Loading...
ZA24-0009 PUBLIC HEARING NOTICE ZA24-0009 • Zoning Change and Site Plan for Lambert Home Headquarters, on a property described as Tract 6C, Thomas M. Hood Survey Abstract 705, and Lot 31, Block 1, Parkway Office Center Addition, an addition to the City of Southlake, Tarrant County, Texas, and located at 1700 N. White Chapel Blvd and 190 W. SH 114, Southlake, Texas. • Current Zoning: “S-P-1” Detailed Site Plan District • Requested Zoning: “S-P-2” Generalized Site Plan District • The purpose of this request is approval of a zoning change and site plan application for a new office and retail development totaling approximately 15,000 sq. ft. at build- out. The existing structures are to remain. Dear Property Owner, Your property has been identified as being within 300 feet of the above referenced Zoning Change and Site Plan application. If you wish to register your opposition or support to this case, you may complete the attached Notification Response Form and either mail to the Planning & Development Services Department (address listed at the top of notice) or email (e-mail listed at the bottom of the notice). You are encouraged to follow the requested action through final approval because changes are often made during the review process. Please contact the Planning and Development Services Department if you have any questions: Please contact the Planning Department at (817)748-8621 or MBarclay@ci.southlake.tx.us if you have any questions. Thank you. CITY OF SOUTHLAKE PLANNING & DEVELOPMENT SERVICES 1400 Main St.; Suite 310 Southlake, TX 76092 Phone: (817)748-8621 www.cityofsouthlake.com Planning and Zoning Commission Thursday, April 18, 2024 6:30 PM Town Hall Council Chambers 1400 Main Street Southlake, Texas Notification Response Form ZA24-0009: Zoning & Site Plan for Lambert Home Headquarters Meeting Date: April 18, 2024, at 6:30 P.M. Fill out: Owner: _____________________________ Address: ____________________________ City, State, Zip Code: __________________ PLEASE PROVIDE COMPLETED FORMS VIA MAIL, FAX OR HAND DELIVERY BEFORE THE START OF THE SCHEDULED PUBLIC HEARING. Being the owner(s) of the property so noted above, are hereby in favor of opposed to undecided about (circle or underline one) the proposed Zoning Change and Site Plan referenced above. Space for comments regarding your position: ___________________________________________________________ ___________________________________________________________ ___________________________________________________________ ___________________________________________________________ ___________________________________________________________ Signature: _______________________________________ Date: ______ Additional Signature: _______________________________ Date: ______ Printed Name(s): _____________________________________________ Must be property owner(s). Otherwise contact the Planning Department. One form per property. Phone Number (optional): ______________________________________ Direct questions and mail responses to: City of Southlake Planning & Development Services Notification Response 1400 Main St; Ste 310 Southlake, TX 76092 Phone: (817) 748-8621 SH 1 1 4 F R WHITE CHAPEL BLVDWHITECHAPELBLVD SH 1 1 4 F R SH 1 1 4 F R W Y SH 1 1 4 F R W Y 190 200 18001900 190190190190 190190 190 204 210 100 1700 140 7 3 4 5 6 8 1 9 2 1000 1001 Vicinity Map ZA24-0009 ® 0 190 38095 Feet 190 W State Hwy 114 and 1700 N White Chapel Blvd Legend Address Points City Parcels Right Of Way City Limit Case Parcel(s) 200 Foot Buffer 300 Foot Buffer Parcels Within Buffer CASE NO: ZA24-0009 CONCEPT AND SITE PLAN / ZONING CHANGE NARRATIVE ARCHITECTURE UNDERGROUND, INC. 1 April 1, 2024 To: City of Southlake Planning and Development Services 1400 Main Street, Suite 460 Southlake, TX 76092 817-748-8400 Re: Lambert Home Headquarters 1700 North White Chapel Blvd. Southlake, TX 76092 General Project Narrative The subject property received an approved zoning change from C-2, “Local Retail Commercial District”, to S-P-1, “Detailed Site Plan District” in 2018 by Ordinance No. 480-747. The approved 4-story office project was terminated, and the property is now being sold. We now request a zoning change to S-P-2, “Generalized Site Plan District” with uses that align best with a C-2 zoning classification as the site was originally designated. The existing tract shall be subdivided in an identical manner as the approved ordinance. Lot 3R1 contains two existing one-story Office Buildings with General non-Medical Office use. The existing parking spaces and a two-entry drive approach from the service road of Highway 114 shall remain as-is. This site remains intact as-is except for the following: 1. The east property line will be defined as the centerline of the existing drive that shall now act as the shared access driveway. A bufferyard shall not be provided. A variance is requested below. 2. A new dumpster enclosure shall be constructed at the northern end of the new drive. The masonry enclosure will be a single structure, but it will have two separate compartments, one for each lot, centered on the property line. A variance is requested below. 