6
14
13.7
HCM LOS
F
B
B
Lane NBLn1 NBLn2 EBLnl E13Ln2 EBLn3 WBLnl WBLn2 SBLnl SBLn2
Vol Left,%
97%
0%
100%
0%
0%
0%
0%
92%
0%
Vol Thru, %
3%
100%
0%
100%
63%
100%
74%
8%
0%
Vol Right, %
0%
0%
0%
0%
37%
0%
26%
0%
100%
Sign Control
Stop
Stop
Stop
Stop
Stop
Stop
Stop
Stop
Stop
Traffic Vol by Lane
26
1
37
623
496
79
53
155
396
LT Vol
25
0
37
0
0
0
0
143
0
Through Vol
1
1
0
623
312
79
39
12
0
RT Vol
0
0
0
0
184
0
14
0
396
Lane Flow Rate
28
1
41
685
542
86
59
170
435
Geometry Grp
8
8
8
8
8
8
8
8
8
Degree ofUtil(X)
0.079
0.004
0.089
1
1
0.219
0.146
0.398
0.879
Departure Headway (Hd)
10.154
9.669
7.86
7.351
7.087
9.133
8.949
8.425
7.268
Convergence, YIN
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Cap
352
369
453
493
510
392
400
429
500
Service Time
7.948
7.462
5.653
5.144
4.879
6.912
6.728
6.158
5.001
HCM Lane VIC Ratio
0.08
0.003
0.091
1.389
1.063
0.219
0.147
0.396
0.87
HCM Control Delay
13.8
12.5
11.4
68
66.7
14.5
13.3
16.6
43
HCM Lane LOS
B
B
B
F
F
B
B
C
E
HCM 95th-tile Q
0.3
0
0.3
13.5
13.7
0.8
0.5
1.9
9.6
TIA for Wilks Tract Development in Southlake, Texas
MS
2: Driveway 4/T W King Rd & Kirkwood Blvd 2027 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Intersection
Intersection Delay, s/veh
Intersection LOS
Movement
SBU
SBL
SBT
SBF
Traffic Vol, veh/h
0
143
12
396
Future Vol, veh/h
0
143
12
396
Peak Hour Factor
0.92
0.91
0.92
0.91
Heavy Vehicles, %
2
2
2
2
Mvmt Flow
0
157
13
435
Number of Lanes
0
0
1
1
Approach
S'
Opposing Approach
NB
Opposing Lanes
2
Conflicting Approach Left
WB
Conflicting Lanes Left
2
Conflicting Approach Right
EB
Conflicting Lanes Right
3
HCM Control Delay
35.6
HCM LOS
E
Synchro 9 Report TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report
Page 1 MS Page 2
12: Kirkwood Blvd & Driveway 3 2027 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Intersection
Int Delay, s/veh 1
14: Kirkwood Blvd & Driveway 1 2027 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Intersection
Int Delay, s/veh 2
Movement -1
EBL
EBR
NBL
NBT
SBT
SBR
Movement
EBL
EB
Traffic Vol, veh/h
22
17
61
364
389
184
Traffic Vol, veh/h
29
25
184
617
63
184
Future Vol, veh/h
22
17
61
364
389
184
Future Vol, veh/h
29
25
184
617
63
184
Conflicting Peds, #Ihr
0
0
0
0
0
0
Conflicting Peds, #Ihr
0
0
0
0
0
0
Sign Control
Stop
Stop
Free
Free
Free
Free
Sign Control
Stop
Stop
Free
Free
Free
Free
RT Channelized
-
None
-
None
None
RT Channelized
-
None
-
None
None
Storage Length
0
100
150
-
150
Storage Length
0
100
150
-
-
150
Veh in Median Storage, #
0
-
-
0
0
-
Veh in Median Storage, #
0
-
-
0
0
-
Grade, %
0
-
-
0
0
-
Grade, %
0
-
-
0
0
-
Peak Hour Factor
92
92
92
92
92
92
Peak Hour Factor
92
92
92
92
92
92
Heavy Vehicles,%
2
2
2
2
2
2
Heavy Vehicles,%
2
2
2
2
2
2
Mvmt Flow
24
18
66
396
423
200
Mvmt Flow
32
27
200
671
68
200
Major/Minor
Minor2
Majorl
Major2
Major/Minor
Minot
Majorl
Major2
Conflicting Flow All
753
211
423
0
0
Conflicting Flow All
803
34
68
0
0
Stage 1
423
-
-
-
Stage 1
68
-
-
-
-
Stage 2
330
-
-
Stage 2
735
-
-
Critical Hdwy
6.84
6.94
4.14
Critical Hdwy
6.84
6.94
4.14
Critical Hdwy Stg 1
5.84
-
-
Critical Hdwy Stg 1
5.84
-
-
Critical Hdwy Stg 2
5.84
-
-
Critical Hdwy Stg 2
5.84
-
-
Follow-up Hdwy
3.52
3.32
2.22
Follow-up Hdwy
3.52
3.32
2.22
Pot Cap-1 Maneuver
346
794
1133
Pot Cap-1 Maneuver
321
1032
1531
Stage 1
629
-
-
Stage 1
947
-
-
Stage 2
701
-
-
Stage 2
435
-
-
Platoon blocked, %
Platoon blocked, %
Mov Cap-1 Maneuver
326
794
1133
Mov Cap-1 Maneuver
279
1032
1531
Mov Cap-2 Maneuver
326
-
-
Mov Cap-2 Maneuver
279
-
-
Stage 1
629
Stage 1
947
Stage 2
660
Stage 2
378
Approach
EB
NB
SB
Approach
EB
NB
SB
HCM Control Delay, s
13.7
1.2
0
HCM Control Delay, s
14.5
1.8
0
HCM LOS
B
HCM LOS
B
Minor Lane/MajorMvmt
NBL
NBTEBLn1EBLn2 SBT SBR
Capacity (veh/h)
1133
326 794
HCM Lane V/C Ratio
0.059
0.073 0.023
HCM Control Delay (s)
8.4
16.9 9.6
HCM Lane LOS
A
C A
HCM 95th %tile Q(veh)
0.2
0.2 0.1
TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report
MS Page 1
Minor Lane/MajorMvmt
NBL
NBT EBLn I EBLn2 SBT SBR
Capacity (veh/h)
1531
279 1032
HCM Lane V/C Ratio
0.131
0.113 0.026
HCM Control Delay (s)
7.7
19.5 8.6
HCM Lane LOS
A
C A
HCM 95th %tile Q(veh)
0.5
0.4 0.1
TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report
MS Page 2
30: Kirkwood Blvd & Driveway 2 2027 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Intersection
Int Delay, s/veh 2.7
37: Driveway 5 & Kirkwood Blvd 2027 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Intersection
Int Delay, s/veh 0.8
Movement -1
EBL
EBR
NBL
NBT
SBT
SBR
Movement
EBT
EBR
WBL WBT
NBL
Traffic Vol, veh/h
25
25
246
400
222
184
Traffic Vol, veh/h
1633
35
2
537
25
2
Future Vol, veh/h
25
25
246
400
222
184
Future Vol, veh/h
1633
35
2
537
25
2
Conflicting Peds, #Ihr
0
0
0
0
0
0
Conflicting Peds, #Ihr
0
0
0
0
0
0
Sign Control
Stop
Stop
Free
Free
Free
Free
Sign Control
Free
Free
Free
Free
Stop
Stop
RT Channelized
-
None
-
None
None
RT Channelized
None
None
-
None
Storage Length
0
100
150
-
-
150
Storage Length
-
0
Veh in Median Storage, #
0
-
-
0
0
-
Veh in Median Storage, #
0
0
0
Grade, %
0
-
-
0
0
-
Grade, %
0
0
0
-
Peak Hour Factor
92
92
92
92
92
92
Peak Hour Factor
92
92
92
92
92
92
Heavy Vehicles,%
2
2
2
2
2
2
Heavy Vehicles,%
2
2
2
2
2
2
Mvmt Flow
27
27
267
435
241
200
Mvmt Flow
1775
38
2
584
27
2
Major/Minor
Minor2
Majorl
Major2
Major/Minor
Majorl
Major2
Minorl
Conflicting Flow All
993
121
241
0
0
Conflicting Flow All
0
0
1813
0
2032
907
Stage 1
241
-
-
-
-
Stage 1
-
-
-
-
1794
-
Stage 2
752
-
-
Stage 2
-
238
-
Critical Hdwy
6.84
6.94
4.14
Critical Hdwy
5.34
5.74
7.14
Critical Hdwy Stg 1
5.84
-
-
Critical Hdwy Stg 1
6.64
Critical Hdwy Stg 2
5.84
-
-
Critical Hdwy Stg 2
-
6.04
-
Follow-up Hdwy
3.52
3.32
2.22
Follow-up Hdwy
3.12
3.82
3.92
Pot Cap-1 Maneuver
242
908
1323
Pot Cap-1 Maneuver
155
90
239
Stage 1
776
-
-
Stage 1
-
77
-
Stage 2
426
-
-
Stage 2
-
715
-
Platoon blocked, %
Platoon blocked, %
Mov Cap-1 Maneuver
193
908
1323
Mov Cap-1 Maneuver
155
88
239
Mov Cap-2 Maneuver
193
-
-
Mov Cap-2 Maneuver
-
88
-
Stage 1
776
Stage 1
77
Stage 2
340
Stage 2
701
Approach
tEl
NB
SB
Approach
EB
WB
INS
HCM Control Delay, s
17.9
3.2
0
HCM Control Delay, s
0
0.3
61.5
HCM LOS
C
HCM LOS
F
Minor Lane/Major Mvmt
NBL
NBT EBLnl EBLn2
SBT
SBR
Minor Lane/Major Mvmt
NBLnt
EBT
EBR WBL
WBT
Capacity (veh/h)
1323
193
908
Capacity (veh/h)
92
155
HCM Lane V/C Ratio
0.202
0.141
0.03
HCM Lane V/C Ratio
0.319
0.014
HCM Control Delay (s)
8.4
26.7
9.1
HCM Control Delay (s)
61.5
28.6
0.2
HCM Lane LOS
A
D
A
HCM Lane LOS
F
D
A
HCM 95th %tile Q(veh)
0.8
0.5
0.1
HCM 95th %tile Q(veh)
1.2
0
-
TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report
MS Page 3
TIA for Wilks Tract Development in Southlake, Texas Synchro 9 Report
MS Page 4
40: Driveway 6 & Kirkwood Blvd
2027 Background + Site
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: AM
Intersection
Int Delay, s/veh 0.9
Movement
EBT EBR
WBL
WBT
It NBL
NBR
Traffic Vol, veh/h
1667 39
2
560
28
1
Future Vol, veh/h
1667 39
2
560
28
1
Conflicting Peds, #Ihr
0 0
0
0
0
0
Sign Control
Free Free
Free
Free
Stop
Stop
RT Channelized
None
-
None
-
None
Storage Length
100
-
0
Veh in Median Storage, #
0
-
0
0
Grade, %
0
-
0
0
-
Peak Hour Factor
92 92
92
92
92
92
Heavy Vehicles, %
2 2
2
2
2
2
Mvmt Flow
1812 42
2
609
30
1
Major/Minor
Majorl
Major2
Minorl
Conflicting Flow All
0 0
1854
0
2081
927
Stage 1
- -
-
-
1833
-
Stage 2
-
248
-
Critical Hdwy
5.34
5.74
7.14
Critical Hdwy Stg 1
6.64
-
Critical Hdwy Stg 2
-
6.04
-
Follow-up Hdwy
3.12
3.82
3.92
Pot Cap-1 Maneuver
148
85
232
Stage 1
-
73
-
Stage 2
-
707
-
Platoon blocked,
Mov Cap-1 Maneuver
148
84
232
Mov Cap-2 Maneuver
-
84
Stage 1
73
Stage 2
697
Approach
EB
WB
HCM Control Delay, s
0
0.1
69.3
HCM LOS
F
Minor Lane/Major Mvmt
NBLnl EBT EBR WBL
WBT
Capacity (veh/h)
86 148
HCM Lane V/C Ratio
0.367 0.015
HCM Control Delay (s)
69.3 29.7
HCM Lane LOS
F D
HCM 95th %tile Q(veh)
1.4 0
TIA for Wilks Tract Development in Southlake, Texas
Synchro 9 Report
MS
Page 5
2: Driveway 4/T W King Rd & Kirkwood Blvd 2027 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Intersection
Intersection Delay, s/veh
53.2
Intersection LOS
F
Movement
EBU
EBL
EBT
EBR
WBU
WBL
WBT
WBR
NBU
NBL
NBT
NBR
Traffic Vol, veh/h
0
76
119
34
0
0
1311
201
0
166
11
0
Future Vol, veh/h
0
76
119
34
0
0
1311
201
0
166
11
0
Peak Hour Factor
0.92
0.89
0.89
0.92
0.92
0.92
0.89
0.89
0.92
0.92
0.92
0.92
Heavy Vehicles, %
2
2
2
2
2
2
2
2
2
2
2
2
Mvmt Flow
0
85
134
37
0
0
1473
226
0
180
12
0
Number of Lanes
0
1
2
0
0
0
2
0
0
0
2
0
Approach -
M-
NO
Opposing Approach
WB
EB
SIB
Opposing Lanes
2
3
2
Conflicting Approach Left
SIB
NB
EB
Conflicting Lanes Left
2
2
3
Conflicting Approach Right
NB
SB
WB
Conflicting Lanes Right
2
2
2
HCM Control Delay
13.9
67.3
20.3
HCM LOS
B
F
C
Lane NBLn1 NBLn2 EBLnl E13Ln2 EBLn3 WBLnl WBLn2 SBLnl SBLn2
Vol Left,%
98%
0%
100%
0%
0%
0%
0%
92%
0%
Vol Thru, %
2%
100%
0%
100%
54%
100%
68%
8%
0%
Vol Right, %
0%
0%
0%
0%
46%
0%
32%
0%
100%
Sign Control
Stop
Stop
Stop
Stop
Stop
Stop
Stop
Stop
Stop
Traffic Vol by Lane
170
7
76
79
74
874
638
24
161
LT Vol
166
0
76
0
0
0
0
22
0
Through Vol
4
7
0
79
40
874
437
2
0
RT Vol
0
0
0
0
34
0
201
0
161
Lane Flow Rate
184
8
85
89
82
982
717
27
181
Geometry Grp
8
8
8
8
8
8
8
8
8
Degree of Util (X)
0.483
0.02
0.219
0.216
0.19
1
1
0.071
0.416
Departure Headway (Hd)
9.427
8.939
9.22
8.72
8.397
7.324
7.099
9.443
8.288
Convergence, YIN
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Cap
382
401
389
412
427
501
509
379
434
Service Time
7.178
6.69
6.974
6.474
6,151
5.102
4.877
7.197
6.042
HCM Lane VIC Ratio
0.482
0.02
0.219
0.216
0.192
1.96
1.409
0.071
0.417
HCM Control Delay
20.7
11.9
14.6
13.9
13.1
67.8
66.7
12.9
16.9
HCM Lane LOS
C
B
B
B
B
F
F
B
C
HCM 95th-tile Q
2.5
0.1
0.8
0.8
0.7
13.5
13.7
0.2
2
2: Driveway 4/T W King Rd & Kirkwood Blvd 2027 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Intersection
Intersection Delay, s/veh
Intersection LOS
Movement
SBU
SBL
SBT
Traffic Vol, veh/h
0
22
2
161
Future Vol, veh/h
0
22
2
161
Peak Hour Factor
0.92
0.89
0.92
0.89
Heavy Vehicles, %
2
2
2
2
Mvmt Flow
0
25
2
181
Number of Lanes
0
0
1
1
Approach
SIB
Opposing Approach
NB
Opposing Lanes
2
Conflicting Approach Left
WB
Conflicting Lanes Left
2
Conflicting Approach Right
EB
Conflicting Lanes Right
3
HCM Control Delay
16.4
HCM LOS
C
2/8/2016 Synchro 9 Report 2/8/2016 Synchro 9 Report
MS Page 1 MS Page 2
6: Solana Blvd/Kirkwood Blvd & SH-114 SB Off -Ramp 2027 Background + Site
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: PM
Lane Groul- EBL
EST
EBR
WBL
WBT
WBR NBL NBT NBR
SBL
Lane Configurations
tt
?I
)
tt
)
r{
Traffic Volume (vph) 0
327
782
617
523
0 0 0 0
292
3 60
Future Volume (vph) 0
327
782
617
523
0 0 0 0
292
3 60
Peak Hour Factor 0.87
0.87
0.87
0.87
0.87
0.87 0.87 0.87 0.87
0.87
0.87 0.87
Adj. Flow (vph) 0
376
899
709
601
0 0 0 0
336
3 69
Shared Lane Traffic (%)
50%
Lane Group Flow (vph) 0
376
899
709
601
0 0 0 0
168
240 0
Turn Type
NA
Perm
pm+pt
NA
Perm
NA
Protected Phases
2
1
12
4
Permitted Phases
2
12
4
Detector Phase
2
2
1
12
4
4
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
5.0
Minimum Split (s)
22.5
22.5
9.5
22.5
22.5
Total Split (s)
32.9
32.9
27.1
40.0
40.0
Total Split (%)
32.9%
32.9 %
27.1 %
40.0 %
40.0 %
Yellow Time (s)
3.5
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
4.5
4.5
Lead/Lag
Lag
Lag
Lead
Lead -Lag Optimize?
Yes
Yes
Yes
Recall Mode
C-Max
C-Max
None
Max
Max
Act Effct Green (s)
28.4
28.4
51.0
55.5
35.5
35.5
Actuated g/C Ratio
0.28
0.28
0.51
0.56
0.36
0.36
v/c Ratio
0.37
0.94
1.11
0.31
0.29
0.21
Control Delay
30.0
27.5
99.5
13.3
25.0
17.1
Queue Delay
0.0
0.0
0.0
0.0
0.1
0.0
Total Delay
30.0
27.5
99.5
13.3
25.1
17.1
LOS
C
C
F
B
C
B
Approach Delay
28.2
59.9
20.4
Approach LOS
C
E
C
Queue Length 50th (ft)
101
141
-377
92
83
42
Queue Length 95th (ft)
137
#406
m#559
m138
137
68
Internal Link Dist (ft)
1216
327
1036
836
Turn Bay Length (ft)
350
Base Capacity (vph)
1005
952
637
1964
571
1151
Starvation Cap Reductn
0
0
0
0
0
0
Spillback Cap Reductn
0
0
0
0
50
99
Storage Cap Reductn
0
0
0
0
0
0
Reduced v/c Ratio
0.37
0.94
1.11
0.31
0.32
0.23
Intersection Summary
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 0 (0%), Referenced to phase 2:EBWB
and
6:, Start of Green
Natural Cycle: 100
Control Type: Actuated -Coordinated
Maximum v/c Ratio: 1.11
2/8/2016 Synchro 9 Report
MS Page 1
6: Solana Blvd/Kirkwood Blvd & SH-114 SIB Off -Ramp 2027 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Lane Group'
06
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
5 6 8
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
5.0 5.0 5.0
Minimum Split (s)
10.0 22.5 22.5
Total Split (s)
26.0 34.0 40.0
Total Split (%)
26% 34% 40%
Yellow Time (s)
3.5 3.5 3.5
All -Red Time (s)
1.0 1.0 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead Lag
Lead -Lag Optimize?
