Loading...
Item 4B 4B - 1 M E M O R A N D U M August 10, 2015 To: Shana K. Yelverton, City Manager From: Chris Tribble, Director of Community Services Subject: Approve contract with Manning Concrete for the reconstruction of South Field Road in Bob Jones Park for an amount not to exceed $225,000 Action Requested: City Council approval of a contract with Manning Concrete for the reconstruction of South Field Road in Bob Jones Park for an amount not to exceed $225,000 Background Information: This item was tabled at the March 3, 2015 Southlake Parks Development Corporation (SPDC) and City Council meetings pending results from geotechnical testing from CMJ Engineering. When the geotechnical tests and recommendations were discussed at the April 7 SPDC meeting, SPDC tabled the item in order for staff to bring back options for partial reconstruction of the road where the erosion and pavement separations are currently the most affected. Also, at the same time, signs advising users of the uneven pavement surface until repairs are completed were posted. City engineers investigated options to repair only sections of the road with the most significant separation areas and concluded that partial repairs would not be effective to achieve the long-term integrity of the road and provide a cost-effective solution at this time. Based on the soils and laboratory test results conducted by CMJ Engineering and best practice protocols, the proposal from Manning Concrete to reconstruct South Field Road in Bob Jones Park in an amount not to exceed $225,000 is presented for consideration. City of Southlake Values: City Council Meeting Date August 18, 2015 4B - 2 Page 2 of 4 The City received an estimate from Manning Concrete of $217,284 for reconstruction of the road. The estimate is based on the terms of a contract that the City of Grapevine bid and awarded for concrete curb, gutter and flatwork services. The City has an Interlocal Governmental Agreement for Purchasing with Grapevine, Keller, and Colleyville, which allows the City to utilize the contract that the City of Grapevine bid and awarded to Manning Concrete. The reconstruction of South Field Road will include removal and disposal of approximately 22,800 square feet of existing At their March 3, 2015 meeting, SPDC recommended staff complete geotechnical testing on the road before proceeding with approval of the project scope. CMJ Engineering performed the geotechnical tests and concluded that the reconstruction design and construction materials proposed by Manning Co recommendation. The use of proposed concrete paving will help stabilize the road and protect it against future swelling caused by the clay subsurface beneath. Staff will work with the contractor to schedule around park programs to minimally impact park users and program participants, as well as work with the athletic associations to identify the best dates for construction. During construction, the road will either be completely closed for a minimum number of days to fully complete the project, or it will be constructed one side of the road at a time and keep the other side open. If the road is closed, staff will make every attempt to maintain and keep open a safe pedestrian passage to allow access to the dog park and day camp areas. City staff recommends Manning Concrete for the following reasons: City of Southlake Values: City Council Meeting Date August 18, 2015 4B - 3 Page 3 of 4 Manning Concrete has constructing sidewalks/roadways for the City of Grapevine and City of Southlake uilt most of the sidewalks on Carroll Avenue and White Chapel Boulevard and have not had any post construction issues The Interlocal Agreement with the City of Grapevine, allows the City to complete the project in a timely and expedited manner SPDC revisited the construction contract for South Field Road at their August 6, 2015 meeting and recommended approval (7-0) of the proposed contract with Manning Concrete. August 18, 2015 meeting. Financial Consideration: The City Council approved this project and funding in the amount of $23 Capital Budget. Item Costs Existing Road Removal and New Road Construction$217,284 Project Contingency$7,716 Anticipated Contract Costs $225,000 Project Budget $235,000 Strategic Link: This focus area of Mobility and meets the corporate objectives to Provide Travel Convenience within City & Region and to Invest to Provide & Maintain High Quality Public Assets. Citizen Input/ Board Review: SPDC Tabled March 3, 2015 City Council Tabled March 3, 2015 SPDC Tabled April 7, 2015 SPDC recommended approval unanimously August 6, 2015 City Council consideration August 18, 2015 City of Southlake Values: City Council Meeting Date August 18, 2015 4B - 4 Page 4 of 4 Legal Review: Not applicable. Alternatives: Alternatives may include: Approve contract with Manning Concrete as presented Approve contract with Manning Concrete with input as desired Not approve contract with Manning Concrete Supporting Documents: Attachment: Estimate from Manning Concrete Copy of Interlocal Governmental Purchasing Agreement Location Map Photos of existing road Staff Recommendation: City Council approval of acontract with Manning Concrete for the reconstruction of South Field Road in Bob Jones Park for an amount not to exceed $225,000. City of Southlake Values: Estimate MANNING CONCRETE PO Box 123566 4B - 5 Fort Worth, TX 76121 Name/Address City of Southlake 1400 Main St. Suite # 440 Southlake Texas 76092 DateEstimate No.Project 07/16/1492 ItemDescriptionQuantityCostTotal 116" removal and disposal 500 sf plus22,8009.53217,284.00 removal of concrete and asphalt install concrete treated base #4 rebar on 18" center install 6" concrete Bob Jones Park entrance Road ContractthroughInterlocalPurchasing AgreementwithCityofGrapevine . MANNINGCONCRETE . By:________________________ AuthorizedRepresentativeDate . . Accepted: CITYOFSOUTHLAKE . By:________________________ MayorJohnTerrellDate . ATTEST: . ____________________________ LoriPayne,TRMCDate CitySecretary We appreciate your business Total$217,284.00 4B - 6 4B - 7 4B - 8 4B - 9 4B - 10 4B - 11 4B - 12 3/11/20147:06:10 AM Lance Wriht - Mannin Concrete Sawin ggg 4B - 13 From: Henry Manning <henrymanning5@yahoo.com> To: Lance Wright <Lwright@grapevinetexas.gov> Date: 3/10/2014 7:28 PM Subect: j Manning Concrete Sawing Page 1of 7 4B - 14 4B - 15