3. Lot 3R1 is currently served by an on-site septic system. The septic tanks are located on the southwest corner of the existing office building nearest Highway 114. The supporting leach field is located in the northwest corner of what will be Lot 3R2. The existing leach field shall be terminated, and the existing buildings on Lot 3R2 shall be connected to the City’s sewer system being routed from Lot 3R2. Lot 3R2 is proposed to be a two-phased project with Retail, General Non-Medical Office and a sit-down café. Phase 1 shall include all sitework and the 2-story southern most building housing retail, offices, and the Café of approximately 11,600 sf. Phase 2 shall be a single-story retail building of approximately 3,000 sf immediately north of Phase 1. The new buildings on Lot 3R2 will be operated from 8am to 10pm. All buildings on Lot 3R2 are of wood-framed construction and clad with a combination of materials to include brick, stone, 3-coat stucco, fiber cement shake siding and fiber cement board and batten siding. The application of materials equals 80% masonry on the buildings. Phase 1 will have a fire protection system. Phase 2 is less than the building code threshold, including any City amendments, that would require sprinkler protection. All HVAC equipment will be fully screened within the roof pits provided in the design. Clarifications Per Lot Lot 3R1: 1. Bufferyards shall not be provided along the shared drive. Variance requested. CASE NO: ZA24-0009 CONCEPT AND SITE PLAN / ZONING CHANGE NARRATIVE ARCHITECTURE UNDERGROUND, INC. 2 2. No fencing or screening of adjacent properties is required due to the adjacent Zoning being C-2 or Agricultural. 3. Existing Landscaping and bufferyards shall remain as-is. Variances requested. 4. The west boundary line setback shall be 15 feet with a variance allowed for the existing extension of the front Building to be allowed to remain with a minimum setback of ten Feet. 5. The Lot, as shown in the attached design, provides adequate parking for the building sizes without the use of any parking on Lot 3R2. Please refer to sheet A1 for a detailed parking analysis. 6. The existing drive approaches along SH114 shall remain as-is being an existing condition. Variance requested. Lot 3R2: 1. Buffer yards shall not be provided along the western shared drive. Variance requested. 2. No fencing or screening of adjacent properties is required due to the adjacent Zoning being C-2 or Agricultural. 3. Access is proposed to be provided to the corner lot outside of this project scope. The lot, owned by Hopkins Dallas Properties LTD, is effectively land-locked with little likelihood of receiving a dedicated drive approach given their proximity to the intersection of Highway 114 and N. White Chapel. The access drives comply with the bufferyard setback and building setbacks. Excluded Uses The following uses are not proposed or permitted - Medical offices, drive-throughs restaurants and exterior display. Project Phasing Phase 1 – Site Development & LHHQ Building Anticipated Construction Start: July 1, 2024 (Shortly after final plat approval). Anticipated Certificate of Occupancy: October 1, 2025 (Approximately 15 months after Construction Start) Project Scope: o All grading and site work, less the building pad for phase 2. o All underground utility work shown on the approved development plan submittal. This includes all water, sewer (including extension of sanitary sewer to adjacent properties), gas, electric, telecom and storm sewer for the entire site. Provisions for the future connection of sewer, water, electric, gas, etc shall be terminated adjacent to the future phase 2 project and capped. o All required landscape as shown on the approved development plan submittal. o Removal of the existing septic leach field from lot 3R1. o All concrete drive lanes, fire lanes and parking for the entirety of the site as shown on the approved development plan submittal. Building 2 – Future Retail Building Anticipated Construction Start: July 1, 2028 (Shortly after final plat approval). Anticipated Certificate of Occupancy: July 1, 2029 (Approximately 12 months after Construction Start) Project Scope: o Building pad (soil preparation) for the 3,000 sf retail building. o Single-story retail building with pitched roof of like design and quality as phase 1. o Utility connection (gas, electric, telecom, sewer water, etc) to the phase 2 building. o Additional landscape material specific to the additional building. CASE NO: ZA24-0009 CONCEPT AND SITE PLAN / ZONING CHANGE NARRATIVE ARCHITECTURE UNDERGROUND, INC. 3 Variance Requests  Drive approach stacking depth – The existing drive approaches along the service road of Highway 114 (Drive Approach #2 and #3) is less than the 75 ft stacking depth required by required by the Driveway Ordinance No. 634 due to the existing conditions of Lot 3R1. A variance is being requested to the leave the existing conditions as-is as modifications would negatively impact the existing parking and entrance of that lot. The stacking depth of Drive Approach #2 is approximately 47’-8”. The existing conditions of Drive Approach #3 are such that the curb return terminates at the property line.  Dumpster screen location and setback – The masonry dumpster screen is designed to be centered along the property line between lots 3R1 and 3R2. The location aligns with the current approved zoning ordinance and is located such that it is the most out of view. A variance is requested to permit the dumpster screen to encroach on the building setback of the property line shared between lots as this is the also the shared access drive.  