Yes Yes
Recall Mode
Max C-Max Max
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
2/8/2016 Synchro 9 Report
MS Page 2
6: Solana Blvd/Kirkwood Blvd & SH-114 SIB Off -Ramp 2027 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Intersection Signal Delay: 41.0 Intersection LOS: D
Intersection Capacity Utilization 100.9% ICU Level of Service G
Analysis Period (min)15
- Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases: 6: Solana Blvd/Kirkwood Blvd & SH-114 SB Off -Ramp
6
791Z
$6
=6I
■ 14
32.9 s 1 140S
}
F
6 Ro6 `R)
193
26 s
34 s
40 s
8: SH-114 NB Off -Ramp & Kirkwood Blvd
2027 Background + Site
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: PM
-'*,-,*
r-
4-
T/,.
ti 1
-'
Lane Group -
EBL
EBT EBR WBL
WBT
WBR
NBL
NBT
NBR
SBL SBT
SBR
Lane Configurations
V1
tt
tt
?I
Vi
+Tf+
Traffic Volume (vph)
464
225 0 0
827
876
374
1135
79
0 0
0
Future Volume (vph)
464
225 0 0
827
876
374
1135
79
0 0
0
Peak Hour Factor
0.95
0.95 0.95 0.95
0.95
0.95
0.95
0.95
0.95
0.95 0.95
0.95
Adj. Flow (vph)
488
237 0 0
871
922
394
1195
83
0 0
0
Shared Lane Traffic (%)
10°%
Lane Group Flow (vph)
488
237 0 0
871
922
355
1317
0
0 0
0
Turn Type
pm+pt
NA
NA
Free
Perm
NA
Protected Phases
5
56
6
8
Permitted Phases
56
Free
8
Detector Phase
5
56
6
8
8
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
Minimum Split (s)
10.0
22.5
22.5
22.5
Total Split (s)
26.0
34.0
40.0
40.0
Total Split (%)
26.0%
34.0 %
40.0%
40.0%
Js
Yellow Time (s)
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
4.5
Lead/Lag
Lead
Lag
Lead -Lag Optimize?
Yes
Yes
-
Recall Mode
Max
C-Max
Max
Max
Act Effct Green (s)
51.0
55.5
29.5
100.0
35.5
35.5
Actuated g/C Ratio
0.51
0.56
0.30
1.00
0.36
0.36
v/c Ratio
1.07
0.12
0.83
0.58
0.62
1.10
-
Control Delay
104.5
12.7
41.4
1.6
32.5
90.4
Queue Delay
0.0
0.0
0.0
0.0
3.1
1.2
-
Total Delay
104.5
12.7
41.4
1.6
35.5
91.5
LOS
F
B
D
A
D
F
-
Approach Delay
74.5
20.9
79.7
Approach LOS
E
C
E
-
Queue Length 50th (ft)
-311
39
272
0
203
-526
Queue Length 95th (ft)
#513
60
#351
0
312
#670
Internal Link Dist (ft)
327
240
1055
1095
Turn Bay Length (ft)
a
Base Capacity(vph)
455
1964
1044
1583
571
1195
Starvation Cap Reductn
0
0
0
0
0
0
Spillback Cap Reductn
0
0
0
0
127
267
Storage Cap Reductn
0
0
0
0
0
0
Reduced v/c Ratio
1.07
0.12
0.83
0.58
0.80
1.42
Intersection Sum`
Cycle Length: 100
Actuated Cycle Length: 100
IIII-
Offset: 0 (0%), Referenced to phase 2:EBWB and 6:, Start of Green
Natural Cycle: 100
Control Type: Actuated -Coordinated
Maximum v/c Ratio:1.11
2/8/2016 Synchro 9 Report 2/8/2016 Synchro 9 Report
MS Page 3 MS Page 4
8: SH-114 NB Off -Ramp & Kirkwood Blvd 2027 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All -Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead -Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
5.0 5.0 5.0
9.5 22.5 22.5
27.1 32.9 40.0
27% 33% 40%
3.5 3.5 3.5
1.0 1.0 1.0
Lead Lag
Yes Yes
None C-Max Max
8: SH-114 NB Off -Ramp & Kirkwood Blvd 2027 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Intersection Signal Delay: 53.6 Intersection LOS: D
Intersection Capacity Utilization 100.9 % ICU Level of Service G
Analysis Period (min)15
- Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases: 8: SH-114 NB Off -Ramp & Kirkwood Blvd
#6 =5
02
=6
1
32.9 s
to s
us =s
,q5 �6 `Rl
71 F
=s
T
I o8
34 s
4o s
2/8/2016 Synchro 9 Report 2/8/2016
MS Page 5 MS
Synchro 9 Report
Page 6
16: Dove Rd & SH-114 SIB Off -Ramp
2027 Background + Site
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: PM
Lane Group EBL
EST EBR
WBL
WBT
WBR NBL NBT NBR
SBL
S
Lane Configurations
tT+
Traffic Volume (vph) 0
220 352
537
1511
0 0 0 0
129
172 157
Future Volume (vph) 0
220 352
537
1511
0 0 0 0
129
172 157
Peak Hour Factor 0.99
0.99 0.99
0.99
0.99
0.99 0.99 0.99 0.99
0.99
0.99 0.96
Adj. Flow (vph) 0
222 356
542
1526
0 0 0 0
130
174 164
Shared Lane Traffic (°!°)
10%
Lane Group Flow (vph) 0
578 0
0
2068
0 0 0 0
117
351 0
Turn Type
NA
pm+pt
NA
Perm
NA
Protected Phases
2
1
12
4
Permitted Phases
12
4
Detector Phase
2
1
12
4
4
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
Minimum Split (s)
22.5
9.5
22.5
22.5
Total Split (s)
39.0
68.0
23.0
23.0
Total Split (%)
30.0%
52.3 %
17.7 %
17.7%
Yellow Time (s)
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
Lead/Lag
Lag
Lead
Lead
Lead -Lag Optimize?
Yes
Yes
Yes
Recall Mode
C-Max
None
None
None
Act Effct Green (s)
37.5
101.0
15.5
15.5
Actuated g/C Ratio
0.29
0.78
0.12
0.12
v/c Ratio
0.51
0.90
0.61
0.76
Control Delay
19.5
7.9
67.6
51.1
Queue Delay
0.0
4.8
0.0
0.0
Total Delay
19.5
12.7
67.6
51.1
LOS
B
B
E
D
Approach Delay
19.5
12.7
55.2
Approach LOS
B
B
E
Queue Length 50th (ft)
97
205
104
115
Queue Length 95th (ft)
160
m140
173
170
Internal Link Dist (ft)
224
394
1722
1376
Turn Bay Length (ft)
240
Base Capacity (vph)
1143
2294
229
530
Starvation Cap Reductn
0
181
0
0
Spillback Cap Reductn
0
0
0
0
Storage Cap Reductn
0
0
0
0
Reduced v/c Ratio
0.51
0.98
0.51
0.66
Intersection Summary
Cycle Length: 130
Actuated Cycle Length: 130
Offset: 0 (0%), Referenced to phase 2:EBWB
and 6:, Start of Green
Natural Cycle:140
Control Type: Actuated -Coordinated
Maximum v/c Ratio:1.04
2/8/2016 Synchro 9 Report
MS Page 7
16: Dove Rd & SH-114 SB Off -Ramp 2027 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Lane Group
o6 08
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
5 6 8
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
5.0 5.0 5.0
Minimum Split (s)
9.5 22.5 22.5
Total Split (s)
9.8 48.2 72.0
Total Split (%)
8% 37% 55%
Yellow Time (s)
3.5 3.5 3.5
All -Red Time (s)
1.0 1.0 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lag Lead
Lead -Lag Optimize?
Yes Yes
Recall Mode
None C-Min Max
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
2/8/2016 Synchro 9 Report
MS Page 8
16: Dove Rd & SH-114 SIB Off -Ramp 2027 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Intersection Signal Delay: 20.4 Intersection LOS: C
Intersection Capacity Utilization 95.1 % ICU Level of Service F
Analysis Period (min)15
m Volume for 95th percentile queue is metered by upstream signal.
iplits and Phases: 16: Dove Rd & SH-114 SB Off -Ramp
=16 1#16 #16
-19
4
19: SH-114 NB Frontage Rd & Dove Rd
2027 Background + Site
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: PM
-,*,-,*
r-
4-
T/,.
ti 1
-'
Lane Group-
EBL
EBT EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL SBT
SBR
Lane Configurations
+Tt
0
►j
q +
Traffic Volume (vph)
71
281 0
0
974
231
1052
1357
168
0 0
0
Future Volume (vph)
71
281 0
0
974
231
1052
1357
168
0 0
0
Peak Hour Factor
0.99
0.99 0.99
0.99
0.99
0.99
0.99
0.99
0.99
0.99 0.99
0.99
Adj. Flow (vph)
72
284 0
0
984
233
1063
1371
170
0 0
0
Shared Lane Traffic (%)
20°%
Lane Group Flow (vph)
0
356 0
0
1217
0
850
1754
0
0 0
0
Turn Type
pm+pt
NA
NA
Perm
NA
Protected Phases
5
56
6
8
Permitted Phases
56
8
Detector Phase
5
56
6
8
8
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
Minimum Split (s)
9.5
22.5
22.5
22.5
Total Split (s)
9.8
48.2
72.0
72.0
Total Split (%)
7.5 %
37.1 %
55.4%
55.4%
JIM
Yellow Time (s)
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
Lead/Lag
Lag
Lead
Lead
Lead -Lag Optimize?
Yes
Yes
Yes
-
Recall Mode
None
C-Min
Max
Max
Act Effct Green (s)
49.0
43.7
67.5
67.5
Actuated g/C Ratio
0.38
0.34
0.52
0.52
v/c Ratio
0.48
1.04
1.02
1.01
-
Control Delay
49.7
72.0
67.2
56.4
Queue Delay
0.0
20.3
0.0
0.0
-
Total Delay
49.7
92.3
67.2
56.4
LOS
D
F
E
E
-
Approach Delay
49.7
92.3
59.9
Approach LOS
D
F
E
Queue Length 50th (ft)
147
-579
-830
-823
Queue Length 95th (ft)
201
#705
#1104
#1000
Internal Link Dist (ft)
394
990
1769
1583
Turn Bay Length (ft)
a
Base Capacity (vph)
745
1171
835
1729
Starvation Cap Reductn
0
0
0
0
Spillback Cap Reductn
0
56
0
0
Storage Cap Reductn
0
0
0
0
Reduced v/c Ratio
0.48
1.09
1.02
1.01
Intersection Summary
Cycle Length: 130
Actuated Cycle Length: 130
Offset: 0 (0%), Referenced to phase 2:EBWB and 6:, Start
of Green
Natural Cycle:140
Control Type: Actuated -Coordinated
Maximum v/c Ratio:1.04
2/8/2016 Synchro 9 Report 2/8/2016 Synchro 9 Report
MS Page 9 MS Page 10
19: SH-114 NB Frontage Rd & Dove Rd 2027 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Lane Group
of o2 o4
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic
Lane Group Flow (vph)
Turn Type
Protected Phases
1 2 4
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
5.0 5.0 5.0
Minimum Split (s)
9.5 22.5 22.5
Total Split (s)
68.0 39.0 23.0
Total Split (%)
52 % 30% 18%
Yellow Time (s)
3.5 3.5 3.5
All -Red Time (s)
1.0 1.0 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lag Lead
Lead -Lag Optimize?
Yes Yes
Recall Mode
None C-Max None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
2/8/2016 Synchro 9 Report
MS Page 11
19: SH-114 NB Frontage Rd & Dove Rd 2027 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Intersection Signal Delay: 68.5 Intersection LOS: E
Intersection Capacity Utilization 104.3 % ICU Level of Service G
Analysis Period (min)15
- Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
2/8/2016
MS
Synchro 9 Report
Page 12
22: Dove Rd & Kirkwood Blvd
2027 Background + Site
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: PM
*_
t
ti
r
Lane Grout-
EBL
EST
WBT
WBR
SBL
SBR
Lane Configurations
►j
Tt
Tf+
Vi
?I
Traffic Volume (vph)
219
220
316
278
179
757
Future Volume (vph)
219
220
316
278
179
757
Peak Hour Factor
0.90
0.90
0.90
0.90
0.90
0.90
Adj. Flow (vph)
243
244
351
309
199
841
Shared Lane Traffic (%)
Lane Group Flow (vph)
243
244
660
0
199
841
Turn Type
pm+pt
NA
NA
Prot
Perm
Protected Phases
7
4
8
1
Permitted Phases
4
6
Detector Phase
7
4
8
1
6
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
5.0
Minimum Split (s)
9.5
22.5
22.5
9.5
22.5
Total Split (s)
27.0
62.0
35.0
68.0
68.0
Total Split(%)
20.8%
47.7%
26.9%
52.3% 52.3%
Yellow Time (s)
3.5
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
4.5
4.5
Lead/Lag
Lead
Lag
Lead -Lag Optimize?
Yes
Yes
Recall Mode
None
C-Max
C-Max
None
Max
Act Effct Green (s)
57.5
57.5
35.7
63.5
63.5
Actuated g/C Ratio
0.44
0.44
0.27
0.49
0.49
v/c Ratio
0.72
0.16
0.65
0.23
0.80
Control Delay
50.3
31.4
35.2
20.1
15.4
Queue Delay
0.0
0.0
0.0
0.0
0.0
Total Delay
50.3
31.4
35.2
20.1
15.4
LOS
D
C
D
C
B
Approach Delay
40.8
35.2
16.3
Approach LOS
D
D
B
Queue Length 50th (ft)
155
67
196
94
211
Queue Length 95th (ft)
m205
m92
281
145
419
Internal Link Dist (ft)
990
172
351
Turn Bay Length (ft)
100
Base Capacity (vph)
394
1565
1019
864
1055
Starvation Cap Reductn
0
0
0
0
0
Spillback Cap Reductn
0
0
0
0
0
Storage Cap Reductn
0
0
0
0
0
Reduced v/c Ratio
0.62
0.16
0.65
0.23
0.80
Intersection Summary
Cycle Length: 130
Actuated Cycle Length:130
Offset: 0 (0%), Referenced to
phase 4:EBTL
and 8:WBT,
Start of Green
Natural Cycle: 70
Control Type: Actuated -Coordinated
Maximum v/c Ratio: 0.80
22: Dove Rd & Kirkwood Blvd 2027 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Intersection Signal Delay: 27.5 Intersection LOS: C
Intersection Capacity Utilization 72.0 % ICU Level of Service C
Analysis Period (min)15
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases: 22: Dove Rd & Kirkwood Blvd
41
--b44
68 s 1 162S
06
P7
2/8/2016 Synchro 9 Report 2/8/2016 Synchro 9 Report
MS Page 13 MS Page 14
19: SH-114 NB Frontage Rd & Dove Rd
2027 Background + Site
TIA for Wilks Heritage in Southlake, Texas
Timing Plan: PM
LaneGrouL
EST EBR
WBL
WBT
WBR
NBL
NBT
NBR SBL SW --'fflffl
Lane Configurations
tt
?I
Vi
+T +
Traffic Volume (vph)
71
281 0
0
974
231
1052
1357
168 0 0 0
Future Volume (vph)
71
281 0
0
974
231
1052
1357
168 0 0 0
Peak Hour Factor
0.99
0.99 0.99
0.99
0.99
0.99
0.99
0.99
0.99 0.99 0.99 0.99
Adj. Flow (vph)
72
284 0
0
984
233
1063
1371
170 0 0 0
Shared Lane Traffic (%)
20%
Lane Group Flow (vph)
0
356 0
0
984
233
850
1754
0 0 0 0
Turn Type
pm+pt
NA
NA
Perm
Perm
NA
Protected Phases
5
56
6
8
Permitted Phases
56
6
8
Detector Phase
5
56
6
6
8
8
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
5.0
Minimum Split (s)
9.5
22.5
22.5
22.5
22.5
Total Split (s)
9.6
39.0
39.0
71.4
71.4
Total Split (%)
8.0%
32.5 %
32.5%
59.5%
59.5%
Yellow Time (s)
3.5
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
4.5
Lead/Lag
Lag
Lag
Lead
Lead
Lead -Lag Optimize?
Yes
Yes
Yes
Yes
Recall Mode
None
Min
Min
C-Max
C-Max
Act Effct Green (s)
39.6
34.5
34.5
66.9
66.9
Actuated g/C Ratio
0.33
0.29
0.29
0.56
0.56
v/c Ratio
0.53
0.97
0.42
0.95
0.95
Control Delay
50.4
58.2
15.9
45.7
36.6
Queue Delay
0.0
1.5
0.0
0.0
0.0
Total Delay
50.4
59.6
15.9
45.7
36.6
LOS
D
E
B
D
D
Approach Delay
50.4
51.3
39.6
Approach LOS
D
D
D
Queue Length 50th (ft)
137
407
44
647
663
Queue Length 95th (ft)
190
#538
m85
#980
#874
Internal Link Dist (ft)
394
990
1769
1584
Turn Bay Length (ft)
200
Base Capacity (vph)
673
1017
552
897
1856
Starvation Cap Reductn
0
0
0
0
0
Spillback Cap Reductn
0
10
0
0
0
Storage Cap Reductn
0
0
0
0
0
Reduced v/c Ratio
0.53
0.98
0.42
0.95
0.95
Intersection Summary
Cycle Length: 120
Actuated Cycle Length:120
Offset: 0 (0%), Referenced to
phase 1:WBTL and 8:, Start of Green
Natural Cycle:100
Control Type: Actuated -Coordinated
Maximum v/c Ratio: 0.97
2/8/2016 Synchro 9 Report
MS Page 1
19: SH-114 NB Frontage Rd & Dove Rd 2027 Background + Site
TIA for Wilks Heritage in Southlake, Texas Timing Plan: PM
Lane Group
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
1 2 4
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
5.0 5.0 5.0
Minimum Split (s)
9.5 22.5 22.5
Total Split (s)
65.4 32.0 22.6
Total Split (%)
55% 27% 19%
Yellow Time (s)
3.5 3.5 3.5
All -Red Time (s)
1.0 1.0 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lag Lead
Lead -Lag Optimize?
