Loading...
Item 4C Final CITY OF SOUTHLAKE Item 4C MEMORANDUM (December 1 , 2015) To: Shana Yelverton, City Manager From: Robert H. Price, P.E., Director of Public Works Greg Hendricks, Director of Information Technology Subject: Authorize expenditures with Brandt Engineering in the amount of $90,000 Action Requested: Authorize expenditures with Brandt Engineering, in an amount not to exceed $90,000 for the electrical finish out of the DPS North IT Disaster Recovery Data Center. Background Information: Included in the FY16 budget, the City Council approved a Facilities project to perform an interior finish out of an existing space at the Southlake Department of Public Safety (DPS) North facility to serve as an Information Technology (IT) Disaster Recovery (DR) Data Center. The proposed Disaster Recovery Data Center is located in the building with the gun range and training facility. Council authorized funds in the FY16 budget for electrical work that is needed for this project including the installation of dedicated electrical panels and a dedicated 60KW emergency backup generator to serve this room that will house the DR data center. Currently, the IT Department operates the City's computer servers on the first floor of Town Hall and in DPS Headquarters. IT has requested that the Facilities Division initiate the finish out of the Disaster Recovery Data Center at DPS North in order to house and operate a redundant computer server room in the event of an emergency. Currently, there is an existing 175KW generator for DPS North that serves as the backup generator for the main building including the fire station, living quarters, training and meeting rooms, and the gun range. This generator is adequate for these areas; but, cannot support the Disaster Recovery Data Center as well. Item 4C Financial Considerations: Brandt Engineering is a member of TXMAS Government Pricing under contract # TXMAS-10-03 FAC070 for mechanical, electrical, and plumbing services. This contract is valid through 3/30/2020; therefore, bids are not required for this electrical project and this item is in compliance with the City's purchasing policy. The budget for this project is $90,000 and it was funded through the Strategic Initiative Fund. The money is available in account 003199-593000. Strategic Link: This item relates to the City's strategy map focus area of Safety & Security and Performance Management. It specifically relates to the City's Corporate Objective to achieve the highest standards of safety & security and to provide high quality services through sustainable business practices. The Public Works objective that is met with this item is to provide a high degree of customer service and satisfaction. Citizen Input/ Board Review: N/A Legal Review: N/A Alternatives: The City Council may approve or deny this request. Supporting Documents: Brandt Proposal No.15-00024608 Staff Recommendation: Authorize expenditures with Brandt Engineering, in an amount not to exceed $90,000 for the electrical finish out of the DPS North IT Disaster Recovery Data Center. Staff Contact: Robert H. Price, P.E., Public Works Director Cristina McMurray, C.P.M, Public Works Dep. Director/Operations BRANDT December 1, 2015 Kurt Ackermann City of Southlake 100 Dove Rd. Southlake, TX REF: DPS Generator Project Type of Proposal: Electrical Brandt Proposal No. 15-00024608 We are pleased to provide our proposal for the subject project. Please refer to the attachments for a detailed breakdown of scope, associated costs, clarifications and exclusions. Pricing is based on TXMAS 10-03FAC070 Contract. PRICING SUMMARY 60KW Emergency Generator $89,998 Should you have any questions or require additional information, please do not hesitate to call. Sincerely, Brandt Greg S. Dusckas Business Development Manager 972-395-6135 AUSTIN CARRLGLLTON FORTWTSRTW SMANTONtO WADD iNOAr,WCwnwwU..SUM575 i M DmrcdCaud 2507Gram Crac 6023Carkbx ftwy..Srk100 pim AwalDrm AU5Jn.TX 7$T41 Cgmp tW.T1{75M FOM Won.TX 76110 $p%lru.TX 71*1 W*w TX 76712 512A91.9100 973.395jum 81T.Ea69033 210,3R'9.5120 33-0.7721699 TALLAMM TACLA[K W TACL:.MWE TAC LAODD 74W 7ACLAOn355C TECL361119 7EC1291@9 TECL20109 IECL291119 TECL.701M 111947-8 M ka-9 101" Q1907a RM Rxpulawd by Thr TEYes D&dwLILILUL Of Luca g:nd RugamraGam P-4-Sax C'_157.Aasti TX 79711-1-600- 03-9' 0= BRANDT Page 2 11/19/2015 Qualifications: 1 Provide and install new 60kw Generator with 24hr fuel tank and sound enclosure. 2 Provide and install 225amp ATS. 3 Feed new 75KVA transformer from exisiting 480/277v panel P3A. 4 Provide and install 75kva transformer. 5 Provide and install 225amp disconnect with fuses. 6 Provide and install 2 section 225amp 84 ckt panel board. 7 Provide and install all associated wiring. 8 Provide and install 16-220v 20amp circuits and 4-120v 20amp circuits. 9 Provide and install power to Mitsubishi Mini split system. 10 There will be an outage to install new feed from exisiting 480/277V Panel P3A. 11 This proposal is based on copper at the current level of$2.75/lb and pricing may be adjusted based on copper levels at time of award. 12 Pricing is valid for 15 days. Exclusions: 1 Utility company fees and charges 2 Placing or forming of concrete (Le. , housekeeping pads, curbs, pole bases, transformer pads, handholes, etc 3 Painting or priming of any kind 4 Payment and performance bond (See add alternate) 5 Temperature control and interlock wiring 6 Telephone, computer, or data cabling 7 Security system cabling and equipment 8 MATV system cabling and equipment 9 Motor starters and VFD's for equipment furnished by DIV 15 10 Irrigation sleeves 11 Special pads, pavers, membrane strips, etc., under lightning protection roof conductors 12 Trash removal from site (however, trash will be deposited in GC's dumpster) 13 Sales Tax.