Bufferyard between lots 3R1 and 3R2 – With lots 3R1 and 3R2 being platted separately, a 5 ft type “A” bufferyard would typically be required on either size of the property line. The proposed site plan utilizes the existing drive approach on the service road of Highway 114, thus creating a joint access drive / fire lane shared between the two lots. A variance is requested to eliminate the bufferyard requirement between the two lots. Please note, in addition to the parking lot island requirements, landscape material is provided in the western parking lot islands of Lot 3R2 to equal the quantity required to meet the bufferyard requirements.  Lot 3R1 Bufferyard and Landscape Requirements – A variance is requested to allow the existing landscape on Lot 3R1 to remain as-is. The existing conditions of Lot 3R1 do not allow the site to meet the adopted bufferyard requirements in the ordinance. Section 42.4.c of the ordinance allows existing buildings to remain nonconforming if 50% or less of the effective construction is impacted by new construction. We believe Lot 3R1, specifically, meets this criteria given the limited scope of work on this lot. Additionally, section 42.14 permits modifications to any requirements for bufferyards when there are practical difficulties. Attempting to meet the current bufferyard ordinance would require significant changes to Lot 3R1 that may ultimately lead to non- compliance of other sections of the ordinance.  Drive Approach Location – The western most existing drive approach along SH114 is non-conforming as the spacing distance is less than 250 ft. A variance is requested to allow the condition to remain as-is.  Lot 3R1 building encroachment into the western most building setback. The existing conditions are currently non-compliant with the current ordinance standards. A variance is requested. Easement to be Included on the Final Plat  Shard parking agreement.  Joint access easements  Sewer easements  Water easements  Power line easements Zoning Change Justification Lots 3R1 and 3R2 have historically been zoned C-2. Additionally, the surrounding properties along Highway 114 are zoned C-2, or have “SP” zoning designations with predominantly C-2 uses as itemized below by parcel:  Parcel 550 W SH 114: Ordinance 480-220A was approved as a mixed us development that was subdivided into two sections (A/B). Section A, nearest the Hwy 114 service road, includes mostly commercial retail uses such as C-1, C-2 and C3.  Parcel 1900 N. White Chapel: The property is family owned and zoned AG “Agricultural.” This appears to be the last remaining unplatted tract of significant size north of 114. CASE NO: ZA24-0009 CONCEPT AND SITE PLAN / ZONING CHANGE NARRATIVE ARCHITECTURE UNDERGROUND, INC. 4  Parcel 210 W SH 114: C-2 zoning  Parcel 204 W SH 114: C-2 zoning  Parcel 200 W SH 114: C-2 zoning  Parcel 140 W SH 114: C-2 zoning  Parcel 100 E SH 114 - Carillon Parc: The mixed-use development has a variety of uses. Per the master plan in the approved ordinance 480-564e, the buildings immediately along White Chapel Road, directly across the subject property, and along the service road of Highway 114 include predominately C-2 like uses. The uses are identical in nature (i.e. retail, restaurant and office) to this project being submitted. Refer to the exhibits below for additional information For reference, C-2 zoning districts permit the following:  Offices of a business and/or professional nature providing services not including fabrication, manufacturing, or production of goods.  Restaurants, tea rooms, cafeterias, fast food and “take-out” food restaurants.  Retail EXHIBIT - CARILLON PARC Note buildings along the service road of Highway 114 and White Chapel are called to be “retail, restaurant and office”. Those structures are shown to be of approximate height and area as the project being in this submittal. CASE NO: ZA24-0009 CONCEPT AND SITE PLAN / ZONING CHANGE NARRATIVE ARCHITECTURE UNDERGROUND, INC. 5 EXHIBIT – PARCEL 550 W SH 114 Note the parcel is subdivided into two primary sections by use. Section ‘A’ is noted to permit uses similar to the project in this submittal by requiring C-1, C-2 and other like retail, office and restaurant uses. More specifically, the width of Section A is approximately the same setback distance from the service road creating a “C-2” ribbon of uses form Carillon Parc to West Dove Road. EXHIBIT – ADJACENT ZONING @ 1700 N WHITE CHAPEL Note, sites immediately adjacent to the project being submitted at zoned C-2. The subject property has historically been zoned C-2 as well completing the ‘ribbon’ of C-2 uses noted above. CASE NO: ZA24-0009 CONCEPT AND SITE PLAN / ZONING CHANGE NARRATIVE ARCHITECTURE UNDERGROUND, INC. 6 Future Land Use Plan (SH 114 Corridor – 114 LU1) The proposed project is consistent with the underlying mixed use land use described in the future land use plan and addresses several key aspects of the criteria noted for 114 LU1.  Future development on these properties should be approved in a manner that is sensitive to potential impacts on adjacent residential areas, particularly as related to noise, traffic, building, heights, lighting, and views. While the proposed project is not immediately adjacent to any residential developments, the design team has taken great care to design a project that is appropriately scaled, both in building area and height, for the site. The building is designed to shield noise and unsightly views from highway 114 to create an enjoyable central courtyard and overall development.  