Yes Yes
Recall Mode
C-Max Max None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
2/8/2016 Synchro 9 Report
MS Page 2
19: SH-114 NB Frontage Rd & Dove Rd 2027 Background + Site
TIA for Wilks Heritage in Southlake, Texas Timing Plan: PM
Intersection Signal Delay: 43.9 Intersection LOS: D
Intersection Capacity Utilization 97.0 % ICU Level of Service F
Analysis Period (min)15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases: 19: SH-114 NB Frontage Rd & Dove Rd
#16 #16 #16
i14 2 7q1
22.6 s
=19 19 =19
F
"5 `R' i66 v5
71.4s 39s 9,6s
218I2016
MS
Synchro 9 Report
Page 3
12: Kirkwood Blvd & Driveway 3 2027 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Intersection
Int Delay, s/veh 4.2
14: Kirkwood Blvd & Driveway 1 2027 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Intersection
Int Delay, s/veh 12.1
Movement
EBL
EBR
NBL
NBT
SBT
SBR
Movement
EBL
Traffic Vol, veh/h
144
110
11
698
453
34
Traffic Vol, veh/h
188
166
34
401
662
34
Future Vol, veh/h
144
110
11
698
453
34
Future Vol, veh/h
188
166
34
401
662
34
Conflicting Peds, #Ihr
0
0
0
0
0
0
Conflicting Peds, #Ihr
0
0
0
0
0
0
Sign Control
Stop
Stop
Free
Free
Free
Free
Sign Control
Stop
Stop
Free
Free
Free
Free
RT Channelized
-
None
-
None
None
RT Channelized
-
None
-
None
None
Storage Length
0
100
150
-
-
150
Storage Length
0
100
150
-
150
Veh in Median Storage, #
0
-
-
0
0
-
Veh in Median Storage, #
0
-
-
0
0
-
Grade, %
0
-
-
0
0
-
Grade, %
0
-
-
0
0
-
Peak Hour Factor
92
92
92
92
92
92
Peak Hour Factor
92
92
92
92
92
92
Heavy Vehicles,%
2
2
2
2
2
2
Heavy Vehicles,%
2
2
2
2
2
2
Mvmt Flow
157
120
12
759
492
37
Mvmt Flow
204
180
37
436
720
37
Major/Minor
Minor2
Majorl
Major2
Major/Minor
Minot
Majorl
Major2
Conflicting Flow All
895
246
492
0
0
Conflicting Flow All
1012
360
720
0
0
Stage 1
492
-
-
-
-
Stage 1
720
-
-
-
-
Stage 2
403
-
-
Stage 2
292
-
-
Critical Hdwy
6.84
6.94
4.14
Critical Hdwy
6.84
6.94
4.14
Critical Hdwy Stg 1
5.84
-
-
Critical Hdwy Stg 1
5.84
-
Critical Hdwy Stg 2
5.84
-
-
Critical Hdwy Stg 2
5.84
-
-
Follow-up Hdwy
3.52
3.32
2.22
Follow-up Hdwy
3.52
3.32
2.22
Pot Cap-1 Maneuver
280
754
1068
Pot Cap-1 Maneuver
236
637
877
Stage 1
580
-
-
Stage 1
443
-
-
Stage 2
644
-
-
Stage 2
732
-
-
Platoon blocked, %
Platoon blocked, %
Mov Cap-1 Maneuver
277
754
1068
Mov Cap-1 Maneuver
226
637
877
Mov Cap-2 Maneuver
277
-
-
Mov Cap-2 Maneuver
226
-
-
Stage 1
580
Stage 1
443
Stage 2
637
Stage 2
701
Approach
E9
NB
SB
Approach
EB
NB
SB
HCM Control Delay, s
23.7
0.1
0
HCM Control Delay, s
50
0.7
0
HCM LOS
C
HCM LOS
F
Minor Lane/MajorMvmt
NBL
NBTEBLn1EBLn2
SBT
SBR
Minor Lane/MajorMvmt
NBL
NBT EBLn I EBLn2
SBT
SBR
Capacity (veh/h)
1068
277 754
Capacity (veh/h)
877
226
637
HCM Lane V/C Ratio
0.011
0.565 0.159
HCM Lane V/C Ratio
0.042
0.904
0.283
HCM Control Delay (s)
8.4
33.6 10.7
HCM Control Delay (s)
9.3
82.7
12.9
HCM Lane LOS
A
D B
HCM Lane LOS
A
F
B
HCM 95th %tile Q(veh)
0
3.2 0.6
HCM 95th %tile Q(veh)
0.1
7.5
1.2
2/8/2016 Synchro 9 Report 2/8/2016 Synchro 9 Report
MS Page 1 MS Page 2
30: Kirkwood Blvd & Driveway 2 2027 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Intersection
Int Delay, s/veh 7.8
37: Driveway 5 & Kirkwood Blvd 2027 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Intersection
Int Delay, s/veh 0.9
Movement -1
EBL
EBR
NBL
NBT
SBT
SBR
Movement
EBT
EBR
WBL WBT
NBL
Traffic Vol, veh/h
166
166
45
543
530
34
Traffic Vol, veh/h
232
35
2 1636
33
2
Future Vol, veh/h
166
166
45
543
530
34
Future Vol, veh/h
232
35
2 1636
33
2
Conflicting Peds, #Ihr
0
0
0
0
0
0
Conflicting Peds, #Ihr
0
0
0 0
0
0
Sign Control
Stop
Stop
Free
Free
Free
Free
Sign Control
Free
Free
Free Free
Stop
Stop
RT Channelized
-
None
-
None
None
RT Channelized
None
None
-
None
Storage Length
0
100
150
-
-
150
Storage Length
-
0
Veh in Median Storage, #
0
-
-
0
0
-
Veh in Median Storage, #
0
0
0
Grade, %
0
-
-
0
0
-
Grade, %
0
0
0
-
Peak Hour Factor
92
92
92
92
92
92
Peak Hour Factor
92
92
92 92
92
92
Heavy Vehicles,%
2
2
2
2
2
2
Heavy Vehicles,%
2
2
2 2
2
2
Mvmt Flow
180
180
49
590
576
37
Mvmt Flow
252
38
2 1778
36
2
Major/Minor
Minor2
Majorl
Major2
Major/Minor
Majorl
E,'
'"
Minorl
a
Conflicting Flow All
969
288
576
0
0
Conflicting Flow All
0
0
290 0
987
145
Stage 1
576
-
-
-
-
Stage 1
-
-
- -
271
-
Stage 2
393
-
-
Stage 2
-
716
-
Critical Hdwy
6.84
6.94
4.14
Critical Hdwy
5.34
5.74
7.14 -
Critical Hdwy Stg 1
5.84
-
-
Critical Hdwy Stg 1
6.64
Critical Hdwy Stg 2
5.84
-
-
Critical Hdwy Stg 2
-
6.04
-
Follow-up Hdwy
3.52
3.32
2.22
Follow-up Hdwy
3.12
3.82
3.92
Pot Cap-1 Maneuver
251
709
993
Pot Cap-1 Maneuver
849
315
745
Stage 1
525
-
-
Stage 1
-
658
-
Stage 2
651
-
-
Stage 2
-
405
-
Platoon blocked, %
Platoon blocked, %
Mov Cap-1 Maneuver
239
709
993
Mov Cap-1 Maneuver
849
254
745
Mov Cap-2 Maneuver
239
-
-
Mov Cap-2 Maneuver
-
254
-
Stage 1
525
Stage 1
658
Stage 2
619
Stage 2
326
Approach
tEl
NB
SB
Approach
EB
WB
N9
HCM Control Delay, s
33.5
0.7
0
HCM Control Delay, s
0
0.6
20.9
HCM LOS
D
HCM LOS
C
Minor Lane/Major Mvmt
NBL
NBT EBLnl EBLn2
SBT
SBR
Minor Lane/Major Mvmt
NBLn1
EBT
EBR WBL
WBT
Capacity (veh/h)
993
239 709
Capacity (veh/h)
264
849
HCM Lane V/C Ratio
0.049
0.755 0.254
HCM Lane V/C Ratio
0.144
0.003
HCM Control Delay (s)
8.8
55.2 11.8
HCM Control Delay (s)
20.9
9.3
0.6
HCM Lane LOS
A
F B
HCM Lane LOS
C
A
A
HCM 95th %tile Q(veh)
0.2
5.3 1
HCM 95th %tile Q(veh)
0.5
0
-
2/8/2016 Synchro 9 Report 2/8/2016 Synchro 9 Report
MS Page 3 MS Page 4
40: Driveway 6 & Kirkwood Blvd
2027 Background + Site
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: PM
Intersection
Int Delay, s/veh 0.4
Movement
EBT
EBR
WBL WBT
0 NBL
NBR
Traffic Vol, veh/h
266
39
2 1667
37
1
Future Vol, veh/h
266
39
2 1667
37
1
Conflicting Peds, #Ihr
0
0
0 0
0
0
Sign Control
Free
Free
Free Free
Stop
Stop
RT Channelized
None
- None
-
None
Storage Length
0
100 -
0
Veh in Median Storage, #
0
-
- 0
0
Grade, %
0
-
- 0
0
-
Peak Hour Factor
92
92
92 92
92
92
Heavy Vehicles, %
2
2
2 2
2
2
Mvmt Flow
289
42
2 1812
40
1
Major/Minor
Majorl
Major2
Minorl
Conflicting Flow All
0
0
289 0
1018
145
Stage 1
-
-
- -
289
-
Stage 2
-
729
-
Critical Hdwy
4.14
6.29
6.94
Critical Hdwy Stg 1
-
5.84
-
Critical Hdwy Stg 2
-
6.04
-
Follow-up Hdwy
2.22
3.67
3.32
Pot Cap-1 Maneuver
1270
266
876
Stage 1
-
709
-
Stage 2
-
409
-
Platoon blocked,
Mov Cap-1 Maneuver
1270
266
876
Mov Cap-2 Maneuver
-
266
Stage 1
709
Stage 2
408
Approach
EB
WB
HCM Control Delay, s
0
0
20.7
HCM LOS
C
Minor Lane/Major Mvmt
NBLn1 EBT
EBR WBL
WBT
Capacity (veh/h)
271
1270
HCM Lane V/C Ratio
0.152
0.002
HCM Control Delay (s)
20.7
7.8
HCM Lane LOS
C
A
HCM 95th %tile Q(veh)
0.5
0
2/8/2016
Synchro 9 Report
MS
Page 5
6: Solana Blvd/Kirkwood Blvd & SH-114 SB Off -Ramp
2032 Background
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: AM
LaneGroul- EBL
EST
EBR
WBL
WBT
WBR NBL NBT NBR
SBL
S§�R
Lane Configurations
tt
?
tt
Traffic Volume (vph) 0
382
376
447
933
0 0 0 0
317
2 93
Future Volume (vph) 0
382
376
447
933
0 0 0 0
317
2 93
Peak Hour Factor 0.92
0.92
0.92
0.92
0.92
0.92 0.92 0.92 0.92
0.92
0.92 0.92
Adj. Flow (vph) 0
415
409
486
1014
0 0 0 0
345
2 101
Shared Lane Traffic (%)
50%
Lane Group Flow (vph) 0
415
409
486
1014
0 0 0 0
172
276 0
Turn Type
NA
Perm
pm+pt
NA
Perm
NA
Protected Phases
2
1
12
4
Permitted Phases
2
12
4
Detector Phase
2
2
1
12
4
4
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
5.0
Minimum Split (s)
22.5
22.5
9.5
22.5
22.5
Total Split (s)
23.8
23.8
21.2
45.0
45.0
Total Split (%)
26.4%
26.4%
23.6 %
50.0 %
50.0%
Yellow Time (s)
3.5
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
4.5
4.5
Lead/Lag
Lag
Lag
Lead
Lead -Lag Optimize?
Yes
Yes
Yes
Recall Mode
C-Max
C-Max
None
None
None
Act Effct Green (s)
19.3
19.3
36.3
40.8
40.2
40.2
Actuated g/C Ratio
0.21
0.21
0.40
0.45
0.45
0.45
v/c Ratio
0.55
0.62
1.01
0.63
0.24
0.19
Control Delay
34.6
7.9
55.9
18.5
16.4
12.4
Queue Delay
0.0
0.0
0.0
2.8
0.0
0.0
Total Delay
34.6
7.9
55.9
21.4
16.4
12.4
LOS
C
A
E
C
B
B
Approach Delay
21.3
32.6
13.9
Approach LOS
C
C
B
Queue Length 50th (it)
111
0
-200
216
63
40
Queue Length 95th (ft)
158
76
m#323
m297
110
65
Internal Link Dist (it)
1214
327
1036
836
Turn Bay Length (ft)
350
Base Capacity (vph)
758
660
481
1603
724
1427
Starvation Cap Reductn
0
0
0
458
0
0
Spillback Cap Reductn
0
0
0
0
0
0
Storage Cap Reductn
0
0
0
0
0
0
Reduced v/c Ratio
0.55
0.62
1.01
0.89
0.24
0.19
Intersection Summary
Cycle Length: 90
Actuated Cycle Length: 90
Offset: 0 (0%), Referenced to phase 2:EBWB
and
6:, Start of Green
Natural Cycle: 80
Control Type: Actuated -Coordinated
Maximum v/c Ratio: 1.01
2/8/2016 Synchro 9 Report
MS Page 1
6: Solana Blvd/Kirkwood Blvd & SH-114 SIB Off -Ramp 2032 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Lane Group'
06
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
5 6 8
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
5.0 5.0 5.0
Minimum Split (s)
9.5 22.5 22.5
Total Split (s)
19.9 25.1 45.0
Total Split (%)
22% 28% 50%
Yellow Time (s)
3.5 3.5 3.5
All -Red Time (s)
1.0 1.0 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lag Lead
Lead -Lag Optimize?
Yes Yes
Recall Mode
None C-Max None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (it)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
2/8/2016 Synchro 9 Report
MS Page 2
6: Solana Blvd/Kirkwood Blvd & SH-114 SIB Off -Ramp 2032 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Intersection Signal Delay: 26.2 Intersection LOS: C
Intersection Capacity Utilization 83.5 % ICU Level of Service E
Analysis Period (min)15
- Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
iplits and Phases:
6: Solana Blvd/Kirkwood Blvd & SH-114 SB Off -Ramp
=6
#6 #6
7�1
�z �•1��4
21:
s
�s
8 #8
F
�Q5 `R•.
05 W.
25.1 s
79.9 s
8: SH-114 NB Off -Ramp & Kirkwood Blvd
2032 Background
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: AM
-'*,-,*
r-
4-
T/,.
ti 1
-'
Lane Group - - - - - -
- - ML
EBT EBR WBL
WBT
WBR
NBL
NBT
NBR SBL SBT
SBR
Lane Configurations
V1
tt
tt
?I
Vi
+Tf+
Traffic Volume (vph)
193
508 0 0
523
40
859
183
675 0 0
0
Future Volume (vph)
193
508 0 0
523
40
859
183
675 0 0
0
Peak Hour Factor
0.92
0.92 0.92 0.92
0.92
0.92
0.92
0.92
0.92 0.92 0.92
0.92
Adj. Flow (vph)
210
552 0 0
568
43
934
199
734 0 0
0
Shared Lane Traffic (%)
31 °%
Lane Group Flow (vph)
210
552 0 0
568
43
644
1223
0 0 0
0
Turn Type
pm+pt
NA
NA
Free
Perm
NA
Protected Phases
5
56
6
8
Permitted Phases
56
Free
8
Detector Phase
5
56
6
8
8
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
Minimum Split (s)
9.5
22.5
22.5
22.5
Total Split (s)
19.9
25.1
45.0
45.0
Total Split (%)
22.1 %
27.9°%
50.0%
50.0%
Yellow Time (s)
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
4.5
Lead/Lag
Lag
Lead
Lead -Lag Optimize?
Yes
Yes
-
Recall Mode
None
C-Max
None
None
Act Effct Green (s)
36.3
40.8
20.9
90.0
40.2
40.2
-
Actuated g/C Ratio
0.40
0.45
0.23
1.00
0.45
0.45
v/c Ratio
0.51
0.34
0.69
0.03
0.90
0.93dr
-
Control Delay
27.3
18.1
36.9
0.0
40.4
23.4
Queue Delay
0.0
0.0
0.6
0.0
0.0
0.0
-
Total Delay
27.3
18.1
37.4
0.0
40.4
23.4
LOS
C
B
D
A
D
C
-
Approach Delay
20.6
34.8
29.3
Approach LOS
C
C
C
Queue Length 50th (ft)
61
85
156
0
357
269
Queue Length 95th (ft)
125
145
214
0
#597
368
Internal Link Dist (ft)
327
247
1055
1095
Turn Bay Length (ft)
a
Base Capacity(vph)
408
1603
821
1583
724
1492
Starvation Cap Reductn
0
0
0
0
0
0
Spillback Cap Reductn
0
0
59
0
0
2
Storage Cap Reductn
0
0
0
0
0
0
-
Reduced v/c Ratio
0.51
0.34
0.75
0.03
0.89
0.82
Intersection Summary
Cycle Length: 90
Actuated Cycle Length: 90
Offset: 0 (0%), Referenced to phase 2:EBWB and 6:, Start of Green
Natural Cycle: 80
Control Type: Actuated -Coordinated
Maximum v/c Ratio:1.01
2/8/2016 Synchro 9 Report 2/8/2016 Synchro 9 Report
MS Page 3 MS Page 4
8: SH-114 NB Off -Ramp & Kirkwood Blvd 2032 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All -Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead -Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
5.0 5.0 5.0
9.5 22.5 22.5
21.2 23.8 45.0
24 % 26 % 50 %
3.5 3.5 3.5
1.0 1.0 1.0
Lead Lag
Yes Yes
None C-Max None
8: SH-114 NB Off -Ramp & Kirkwood Blvd 2032 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Intersection Signal Delay: 28.3 Intersection LOS: C
Intersection Capacity Utilization 83.5 % ICU Level of Service E
Analysis Period (min)15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
dr Defacto Right Lane. Recode with 1 though lane as a right lane.
iplits and Phases: 8: SH-114 NB Off -Ramp & Kirkwood Blvd
#6 #6 #6
7o 1 N2 Tp4
zs.8
#8 =s #8
�6 �25 0e
Y9.9 s
2/8/2016 Synchro 9 Report 2/8/2016
MS Page 5 MS
Synchro 9 Report
Page 6
16: Dove Rd & SH-114 SIB Off -Ramp
2032 Background
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: AM
Lane Group EBL
EST EBR
WBL
WBT
WBR NBL NBT NBR
SBL
S
Lane Configurations
tT+
Traffic Volume (vph) 0
468 1056
116
674
0 0 0 0
117
181 89
Future Volume (vph) 0
468 1056
116
674
0 0 0 0
117
181 89
Peak Hour Factor 0.83
0.83 0.83
0.83
0.83
0.83 0.83 0.83 0.83
0.83
0.83 0.83
Adj. Flow (vph) 0
564 1272
140
812
0 0 0 0
141
218 107
Shared Lane Traffic (°!°)
10%
Lane Group Flow (vph) 0
1836 0
0
952
0 0 0 0
127
339 0
Turn Type
NA
pm+pt
NA
Perm
NA
Protected Phases
2
1
21
4
Permitted Phases
21
4
Detector Phase
2
1
21
4
4
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
Minimum Split (s)
22.5
9.5
22.5
22.5
Total Split (s)
57.9
9.5
22.6
22.6
Total Split (%)
64.3%
10.6 %
25.1 %
25.1 %
Yellow Time (s)
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
Lead/Lag
Lag
Lead
Lead
Lead -Lag Optimize?
Yes
Yes
Yes
Recall Mode
C-Max
None
None
None
Act Effct Green (s)
58.2
63.2
13.3
13.3
Actuated g/C Ratio
0.65
0.70
0.15
0.15
v/c Ratio
1.09dr
0.71
0.53
0.63
Control Delay
15.4
7.7
43.0
33.6
Queue Delay
0.0
0.0
0.0
0.0
Total Delay
15.4
7.7
43.0
33.6
LOS
B
A
D
C
Approach Delay
15.4
7.7
36.2
Approach LOS
B
A
D
Queue Length 50th (ft)
311
15
74
80
Queue Length 95th (ft)
410
59
116
107
Internal Link Dist (ft)
224
394
1722
1376
Turn Bay Length (ft)
240
Base Capacity (vph)
2173
1345
323
702
Starvation Cap Reductn
0
0
0
0
Spillback Cap Reductn
0
0
0
0
Storage Cap Reductn
0
0
0
0
Reduced v/c Ratio
0.84
0.71
0.39
0.48
Intersection Summary
Cycle Length: 90
Actuated Cycle Length: 90
Offset: 77.2 (86%), Referenced to phase 2:EBWB and 6:,
Start of Green
Natural Cycle: 90
Control Type: Actuated -Coordinated
Maximum v/c Ratio: 0.84
2/8/2016 Synchro 9 Report
MS Page 7
16: Dove Rd & SH-114 SB Off -Ramp 2032 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Lane Group
o6 08
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
5 6 8
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
5.0 5.0 5.0
Minimum Split (s)
9.5 22.5 22.5
Total Split (s)
9.5 45.1 35.4
Total Split (%)
11 % 50% 39%
Yellow Time (s)
3.5 3.5 3.5
All -Red Time (s)
1.0 1.0 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lag Lead
Lead -Lag Optimize?