Undeveloped properties should be developed in a cohesive manner with consideration for connectivity, design, and architectural style. The elegant and timeless design proposed by the design team is complimentary to the adjacent buildings of Carillon Parc while being somewhat reflective in general design approach of the Shiver family farmhouse immediately north of the property with the gabled roofs and façade articulation.  Any development should be walkable and pedestrian-friendly. The project design encourages pedestrian walkability by dedicating a generous amount of site area a centralized, “livable” courtyard that connects to the 8 ft wide multi-use trail along White Chapel.  Family history of Shivers tract should be preserved or recognized possibly through use of open space. It is the design team’s intent to incorporate some form of historical marker or design element that speaks to the Shiver’s family history. We’ve reached out to the family to schedule a meeting for this purpose. Thank you, S. Jacob Scoggins, AIA Architecture Underground Inc., Principal Jacob@arc--und.com P-8"S P-8"S P-8"S P-8"S P-8"S P-8"S P-8"S P-8"S P-8"S P-8"S P-8"S P-8"S P-8"S P-8"S P-8"S P-8"S P-8"S P-8"S P-8"S P-8"SP-8"SP-8"SP-8"SP-8"SP-8"SP-8"SP-8"SP-8"SP-8"S SS P-MH P-CO P-FHSS P-MH SS P-MH P-8"WP-8"WP-8"WP-8"W P-8"W P-8"W P-8"W P-8"W P-8"W P-8"W P-8"W P-8"W P-8"W P-8"W P-8"W P-8"W P-8"W P-6"SP-WM P-2''WP-CO GMC 300 PROCEPTOR P-8"SP-6"S P-6"S SS P-MH P-4"S P-4"S P-FDC P-6"WP-CO P-CO P-CO P-CO P-CO P-CO P-FH Xref ..\..\Downloads\LH_Base 1.dwg OHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OH E OHE OHE OHE OHE OHE OH E OHE OH E OHE OHE OHE OHE OHE OH E OHE OH E OHE OHE OHE OHE OHE OH E OH E OHE OHE OHE OHE OHE OHE OH E OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEGAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGAS GAS GAS GAS F I R E L A N EFIRE LANEFIRE LANEFIRE LANEFIRE L A N E FIRE LANE FIRE LANE FIRE LANE FIRE LANE FIRE LANE FIRE LANE FIRE LANE FIRE LANE FIRE LANE FIRE LANE FIRE L A N E FIRE LANEFIRE LANEFIRE LANEFIRE LANEFIRE LANE F I R E L A N EFIRE LANEFIRE LANEFIRE L A NE FIRE LANE FIRE LANE F IR E L AN E FIRE L A N E FIRE LANE FIRE LANEFIRE LANEFIRE LANEFIRE LANEFIRE LANEFIRE LANEFIRE LANEFIRE LANEFIRE LANEFIRE LANEFIRE LANEFIRE L A N E FIRE LANE FIRE LANE FIRE LANE FIRE LANE FIRE LANE FIRE LANE FIRE LANE FIRE LANE FIRE LANE FIRE LANE FIRE LANE FIRE L A N E FIRE LAN E FIRE LANEXXXXXXXXXXXXXXXXXXXXXXXXXXX X P -CP-CP-CP-CP-CP-CP-CP-CFIRE LANE FI R E L A N EFIRE LANEFIRE LANE FIR E L A N E FIRE LANEFIRE LANEFIRE LANEFIRE LANEFIRE LANEFIRE LANEFIRE LANEFIRE LANEFIRE LANE FIRE L A N E FIRE LANEFIRE LANEFIRE LANEFIRE LANEFIRE LANEFIRE LANEFIRE L A N E FIRE LANE FIRE LANE FIRE LANE FIRE LANE FIRE LANE FIRE LANE FIRE LANE FIRE LANE FIRE LANE FIRE LA N E FIRE LANEFIRE LANE6 9 16 10 5 9 14 13 3 S. H . 1 1 4 S E R V I C E R O A D (VA R I A B L E W I D T H R O W ) (C O N C R E T E P A V I N G )NORTH WHITE CHAPEL BOULEVARD(VARIABLE WIDTH ROW)10 5 EXISTING GENERAL OFFICE ONE-STORY 27'-0" TALL EXISTING GENERAL OFFICE ONE-STORY 27'-4" TALL S. 89° 16' 47" E. 365.77'S. 00° 08' 35" W. 248.46'N. 88° 36' 24" W. 248.96'S. 00° 51' 06" E. 100.65'N. 6 4 ° 5 8 ' 4 0 " W . 1 2 3 . 8 9 'N. 00° 43' 13" E. 113.48'N. 00° 43' 13" E. 131.05'N. 29 ° 21 ' 20 " W . 35 .92 ' N. 25° 01' 16" E. 21.44' LOT 3R1 LOT 3R2 S. 89° 16' 47" E. 149.82' S. 89° 33' 57" E. 62.50'N. 01° 32' 59" E. 58.38'N. 01° 32' 59" E. 163.56'N. 01° 32' 35" E. 191.88'N. 6 4 ° 5 8 ' 4 0 " W . 1 0 9 . 9 7 ' PHASE 1 OFFICE, RETAIL & CAFE (11,600 SF +/-) (TWO-STORY) PHASE 2 FUTURE RETAIL (3,000 SF +/-) (ONE-STORY) GRAND COURTYARD 10 FT TYPE "B" BUFFERYARD 10 FT TYPE 'E' BUFFERYARD5 FT TYPE "A" BUFFERYARD 25 F T T Y P E " J " B U F F E R Y A R D 10 FT BLDG SETBACK15 FT BLDG SETBACK 10 FT BLDG SETBACK 50 FT BLDG SETBACK 30 FT BLDG SETBACK NO BUFFERYARD (VARIANCE REQUEST)LOT 3R2 LOT 3R1 SITE PLAN A1 01 SITE PLAN STEVEN SCOGGINS 6406 REDSTONE DRIVE ARLINGTON, TEXAS 817-965-0763 LAMBERT HOMEHEADQUARTERS1700 N. WHITE CHAPEL ROADSOUTHLAKE, TEXASA TTS XETEFO SASTEVEN JA C OB SC O GGINS22 4 3 5REGISTEREDARC H I TECTDATE: 04/01/2024 REVISION: CONCEPT AND SITE PLAN SUBMITTAL CASE #: ZA24-0009 CONCEPT AND SITE PLAN PROJECT INFO ADDRESS: FIRE LANE NOTES: PROPERTY INFO: OWNER: ARCHITECT: CIVIL ENGINEER: SITE DATA SUMMARY EXISTING SEPTIC AND LEACHFIELD PROPOSED VARIANCES PROPOSED USES: EXCLUDED USES 02 BLDG SETBACK & BUFFERYARD GRAPHIC 03 VICINITY MAP RENDERINGS A201EXTERIOR ELEVATION - SOUTH (FACING HIGHWAY 114) STEVEN SCOGGINS 6406 REDSTONE DRIVE ARLINGTON, TEXAS 817-965-0763 LAMBERT HOMEHEADQUARTERS1700 N. WHITE CHAPEL ROADSOUTHLAKE, TEXASA TTS XETEFO SASTEVEN JA C OB SC O GGINS22 4 3 5REGISTEREDARC H I TECTDATE: 04/01/2024 REVISION: CONCEPT AND SITE PLAN SUBMITTAL CASE #: ZA24-0009 CONCEPT AND SITE PLAN 02 EXTERIOR ELEVATION - NORTH (COURTYARD SIDE) RENDERINGS A301EXTERIOR ELEVATION - EAST (FACING WHITE CHAPEL) STEVEN SCOGGINS 6406 REDSTONE DRIVE ARLINGTON, TEXAS 817-965-0763 LAMBERT HOMEHEADQUARTERS1700 N. WHITE CHAPEL ROADSOUTHLAKE, TEXASA TTS XETEFO SASTEVEN JA C OB SC O GGINS22 4 3 5REGISTEREDARC H I TECTDATE: 04/01/2024 REVISION: CONCEPT AND SITE PLAN SUBMITTAL CASE #: ZA24-0009 CONCEPT AND SITE PLAN 02 EXTERIOR ELEVATION - WEST (COURTYARD SIDE) EXTERIOR ELEVATIONS A4 01 EXTERIOR ELEVATION - SOUTH (FACING HIGHWAY 114) STEVEN SCOGGINS 6406 REDSTONE DRIVE ARLINGTON, TEXAS 817-965-0763 LAMBERT HOMEHEADQUARTERS1700 N. WHITE CHAPEL ROADSOUTHLAKE, TEXASA TTS XETEFO SASTEVEN JA C OB SC O GGINS22 4 3 5REGISTEREDARC H I TECTDATE: 04/01/2024 REVISION: CONCEPT AND SITE PLAN SUBMITTAL CASE #: ZA24-0009 CONCEPT AND SITE PLAN 02 EXTERIOR ELEVATION - NORTH (FACING COURTYARD) T H E G R E E N H O U S E T H E G R E E N H O U S E EXTERIOR ELEVATIONS A5 01 EXTERIOR ELEVATION - CAFE EAST (FACING WHITE CHAPEL) STEVEN SCOGGINS 6406 REDSTONE DRIVE ARLINGTON, TEXAS 817-965-0763 LAMBERT HOMEHEADQUARTERS1700 N. WHITE CHAPEL ROADSOUTHLAKE, TEXASA TTS XETEFO SASTEVEN JA C OB SC O GGINS22 4 3 5REGISTEREDARC H I TECTDATE: 04/01/2024 REVISION: CONCEPT AND SITE PLAN SUBMITTAL CASE #: ZA24-0009 CONCEPT AND SITE PLAN 03 EXTERIOR ELEVATION - WEST @ RETAIL (FACING PARKING / LOT 3R1) 02 EXTERIOR ELEVATION - CAFE WEST (FACING COURTYARD) MASONRY CALCULATIONS 04 DUMPSTER ENCLOSURE - PLAN 05 DUMPSTER ENCLOSURE - ELEVATIONS 1700 PLAN SECTION 'A' PLAN SECTION 'B' PLAN SECTION 'C' RENDERING T H E G R E E N H O U S E SIGNAGE A6 01 MONUMENT SIGN - WHITE CHAPEL DRIVE ENTRANCE STEVEN SCOGGINS 6406 REDSTONE DRIVE ARLINGTON, TEXAS 817-965-0763 LAMBERT HOMEHEADQUARTERS1700 N. WHITE CHAPEL ROADSOUTHLAKE, TEXASA TTS XETEFO SASTEVEN JA C OB SC O GGINS22 4 3 5REGISTEREDARC H I TECTDATE: 04/01/2024 REVISION: CONCEPT AND SITE PLAN SUBMITTAL CASE #: ZA24-0009 CONCEPT AND SITE PLAN 02 BUILDING SIGNAGE - NORTH ENTRY03BUILDING SIGNAGE - CAFE @ EAST (WHITE CHAPEL) & WEST (COURTYARD) 04 BUILDING SIGNAGE - HIGHWAY 114 NOTE: THIS PLAN ALIGNS WITH THE LANDSCAPE DESIGN SHOWN ON SHEET L1.2. REFER TO THE LANDSCAPE DESIGN SHEET AND CIVIL ENGINEERING SHEETS FOR INFORMATION SPECIFIC TO EACH DISCIPLINE. DETENTION POND ALL PAVEMENT SHALL BE CONCRETE (GRAY) ALL PAVEMENT SHALL BE CONCRETE (GRAY) ALL PAVEMENT SHALL BE CONCRETE (GRAY) GRASS (GREEN) GRASS (GREEN) SITE PLAN RENDERING A701SITE PLAN - RENDERED TO ALIGN WITH LANDSCAPE PLAN STEVEN SCOGGINS 6406 REDSTONE DRIVE ARLINGTON, TEXAS 817-965-0763 LAMBERT HOMEHEADQUARTERS1700 N. WHITE CHAPEL ROADSOUTHLAKE, TEXASA TTS XETEFO SASTEVEN JA C OB SC O GGINS22 4 3 5REGISTEREDARC H I TECTDATE: 04/01/2024 REVISION: CONCEPT AND SITE PLAN SUBMITTAL CASE #: ZA24-0009 CONCEPT AND SITE PLAN RETAIL (31'-0" X 30'-0") (915 SF) STOR (6'-9" X 15'-0") (102 SF) BREEZEWAY (20'-0" X 25-4") (500 SF) RETAIL (31'-0" X 30'-0") (915 SF) STOR (6'-9" X 15'-0") (102 SF) STOR (6'-9" X 15'-0") (102 SF) RETAIL (31'-0" X 30'-0") (915 SF) PHASE 2 FUTURE RETAIL CONCEPTS A8 01 PHASE 2 - FUTURE RETAIL - CONCEPT PLAN STEVEN SCOGGINS 6406 REDSTONE DRIVE ARLINGTON, TEXAS 817-965-0763 LAMBERT HOMEHEADQUARTERS1700 N. WHITE CHAPEL ROADSOUTHLAKE, TEXASA TTS XETEFO SASTEVEN JA C OB SC O GGINS22 4 3 5REGISTEREDARC H I TECTDATE: 04/01/2024 REVISION: CONCEPT AND SITE PLAN SUBMITTAL CASE #: ZA24-0009 CONCEPT AND SITE PLAN 02 PHASE 2 - CONCEPT RENDERING 01 03 PHASE 2 - CONCEPT RENDERING 02 04 PHASE 2 - CONCEPT RENDERING 03 NOTE: THE CONCEPT PLAN AND ELEVATIONS SHOWN DEPICT THE DESIGN INTENT, QUALITY AND STYLE OF BUILDING TO BE CONSTRUCTED DURING PHASE 2. THE FUTURE RETAIL BUILDNG MAY ALTER FROM WHAT IS SHOWN WHEN THE PROJECT PROCEEDS, BUT THE OVERALL AESTHETIC AND SIZE SHALL REMAIN AS SHOWN. XX X X X X X X X X X X X X X X OHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH EOHEOHEOHEOHEOHEOHEOHEOHEEXISTING TREE TO REMAIN, TYP. EXISTING TREE TO BE REMOVED, TYP. 1 2 3 4 5 6 7 8 9 10 11 12 13 14XXXXXX X X X X X X X X X X OHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH EOHEOHEOHEOHEOHEOHEOHEOHE P-CO P-FHSS P-MH SS P-MH BUILDING #1 ONE STORY (±8,692 s.f.) FFE=650.00VAN VANP-WM P-CO GMC 300 PROCEPTOR SS P-MH P-FDC P-CO P-CO P-CO P-CO P-CO P-CO P-FH 15 16 17 18 19 STA TE O F T E XASTCETHI R C A EPACSDNALDEE GEISRRT572 4AMANARICHDW. A RDSONa W R AWR Designs, LLC P.O. Box 1746 Aledo, Texas 76008 amanda@awr-designs.com c. 512.517.5589 STEVEN SCOGGINS 6406 REDSTONE DRIVE ARLINGTON, TEXAS 817-965-0763 LAMBERT HOMEHEADQUARTERS1700 N. WHITE CHAPEL ROADSOUTHLAKE, TEXASDATE: 04/01/2024 REVISION: CONCEPT AND SITE PLAN SUBMITTAL CASE #: ZA24-0009 CONCEPT AND SITE PLAN L1.1 TREE PRESERVATION PLAN TREE PRESERVATION LEGEND TREE TO BE REMOVED TREE TO REMAIN TREE PRESERVATION FENCING GRAPHIC SCALE FEET04020 SFDOH 1"=20 - 0" TREE PRESERVATION NOTES CONSTRUCTION METHODS: BORING: BORING OF UTILITIES UNDER PROTECTED TREES MAY BE REQUIRED. WHEN REQUIRED, THE MINIMUM LENGTH OF THE BORE SHALL BE THE WIDTH OF THE CRITICAL ROOT ZONE AND SHALL BE A MINIMUM DEPTH OF FORTY (48) INCHES. TRENCHING: ALL TRENCHING SHALL BE DESIGNED TO AVOID TRENCHING ACROSS CRITICAL ROOT ZONES OF ANY PROTECTED TREE. THE PLACEMENT OF UNDERGROUND UTILITY LINES SUCH AS ELECTRIC, PHONE, GAS, ETC., IS ENCOURAGED TO BE LOCATED OUTSIDE THE CRITICAL ROOT ZONE. TRENCHING FOR IRRIGATION SYSTEMS SHALL BE PLACED OUTSIDE THE CRITICAL ROOT ZONE EXCEPT THE MINIMUM REQUIRED SINGLE HEAD SUPPLY LINE. THIS LINE IS ALLOWED TO EXTEND INTO THE CRITICAL ROOT ZONE PERPENDICULAR TO THE TREE TRUNK WITH THE LEAST POSSIBLE DISTURBANCE. TREES TO BE REMOVED: ALL TREES TO BE REMOVED FROM THE SITE SHALL BE FLAGGED BY THE CONTRACTOR