Yes Yes
Recall Mode
None C-Min Max
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
2/8/2016 Synchro 9 Report
MS Page 8
16: Dove Rd & SH-114 SIB Off -Ramp 2032 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Intersection Signal Delay: 16.1 Intersection LOS: B
Intersection Capacity Utilization 87.8 % ICU Level of Service E
Analysis Period (min)15
dr Defacto Right Lane. Recode with 1 though lane as a right lane.
iplits and Phases: 16: Dove Rd & SH-114 SB
=16 1 #]6
-19
4
19: SH-114 NB Frontage Rd & Dove Rd
2032 Background
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: AM
-,*,-,*
r-
4-
T/,.
ti
1
-'
Lane Group
L
EBT EBR
WBL
WBT
WBR
NBL
NBT
NBR SBL
SBT
SBR
Lane Configurations
+Tt
0
►j
q +
Traffic Volume (vph)
104
470 0
0
451
116
353
160
372 0
0
0
Future Volume (vph)
104
470 0
0
451
116
353
160
372 0
0
0
Peak Hour Factor
0.80
0.80 0.80
0.80
0.80
0.80
0.80
0.80
0.80 0.80
0.80
0.80
Adj. Flow (vph)
130
588 0
0
564
145
441
200
465 0
0
0
Shared Lane Traffic (%)
13%
Lane Group Flow (vph)
0
718 0
0
709
0
384
722
0 0
0
0
Turn Type
pm+pt
NA
NA
Perm
NA
Protected Phases
5
65
6
8
Permitted Phases
65
8
Detector Phase
5
65
6
8
8
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
Minimum Split (s)
9.5
22.5
22.5
22.5
Total Split (s)
9.5
45.1
35.4
35.4
Total Split (%)
10.6 %
50.1 %
39.3%
39.3%
AN
Yellow Time (s)
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
Lead/Lag
Lag
Lead
Lead
Lead -Lag Optimize?
Yes
Yes
Yes
-
Recall Mode
None
C-Min
Max
Max
Act Effct Green (s)
45.6
32.9
30.9
30.9
Actuated g/C Ratio
0.51
0.37
0.34
0.34
v/c Ratio
0.55
0.55
0.70
0.60
-
Control Delay
11.0
16.3
33.4
18.0
Queue Delay
0.0
0.0
0.0
0.0
-
Total Delay
11.0
16.3
33.4
18.0
LOS
B
B
C
B
Approach Delay
11.0
16.3
23.3
Approach LOS
B
B
C
-
Queue Length 50th (ft)
93
79
204
119
Queue Length 95th (ft)
80
83
269
145
Internal Link Dist (ft)
394
990
1769
1583
Turn Bay Length (ft)
a
Base Capacity (vph)
1376
1572
552
1208
Starvation Cap Reductn
0
0
0
0
Spillback Cap Reductn
0
0
0
0
Storage Cap Reductn
0
0
0
0
Reduced v/c Ratio
0.52
0.45
0.70
0.60
Intersection Summary
Cycle Length: 90
Actuated Cycle Length: 90
Offset: 77.2 (86%), Referenced to phase 2:EBWB and 6:, Start of Green
Natural Cycle: 90
Control Type: Actuated -Coordinated
Maximum v/c Ratio: 0.84
2/8/2016 Synchro 9 Report 2/8/2016 Synchro 9 Report
MS Page 9 MS Page 10
19: SH-114 NB Frontage Rd & Dove Rd 2032 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Lane Group
of o2 o4
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic
Lane Group Flow (vph)
Turn Type
Protected Phases
1 2 4
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
5.0 5.0 5.0
Minimum Split (s)
9.5 22.5 22.5
Total Split (s)
9.5 57.9 22.6
Total Split (%)
11 % 64% 25 %
Yellow Time (s)
3.5 3.5 3.5
All -Red Time (s)
1.0 1.0 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lag Lead
Lead -Lag Optimize?
Yes Yes
Recall Mode
None C-Max None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
2/8/2016 Synchro 9 Report
MS Page 11
19: SH-114 NB Frontage Rd & Dove Rd 2032 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Intersection Signal Delay: 17.9 Intersection LOS: B
Intersection Capacity Utilization 61.2 % ICU Level of Service B
Analysis Period (min)15
Splits and Phases: 19: SH-114 NB Frontage Rd & Dove Rd
#16 #16
#16
1 2 7
7p1
sMENU- 1
#19 � 19
F
„108
=19
�p5
006'R
45.1 s
9.5 s
2/8/2016
MS
Synchro 9 Report
Page 12
22: Dove Rd & Kirkwood Blvd
2032 Background
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: AM
*_
t
ti
r
Lane Grout-
EBL
EST
WBT
WBR
SBL
SBR
Lane Configurations
I
Tt
Tj+
Vi
?I
Traffic Volume (vph)
355
281
384
111
51
152
Future Volume (vph)
355
281
384
111
51
152
Peak Hour Factor
0.77
0.77
0.77
0.77
0.77
0.77
Adj. Flow (vph)
461
365
499
144
66
197
Shared Lane Traffic (%)
Lane Group Flow (vph)
461
365
643
0
66
197
Turn Type
pm+pt
NA
NA
Prot
Perm
Protected Phases
7
4
8
1
Permitted Phases
4
6
Detector Phase
7
4
8
1
6
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
5.0
Minimum Split (s)
9.5
22.5
22.5
9.5
9.5
Total Split (s)
52.0
77.0
25.0
13.0
13.0
Total Split(%)
57.8%
85.6%
27.8%
14.4% 14.4%
Yellow Time (s)
3.5
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
4.5
4.5
Lead/Lag
Lead
Lag
Lead -Lag Optimize?
Yes
Yes
Recall Mode
None
C-Max
C-Max
None
None
Act Effct Green (s)
73.3
73.3
49.6
7.7
7.7
Actuated g/C Ratio
0.81
0.81
0.55
0.09
0.09
v/c Ratio
0.61
0.13
0.34
0.44
0.63
Control Delay
9.2
3.1
12.7
48.1
15.6
Queue Delay
0.0
0.0
0.0
0.0
0.0
Total Delay
9.2
3.1
12.7
48.1
15.6
LOS
A
A
B
D
B
Approach Delay
6.5
12.7
23.7
Approach LOS
A
B
C
Queue Length 50th (ft)
106
30
94
36
0
Queue Length 95th (ft)
103
32
140
65
37
Internal Link Dist (ft)
990
172
351
Turn Bay Length (ft)
100
Base Capacity (vph)
1114
2882
1901
167
327
Starvation Cap Reductn
0
0
0
0
0
Spillback Cap Reductn
0
0
0
0
0
Storage Cap Reductn
0
0
0
0
0
Reduced v/c Ratio
0.41
0.13
0.34
0.40
0.60
Intersection Summary
Cycle Length: 90
Actuated Cycle Length: 90
Offset: 0 (0%), Referenced to phase 4:EBTL
and 8:WBT,
Start of Green
Natural Cycle: 50
Control Type: Actuated -Coordinated
Maximum v/c Ratio: 0.63
22: Dove Rd & Kirkwood Blvd 2032 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Intersection Signal Delay: 11.4 Intersection LOS: B
Intersection Capacity Utilization 49.2 % ICU Level of Service A
Analysis Period (min)15
Splits and Phases: 22: Dove Rd & Kirkwood Blvd
\4.61
--lp4 `R'-
ns
on
■ F
J 7 48 R)
2/8/2016 Synchro 9 Report 2/8/2016 Synchro 9 Report
MS Page 13 MS Page 14
19: SH-114 NB Frontage Rd & Dove Rd 2032 Background(With Improvements)
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Lane Group
EBL
EST
EBR
WBL
WBT
WBR
NBL
Nr
NBR
SBL
Lane Configurations
0
tT+
Vi
tt
r
Traffic Volume (vph)
104
470
0
0
451
116
353
160
372
0 0 0
Future Volume (vph)
104
470
0
0
451
116
353
160
372
0 0 0
Peak Hour Factor
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80 0.80 0.80
Adj. Flow (vph)
130
588
0
0
564
145
441
200
465
0 0 0
Shared Lane Traffic (%)
Lane Group Flow (vph)
0
718
0
0
709
0
441
200
465
0 0 0
Turn Type
pm+pt
NA
NA
Perm
NA
Perm
Protected Phases
5
65
6
8
Permitted Phases
65
8
8
Detector Phase
5
65
6
8
8
8
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
5.0
Minimum Split (s)
9.5
22.5
22.5
22.5
22.5
Total Split (s)
9.5
45.1
35.4
35.4
35.4
Total Split (%)
10.6 %
50.1 %
39.3%
39.3%
39.3%
Yellow Time (s)
3.5
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
4.5
Lead/Lag
Lag
Lead
Lead
Lead
Lead -Lag Optimize?
Yes
Yes
Yes
Yes
Recall Mode
None
C-Min
Max
Max
Max
Act Effct Green (s)
45.6
32.9
30.9
30.9
30.9
Actuated g/C Ratio
0.51
0.37
0.34
0.34
0.34
v/c Ratio
0.55
0.55
0.37
0.16
0.66
Control Delay
11.0
16.3
23.4
21.0
16.5
Queue Delay
0.0
0.0
0.0
0.0
0.0
Total Delay
11.0
16.3
23.4
21.0
16.5
LOS
B
B
C
C
B
Approach Delay
11.0
16.3
20.1
Approach LOS
B
B
C
Queue Length 50th (ft)
93
79
96
41
100
Queue Length 95th (ft)
80
83
118
58
157
Internal Link Dist (ft)
394
990
1769
1583
Turn Bay Length (ft)
200
Base Capacity (vph)
1376
1572
1178
1215
705
Starvation Cap Reductn
0
0
0
0
0
Spillback Cap Reductn
0
0
0
0
0
Storage Cap Reductn
0
0
0
0
0
Reduced v/c Ratio
0.52
0.45
0.37
0.16
0.66
Intersection Summary
Cycle Length: 90
Actuated Cycle Length: 90
Offset: 77.2 (86%), Referenced to phase 2:EBWB and 6:,
Start of
Green
Natural Cycle: 90
Control Type: Actuated -Coordinated
Maximum v/c Ratio: 0.84
2/8/2016 Synchro 9 Report
MS Page 1
19: SH-114 NB Frontage Rd & Dove Rd 2032 Background(With Improvements)
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Lane Group-
e1 e2 o4
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
1 2 4
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
5.0 5.0 5.0
Minimum Split (s)
9.5 22.5 22.5
Total Split (s)
9.5 57.9 22.6
Total Split (%)
11 % 64% 25%
Yellow Time (s)
3.5 3.5 3.5
All -Red Time (s)
1.0 1.0 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lag Lead
Lead -Lag Optimize?
Yes Yes
Recall Mode
None C-Max None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
2/8/2016 Synchro 9 Report
MS Page 2
19: SH-114 NB Frontage Rd & Dove Rd 2032 Background(With Improvements)
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: AM
Intersection Signal Delay: 16.5 Intersection LOS: B
Intersection Capacity Utilization 53.5 % ICU Level of Service A
Analysis Period (min)15
Splits and Phases: 19: SH-114 NB Frontage Rd & Dove Rd
#1I6
``-16
#16
+ 04
4,2'R)
701
57.9 s
19 19
#19
F
AB �A6 `R)
pS
_
45.1 s
218I2016
Synchro 9 Report
MS
Page 3
6: Solana Blvd/Kirkwood Blvd & SH-114 SB Off -Ramp
2032 Background
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: PM
Lane Grouf------'TBL
EST
EBR
WBL
WBT
WBR NBL NBT NBR
SBL
Lane Configurations
tt
?I
)
tt
)
r{
Traffic Volume (vph) 0
351
907
648
477
0 0 0 0
227
3 69
Future Volume (vph) 0
351
907
648
477
0 0 0 0
227
3 69
Peak Hour Factor 0.96
0.96
0.96
0.96
0.96
0.96 0.96 0.96 0.96
0.96
0.96 0.96
Adj. Flow (vph) 0
366
945
675
497
0 0 0 0
236
3 72
Shared Lane Traffic (%)
50%
Lane Group Flow (vph) 0
366
945
675
497
0 0 0 0
118
193 0
Turn Type
NA
Perm
pm+pt
NA
Perm
NA
Protected Phases
2
1
12
4
Permitted Phases
2
12
4
Detector Phase
2
2
1
12
4
4
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
5.0
Minimum Split (s)
22.5
22.5
9.5
22.5
22.5
Total Split (s)
33.6
33.6
32.4
44.0
44.0
Total Split (%)
30.5%
30.5 %
29.5 %
40.0 %
40.0%
Yellow Time (s)
3.5
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
4.5
4.5
Lead/Lag
Lag
Lag
Lead
Lead -Lag Optimize?
Yes
Yes
Yes
Recall Mode
C-Max
C-Max
None
Max
Max
Act Effct Green (s)
29.1
29.1
57.0
61.5
39.5
39.5
Actuated g/C Ratio
0.26
0.26
0.52
0.56
0.36
0.36
v/c Ratio
0.39
1.02
1.02
0.25
0.20
0.17
Control Delay
34.7
47.6
72.1
14.4
25.6
15.3
Queue Delay
0.0
0.0
12.4
0.0
0.2
0.1
Total Delay
34.7
47.6
84.6
14.4
25.8
15.3
LOS
C
D
F
B
C
B
Approach Delay
44.0
54.8
19.3
Approach LOS
D
D
B
Queue Length 50th (ft)
111
-326
-404
87
62
30
Queue Length 95th (ft)
155
#575
#592
m138
110
58
Internal Link Dist (ft)
1216
327
1036
836
Turn Bay Length (ft)
350
Base Capacity (vph)
936
924
664
1978
578
1160
Starvation Cap Reductn
0
0
24
0
0
0
Spillback Cap Reductn
0
0
0
0
137
269
Storage Cap Reductn
0
0
0
0
0
0
Reduced v/c Ratio
0.39
1.02
1.05
0.25
0.27
0.22
Intersection Summary
Cycle Length: 110
Actuated Cycle Length: 110
mr�
Offset: 0 (0%), Referenced to phase 2:EBWB
and
5:, Start of Green
Natural Cycle:100
Control Type: Actuated -Coordinated
Maximum v/c Ratio:1.13
2/8/2016 Synchro 9 Report
MS Page 1
6: Solana Blvd/Kirkwood Blvd & SH-114 SIB Off -Ramp 2032 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Lane Group'
06
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
5 6 8
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
5.0 5.0 5.0
Minimum Split (s)
10.0 22.5 22.5
Total Split (s)
31.0 35.0 44.0
Total Split (%)
28% 32 % 40%
Yellow Time (s)
3.5 3.5 3.5
All -Red Time (s)
1.0 1.0 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead Lag
Lead -Lag Optimize?
Yes Yes
Recall Mode
C-Max Max Max
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
2/8/2016 Synchro 9 Report
MS Page 2
6: Solana Blvd/Kirkwood Blvd & SH-114 SIB Off -Ramp 2032 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Intersection Signal Delay: 45.8 Intersection LOS: D
Intersection Capacity Utilization 109.2% ICU Level of Service H
Analysis Period (min)15
- Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases: 6: Solana Blvd/Kirkwood Blvd & SH-114 SB Off -Ramp
46 #6
7q1 042
=6I
j 14
.6 s
44 s
s =s
F
144
=3
s
nm� ��¢6
.s
31s 1
35s
s
8: SH-114 NB Off -Ramp & Kirkwood Blvd
2032 Background
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: PM
-'*,-,*
r-
4-
T/,.
ti
1 -'
Lane Group - - - - - -
- - ML
EBT EBR WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT SBR
Lane Configurations
V1
tt
tt
?I
Vi
tt
?I
Traffic Volume (vph)
538
122 0 0
763
497
433
1316
74
0
0 0
Future Volume (vph)
538
122 0 0
763
497
433
1316
74
0
0 0
Peak Hour Factor
0.96
0.96 0.96 0.96
0.96
0.96
0.96
0.96
0.96
0.96
0.96 0.96
Adj. Flow (vph)
560
127 0 0
795
518
451
1371
77
0
0 0
Shared Lane Traffic (%)
Lane Group Flow (vph)
560
127 0 0
795
518
451
1371
77
0
0 0
Turn Type
pm+pt
NA
NA
Free
Perm
NA
Free
Protected Phases
5
56
6
8
Permitted Phases
56
Free
8
Free
Detector Phase
5
56
6
8
8
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
Minimum Split (s)
10.0
22.5
22.5
22.5
Total Split (s)
31.0
35.0
44.0
44.0
Total Split (%)
28.2 %
31.8 %
40.0%
40.0%
JIM
Yellow Time (s)
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
4.5
Lead/Lag
Lead
Lag
Lead -Lag Optimize?
Yes
Yes
Recall Mode
C-Max
Max
Max
Max
Act Effct Green (s)
57.0
61.5
30.5
110.0
39.5
39.5
110.0
Actuated g/C Ratio
0.52
0.56
0.28
1.00
0.36
0.36
1.00
v/c Ratio
1.13
0.06
0.81
0.33
0.71
1.08
0.05
Control Delay
127.2
11.7
44.7
0.6
37.7
84.2
0.1
Queue Delay
0.0
0.0
0.0
0.0
7.4
0.0
0.0
Total Delay
127.2
11.7
44.7
0.6
45.1
84.2
0.1
LOS
F
B
D
A
D
F
A
i
Approach Delay
105.9
27.3
71.5
Approach LOS
F
C
E
-
Queue Length 50th (ft)
-425
19
275
0
271
-570
0
Queue Length 95th (ft)
#646
33
351
0
393
#706
0
Internal Link Dist (ft)
327
240
1055
1095
Turn Bay Length (ft)
340
Base Capacity(vph)
494
1978
981
1583
635
1270
1583
Starvation Cap Reductn
1
0
0
0
0
0
0
Spillback Cap Reductn
0
0
0
0
142
0
0
Storage Cap Reductn
0
0
0
0
0
0
0
Reduced v/c Ratio
1.14
0.06
0.81
0.33
0.91
1.08
0.05
Intersection Summary
Cycle Length: 110
Actuated Cycle Length: 110
Offset: 0 (0%), Referenced to phase 2:EBWB
and 5:, Start of Green
Natural Cycle:100
Control Type: Actuated -Coordinated
Maximum v/c Ratio:1.13
2/8/2016 Synchro 9 Report 2/8/2016 Synchro 9 Report
MS Page 3 MS Page 4
8: SH-114 NB Off -Ramp & Kirkwood Blvd 2032 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All -Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead -Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
5.0 5.0 5.0
9.5 22.5 22.5
32.4 33.6 44.0
29% 31% 40%
3.5 3.5 3.5
1.0 1.0 1.0
Lead Lag
Yes Yes
None C-Max Max
8: SH-114 NB Off -Ramp & Kirkwood Blvd 2032 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Intersection Signal Delay: 62.7 Intersection LOS: E
Intersection Capacity Utilization 109.2 % ICU Level of Service H
Analysis Period (min)15
- Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases: 8: SH-114 NB Off -Ramp & Kirkwood Blvd
#6 #6
6
= 6
's
33.6s R
44s
ma
0.5
�8
��F p6
=a
oa
35 s
44 s
2/8/2016 Synchro 9 Report 2/8/2016
MS Page 5 MS
Synchro 9 Report
Page 6
16: Dove Rd & SH-114 SIB Off -Ramp
2032 Background
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: PM
Lane Group EBL
EST EBR
WBL
WBT
WBR NBL NBT NBR
SBL
Lane Configurations
tT+
Traffic Volume (vph) 0
228 408
430
1624
0 0 0 0
124
199
181
Future Volume (vph) 0
228 408
430
1624
0 0 0 0
124
199
181
Peak Hour Factor 0.96
0.96 0.96
0.96
0.96
0.96 0.96 0.96 0.96
0.96
0.96
0.96
Adj. Flow (vph) 0
238 425
448
1692
0 0 0 0
129
207
189
Shared Lane Traffic (°!°)
10%
Lane Group Flow (vph) 0
663 0
0
2140
0 0 0 0
116
409
0
Turn Type
NA
pm+pt
NA
Perm
NA
Protected Phases
2
1
12
4
Permitted Phases
12
4
Detector Phase
2
1
12
4
4
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
Minimum Split (s)
22.5
9.5
22.5
22.5
Total Split (s)
42.2
65.2
22.6
22.6
Total Split (%)
32.5%
50.2 %
17.4 %
17.4%
Yellow Time (s)
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
Lead/Lag
Lag
Lead
Lead
Lead -Lag Optimize?