WITH BRIGHT RED VINYL TAPE WRAPPED AROUND THE MAIN TRUNK AT A HEIGHT OF FOUR (4') FEET ABOVE GRADE. TREES TO REMAIN: ALL TREES TO REMAIN, AS NOTED ON DRAWINGS, SHALL HAVE PROTECTIVE FENCING LOCATED AT THE TREE'S DRIP LINE. THE PROTECTIVE FENCING SHALL BE LOCATED AS INDICATED ON THE TREE PROTECTION DETAIL. EXISTING TREES NOTED TO REMAIN SHALL BE PROTECTED DURING CONSTRUCTION FROM DAMAGE AND COMPACTION OF SOIL UNDER AND AROUND DRIP LINE OF TREE. UNDER NO CIRCUMSTANCE SHALL THE CONTRACTOR PRUNE ANY PORTION OF THE DAMAGED TREE WITHOUT THE PRIOR APPROVAL BY THE OWNER'S AUTHORIZED REPRESENTATIVE. PROHIBITED ACTIVITIES IN CRITICAL ROOT ZONE: THE FOLLOWING ACTIVITIES ARE PROHIBITED IN THE AREAS NOTED AS THE CRITICAL ROOT ZONE. MATERIAL STORAGE: NO MATERIALS INTENDED FOR USE IN CONSTRUCTION, OR WASTE MATERIALS ACCUMULATED DUE TO EXCAVATION OR DEMOLITION, SHALL BE PLACED WITHIN THE LIMITS OF THE CRITICAL ROOT ZONE OF ANY PROTECTED TREE. EQUIPMENT CLEANING/LIQUID DISPOSAL: NO EQUIPMENT SHALL BE CLEANED, OR OTHER LIQUIDS DEPOSITED OR ALLOWED WITHIN THE LIMITS OF THE CRITICAL ROOT ZONE OF A PROTECTED TREE. THIS INCLUDES, WITHOUT LIMITATION: PAINT, OIL, SOLVENTS, ASPHALT, CONCRETE, MORTAR OR SIMILAR MATERIALS. TREE ATTACHMENTS: NO SIGNS, WIRES, OR OTHER ATTACHMENTS, OTHER THAN THOSE OF A PROTECTIVE NATURE, SHALL BE ATTACHED TO ANY PROTECTED TREE. VEHICULAR TRAFFIC: NO VEHICULAR AND/OR CONSTRUCTION, EQUIPMENT, TRAFFIC, OR PARKING SHALL TAKE PLACE WITHIN THE LIMITS OF THE CRITICAL ROOT ZONE OF ANY PROTECTED TREE OTHER THAN ON EXISTING STREET PAVEMENT. GRADE CHANGES: A MINIMUM OF 75% OF THE DRIP LINE AND ROOT ZONE SHALL BE PRESERVED AT NATURAL GRADE. ANY FINE GRADING DONE WITHIN THE CRITICAL ROOT ZONES OF THE PROTECTED TREES MUST BE DONE WITH LIGHT MACHINERY SUCH AS A BOBCAT OR LIGHT TRACTOR. NO EARTH MOVING EQUIPMENT WITH TRACKS IS ALLOWED WITHIN THE CRITICAL ROOT ZONE OF THE TREES. PROCEDURES REQUIRED PRIOR TO CONSTRUCTION: PROTECTIVE FENCING: PRIOR TO CONSTRUCTION, THE CONTRACTOR OR SUBCONTRACTOR SHALL CONSTRUCT AND MAINTAIN, FOR EACH PROTECTED TREE ON A CONSTRUCTION SITE, A PROTECTIVE FENCING WHICH ENCIRCLES THE OUTER LIMITS OF THE CRITICAL ROOT ZONE OF THE TREE TO PROTECT IT FROM CONSTRUCTION ACTIVITY. ALL PROTECTIVE FENCING SHALL BE IN PLACE PRIOR TO COMMENCEMENT OF ANY SITE WORK, AND REMAIN IN PLACE UNTIL ALL EXTERIOR WORK HAS BEEN COMPLETED. BARK PROTECTION: IN SITUATIONS WHERE A PROTECTED TREE REMAINS IN THE IMMEDIATE AREA OF INTENDED CONSTRUCTION, AND THE LANDSCAPE ARCHITECT OR OWNERS'S REPRESENTATIVE DETERMINES THE TREE BARK TO BE IN DANGER OF DAMAGE BY CONSTRUCTION EQUIPMENT OR OTHER ACTIVITY, THE CONTRACTOR OR SUBCONTRACTOR SHALL PROTECT THE TREE BY ENCLOSING THE ENTIRE CIRCUMFERENCE OF THE TREE WITH 2"X4" LUMBER ENCIRCLED WITH WIRE OR OTHER MEANS THAT DO NOT DAMAGE THE TREE. THE INTENT IS TO PROTECT THE BARK OF THE TREE AGAINST INCIDENTAL CONTACT BY LARGE CONSTRUCTION EQUIPMENT. TREE PROTECTION FENCING N.T.S. 1 METAL T-POST 2'-3' IN GROUND ORANGE VINYL OR CHAIN LINK FENCE TO REMAIN DURING CONSTRUCTION NO GRADING SHALL OCCUR WITHIN LIMITS OF DRIPLINE EXISTING TREE NO ENTRY SIGNAGE 4' MIN.BORING: BORING OF UTILITIES UNDER PROTECTED TREES SHALL BE REQUIRED IN CIRCUMSTANCES WHERE IT IS NOT POSSIBLE TO TRENCH AROUND THE CRITICAL ROOT ZONE OF THE PROTECTED TREE. WHERE REQUIRED, THE LENGTH OF THE BORE SHALL BE THE WIDTH OF THE CRITICAL ROOT ZONE AT A MINIMUM AND SHALL BE A MINIMUM DEPTH OF FORTY EIGHT (48") INCHES. TRENCH = 40% ROOT KILL TUNNELING SAVES ROOTS PROTECTED TREE DRIP LINE BORING AND TUNNELING N.T.S. 2 WHERE A PROTECTED TREE REMAINS IN THE IMMEDIATE AREA OF INTENDED CONSTRUCTION, AND THE TREE MAY BE IN DANGER OF BEING DAMAGED BY CONSTRUCTION EQUIPMENT OR OTHER ACTIVITY, THE CONTRACTOR OR SUBCONTRACTOR SHALL PROTECT THE TREE WITH 2" X 4" LUMBER ENCIRCLED WITH WIRE OR OTHER MEANS THAT DO NOT DAMAGE THE BARK OF THE TREE. THE INTENT IS TO PROTECT THE TRUNK OF THE TREE AGAINST INCIDENTAL CONTACT BY LARGE CONSTRUCTION EQUIPMENT. 2" X 4" LUMBER WIRE FINISH GRADE BARK PROTECTION N.T.S. 3 REFER TO SECTION 9.8 OF SOUTHLAKE CITY ORDINANCE 585-E FOR ADDITIONAL TREE PROTECTION AND PRESERVATION CONSTRUCTION METHODS. XX X X X X X X X X X X X X X X OHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH EOHEOHEOHEOHEOHEOHEOHEOHEXXXXXXXXX X X X X X X X OHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH EOHEOHEOHEOHEOHEOHEOHEOHE P-CO P-FHSS P-MH SS P-MH BUILDING #1 ONE STORY (±8,692 s.f.) FFE=650.00VAN VANP-WM P-CO GMC 300 PROCEPTOR SS P-MH P-FDC P-CO P-CO P-CO P-CO P-CO P-CO P-FH 120 GL 3 CMN BERMUDA SOLID SOD, TYP. BERMUDA SOLID SOD, TYP. DECOMPOSED GRANITE, TYP. 1 CP 125 SC 17 AB 3 BO 3 TS 9 MS 28 DY 4 MS 20 DY 125 GL 1 RO 3 CMB 9 MS 12 LOR 7 MS 8 LOR 12 LOR 17 AB 6 CMB 1 CP 3 VIT 37 NRS 3 VIT 1 RO 150 GL 2 RO 11 MS 7 CMB 5 VIT 1 RO 3 NRS 2 RO 1 CMB 1 RO 3 VIT 2 RO 160 GL 11 MS 3 CO 5 CMN 20 TS 8 MS 5 CMN 15 GM 9 LOR 10 GM 4 BC 5 VIT PHASE 2 AREA TO BE DECOMPOSED GRANITE UNTIL CONSTRUCTION COMMENCES, TYP. LOW RETAINING WALL, TYP. 3 DY 18'-0"15'-0"150 AJ60 AJ 200 AJ 3 VIT 350 AJ 2 CMN 13 LOR 6 MS 1 CMN 1 CMN 90 AJ 2 CO 1 CO CONCRETE SEATING AREA SALT FINISH, JOINTS AS SHOWN, TYP. 1 0 ' - 0 "10'-0"STA TE O F T E XASTCETHI R C A EPACSDNALDEE GEISRRT572 4AMANARICHDW. A RDSONa W R AWR Designs, LLC P.O. Box 1746 Aledo, Texas 76008 amanda@awr-designs.com c. 512.517.5589 STEVEN SCOGGINS 6406 REDSTONE DRIVE ARLINGTON, TEXAS 817-965-0763 LAMBERT HOMEHEADQUARTERS1700 N. WHITE CHAPEL ROADSOUTHLAKE, TEXASDATE: 04/01/2024 REVISION: CONCEPT AND SITE PLAN SUBMITTAL CASE #: ZA24-0009 CONCEPT AND SITE PLAN L1.2 LANDSCAPE PLAN GRAPHIC SCALE FEET04020 SFDOH 1"=20' - 0" GENERAL LAWN NOTES 1.CONTRACTOR SHALL COORDINATE OPERATIONS AND AVAILABILITY OF EXISTING TOPSOIL WITH ON-SITE CONSTRUCTION MANAGER 2.LAWN AREAS SHALL BE LEFT 1" BELOW FINAL FINISHED GRADE PRIOR TO TOPSOIL INSTALLATION. 3.CONTRACTOR TO FIND GRADE AREAS TO ACHIEVE FINAL CONTOURS AS SHOWN ON CIVIL DRAWINGS. POSITIVE DRAINAGE SHALL BE PROVIDED AWAY FROM ALL BUILDINGS. ROUNDING AT TOP AND BOTTOM OF SLOPES SHALL BE PROVIDED AND IN OTHER BREAKS IN GRADE. CORRECT AREAS WHERE STANDING WATER MAY OCCUR. 4.ALL LAWN AREAS SHALL BE FINE GRADED, IRRIGATION TRENCHES COMPLETELY SETTLED AND FINISH GRADE APPROVED BY THE OWNER'S CONSTRUCTION MANAGER OR LANDSCAPE ARCHITECT PRIOR TO LAWN INSTALLATION. 5.CONTRACTOR SHALL REMOVE ALL ROCKS 3/4" IN DIAMETER AND LARGER. REMOVE ALL DIRT CLODS, STICKS, CONCRETE SPOILS, TRASH ETC PRIOR TO PLACING TOPSOIL AND GRASS INSTALLATION. 6.CONTRACTOR SHALL MAINTAIN ALL LAWN AREAS UNTIL FINAL ACCEPTANCE. 7.CONTRACTOR SHALL GUARANTEE ESTABLISHMENT OF ACCEPTABLE TURF AREA AND SHALL PROVIDE REPLACEMENT IF NECESSARY. SOLID SOD: 1.SOLID SOD SHALL BE PLACED ALONG ALL IMPERVIOUS EDGES, AT A MINIMUM. THIS SHALL INCLUDE CURBS, WALKS, INLETS, MANHOLES AND PLANTING BED AREAS. SOD SHALL COVER OTHER AREAS COMPLETELY AS INDICATED BY PLAN. 2.SOD SHALL BE STRONGLY ROOTED DROUGHT RESISTANT SOD, NOT LESS THAN 2 YEARS OLD, FREE OF WEEDS AND UNDESIRABLE NATIVE GRASS AND MACHINE CUT TO PAD THICKNESS OF 3/4" (+1/4"), EXCLUDING TOP GROWTH AND THATCH. 3.LAY SOD BY HAND TO COVER INDICATED AREAS COMPLETELY, ENSURING EDGES ARE TOUCHING WITH TIGHTLY FITTING JOINTS, NO OVERLAPS WITH STAGGERED STRIPS TO OFFSET JOINTS. 4.TOP DRESS JOINTS IN SOD BY HAND WITH TOPSOIL TO FILL VOIDS IF NECESSARY 5.SOD SHALL BE ROLLED TO CREATE A SMOOTH EVEN SURFACE. SOD SHOULD BE WATERED THOROUGHLY DURING INSTALLATION PROCESS. 6.SHOULD INSTALLATION OCCUR BETWEEN OCTOBER 1ST AND MARCH 1ST, OVERSEED BERMUDAGRASS SOD WITH WINTER RYEGRASS AT A RATE OF 4 POUNDS PER 1000 S.F. HYDROMULCH: 1.SCARIFY AND LOOSEN ALL AREAS TO BE HYDROMULCHED TO A MINIMUM DEPTH OF 4" PRIOR TO TOPSOIL AND HYDROMULCH INSTALLATION. 2.BERMUDA GRASS SEED SHALL BE EXTRA HULLED, TREATED LAWN TYPE. SEED SHALL BE DELIVERED TO THE SITE IN ITS ORIGINAL UNOPENED CONTAINER AND SHALL MEET ALL STATE/LOCAL LAW REQUIREMENTS. 3.FIBER SHALL BE 100% WOOD CELLULOSE FIVER, DELIVERED TO THE SITE IN ITS ORIGINAL UNOPENED CONTAINER AS MANUFACTURED BY "CONWEB' OR EQUAL. 4.FIBER TACK SHALL BE DELIVERED TO THE SITE IN ITS UNOPENED CONTAINER AND SHALL BE 'TERRO-TACK ONE', AS MANUFACTURED BY GROWERS, INC OR APPROVED EQUAL. 5.HYDROMULCH WITH BERMUDA GRASS SEET AT A RATE OF 2 POUNDS PER 1000 S.F. 6.USE A BATTER BOARD AGAINST ALL BED AREAS TO PREVENT OVER SPRAY. 7.IF INADEQUATE MOISTURE IS PRESENT IN SOIL, APPLY WATER AS NECESSARY FOR OPTIMUM MOISTURE FOR SEED APPLICATION. 8.IF INSTALLATION OCCURS BETWEEN SEPTEMBER 1ST AND MAY 1ST, ALL HYDORMULCH AREAS SHALL BE OVER-SEEDED WITH WINTER RYE GRASS AT A RATE OF FOUR POUNDS PER ONE THOUSAND SQUARE FEET. CONTRACTOR SHALL BE REQUIRED TO RE-HYDROMULCH WITH BERMUDA GRASS THE FOLLOWING GROWING SEASON AS PART OF THIS CONTRACT. 9.AFTER APPLICATION, NO EQUIPMENT SHALL OPERATE OVER APPLIED AREAS. WATER SEEDED AREAS IMMEDIATELY AFTER INSTALLATION TO SATURATION. 10.ALL LAWN AREAS TO BE HYDROMULCHED SHALL ACHIEVE 100% COVERAGE PRIOR TO FINAL ACCEPTANCE. LANDSCAPE NOTES 1.CONTRACTOR TO VERIFY AND LOCATE ALL PROPOSED AND EXISTING ELEMENTS. NOTIFY LANDSCAPE ARCHITECT OR DESIGNATED REPRESENTATIVE FOR ANY LAYOUT DISCREPANCIES OR ANY CONDITION THAT WOULD PROHIBIT THE INSTALLATION AS SHOWN. SURVEY DATA OF EXISTING CONDITIONS WAS SUPPLIED BY OTHERS 2.CONTRACTOR SHALL CALL 811 TO VERIFY AND LOCATE ANY AND ALL UTILITIES ON SITE PRIOR TO COMMENCING WORK. LANDSCAPE ARCHITECT SHOULD BE NOTIFIED OF ANY CONFLICTS. CONTRACTOR TO EXERCISE EXTREME CAUTION WHEN WORKING NEAR UNDERGROUND UTILITIES. 3.A MINIMUM OF 2% SLOPE SHALL BE PROVIDED AWAY FROM ALL STRUCTURES. 4.CONTRACTOR SHALL FINE GRADE AREAS TO ACHIEVE FINAL CONTOURS AS INDICATED. LEAVE AREAS TO RECEIVE TOPSOIL 3" BELOW FINAL FINISHED GRADE IN PLANTING AREAS AND 1" BELOW FINAL FINISHED GRADE IN LAWN AREAS. 5.LANDSCAPE ISLANDS SHALL BE CROWNED, AND UNIFORM THROUGHOUT THE SITE. 6.PLANTING AREAS AND SOD TO BE SEPARATED BY STEEL EDGING. NO STEEL EDGING SHALL BE INSTALLED ADJACENT TO BUILDINGS, WALKS OR CURBS. EDGING NOT TO BE MORE THAN 1/2" ABOVE FINISHED GRADE. 7.EDGING SHALL BE CUT AT 45 DEGREE ANGLE WHERE IT INTERSECTS WALKS AND/OR CURBS. 8.MULCH SHALL BE INSTALLED AT 1/2" BELOW THE TOPS OF SIDEWALKS AND CURBING. 9.QUANTITIES ON THESE PLANS ARE FOR REFERENCE ONLY. THE SPACING OF PLANTS SHOULD BE AS INDICATED ON PLANS OR OTHERWISE NOTED. ALL TREES AND SHRUBS SHALL BE PLANTED PER DETAILS. 10.CONTAINER GROWN PLANT MATERIAL IS PREFERRED HOWEVER BALL AND BURLAP PLANT MATERIAL CAN BE SUBSTITUTED IF NEED BE AND IS APPROPRIATE TO THE SIZE AND QUALITY INDICATED ON THE PLANT MATERIAL LIST. 11.TREES SHALL BE PLANTED AT A MINIMUM OF 5' FROM ANY UTILITY LINE, SIDEWALK OR CURB. TREES SHALL ALSO BE 10' CLEAR FROM FIRE HYDRANTS. 