Yes
Yes
Yes
Recall Mode
C-Max
None
None
None
Act Effct Green (s)
38.7
99.4
17.1
17.1
Actuated g/C Ratio
0.30
0.76
0.13
0.13
v/c Ratio
0.55
0.96
0.55
0.85
Control Delay
19.2
14.7
62.9
61.1
Queue Delay
0.0
9.8
0.0
0.0
Total Delay
19.2
24.5
62.9
61.1
LOS
B
C
E
E
Approach Delay
19.2
24.5
61.5
Approach LOS
B
C
E
Queue Length 50th (ft)
113
347
101
151
Queue Length 95th (ft)
176
m314
172
#229
Internal Link Dist (ft)
224
394
1722
1376
Turn Bay Length (ft)
240
Base Capacity (vph)
1200
2227
224
506
Starvation Cap Reductn
0
117
0
0
Spillback Cap Reductn
0
0
0
0
Storage Cap Reductn
0
0
0
0
Reduced v/c Ratio
0.55
1.01
0.52
0.81
Intersection Summary
Cycle Length: 130
Actuated Cycle Length:130
JIMEEMEr-
Offset: 0 (0%), Referenced to phase 2:EBWB
and 6:, Start of Green
Natural Cycle:130
Control Type: Actuated -Coordinated
Maximum v/c Ratio:1.03
2/8/2016 Synchro 9 Report
MS Page 7
16: Dove Rd & SH-114 SB Off -Ramp 2032 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Lane Group
o6 08
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
5 6 8
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
5.0 5.0 5.0
Minimum Split (s)
9.5 22.5 22.5
Total Split (s)
9.8 39.2 81.0
Total Split (%)
8% 30% 62%
Yellow Time (s)
3.5 3.5 3.5
All -Red Time (s)
1.0 1.0 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lag Lead
Lead -Lag Optimize?
Yes Yes
Recall Mode
None C-Min Max
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
2/8/2016 Synchro 9 Report
MS Page 8
16: Dove Rd & SH-114 SIB Off -Ramp 2032 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Intersection Signal Delay: 29.3 Intersection LOS: C
Intersection Capacity Utilization 98.0 % ICU Level of Service F
Analysis Period (min)15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
iplits and Phases: 16: Dove Rd & SH-114 SB Off -Ramp
#16 #16 #16
i14 2 701
72.6 s
19 _-19 =19
19: SH-114 NB Frontage Rd & Dove Rd
2032 Background
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: PM
-'*,-,*
r-
4-
T/,.
ti
1
-'
Lane Group-
EBL
EBT EBR
WBL
WBT
WBR
NBL
NBT
NBR SBL
SBT
SBR
Lane Configurations
+Tt
0
)
4T+
Traffic Volume (vph)
82
273 0
0
809
140
1220
1573
156 0
0
0
Future Volume (vph)
82
273 0
0
809
140
1220
1573
156 0
0
0
Peak Hour Factor
0.99
0.99 0.99
0.99
0.99
0.99
0.99
0.99
0.99 0.99
0.99
0.99
Adj. Flow (vph)
83
276 0
0
817
141
1232
1589
158 0
0
0
Shared Lane Traffic (%)
21 °%
Lane Group Flow (vph)
0
359 0
0
958
0
973
2006
0 0
0
0
Turn Type
pm+pt
NA
NA
Perm
NA
Protected Phases
5
56
6
8
Permitted Phases
56
8
Detector Phase
5
56
6
8
8
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
Minimum Split (s)
9.5
22.5
22.5
22.5
Total Split (s)
9.8
39.2
81.0
81.0
Total Split (%)
7.5 %
30.2 %
62.3%
62.3%
JIM
Yellow Time (s)
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
Lead/Lag
Lag
Lead
Lead
Lead -Lag Optimize?
Yes
Yes
Yes
Recall Mode
None
C-Min
Max
Max
Act Effct Green (s)
40.0
34.7
76.5
76.5
Actuated g/C Ratio
0.31
0.27
0.59
0.59
v/c Ratio
0.56
1.03
1.03
1.02
-
Control Delay
57.8
82.1
63.7
52.9
Queue Delay
0.0
19.3
12.8
6.1
-
Total Delay
57.8
101.4
76.4
59.0
LOS
E
F
E
E
-
Approach Delay
57.8
101.4
64.7
Approach LOS
E
F
E
Queue Length 50th (ft)
153
-447
-960
-983
Queue Length 95th (ft)
m207
#582
#1241
#1129
Internal Link Dist (ft)
394
990
1769
1583
Turn Bay Length (ft)
a
Base Capacity (vph)
642
934
947
1963
Starvation Cap Reductn
0
0
0
0
Spillback Cap Reductn
0
46
32
33
Storage Cap Reductn
0
0
0
0
Reduced v/c Ratio
0.56
1.08
1.06
1.04
Intersection Summary
Cycle Length: 130
Actuated Cycle Length: 130
Offset: 0 (0%), Referenced to phase 2:EBWB
and 6:, Start
of Green
Natural Cycle: 130
Control Type: Actuated -Coordinated
Maximum v/c Ratio: 1.03
2/8/2016 Synchro 9 Report 2/8/2016 Synchro 9 Report
MS Page 9 MS Page 10
19: SH-114 NB Frontage Rd & Dove Rd 2032 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Lane Group
of o2 o4
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic
Lane Group Flow (vph)
Turn Type
Protected Phases
1 2 4
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
5.0 5.0 5.0
Minimum Split (s)
9.5 22.5 22.5
Total Split (s)
65.2 42.2 22.6
Total Split (%)
50% 32 % 17%
Yellow Time (s)
3.5 3.5 3.5
All -Red Time (s)
1.0 1.0 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lag Lead
Lead -Lag Optimize?
Yes Yes
Recall Mode
None C-Max None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
2/8/2016 Synchro 9 Report
MS Page 11
19: SH-114 NB Frontage Rd & Dove Rd 2032 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Intersection Signal Delay: 72.3 Intersection LOS: E
Intersection Capacity Utilization 103.9 % ICU Level of Service G
Analysis Period (min)15
- Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases: 19: SH-114 NB Frontage Rd & Dove Rd
#16 #16
04 p2
116
7A1
m s
65.2 s
=19 =19
F
Q8 �95 `R'-
=19
05
81s 39.2s
9.8s
2/8/2016
MS
Synchro 9 Report
Page 12
22: Dove Rd & Kirkwood Blvd
2032 Background
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: PM
*_
t
ti
r
Lane Grout-
EBL
EST
WBT
WBR
SBL
SBR
Lane Configurations
►j
Tt
Tf+
Vi
?I
Traffic Volume (vph)
162
255
366
309
143
430
Future Volume (vph)
162
255
366
309
143
430
Peak Hour Factor
0.90
0.90
0.90
0.90
0.90
0.90
Adj. Flow (vph)
180
283
407
343
159
478
Shared Lane Traffic (%)
Lane Group Flow (vph)
180
283
750
0
159
478
Turn Type
pm+pt
NA
NA
Prot
Perm
Protected Phases
7
4
8
1
Permitted Phases
4
6
Detector Phase
7
4
8
1
6
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
5.0
Minimum Split (s)
9.5
22.5
22.5
9.5
22.5
Total Split (s)
22.0
51.0
29.0
59.0
59.0
Total Split (%)
20.0 %
46.4%
26.4%
53.6% 53.6%
Yellow Time (s)
3.5
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
4.5
4.5
Lead/Lag
Lead
Lag
Lead -Lag Optimize?
Yes
Yes
Recall Mode
None
C-Max
C-Max
None
Max
Act Effct Green (s)
46.5
46.5
29.2
54.5
54.5
Actuated g/C Ratio
0.42
0.42
0.27
0.50
0.50
v/c Ratio
0.66
0.19
0.75
0.18
0.47
Control Delay
33.9
20.4
33.9
16.1
3.0
Queue Delay
0.0
0.0
0.0
0.0
0.0
Total Delay
33.9
20.4
33.9
16.1
3.0
LOS
C
C
C
B
A
Approach Delay
25.6
33.9
6.3
Approach LOS
C
C
A
Queue Length 50th (ft)
80
64
196
60
0
Queue Length 95th (ft)
142
94
#310
100
52
Internal Link Dist (ft)
990
172
351
Turn Bay Length (ft)
100
Base Capacity (vph)
340
1496
1005
876
1025
Starvation Cap Reductn
0
0
0
0
0
Spillback Cap Reductn
0
0
0
0
0
Storage Cap Reductn
0
0
0
0
0
Reduced v/c Ratio
0.53
0.19
0.75
0.18
0.47
Intersection Summary
Cycle Length: 110
Actuated Cycle Length:110
Offset: 0 (0%), Referenced to
phase 4:EBTL
and 8:WBT,
Start of Green
Natural Cycle: 60
Control Type: Actuated -Coordinated
Maximum v/c Ratio: 0.75
22: Dove Rd & Kirkwood Blvd 2032 Background
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Intersection Signal Delay: 22.3 Intersection LOS: C
Intersection Capacity Utilization 54.2 % ICU Level of Service A
Analysis Period (min)15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases: 22: Dove Rd & Kirkwood Blvd
y01
--lp4 R'
51s
06
F
f 0 o8 `R1
2/8/2016 Synchro 9 Report 2/8/2016 Synchro 9 Report
MS Page 13 MS Page 14
19: SH-114 NB Frontage Rd & Dove Rd 2032 Background(With Improvements)
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Lane Group
EBL
EST
EBR WBL
WBT
WBR
NBL
NSF
NBR
SBL
Lane Configurations
0
tt
?I
Vi
tt
r
Traffic Volume (vph)
82
273
0 0
809
140
1220
1573
156
0 0 0
Future Volume (vph)
82
273
0 0
809
140
1220
1573
156
0 0 0
Peak Hour Factor
0.99
0.99
0.99 0.99
0.99
0.99
0.99
0.99
0.99
0.99 0.99 0.99
Adj. Flow (vph)
83
276
0 0
817
141
1232
1589
158
0 0 0
Shared Lane Traffic (%)
Lane Group Flow (vph)
0
359
0 0
817
141
1232
1589
158
0 0 0
Turn Type
pm+pt
NA
NA
Perm
Perm
NA
Perm
Protected Phases
5
56
6
8
Permitted Phases
56
6
8
8
Detector Phase
5
56
6
6
8
8
8
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
5.0
5.0
Minimum Split (s)
9.5
22.5
22.5
22.5
22.5
22.5
Total Split (s)
10.2
45.4
45.4
64.4
64.4
64.4
Total Split(%)
8.5%
37.8%
37.8%
53.7%
53.7%
53.7%
Yellow Time (s)
3.5
3.5
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
4.5
4.5
Lead/Lag
Lag
Lag
Lead
Lead
Lead
Lead -Lag Optimize?
Yes
Yes
Yes
Yes
Yes
Recall Mode
None
C-Min
C-Min
Max
Max
Max
Act Effct Green (s)
46.6
37.2
37.2
59.9
59.9
59.9
Actuated g/C Ratio
0.39
0.31
0.31
0.50
0.50
0.50
v/c Ratio
0.40
0.74
0.24
0.72
0.90
0.19
Control Delay
41.0
34.9
4.6
26.5
35.6
6.9
Queue Delay
0.0
2.7
0.0
16.7
0.0
0.0
Total Delay
41.0
37.6
4.6
43.2
35.6
6.9
LOS
D
D
A
D
D
A
Approach Delay
41.0
32.7
37.2
Approach LOS
D
C
D
Queue Length 50th (ft)
136
212
1
372
570
22
Queue Length 95th (ft)
189
271
32
454
687
59
Internal Link Dist (ft)
394
990
1769
1583
Turn Bay Length (ft)
200
200
Base Capacity (vph)
925
1206
629
1713
1766
841
Starvation Cap Reductn
0
0
0
0
0
0
Spillback Cap Reductn
0
267
0
497
0
0
Storage Cap Reductn
0
0
0
0
0
0
Reduced v/c Ratio
0.39
0.87
0.22
1.01
0.90
0.19
Intersection Summary
Cycle Length: 120
Actuated Cycle Length:120
Offset: 0 (0%), Referenced to
phase 2:EBWB and 6:, Start of Green
Natural Cycle: 90
Control Type: Actuated -Coordinated
Maximum v/c Ratio: 0.96
2/8/2016 Synchro 9 Report
MS Page 1
19: SH-114 NB Frontage Rd & Dove Rd 2032 Background(With Improvements)
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Lane Group-
e1 e2 o4
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
1 2 4
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
5.0 5.0 5.0
Minimum Split (s)
9.5 22.5 22.5
Total Split (s)
66.2 30.8 23.0
Total Split (%)
55% 26 % 19%
Yellow Time (s)
3.5 3.5 3.5
All -Red Time (s)
1.0 1.0 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lag Lead
Lead -Lag Optimize?
Yes Yes
Recall Mode
None C-Max None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
2/8/2016 Synchro 9 Report
MS Page 2
19: SH-114 NB Frontage Rd & Dove Rd
2032 Background(With Improvements)
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: PM
Intersection Signal Delay: 36.5
Intersection LOS: D
Intersection Capacity Utilization 87.0 %
ICU Level of Service E
Analysis Period (min)15
Splits and Phases: 19: SH-114 NB Frontage Rd & Dove Rd
#16 #16
#16
F
l 04
7n1
23s M JF.2s
19
19
R 19
A3
F
�P6 �'-
05
64.4s
1 1 145.4s
10.2s
218I2016
Synchro 9 Report
MS
Page 3
6: Solana Blvd/Kirkwood Blvd & SH-114 SB Off -Ramp 2032 Background + Site
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: AM
Lane Grouf------'TBL
EST
EBR
WBL
WBT
WBR NBL NBT NBR
SBL
S
Lane Configurations
tt
?
tt
+{�
Traffic Volume (vph) 0
504
376
455
950
0 0 0 0
809
2 93
Future Volume (vph) 0
504
376
455
950
0 0 0 0
809
2 93
Peak Hour Factor 0.92
0.92
0.92
0.92
0.92
0.92 0.92 0.92 0.92
0.92
0.92 0.92
Adj. Flow (vph) 0
548
409
495
1033
0 0 0 0
879
2 101
Shared Lane Traffic (%)
50%
Lane Group Flow (vph) 0
548
409
495
1033
0 0 0 0
439
543 0
Turn Type
NA
Perm
pm+pt
NA
Perm
NA
Protected Phases
2
1
12
4
Permitted Phases
2
12
4
Detector Phase
2
2
1
12
4
4
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
5.0
Minimum Split (s)
22.5
22.5
9.5
22.5
22.5
Total Split (s)
23.8
23.8
28.2
48.0
48.0
Total Split (%)
23.8%
23.8 %
28.2 %
48.0 %
48.0 %
Yellow Time (s)
3.5
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
4.5
4.5
Lead/Lag
Lag
Lag
Lead
Lead -Lag Optimize?
Yes
Yes
Yes
Recall Mode
C-Max
C-Max
None
None
None
Act Effct Green (s)
19.3
19.3
43.0
47.5
43.5
43.5
Actuated g/C Ratio
0.19
0.19
0.43
0.48
0.44
0.44
v/c Ratio
0.80
0.64
1.00
0.61
0.63
0.39
Control Delay
48.7
8.9
52.8
20.0
26.9
19.0
Queue Delay
0.0
0.0
0.0
3.3
0.6
0.1
Total Delay
48.7
8.9
52.8
23.3
27.5
19.0
LOS
D
A
D
C
C
B
Approach Delay
31.7
32.9
22.8
Approach LOS
C
C
C
Queue Length 50th (ft)
176
0
-252
298
232
117
Queue Length 95th (ft)
#252
84
m#367
m324
350
162
Internal Link Dist (ft)
1214
327
1036
836
Turn Bay Length (ft)
350
Base Capacity (vph)
683
635
493
1681
700
1396
Starvation Cap Reductn
0
0
0
530
0
0
Spillback Cap Reductn
0
0
0
0
68
102
Storage Cap Reductn
0
0
0
0
0
0
Reduced v/c Ratio
0.80
0.64
1.00
0.90
0.69
0.42
Intersection Summary
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 0 (0%), Referenced to phase 2:EBWB
and
6:, Start of Green
Natural Cycle: 90
Control Type: Actuated -Coordinated
Maximum v/c Ratio: 1.00
2/8/2016 Synchro 9 Report
MS Page 1
6: Solana Blvd/Kirkwood Blvd & SH-114 SIB Off -Ramp 2032 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Lane Group'
06
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
5 6 8
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
5.0 5.0 5.0
Minimum Split (s)
9.5 22.5 22.5
Total Split (s)
21.2 30.8 48.0
Total Split(%)
21% 31% 48%
Yellow Time (s)
3.5 3.5 3.5
All -Red Time (s)
1.0 1.0 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lag Lead
Lead -Lag Optimize?
Yes Yes
Recall Mode
None C-Max None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
2/8/2016 Synchro 9 Report
MS Page 2
6: Solana Blvd/Kirkwood Blvd & SH-114 SIB Off -Ramp 2032 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Intersection Signal Delay: 29.7 Intersection LOS: C
Intersection Capacity Utilization 91.4 % ICU Level of Service F
Analysis Period (min)15
- Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
iplits and Phases: 6: Solana Blvd/Kirkwood Blvd & SH-114 SB Off -Ramp
6 #6 #6
7q1 �m2 1`q4
�s #8 #8
F A
30.8 s
8: SH-114 NB Off -Ramp & Kirkwood Blvd
2032 Background + Site
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: AM
-'*,-,*
r-
4-
T/,.
ti 1
-'
Lane Group - - - - - -
- - ML
EBT EBR WBL
WBT
WBR
NBL
NBT
NBR SBL SBT
SBR
Lane Configurations
V1
tt
tt
?I
Vi
+Tf+
Traffic Volume (vph)
193
1122 0 0
548
107
859
183
736 0 0
0
Future Volume (vph)
193
1122 0 0
548
107
859
183
736 0 0
0
Peak Hour Factor
0.92
0.92 0.92 0.92
0.92
0.92
0.92
0.92
0.92 0.92 0.92
0.92
Adj. Flow (vph)
210
1220 0 0
596
116
934
199
800 0 0
0
Shared Lane Traffic (%)
28°%
Lane Group Flow (vph)
210
1220 0 0
596
116
672
1261
0 0 0
0
Turn Type
pm+pt
NA
NA
Free
Perm
NA
Protected Phases
5
56
6
8
Permitted Phases
56
Free
8
Detector Phase
5
56
6
8
8
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
Minimum Split (s)
9.5
22.5
22.5
22.5
Total Split (s)
21.2
30.8
48.0
48.0
Total Split (%)
21.2 %
30.8 %
48.0%
48.0%
Yellow Time (s)
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
4.5
Lead/Lag
Lag
Lead
Lead -Lag Optimize?
Yes
Yes
-
Recall Mode
None
C-Max
None
None
Act Effct Green (s)
43.0
47.5
26.3
100.0
43.5
43.5
-
Actuated g/C Ratio
0.43
0.48
0.26
1.00
0.44
0.44
v/c Ratio
0.50
0.73
0.64
0.07
0.96
1.19dr
-
Control Delay
39.3
33.2
36.4
0.1
54.4
41.2
Queue Delay
0.0
10.9
1.1
0.0
0.0
0.0
-
Total Delay
39.3
44.2
37.5
0.1
54.4
41.2
LOS
D
D
D
A
D
D
-
Approach Delay
43.5
31.4
45.8
Approach LOS
D
C
D
Queue Length 50th (ft)
106
332
177
0
445
403
Queue Length 95th (ft)
m164
411
236
0
#710
#565
Internal Link Dist (ft)
327
247
1055
1095
Turn Bay Length (ft)
a
Base Capacity(vph)
416
1681
930
1583
700
1340
Starvation Cap Reductn
0
448
0
0
0
0
Spillback Cap Reductn
0
0
147
0
0
0
Storage Cap Reductn
0
0
0
0
0
0
Reduced v/c Ratio
0.50
0.99
0.76
0.07
0.96
0.94
Intersection Summary
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 0 (0%), Referenced to phase 2:EBWB and 6:, Start of Green
Natural Cycle: 90
Control Type: Actuated -Coordinated
Maximum v/c Ratio:1.00
2/8/2016 Synchro 9 Report 2/8/2016 Synchro 9 Report
MS Page 3 MS Page 4
8: SH-114 NB Off -Ramp & Kirkwood Blvd 2032 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All -Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead -Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
5.0 5.0 5.0
9.5 22.5 22.5
28.2 23.8 48.0
28% 24% 48%
3.5 3.5 3.5
1.0 1.0 1.0
Lead Lag
Yes Yes
None C-Max None
8: SH-114 NB Off -Ramp & Kirkwood Blvd 2032 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Intersection Signal Delay: 42.4 Intersection LOS: D
Intersection Capacity Utilization 91.4 % ICU Level of Service F
Analysis Period (min)15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
dr Defacto Right Lane. Recode with 1 though lane as a right lane.
2/8/2016 Synchro 9 Report 2/8/2016
MS Page 5 MS
Synchro 9 Report
Page 6
16: Dove Rd & SH-114 SIB Off -Ramp
2032 Background + Site
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: AM
Lane Group EBL
EST EBR
WBL
WBT
WBR NBL NBT NBR
SBL
Lane Configurations
tT+
+Tt
)
r{
Traffic Volume (vph) 0
591 1056
141
691
0 0 0 0
240
181 89
Future Volume (vph) 0
591 1056
141
691
0 0 0 0
240
181 89
Peak Hour Factor 0.83
0.83 0.83
0.83
0.83
0.83 0.83 0.83 0.83
0.83
0.83 0.83
Adj. Flow (vph) 0
712 1272
170
833
0 0 0 0
289
218 107
Shared Lane Traffic (°!°)
29%
Lane Group Flow (vph) 0
1984 0
0
1003
0 0 0 0
205
409 0
Turn Type
NA
pm+pt
NA
Perm
NA
Protected Phases
2
1
21
4
Permitted Phases
21
4
Detector Phase
2
1
21
4
4
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
Minimum Split (s)
22.5
9.5
22.5
22.5
Total Split (s)
68.0
9.5
22.5
22.5
Total Split (%)
68.0%
9.5 %
22.5 %
22.5%
Yellow Time (s)
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
Lead/Lag
Lag
Lead
Lead
Lead -Lag Optimize?
Yes
Yes
Yes
Recall Mode
C-Max
None
None
None
Act Effct Green (s)
65.0
70.0
16.5
16.5
Actuated g/C Ratio
0.65
0.70
0.16
0.16
v/c Ratio
1.10dr
1.04dl
0.77
0.72
Control Delay
20.5
9.7
59.9
43.4
Queue Delay
0.0
0.0
0.0
0.0
Total Delay
20.5
9.7
59.9
43.4
LOS
C
A
E
D
Approach Delay
20.5
9.7
48.9
Approach LOS
C
A
D
Queue Length 50th (ft)
475
76
136
121
Queue Length 95th (ft)
494
57
202
158
Internal Link Dist (ft)
224
394
1722
1376
Turn Bay Length (ft)
240
Base Capacity (vph)
2187
1323
289
613
Starvation Cap Reductn
0
0
0
0
Spillback Cap Reductn
0
0
0
0
Storage Cap Reductn
0
0
0
0
Reduced v/c Ratio
0.91
0.76
0.71
0.67
Intersection Summary
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 0 (0%), Referenced to phase 2:EBWB
and 6:, Start of Green
Natural Cycle: 90
Control Type: Actuated -Coordinated
Maximum v/c Ratio: 0.91
2/8/2016 Synchro 9 Report
MS Page 7
16: Dove Rd & SH-114 SB Off -Ramp 2032 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Lane Group
o6 08
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
5 6 8
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
5.0 5.0 5.0
Minimum Split (s)
9.5 22.5 22.5
Total Split (s)
9.5 54.5 36.0
Total Split (%)
10% 55 % 36%
Yellow Time (s)
3.5 3.5 3.5
All -Red Time (s)
1.0 1.0 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lag Lead
Lead -Lag Optimize?
Yes Yes
Recall Mode
None C-Min Max
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
2/8/2016 Synchro 9 Report
MS Page 8
16: Dove Rd & SH-114 SIB Off -Ramp 2032 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Intersection Signal Delay: 22.4 Intersection LOS: C
Intersection Capacity Utilization 94.7 % ICU Level of Service F
Analysis Period (min)15
dl Defacto Left Lane. Recode with 1 though lane as a left lane.
dr Defacto Right Lane. Recode with 1 though lane as a right lane.
Splits and Phases: 16: Dove Rd & SH-114 SB Off -Ramp
#16 #16
04 p2
#16
F i 1
22.5 s
9.5 s.
-19 #�1+9}
06
r 19
36s
9.ss
19: SH-114 NB Frontage Rd & Dove Rd
2032 Background + Site
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: AM
-,*,-,*
r-
4-
T/,.
ti
1
-'
Lane Group-
EBL
EBT EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
Lane Configurations
+Tt
0
►j
q +
Traffic Volume (vph)
104
716 0
0
493
132
353
160
556
0
0
0
Future Volume (vph)
104
716 0
0
493
132
353
160
556
0
0
0
Peak Hour Factor
0.80
0.80 0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
Adj. Flow (vph)
130
895 0
0
616
165
441
200
695
0
0
0
Shared Lane Traffic (%)
10°%
Lane Group Flow (vph)
0
1025 0
0
781
0
397
939
0
0
0
0
Turn Type
pm+pt
NA
NA
Perm
NA
Protected Phases
5
65
6
8
Permitted Phases
65
8
Detector Phase
5
65
6
8
8
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
Minimum Split (s)
9.5
22.5
22.5
22.5
Total Split (s)
9.5
54.5
36.0
36.0
Total Split (%)
9.5 %
54.5 %
36.0%
36.0%
AN
Yellow Time (s)
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
Lead/Lag
Lag
Lead
Lead
Lead -Lag Optimize?
Yes
Yes
Yes
Recall Mode
None
C-Min
Max
Max
Act Effct Green (s)
55.0
46.2
31.5
31.5
Actuated g/C Ratio
0.55
0.46
0.32
0.32
v/c Ratio
0.74
0.49
0.78
1.23dr
-
Control Delay
15.6
9.0
43.7
41.6
Queue Delay
0.1
0.0
0.0
0.0
-
Total Delay
15.8
9.0
43.7
41.6
LOS
B
A
D
D
-
Approach Delay
15.8
9.0
42.2
Approach LOS
B
A
D
Queue Length 50th (ft)
167
49
251
275
Queue Length 95th (ft)
175
71
320
302
Internal Link Dist (ft)
394
990
1769
1583
Turn Bay Length (ft)
a
Base Capacity (vph)
1421
1737
507
1037
Starvation Cap Reductn
39
0
0
0
Spillback Cap Reductn
0
0
0
0
Storage Cap Reductn
0
0
0
0
Reduced v/c Ratio
0.74
0.45
0.78
0.91
Intersection Summary
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 0 (0%), Referenced to phase 2:EBWB and 6:, Start
of Green
Natural Cycle: 90
Control Type: Actuated -Coordinated
Maximum v/c Ratio: 0.91
2/8/2016 Synchro 9 Report 2/8/2016 Synchro 9 Report
MS Page 9 MS Page 10
19: SH-114 NB Frontage Rd & Dove Rd 2032 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Lane Group
of o2 o4
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic
Lane Group Flow (vph)
Turn Type
Protected Phases
1 2 4
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
5.0 5.0 5.0
Minimum Split (s)
9.5 22.5 22.5
Total Split (s)
9.5 68.0 22.5
Total Split (%)
10% 68% 23%
Yellow Time (s)
3.5 3.5 3.5
All -Red Time (s)
1.0 1.0 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lag Lead
Lead -Lag Optimize?
Yes Yes
Recall Mode
None C-Max None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
2/8/2016 Synchro 9 Report
MS Page 11
19: SH-114 NB Frontage Rd & Dove Rd 2032 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Intersection Signal Delay: 25.3 Intersection LOS: C
Intersection Capacity Utilization 73.6 % ICU Level of Service D
Analysis Period (min)15
dr Defacto Right Lane. Recode with 1 though lane as a right lane.
Splits and Phases: 19: SH-114 NB Frontage Rd & Dove Rd
#16 #�16p
1 11 ;;2
=16
■ 11
22.5 s
9.5 s
-19 #19
TAB
=19
4"
06
36 s
9.5 s
2/8/2016
MS
Synchro 9 Report
Page 12
22: Dove Rd & Kirkwood Blvd
2032 Background + Site
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: AM
*_
t
ti
r
Lane Grout-
EBL
EST
WBT
WBR
SBL
SBR
Lane Configurations
►j
Tt
Tf+
Vi
?I
Traffic Volume (vph)
784
281
384
173
59
211
Future Volume (vph)
784
281
384
173
59
211
Peak Hour Factor
0.77
0.77
0.77
0.77
0.77
0.77
Adj. Flow (vph)
1018
365
499
225
77
274
Shared Lane Traffic (%)
Lane Group Flow (vph)
1018
365
724
0
77
274
Turn Type
pm+pt
NA
NA
Prot
Perm
Protected Phases
7
4
8
1
Permitted Phases
4
6
Detector Phase
7
4
8
1
6
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
5.0
Minimum Split (s)
9.5
22.5
22.5
9.5
9.5
Total Split (s)
57.0
86.0
29.0
14.0
14.0
Total Split (%)
57.0 %
86.0%
29.0 %
14.0 % 14.0%
Yellow Time (s)
3.5
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
4.5
4.5
Lead/Lag
Lead
Lag
Lead -Lag Optimize?
Yes
Yes
Recall Mode
None
C-Max
C-Max
None
None
Act Effct Green (s)
82.6
82.6
24.5
8.5
8.4
Actuated g/C Ratio
0.83
0.83
0.24
0.08
0.08
v/c Ratio
1.00
0.12
0.82
0.51
0.71
Control Delay
45.1
2.4
41.4
55.6
16.6
Queue Delay
0.0
0.0
0.0
0.0
0.0
Total Delay
45.1
2.4
41.4
55.6
16.6
LOS
D
A
D
E
B
Approach Delay
33.9
41.4
25.2
Approach LOS
C
D
C
Queue Length 50th (ft)
-594
25
210
47
0
Queue Length 95th (ft)
#611
m23
225
80
38
Internal Link Dist (ft)
990
172
351
Turn Bay Length (ft)
100
Base Capacity (vph)
1022
2922
878
168
398
Starvation Cap Reductn
0
0
0
0
0
Spillback Cap Reductn
0
0
0
0
0
Storage Cap Reductn
0
0
0
0
0
Reduced v/c Ratio
1.00
0.12
0.82
0.46
0.69
Intersection Sunl
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 0 (0%), Referenced to
phase 4:EBTL
and 8:WBT,
Start of Green
Natural Cycle: 90
Control Type: Actuated -Coordinated
Maximum v/c Ratio: 1.00
22: Dove Rd & Kirkwood Blvd 2032 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Intersection Signal Delay: 34.9 Intersection LOS: C
Intersection Capacity Utilization 75.0 % ICU Level of Service D
Analysis Period (min)15
- Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases: 22: Dove Rd & Kirkwood Blvd
�pl
--"p4
14s
86s
05
A7 08
14s
575
2/8/2016 Synchro 9 Report 2/8/2016 Synchro 9 Report
MS Page 13 MS Page 14
19: SH-114 NB Frontage Rd & Dove Rd 2032 Background + Site(With Improvements)
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Lane Group
EBL
EST
EBR
WBL
WBT
WBR
NBL
NBT
NBR SBL S
Lane Configurations
0
tt
?I
)VI
tt
Traffic Volume (vph)
104
716
0
0
493
132
353
160
556 0 0 0
Future Volume (vph)
104
716
0
0
493
132
353
160
556 0 0 0
Peak Hour Factor
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80 0.80 0.80 0.80
Adj. Flow (vph)
130
895
0
0
616
165
441
200
695 0 0 0
Shared Lane Traffic (%)
Lane Group Flow (vph)
0
1025
0
0
616
165
441
895
0 0 0 0
Turn Type
pm+pt
NA
NA
Perm
Perm
NA
Protected Phases
5
65
6
8
Permitted Phases
65
6
8
Detector Phase
5
65
6
6
8
8
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
5.0
Minimum Split (s)
9.5
22.5
22.5
22.5
22.5
Total Split (s)
9.5
52.5
52.5
38.0
38.0
Total Split (%)
9.5%
52.5 %
52.5%
38.0%
38.0%
Yellow Time (s)
3.5
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
4.5
Lead/Lag
Lag
Lag
Lead
Lead
Lead -Lag Optimize?
Yes
Yes
Yes
Yes
Recall Mode
None
C-Min
C-Min
Max
Max
Act Effct Green (s)
53.0
43.9
43.9
33.5
33.5
Actuated g/C Ratio
0.53
0.44
0.44
0.34
0.34
v/c Ratio
0.72
0.40
0.21
0.38
1.14dr
Control Delay
15.8
19.3
3.0
26.6
32.0
Queue Delay
0.2
0.0
0.0
0.0
0.0
Total Delay
16.0
19.3
3.0
26.6
32.0
LOS
B
B
A
C
C
Approach Delay
16.0
15.9
30.2
Approach LOS
B
B
C
Queue Length 50th (ft)
180
125
0
109
236
Queue Length 95th (ft)
187
143
23
131
261
Internal Link Dist (ft)
394
990
1769
1583
Turn Bay Length (ft)
200
Base Capacity (vph)
1470
1698
845
1150
1128
Starvation Cap Reductn
67
0
0
0
0
Spillback Cap Reductn
0
0
0
0
0
Storage Cap Reductn
0
0
0
0
0
Reduced v/c Ratio
0.73
0.36
0.20
0.38
0.79
Intersection Summary
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 0 (0%), Referenced to
phase 2:EBWB and 6:, Start of Green
Natural Cycle: 90
Control Type: Actuated -Coordinated
Maximum v/c Ratio: 0.91
2/8/2016 Synchro 9 Report
MS Page 1
19: SH-114 NB Frontage Rd & Dove Rd 2032 Background + Site(With Improvements)
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Lane Group-
of o2 o4
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
1 2 4
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
5.0 5.0 5.0
Minimum Split (s)
9.5 22.5 22.5
Total Split (s)
9.5 68.0 22.5
Total Split (%)
10% 68% 23%
Yellow Time (s)
3.5 3.5 3.5
All -Red Time (s)
1.0 1.0 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lag Lead
Lead -Lag Optimize?
Yes Yes
Recall Mode
None C-Max None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
2/8/2016 Synchro 9 Report
MS Page 2
19: SH-114 NB Frontage Rd & Dove Rd 2032 Background + Site(With Improvements)
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: AM
Intersection Signal Delay: 22.0 Intersection LOS: C
Intersection Capacity Utilization 70.1 % ICU Level of Service C
Analysis Period (min)15
dr Defacto Right Lane. Recode with 1 though lane as a right lane.
Splits and Phases: 19: SH-114 NB Frontage Rd & Dove Rd
218I2016
Synchro 9 Report
Ms
Page 3
=16
1 04
#�1+6
rt�W2
=16
701
22.5 s
9.5 s
=19
QB
-19
F
� �5 'R',
=19
4.1
38s
525s
9.5s
2: Driveway 4/T W King Rd & Kirkwood Blvd 2032 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Intersection
Intersection Delay, s/veh
58.4
Intersection LOS
F
Movement
EBU
EBL
EBT
EBR
WBU
WBL
WBT
WBR
NBU
NBL
NBT
NBR
Traffic Vol, veh/h
0
43
1031
184
0
0
126
15
0
25
2
0
Future Vol, veh/h
0
43
1031
184
0
0
126
15
0
25
2
0
Peak Hour Factor
0.92
0.91
0.91
0.92
0.92
0.92
0.91
0.91
0.92
0.92
0.92
0.92
Heavy Vehicles, %
2
2
2
2
2
2
2
2
2
2
2
2
Mvmt Flow
0
47
1133
200
0
0
138
16
0
27
2
0
Number of Lanes
0
1
2
0
0
0
2
0
0
0
2
0
Approach
Wf3 -
NB ]NEW
Opposing Approach
WB
EB
SB
Opposing Lanes
2
3
2
Conflicting Approach Left
SB
NB
EB
Conflicting Lanes Left
2
2
3
Conflicting Approach Right
NB
SB
WB
Conflicting Lanes Right
2
2
2
HCM Control Delay
66.3
14.6
14.1
HCM LOS
F
B
B
Lane NBLn1 NBLn2 EBLnl E13Ln2 EBLn3 WBLnl WBLn2 SBLnl S13Ln2
Vol Left,%
97%
0%
100%
0%
0%
0%
0%
93%
0%
Vol Thru, %
3%
100%
0%
100%
65%
100%
74%
7%
0%
Vol Right, %
0%
0%
0%
0%
35%
0%
26%
0%
100%
Sign Control
Stop
Stop
Stop
Stop
Stop
Stop
Stop
Stop
Stop
Traffic Vol by Lane
26
1
43
687
528
84
57
168
459
LT Vol
25
0
43
0
0
0
0
156
0
Through Vol
1
1
0
687
344
84
42
12
0
RT Vol
0
0
0
0
184
0
15
0
459
Lane Flow Rate
28
1
47
755
578
92
63
184
504
Geometry Grp
8
8
8
8
8
8
8
8
8
Degree ofUtil(X)
0.081
0.004
0.107
1
1
0.242
0.161
0.435
1
Departure Headway (Hd)
10.493
10.008
8.181
7.671
7.422
9.442
9.258
8.497
7.337
Convergence, YIN
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Cap
341
357
445
483
497
382
389
424
494
Service Time
8.258
7.772
5.808
5.31
5,067
7.162
6.978
6.231
5.072
HCM Lane VIC Ratio
0.082
0.003
0.106
1.563
1.163
0.241
0.162
0.434
1.02
HCM Control Delay
14.2
12.8
11.8
68.8
67.6
15.2
13.8
17.6
67.7
HCM Lane LOS
B
B
B
F
F
C
B
C
F
HCM 95th-tile Q
0.3
0
0.4
13.3
13.5
0.9
0.6
2.2
13.5
2: Driveway 4/T W King Rd & Kirkwood Blvd 2032 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Intersection
Intersection Delay, s/veh
Intersection LOS
Movement
SBU
SBL
SBT
SBF
Traffic Vol, veh/h
0
156
12
459
Future Vol, veh/h
0
156
12
459
Peak Hour Factor
0.92
0.91
0.92
0.91
Heavy Vehicles, %
2
2
2
2
Mvmt Flow
0
171
13
504
Number of Lanes
0
0
1
1
Approach
SB
Opposing Approach
NB
Opposing Lanes
2
Conflicting Approach Left
WB
Conflicting Lanes Left
2
Conflicting Approach Right
EB
Conflicting Lanes Right
3
HCM Control Delay
54.3
HCM LOS
F
2/8/2016 Synchro 9 Report 2/8/2016 Synchro 9 Report
MS Page 1 MS Page 2
12: Kirkwood Blvd & Driveway 3 2032 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Intersection
Int Delay, s/veh 1.1
14: Kirkwood Blvd & Driveway 1 2032 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: AM
Intersection
Int Delay, s/veh 1.9
Movement -1
EBL
EBR
NBL
NBT
SBT
SBR
Movement
EBL
EB
Traffic Vol, veh/h
22
17
61
412
392
184
Traffic Vol, veh/h
29
25
184
666
66
184
Future Vol, veh/h
22
17
61
412
392
184
Future Vol, veh/h
29
25
184
666
66
184
Conflicting Peds, #Ihr
0
0
0
0
0
0
Conflicting Peds, #Ihr
0
0
0
0
0
0
Sign Control
Stop
Stop
Free
Free
Free
Free
Sign Control
Stop
Stop
Free
Free
Free
Free
RT Channelized
-
None
None
None
RT Channelized
-
None
-
None
None
Storage Length
0
100
-
150
Storage Length
0
100
150
-
150
Veh in Median Storage, #
0
-
0
0
-
Veh in Median Storage, #
0
-
-
0
0
-
Grade, %
0
-
0
0
-
Grade, %
0
-
-
0
0
-
Peak Hour Factor
92
92
92
92
92
92
Peak Hour Factor
92
92
92
92
92
92
Heavy Vehicles,%
2
2
2
2
2
2
Heavy Vehicles,%
2
2
2
2
2
2
Mvmt Flow
24
18
66
448
426
200
Mvmt Flow
32
27
200
724
72
200
Major/Minor
Minor2
Majorl
Major2
Major/Minor
Minot
Majorl
Major2
Conflicting Flow All
783
213
426
0
0
Conflicting Flow All
834
36
72
0
0
Stage 1
426
-
-
-
-
Stage 1
72
-
-
-
-
Stage 2
357
-
-
Stage 2
762
-
-
Critical Hdwy
6.84
6.94
4.14
Critical Hdwy
6.84
6.94
4.14
Critical Hdwy Stg 1
5.84
-
-
Critical Hdwy Stg 1
5.84
-
Critical Hdwy Stg 2
5.84
-
-
Critical Hdwy Stg 2
5.84
-
-
Follow-up Hdwy
3.52
3.32
2.22
Follow-up Hdwy
3.52
3.32
2.22
Pot Cap-1 Maneuver
331
792
1130
Pot Cap-1 Maneuver
307
1029
1526
Stage 1
627
-
-
Stage 1
942
-
-
Stage 2
679
-
-
Stage 2
421
-
-
Platoon blocked, %
Platoon blocked, %
Mov Cap-1 Maneuver
305
792
1130
Mov Cap-1 Maneuver
267
1029
1526
Mov Cap-2 Maneuver
305
-
-
Mov Cap-2 Maneuver
267
-
-
Stage 1
627
Stage 1
942
Stage 2
626
Stage 2
366
Approach
EB
NB
SB
Approach
EB
NB
SB
HCM Control Delay, s
14.3
1.3
0
HCM Control Delay, s
14.9
1.7
0
HCM LOS
B
HCM LOS
B
Minor Lane/MajorMvmt
NBL
NBTEBLn1EBLn2
SBT
SBR
Minor Lane/MajorMvmt
NBL
NBT EBLn I EBLn2
SBT
SBR
Capacity (veh/h)
1130
305 792
Capacity (veh/h)
1526
267 1029
HCM Lane V/C Ratio
0.059
0.078 0.023
HCM Lane V/C Ratio
0.131
0.118 0.026
HCM Control Delay (s)
8.4
0.3 17.8 9.7
HCM Control Delay (s)
7.7
20.3 8.6
HCM Lane LOS
A
A C A
HCM Lane LOS
A
C A
HCM 95th %tile Q(veh)
0.2
- 0.3 0.1
HCM 95th %tile Q(veh)
0.5
0.4 0.1
2/8/2016 Synchro 9 Report 2/8/2016 Synchro 9 Report
MS Page 1 MS Page 2
30: Kirkwood Blvd & Driveway 2
2032 Background + Site
TIA for Wilks Tract Development
in Southlake,
Texas
Timing Plan: AM
Intersection
Int Delay, s/veh 2.6
Movement -1
EBL
EBR
NBL
NBT
SBT
SBR
Traffic Vol, veh/h
25
25
246
449
225
184
Future Vol, veh/h
25
25
246
449
225
184
Conflicting Peds, #/hr
0
0
0
0
0
0
Sign Control
Stop
Stop
Free
Free
Free
Free
RT Channelized
-
None
-
None
None
Storage Length
0
100
150
-
-
150
Veh in Median Storage, #
0
-
-
0
0
-
Grade, %
0
-
-
0
0
-
Peak Hour Factor
92
92
92
92
92
92
Heavy Vehicles, %
2
2
2
2
2
2
Mvmt Flow
27
27
267
488
245
200
Major/Minor
Minor2
Majorl
Major2
Conflicting Flow All
1024
122
245
0
0
Stage 1
245
-
-
-
-
Stage 2
779
-
-
Critical Hdwy
6.84
6.94
4.14
Critical Hdwy Stg 1
5.84
-
-
Critical Hdwy Stg 2
5.84
-
-
Follow-up Hdwy
3.52
3.32
2.22
Pot Cap-1 Maneuver
231
906
1318
Stage 1
773
-
-
Stage 2
413
-
-
Platoon blocked,
Mov Cap-1 Maneuver
184
906
1318
Mov Cap-2 Maneuver
184
-
-
Stage 1
773
Stage 2
329
Approach
EB
NB
SB
HCM Control Delay, s
18.5
3
0
HCM LOS
C
Minor Lane/MajorMvmt
NBL
NBTEBLn1EBLn2
SBT
SBR
Capacity (veh/h)
1318
184 906
HCM Lane V/C Ratio
0.203
0.148 0.03
HCM Control Delay (s)
8.4
27.9 9.1
HCM Lane LOS
A
D A
HCM 95th %tile Q(veh)
0.8
0.5 0.1
2/8/2016
Synchro 9 Report
MS
Page 3
6: Solana Blvd/Kirkwood Blvd & SH-114 SB Off -Ramp 2032 Background + Site
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: PM
Lane Grouf------'TBL
EST
EBR
WBL
WBT
WBR NBL NBT NBR
SBL
Sk
Lane Configurations
tt
?I
)
tt
)
+j +
Traffic Volume (vph) 0
374
907
703
588
0 0 0 0
317
3 69
Future Volume (vph) 0
374
907
703
588
0 0 0 0
317
3 69
Peak Hour Factor 0.96
0.96
0.96
0.96
0.96
0.96 0.96 0.96 0.96
0.96
0.96 0.96
Adj. Flow (vph) 0
390
945
732
613
0 0 0 0
330
3 72
Shared Lane Traffic (%)
50%
Lane Group Flow (vph) 0
390
945
732
613
0 0 0 0
165
240 0
Turn Type
NA
Perm
pm+pt
NA
Perm
NA
Protected Phases
2
1
12
4
Permitted Phases
2
12
4
Detector Phase
2
2
1
12
4
4
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
5.0
Minimum Split (s)
22.5
22.5
9.5
22.5
22.5
Total Split (s)
33.6
33.6
32.4
44.0
44.0
Total Split (%)
30.5%
30.5 %
29.5 %
40.0 %
40.0%
Yellow Time (s)
3.5
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
4.5
4.5
Lead/Lag
Lag
Lag
Lead
Lead -Lag Optimize?
Yes
Yes
Yes
Recall Mode
C-Max
C-Max
None
Max
Max
Act Effct Green (s)
29.1
29.1
57.0
61.5
39.5
39.5
Actuated g/C Ratio
0.26
0.26
0.52
0.56
0.36
0.36
v/c Ratio
0.42
1.03
1.12
0.31
0.29
0.21
Control Delay
35.1
50.3
103.4
16.5
26.9
18.5
Queue Delay
0.0
0.0
0.3
0.4
0.3
0.1
Total Delay
35.1
50.3
103.6
16.9
27.2
18.6
LOS
D
D
F
B
C
B
Approach Delay
45.9
64.1
22.1
Approach LOS
D
E
C
Queue Length 50th (ft)
120
-336
-464
127
90
46
Queue Length 95th (ft)
166
#585
m#550
m140
150
77
Internal Link Dist (ft)
1216
327
1036
836
Turn Bay Length (ft)
350
Base Capacity (vph)
936
917
653
1978
578
1163
Starvation Cap Reductn
0
0
24
830
0
0
Spillback Cap Reductn
0
0
0
0
133
264
Storage Cap Reductn
0
0
0
0
0
0
Reduced v/c Ratio
0.42
1.03
1.16
0.53
0.37
0.27
Intersection Summary
Cycle Length: 110
Actuated Cycle Length:110
Offset: 0 (0%), Referenced to phase 2:EBWB
and
5:, Start of Green
Natural Cycle:110
Control Type: Actuated -Coordinated
Maximum v/c Ratio:1.13
2/8/2016 Synchro 9 Report
MS Page 1
6: Solana Blvd/Kirkwood Blvd & SH-114 SIB Off -Ramp 2032 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Lane Group'
06
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
5 6 8
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
5.0 5.0 5.0
Minimum Split (s)
10.0 22.5 22.5
Total Split (s)
31.0 35.0 44.0
Total Split (%)
28% 32 % 40%
Yellow Time (s)
3.5 3.5 3.5
All -Red Time (s)
1.0 1.0 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead Lag
Lead -Lag Optimize?
Yes Yes
Recall Mode
C-Max Max Max
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
2/8/2016 Synchro 9 Report
MS Page 2
6: Solana Blvd/Kirkwood Blvd & SH-114 SIB Off -Ramp 2032 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Intersection Signal Delay: 50.7 Intersection LOS: D
Intersection Capacity Utilization 114.0% ICU Level of Service H
Analysis Period (min)15
- Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases: 6: Solana Blvd/Kirkwood Blvd & SH-114 SB Off -Ramp
46 #6
7q1 042
=6I
j 14
.6 s
44 s
s =s
F
144
=3
s
nm� ��¢6
.s
31s 1
35s
s
8: SH-114 NB Off -Ramp & Kirkwood Blvd
2032 Background + Site
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: PM
-'*,-,*
r-
4-
T/,.
ti
1 -'
Lane Group -
EBL
EBT EBR WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT SBR
Lane Configurations
V1
tt
tt
?I
Vi
tt
?I
Traffic Volume (vph)
538
235 0 0
928
939
433
1316
86
0
0 0
Future Volume (vph)
538
235 0 0
928
939
433
1316
86
0
0 0
Peak Hour Factor
0.96
0.96 0.96 0.96
0.96
0.96
0.96
0.96
0.96
0.96
0.96 0.96
Adj. Flow (vph)
560
245 0 0
967
978
451
1371
90
0
0 0
Shared Lane Traffic (%)
Lane Group Flow (vph)
560
245 0 0
967
978
451
1371
90
0
0 0
Turn Type
pm+pt
NA
NA
Free
Perm
NA
Free
Protected Phases
5
56
6
8
Permitted Phases
56
Free
8
Free
Detector Phase
5
56
6
8
8
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
Minimum Split (s)
10.0
22.5
22.5
22.5
Total Split (s)
31.0
35.0
44.0
44.0
Total Split (%)
28.2 %
31.8 %
40.0%
40.0%
JIM
Yellow Time (s)
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
4.5
Lead/Lag
Lead
Lag
Lead -Lag Optimize?
Yes
Yes
Recall Mode
C-Max
Max
Max
Max
Act Effct Green (s)
57.0
61.5
30.5
110.0
39.5
39.5
110.0
Actuated g/C Ratio
0.52
0.56
0.28
1.00
0.36
0.36
1.00
v/c Ratio
1.13
0.12
0.99
0.62
0.71
1.08
0.06
Control Delay
125.9
13.6
65.6
1.8
37.7
84.2
0.1
Queue Delay
0.0
0.0
2.1
0.0
18.6
0.0
0.0
i
Total Delay
125.9
13.6
67.7
1.8
56.3
84.2
0.1
LOS
F
B
E
A
E
F
A
-
Approach Delay
91.7
34.6
73.6
Approach LOS
F
C
E
Queue Length 50th (ft)
-425
43
357
0
271
-570
0
Queue Length 95th (ft)
#649
64
#498
0
393
#706
0
Internal Link Dist (ft)
327
240
1055
1095
Turn Bay Length (ft)
340
Base Capacity(vph)
494
1978
981
1583
635
1270
1583
Starvation Cap Reductn
1
0
0
0
0
0
0
Spillback Cap Reductn
0
0
10
0
179
0
0
Storage Cap Reductn
0
0
0
0
0
0
0
Reduced v/c Ratio
1.14
0.12
1.00
0.62
0.99
1.08
0.06
Intersection Sum`
Cycle Length: 110
Actuated Cycle Length: 110
Offset: 0 (0%), Referenced to phase 2:EBWB and 5:, Start of Green
Natural Cycle: 110
Control Type: Actuated -Coordinated
Maximum v/c Ratio:1.13
2/8/2016 Synchro 9 Report 2/8/2016 Synchro 9 Report
MS Page 3 MS Page 4
8: SH-114 NB Off -Ramp & Kirkwood Blvd 2032 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All -Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead -Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
5.0 5.0 5.0
9.5 22.5 22.5
32.4 33.6 44.0
29% 31% 40%
3.5 3.5 3.5
1.0 1.0 1.0
Lead Lag
Yes Yes
None C-Max Max
8: SH-114 NB Off -Ramp & Kirkwood Blvd 2032 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Intersection Signal Delay: 60.5 Intersection LOS: E
Intersection Capacity Utilization 114.0 % ICU Level of Service H
Analysis Period (min)15
- Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases: 8: SH-114 NB Off -Ramp & Kirkwood Blvd
#6 #6
6
= 6
's
33.6s R
44s
ma
0.5
�8
��F p6
=a
oa
35 s
44 s
2/8/2016 Synchro 9 Report 2/8/2016
MS Page 5 MS
Synchro 9 Report
Page 6
16: Dove Rd & SH-114 SIB Off -Ramp
2032 Background + Site
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: PM
Lane Group EBL
EST EBR
WBL
WBT
WBR NBL NBT NBR
SBL
Lane Configurations
tT+
Traffic Volume (vph) 0
250 408
596
1734
0 0 0 0
146
199
181
Future Volume (vph) 0
250 408
596
1734
0 0 0 0
146
199
181
Peak Hour Factor 0.96
0.96 0.96
0.96
0.96
0.96 0.96 0.96 0.96
0.96
0.96
0.96
Adj. Flow (vph) 0
260 425
621
1806
0 0 0 0
152
207
189
Shared Lane Traffic (°!°)
10%
Lane Group Flow (vph) 0
685 0
0
2427
0 0 0 0
137
411
0
Turn Type
NA
pm+pt
NA
Perm
NA
Protected Phases
2
1
12
4
Permitted Phases
12
4
Detector Phase
2
1
12
4
4
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
Minimum Split (s)
22.5
9.5
22.5
22.5
Total Split (s)
42.8
84.2
23.0
23.0
Total Split (%)
28.5%
56.1 %
15.3 %
15.3%
Yellow Time (s)
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
Lead/Lag
Lag
Lead
Lead
Lead -Lag Optimize?
Yes
Yes
Yes
Recall Mode
C-Max
None
None
None
Act Effct Green (s)
38.6
118.3
18.2
18.2
Actuated g/C Ratio
0.26
0.79
0.12
0.12
v/c Ratio
0.67
1.04
0.71
0.92
Control Delay
33.7
34.8
83.0
78.0
Queue Delay
0.0
23.2
0.0
0.0
Total Delay
33.7
58.0
83.0
78.0
LOS
C
E
F
E
Approach Delay
33.7
58.0
79.3
Approach LOS
C
E
E
Queue Length 50th (ft)
200
-1088
143
181
Queue Length 95th (ft)
272
m378
#242
#283
Internal Link Dist (ft)
224
394
1722
1376
Turn Bay Length (ft)
240
Base Capacity (vph)
1022
2324
198
456
Starvation Cap Reductn
0
205
0
0
Spillback Cap Reductn
0
0
0
0
Storage Cap Reductn
0
0
0
0
Reduced v/c Ratio
0.67
1.15
0.69
0.90
Intersection Summary
Cycle Length: 150
Actuated Cycle Length:150
Offset: 0 (0%), Referenced to phase 2:EBWB
and 6:, Start of Green
Natural Cycle:150
Control Type: Actuated -Coordinated
Maximum v/c Ratio:1.14
2/8/2016 Synchro 9 Report
MS Page 7
16: Dove Rd & SH-114 SB Off -Ramp 2032 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Lane Group
o6 08
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
5 6 8
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
5.0 5.0 5.0
Minimum Split (s)
9.5 22.5 22.5
Total Split (s)
9.5 55.5 85.0
Total Split (%)
6% 37% 57%
Yellow Time (s)
3.5 3.5 3.5
All -Red Time (s)
1.0 1.0 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lag Lead
Lead -Lag Optimize?
Yes Yes
Recall Mode
None C-Min Max
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
2/8/2016 Synchro 9 Report
MS Page 8
16: Dove Rd & SH-114 SIB Off -Ramp 2032 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Intersection Signal Delay: 56.7 Intersection LOS: E
Intersection Capacity Utilization 106.9% ICU Level of Service G
Analysis Period (min)15
- Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
iplits and Phases: 16: Dove Rd & SH-114 SB Off -Ramp
916 #16 «16
�-
94 2 701
Z3 s 84.2s
=19 -19 -19
F
A8 6
35s 1 19.5
19: SH-114 NB Frontage Rd & Dove Rd
2032 Background + Site
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: PM
-'*,-,*
r-
4-
T/,.
ti 1
-'
Lane Group
L
EBT EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL SBT
SBR
Lane Configurations
+Tt
0
)
4T+
Traffic Volume (vph)
82
318 0
0
1085
250
1220
1573
190
0 0
0
Future Volume (vph)
82
318 0
0
1085
250
1220
1573
190
0 0
0
Peak Hour Factor
0.99
0.99 0.99
0.99
0.99
0.99
0.99
0.99
0.99
0.99 0.99
0.99
Adj. Flow (vph)
83
321 0
0
1096
253
1232
1589
192
0 0
0
Shared Lane Traffic (%)
20°%
Lane Group Flow (vph)
0
404 0
0
1349
0
986
2027
0
0 0
0
Turn Type
pm+pt
NA
NA
Perm
NA
Protected Phases
5
56
6
8
Permitted Phases
56
8
Detector Phase
5
56
6
8
8
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
Minimum Split (s)
9.5
22.5
22.5
22.5
Total Split (s)
9.5
55.5
85.0
85.0
Total Split (%)
6.3%
37.0 %
56.7%
56.7%
JIM
Yellow Time (s)
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
Lead/Lag
Lag
Lead
Lead
Lead -Lag Optimize?
Yes
Yes
Yes
-
Recall Mode
None
C-Min
Max
Max
Act Effct Green (s)
56.0
51.0
80.5
80.5
-
Actuated g/C Ratio
0.37
0.34
0.54
0.54
v/c Ratio
0.55
1.14
1.14
1.13
-
Control Delay
63.5
117.9
110.4
100.8
Queue Delay
0.0
0.1
0.9
0.2
-
Total Delay
63.5
117.9
111.4
101.0
LOS
E
F
F
F
-
Approach Delay
63.5
117.9
104.4
Approach LOS
E
F
F
-
Queue Length 50th (ft)
203
-804
-1235
-1263
Queue Length 95th (ft)
m260
#946
#1521
#1403
Internal Link Dist (ft)
394
990
1769
1583
Turn Bay Length (ft)
a
Base Capacity (vph)
731
1182
864
1788
Starvation Cap Reductn
0
0
0
0
i
Spillback Cap Reductn
0
22
127
131
Storage Cap Reductn
0
0
0
0
Reduced v/c Ratio
0.55
1.16
1.34
1.22
Intersection Summary
Cycle Length: 150
Actuated Cycle Length: 150
Offset: 0 (0%), Referenced to phase 2:EBWB
and 6:, Start
of Green
Natural Cycle: 150
Control Type: Actuated -Coordinated
Maximum v/c Ratio: 1.14
2/8/2016 Synchro 9 Report 2/8/2016 Synchro 9 Report
MS Page 9 MS Page 10
19: SH-114 NB Frontage Rd & Dove Rd 2032 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Lane Group
of o2 o4
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic
Lane Group Flow (vph)
Turn Type
Protected Phases
1 2 4
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
5.0 5.0 5.0
Minimum Split (s)
9.5 22.5 22.5
Total Split (s)
84.2 42.8 23.0
Total Split (%)
56 % 29% 15%
Yellow Time (s)
3.5 3.5 3.5
All -Red Time (s)
1.0 1.0 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lag Lead
Lead -Lag Optimize?
Yes Yes
Recall Mode
None C-Max None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
2/8/2016 Synchro 9 Report
MS Page 11
19: SH-114 NB Frontage Rd & Dove Rd 2032 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Intersection Signal Delay: 104.8 Intersection LOS: F
Intersection Capacity Utilization 117.1 % ICU Level of Service H
Analysis Period (min)15
- Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases: 19: SH-114 NB Frontage Rd & Dove Rd
#16 #16 4:16
--
01 spa 701
a3s
19 #19
—19
8S s 19.54
2/8/2016
MS
Synchro 9 Report
Page 12
22: Dove Rd & Kirkwood Blvd
2032 Background + Site
TIA for Wilks Tract Development in Southlake, Texas
Timing Plan: PM
*_
t
ti
r
Lane Grout-
EBL
EST
WBT
WBR
SBL
SBR
Lane Configurations
►j
Tt
Tf+
Vi
?I
Traffic Volume (vph)
241
255
366
320
198
816
Future Volume (vph)
241
255
366
320
198
816
Peak Hour Factor
0.90
0.90
0.90
0.90
0.90
0.90
Adj. Flow (vph)
268
283
407
356
220
907
Shared Lane Traffic (%)
Lane Group Flow (vph)
268
283
763
0
220
907
Turn Type
pm+pt
NA
NA
Prot
Perm
Protected Phases
7
4
8
1
Permitted Phases
4
6
Detector Phase
7
4
8
1
6
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
5.0
Minimum Split (s)
9.5
22.5
22.5
9.5
22.5
Total Split (s)
22.0
51.0
29.0
59.0
59.0
Total Split (%)
20.0 %
46.4%
26.4%
53.6% 53.6%
Yellow Time (s)
3.5
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
4.5
4.5
Lead/Lag
Lead
Lag
Lead -Lag Optimize?
Yes
Yes
Recall Mode
None
C-Max
C-Max
None
Max
Act Effct Green (s)
46.5
46.5
26.1
54.5
54.5
Actuated g/C Ratio
0.42
0.42
0.24
0.50
0.50
v/c Ratio
0.83
0.19
0.83
0.25
0.87
Control Delay
47.9
20.4
39.2
17.0
21.0
Queue Delay
0.0
0.0
0.0
0.0
0.0
Total Delay
47.9
20.4
39.2
17.0
21.0
LOS
D
C
D
B
C
Approach Delay
33.7
39.2
20.2
Approach LOS
C
D
C
Queue Length 50th (ft)
132
64
213
86
269
Queue Length 95th (ft)
#257
94
#316
137
#614
Internal Link Dist (ft)
990
172
351
Turn Bay Length (ft)
100
Base Capacity (vph)
345
1496
921
876
1042
Starvation Cap Reductn
0
0
0
0
0
Spillback Cap Reductn
0
0
0
0
0
Storage Cap Reductn
0
0
0
0
0
Reduced v/c Ratio
0.78
0.19
0.83
0.25
0.87
Intersection Summary
Cycle Length: 110
Actuated Cycle Length:110
Offset: 0 (0%), Referenced to
phase 4:EBTL
and 8:WBT,
Start of Green
Natural Cycle: 80
Control Type: Actuated -Coordinated
Maximum v/c Ratio: 0.87
22: Dove Rd & Kirkwood Blvd 2032 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Intersection Signal Delay: 29.2 Intersection LOS: C
Intersection Capacity Utilization 78.4 % ICU Level of Service D
Analysis Period (min)15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases: 22: Dove Rd & Kirkwood Blvd
y01
--lp4 R'
51s
06
F
f 0 o8 `R1
2/8/2016 Synchro 9 Report 2/8/2016 Synchro 9 Report
MS Page 13 MS Page 14
19: SH-114 NB Frontage Rd & Dove Rd 2032 Background + Site(With Improvements)
TIA for Wilks Tract Office Development in Southlake, Texas Timing Plan: PM
Lane Group
EBL
EST
EBR
WBL WBT
WBR
NBL
NBT
NBR
SBL S13T M,
Lane Configurations
0
tt
?I
Vi
tt
r
Traffic Volume (vph)
82
318
0
0 1085
250
1220
1573
190
0 0 0
Future Volume (vph)
82
318
0
0 1085
250
1220
1573
190
0 0 0
Peak Hour Factor
0.99
0.99
0.99
0.99 0.99
0.99
0.99
0.99
0.99
0.99 0.99 0.99
Adj. Flow (vph)
83
321
0
0 1096
253
1232
1589
192
0 0 0
Shared Lane Traffic (%)
Lane Group Flow (vph)
0
404
0
0 1096
253
1232
1589
192
0 0 0
Turn Type
pm+pt
NA
NA
Perm
Perm
NA
Perm
Protected Phases
5
56
6
8
Permitted Phases
56
6
8
8
Detector Phase
5
56
6
6
8
8
8
Switch Phase
Minimum Initial (s)
5.0
5.0
5.0
5.0
5.0
5.0
Minimum Split (s)
9.5
22.5
22.5
22.5
22.5
22.5
Total Split (s)
9.9
46.1
46.1
64.0
64.0
64.0
Total Split(%)
8.3%
38.4%
38.4%
53.3%
53.3%
53.3%
Yellow Time (s)
3.5
3.5
3.5
3.5
3.5
3.5
All -Red Time (s)
1.0
1.0
1.0
1.0
1.0
1.0
Lost Time Adjust (s)
0.0
0.0
0.0
0.0
0.0
Total Lost Time (s)
4.5
4.5
4.5
4.5
4.5
Lead/Lag
Lag
Lag
Lead
Lead
Lead
Lead -Lag Optimize?
Yes
Yes
Yes
Yes
Yes
Recall Mode
None
C-Min
C-Min
Max
Max
Max
Act Effct Green (s)
47.0
41.5
41.5
59.5
59.5
59.5
Actuated g/C Ratio
0.39
0.35
0.35
0.50
0.50
0.50
v/c Ratio
0.51
0.90
0.40
0.72
0.91
0.23
Control Delay
44.1
43.8
16.6
26.9
36.5
7.1
Queue Delay
0.0
16.5
0.0
49.0
0.0
0.0
Total Delay
44.1
60.2
16.6
75.9
36.5
7.1
LOS
D
E
B
E
D
A
Approach Delay
44.1
52.0
50.7
Approach LOS
D
D
D
Queue Length 50th (ft)
159
355
65
375
574
27
Queue Length 95th (ft)
m206
m#491
m108
458
692
69
Internal Link Dist (ft)
394
990
1769
1583
Turn Bay Length (ft)
200
200
Base Capacity (vph)
793
1226
637
1702
1754
846
Starvation Cap Reductn
0
0
0
0
0
0
Spillback Cap Reductn
0
150
0
590
0
0
Storage Cap Reductn
0
0
0
0
0
0
Reduced v/c Ratio
0.51
1.02
0.40
1.11
0.91
0.23
Intersection Summary
Cycle Length: 120
Actuated Cycle Length:120
Offset: 0 (0%), Referenced to phase 2:EBWB and 6:, Start of Green
Natural Cycle:120
Control Type: Actuated -Coordinated
Maximum v/c Ratio:1.05
2/8/2016 Synchro 9 Report
MS Page 1
19: SH-114 NB Frontage Rd & Dove Rd 2032 Background + Site(With Improvements)
TIA for Wilks Tract Office Development in Southlake, Texas Timing Plan: PM
Lane Group
o2 e4
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
1 2 4
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
5.0 5.0 5.0
Minimum Split (s)
9.5 22.5 22.5
Total Split (s)
71.0 26.4 22.6
Total Split (%)
59% 22 % 19%
Yellow Time (s)
3.5 3.5 3.5
All -Red Time (s)
1.0 1.0 1.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lag Lead
Lead -Lag Optimize?
Yes Yes
Recall Mode
None C-Max None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary
2/8/2016 Synchro 9 Report
MS Page 2
19: SH-114 NB Frontage Rd & Dove Rd
2032 Background + Site(With Improvements)
TIA for Wilks Tract Office Development in Southlake,
Texas
Timing Plan: PM
Intersection Signal Delay: 50.5 Intersection LOS: D
Intersection Capacity Utilization 95.9 % ICU Level
of Service F
Analysis Period (min)15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases: 19: SH-114 NB Frontage Rd & Dove Rd
218I2016
Synchro 9 Report
MS
Page 3
#16 #16
1 e4 �2
#Y6
�61
22.6 s
=19
�s9
=19
F
�9.9
=19
p5
64s
46.1s
s
2: Driveway 4/T W King Rd & Kirkwood Blvd 2032 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Intersection
Intersection Delay, s/veh
54.6
Intersection LOS
F
Movement
EBU
EBL
EBT
EBR
WBU
WBL
WBT
WBR
NBU
NBL
NBT
NBR
Traffic Vol, veh/h
0
88
123
34
0
0
1448
224
0
166
11
0
Future Vol, veh/h
0
88
123
34
0
0
1448
224
0
166
11
0
Peak Hour Factor
0.92
0.89
0.89
0.92
0.92
0.92
0.89
0.89
0.92
0.92
0.92
0.92
Heavy Vehicles, %
2
2
2
2
2
2
2
2
2
2
2
2
Mvmt Flow
0
99
138
37
0
0
1627
252
0
180
12
0
Number of Lanes
0
1
2
0
0
0
2
0
0
0
2
0
Approach -
Opposing Approach
WB
EB
SIB
Opposing Lanes
2
3
2
Conflicting Approach Left
SIB
NB
EB
Conflicting Lanes Left
2
2
3
Conflicting Approach Right
NB
SB
WB
Conflicting Lanes Right
2
2
2
HCM Control Delay
14.5
68.5
21.1
HCM LOS
B
F
C
Lane NBLn1 NBLn2 EBLnl E13Ln2 EBLn3 WBLnl WBLn2 SBLnl SBLn2
Vol Left,%
98%
0%
100%
0%
0%
0%
0%
92%
0%
Vol Thru, %
2%
100%
0%
100%
55%
100%
68%
8%
0%
Vol Right, %
0%
0%
0%
0%
45%
0%
32%
0%
100%
Sign Control
Stop
Stop
Stop
Stop
Stop
Stop
Stop
Stop
Stop
Traffic Vol by Lane
170
7
88
82
75
965
707
26
186
LT Vol
166
0
88
0
0
0
0
24
0
Through Vol
4
7
0
82
41
965
483
2
0
RT Vol
0
0
0
0
34
0
224
0
186
Lane Flow Rate
184
8
99
92
83
1085
794
29
209
Geometry Grp
8
8
8
8
8
8
8
8
8
Degree of Util (X)
0.494
0.02
0.258
0.228
0.198
1
1
0.077
0.487
Departure Headway (Hd)
9.637
9.149
9.39
8.89
8.572
7.561
7.334
9.549
8.392
Convergence, YIN
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Cap
374
391
383
404
418
488
500
375
428
Service Time
7.396
6.909
7.151
6.651
6,333
5.348
5.12
7.307
6.149
HCM Lane VIC Ratio
0.492
0.02
0.258
0.228
0.199
2.223
1.588
0.077
0.488
HCM Control Delay
21.5
12.1
15.4
14.3
13.5
69
67.9
13.1
18.9
HCM Lane LOS
C
B
C
B
B
F
F
B
C
HCM 95th-tile Q
2.6
0.1
1
0.9
0.7
13.3
13.5
0.2
2.6
2: Driveway 4/T W King Rd & Kirkwood Blvd 2032 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Intersection
Intersection Delay, s/veh
Intersection LOS
Movement
SBU
SBL
SBT
Traffic Vol, veh/h
0
24
2
186
Future Vol, veh/h
0
24
2
186
Peak Hour Factor
0.92
0.89
0.92
0.89
Heavy Vehicles, %
2
2
2
2
Mvmt Flow
0
27
2
209
Number of Lanes
0
0
1
1
Approach
SIB
Opposing Approach
NB
Opposing Lanes
2
Conflicting Approach Left
WB
Conflicting Lanes Left
2
Conflicting Approach Right
EB
Conflicting Lanes Right
3
HCM Control Delay
18.2
HCM LOS
C
2/8/2016 Synchro 9 Report 2/8/2016 Synchro 9 Report
MS Page 1 MS Page 2
12: Kirkwood Blvd & Driveway 3 2032 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Intersection
Int Delay, s/veh 2.2
14: Kirkwood Blvd & Driveway 1 2032 Background + Site
TIA for Wilks Tract Development in Southlake, Texas Timing Plan: PM
Intersection
Int Delay, s/veh 16.7
Movement
EBL
EBR
NBL
NBT
SBT
SBR
Movement
EBL
Traffic Vol, veh/h
144
110
11
752
514
34
Traffic Vol, veh/h
188
166
34
455
723
34
Future Vol, veh/h
144
110
11
752
514
34
Future Vol, veh/h
188
166
34
455
723
34
Conflicting Peds, #Ihr
0
0
0
0
0
0
Conflicting Peds, #Ihr
0
0
0
0
0
0
Sign Control
Stop
Stop
Free
Free
Free
Free
Sign Control
Stop
Stop
Free
Free
Free
Free
RT Channelized
-
None
None
None
RT Channelized
-
None
-
None
None
Storage Length
0
100
-
150
Storage Length
0
100
150
-
-
150
Veh in Median Storage, #
0
-
0
0
-
Veh in Median Storage, #
0
-
-
0
0
-
Grade, %
0
-
0
0
-
Grade, %
0
-
-
0
0
-
Peak Hour Factor
92
92
92
92
92
92
Peak Hour Factor
92
92
92
92
92
92
Heavy Vehicles,%
2
2
2
2
2
2
Heavy Vehicles,%
2
2
2
2
2
2
Mvmt Flow
157
120
12
817
559
37
Mvmt Flow
204
180
37
495
786
37
Major/Minor
Minor2
Majorl
Major2
Major/Minor
Minot
Majorl
Major2
Conflicting Flow All
992
279
559
0
0
Conflicting Flow All
1107
393
786
0
0
Stage 1
559
-
-
-
-
Stage 1
786
-
-
-
-
Stage 2
433
-
-
Stage 2
321
-
-
Critical Hdwy
6.84
6.94
4.14
Critical Hdwy
6.84
6.94
4.14
Critical Hdwy Stg 1
5.84
-
-
Critical Hdwy Stg 1
5.84
-
Critical Hdwy Stg 2
5.84
-
-
Critical Hdwy Stg 2
5.84
-
-
Follow-up Hdwy
3.52
3.32
2.22
Follow-up Hdwy
3.52
3.32
2.22
Pot Cap-1 Maneuver
243
718
1008
Pot Cap-1 Maneuver
- 204
606
829
Stage 1
536
-
-
Stage 1
410
-
-
Stage 2
621
-
-
Stage 2
708
-
-
Platoon blocked, %
Platoon blocked, %
Mov Cap-1 Maneuver
238
718
1008
Mov Cap-1 Maneuver
-195
606
829
Mov Cap-2 Maneuver
536
-
-
Mov Cap-2 Maneuver
-195
-
-
Stage 1
536
Stage 1
410
Stage 2
607
Stage 2
676
Approach
E9
NB
SB
Approach
EB
NB
SB
HCM Control Delay, s
13
0.2
0
HCM Control Delay, s
74.4
0.7
0
HCM LOS
B
HCM LOS
F
Minor Lane/MajorMvmt
NBL
NBTEBLn1EBLn2
SBT
SBR
Minor Lane/MajorMvmt
NBL
NBT EBLn I EBLn2
SBT
SBR
Capacity (veh/h)
1008
536 718
Capacity (veh/h)
829
195 606
HCM Lane V/C Ratio
0.012
0.292 0.167
HCM Lane V/C Ratio
0.045
1.048 0.298
HCM Control Delay (s)
8.6
0.1 14.5 11
HCM Control Delay (s)
9.5
128.2 13.4
HCM Lane LOS
A
A B B
HCM Lane LOS
A
F B
HCM 95th %tile Q(veh)
0
- 1.2 0.6
HCM 95th %tile Q(veh)
0.1
9.4 1.2
Motes
-: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined ': All major volume in platoon
2/8/2016 Synchro 9 Report 2/8/2016 Synchro 9 Report
MS Page 1 MS Page 2
30: Kirkwood Blvd & Driveway 2
2032 Background + Site
TIA for Wilks Tract Development
in Southlake,
Texas
Timing Plan: PM
Intersection
Int Delay, s/veh 9.9
Movement -1
EBL
EBR
NBL
NBT
SBT
SBR
Traffic Vol, veh/h
166
166
45
598
591
34
Future Vol, veh/h
166
166
45
598
591
34
Conflicting Peds, #/hr
0
0
0
0
0
0
Sign Control
Stop
Stop
Free
Free
Free
Free
RT Channelized
-
None
-
None
None
Storage Length
0
100
150
-
150
Veh in Median Storage, #
0
-
-
0
0
-
Grade, %
0
-
-
0
0
-
Peak Hour Factor
92
92
92
92
92
92
Heavy Vehicles, %
2
2
2
2
2
2
Mvmt Flow
180
180
49
650
642
37
Major/Minor
Minor2
Majorl
Major2
Conflicting Flow All
1065
321
642
0
0
Stage 1
642
-
-
-
-
Stage 2
423
-
-
Critical Hdwy
6.84
6.94
4.14
Critical Hdwy Stg 1
5.84
-
-
Critical Hdwy Stg 2
5.84
-
-
Follow-up Hdwy
3.52
3.32
2.22
Pot Cap-1 Maneuver
218
675
939
Stage 1
486
-
-
Stage 2
629
-
-
Platoon blocked,
Mov Cap-1 Maneuver
207
675
939
Mov Cap-2 Maneuver
207
-
-
Stage 1
486
Stage 2
596
Approach
E9
NB
SB
HCM Control Delay, s
46.7
0.6
0
HCM LOS
E
Minor Lane/MajorMvmt
NBL
NBTEBLn1EBLn2
SBT
SBR
Capacity (veh/h)
939
207 675
HCM Lane V/C Ratio
0.052
0.872 0.267
HCM Control Delay (s)
9
81 12.3
HCM Lane LOS
A
F B
HCM 95th %tile Q(veh)
0.2
6.7 1.1
2/8/2016
Synchro 9 Report
MS
Page 3