12.4" OF SHREDDED HARDWOOD MULCH (2" SETTLED THICKNESS) SHALL BE PLACED OVER WEED BARRIER FABRIC. MULCH SHALL BE SHREDDED HARDWOOD MULCH OR APPROVED EQUAL, PINE STRAW MULCH IS PROHIBITED. 13.WEED BARRIER FABRIC SHALL BE USED IN PLANT BEDS AND AROUND ALL TREES AND SHALL BE MIRAFI 1405 WEED BARRIER OR APPROVED EQUAL. 14.CONTRACTOR TO PROVIDE UNIT PRICING OF LANDSCAPE MATERIALS AND BE RESPONSIBLE FOR OBTAINING ALL LANDSCAPE AND IRRIGATION PERMITS. IRRIGATION: 1.ALL REQUIRED LANDSCAPE AREAS SHALL HAVE AN AUTOMATIC IRRIGATION SYSTEM WITH A FREEZE/RAIN SENSOR. SYSTEM SHALL ALSO HAVE AN ET WEATHER BASED CONTROLLER AND BE DESIGNED AND INSTALLED BY A LICENSED IRRIGATOR. MAINTENANCE REQUIREMENTS: 1.VEGETATION SHOULD BE INSPECTED REGULARLY TO ENSURE THAT PLANT MATERIAL IS ESTABLISHING PROPERLY AND REMAINS IN A HEALTHY GROWING CONDITION APPROPRIATE FOR THE SEASON. IF DAMAGED OR REMOVED, PLANTS MUST BE REPLACED BY A SIMILAR VARIETY AND SIZE. 2.MOWING, TRIMMING, EDGING AND SUPERVISION OF WATER APPLICATIONS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR UNTIL THE OWNER OR OWNER'S REPRESENTATIVE ACCEPTS AND ASSUMES REGULAR MAINTENANCE. 3.ALL LANDSCAPE AREAS SHOULD BE CLEANED AND KEPT FREE OF TRASH, DEBRIS, WEEDS AND OTHER MATERIAL. MISCELLANEOUS MATERIALS: 1.STEEL EDGING SHALL BE 3/16" X 4 X 16' DARK GREEN DURAEDGE STEEL LANDSCAPE EDGING UNLESS NOTED OTHERWISE ON PLANS/DETAILS. 2.RIVER ROCK SHALL BE ARIZONA RIVER ROCK, 2" - 4" DIAMETER. RIVER ROCK SHALL BE COMPACTED TO A MINIMUM OF 3" DEPTH OVER FILTER FABRIC. 3.DECOMPOSED GRANITE SHALL CONSIST OF A NATURAL MIX OF GRANITE AGGREGATE NOT TO EXCEED 1/8" IN DIAMETER AND COMPOSED OF VARIOUS STAGES OF DECOMPOSED EARTH BASE. DG SHALL BE PLACED OVER FILTER FABRIC AT A MINIMUM OF 3" DEPTH. 4.BOULDERS SHALL BE ON AVERAGE 36" X 24" X 24" AND A MIN. OF 500LBS. BOULDER TO BE SET IN GROUND ON A 1" SAND SETTING BED. APPROXIMATELY 2" BELOW FINISH GRADE. BOULDER SHOULD HAVE A WEATHERED FINISH. EACH BOULDER HAS A NATURAL TOP AND BOTTOM. ENSURE THAT THE BOULDER IS POSITIONED CORRECTLY BEFORE INSTALLATION. PRUNING AND TRIMMING NOTES 1.CONTRACTOR SHALL PRUNE ALL EXISTING TREES ON-SITE USING STANDARD GUIDELINES IN THE INDUSTRY. 2.ALL TREES SHALL BE TRIMMED SO THAT NATURAL SHAPES OF THE PLANTS ARE RETAINED. 3.DO NOT 'TOP' OR 'HEAD' TREES. 4.IF BALLING OR SHEARING OF TREES HAS OCCURRED IN THE PAST, DISCONTINUE THIS PRACTICE AND ALLOW PLANTS TO GROW INTO NATURAL SHAPE. 5.REMOVE SUCKERS, DEAD, DYING, DISEASED, BROKEN AND / OR WEAK BRANCHES FROM ALL TREES ALONG THE MAIN TRUNK STRUCTURE AND WITHIN THE BRANCHING AREA. 6.CONTRACTOR SHALL PRUNE EXISTING DECIDUOUS HARDWOOD BY REMOVING LOWER LIMBS TO RAISE THE CANOPY. THE BOTTOM OF THE CANOPY SHALL BE RAISED TO 12'-0" ABOVE GRADE FOR DECIDUOUS HARDWOOD TREES, WHEN POSSIBLE. THE INTEGRITY OF THE CANOPY AND STRUCTURE OF THE TREE SHALL BE MAINTAINED. DO NOT CUT OR PRUNE CENTRAL LEADERS. 7.CONTRACTOR SHALL THIN THE CANOPY BY ONE-FOURTH. PRUNE TREE TO EVENLY SPACE BRANCHES WITHIN THE CANOPY WHENEVER POSSIBLE. REMOVE THOSE LIMBS THAT CROSS OTHERS, DOUBLE LEADERS AND THOSE THAT EXCESSIVELY EXTEND BEYOND THE NATURAL CROWN OF THE TREE. 8.CONTRACTOR SHALL PROVIDE DEEP ROOT FEEDING AND INVIGORATION OF EXISTING TREES. THIS SHALL BE ORGANIC BASED NUTRIENTS BASED FOR ROOT GROWTH AND LEAF GROWTH STIMULATION. 9.CONTRACTOR SHALL BE REQUIRED TO CHIP ALL REMOVED BRANCHES, LEAFS, ETC. XX X X X X X X X X X X X X X X OHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH EOHEOHEOHEOHEOHEOHEOHEOHEXXXXXXXXX X X X X X X X OHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH EOHEOHEOHEOHEOHEOHEOHEOHE P-CO P-FHSS P-MH SS P-MH BUILDING #1 ONE STORY (±8,692 s.f.) FFE=650.00VAN VANP-WM P-CO GMC 300 PROCEPTOR SS P-MH P-FDC P-CO P-CO P-CO P-CO P-CO P-CO P-FH 120 GL 3 CMN BERMUDA SOLID SOD, TYP. BERMUDA SOLID SOD, TYP. DECOMPOSED GRANITE, TYP. 1 CP 125 SC 17 AB 3 BO 3 TS 9 MS 28 DY 4 MS 20 DY 125 GL 1 RO 3 CMB 9 MS 12 LOR 7 MS 8 LOR 12 LOR 17 AB 6 CMB 1 CP 3 VIT 37 NRS 3 VIT 1 RO 150 GL 2 RO 11 MS 7 CMB 5 VIT 1 RO 3 NRS 2 RO 1 CMB 1 RO 3 VIT 2 RO 160 GL 11 MS 3 CO 5 CMN 20 TS 8 MS 5 CMN 15 GM 9 LOR 10 GM 4 BC 5 VIT PHASE 2 AREA TO BE DECOMPOSED GRANITE UNTIL CONSTRUCTION COMMENCES, TYP. LOW RETAINING WALL, TYP. 3 DY 18'-0"15'-0"150 AJ60 AJ 200 AJ 3 VIT 350 AJ 2 CMN 13 LOR 6 MS 1 CMN 1 CMN 90 AJ 2 CO 1 CO CONCRETE SEATING AREA SALT FINISH, JOINTS AS SHOWN, TYP. 1 0 ' - 0 "10'-0"STA TE O F T E XASTCETHI R C A EPACSDNALDEE GEISRRT572 4AMANARICHDW. A RDSONa W R AWR Designs, LLC P.O. Box 1746 Aledo, Texas 76008 amanda@awr-designs.com c. 512.517.5589 STEVEN SCOGGINS 6406 REDSTONE DRIVE ARLINGTON, TEXAS 817-965-0763 LAMBERT HOMEHEADQUARTERS1700 N. WHITE CHAPEL ROADSOUTHLAKE, TEXASDATE: 04/01/2024 REVISION: CONCEPT AND SITE PLAN SUBMITTAL CASE #: ZA24-0009 CONCEPT AND SITE PLAN L1.2 LANDSCAPE PLAN GRAPHIC SCALE FEET04020 SFDOH 1"=20' - 0" GENERAL LAWN NOTES 1.CONTRACTOR SHALL COORDINATE OPERATIONS AND AVAILABILITY OF EXISTING TOPSOIL WITH ON-SITE CONSTRUCTION MANAGER 2.LAWN AREAS SHALL BE LEFT 1" BELOW FINAL FINISHED GRADE PRIOR TO TOPSOIL INSTALLATION. 3.CONTRACTOR TO FIND GRADE AREAS TO ACHIEVE FINAL CONTOURS AS SHOWN ON CIVIL DRAWINGS. POSITIVE DRAINAGE SHALL BE PROVIDED AWAY FROM ALL BUILDINGS. ROUNDING AT TOP AND BOTTOM OF SLOPES SHALL BE PROVIDED AND IN OTHER BREAKS IN GRADE. CORRECT AREAS WHERE STANDING WATER MAY OCCUR. 4.ALL LAWN AREAS SHALL BE FINE GRADED, IRRIGATION TRENCHES COMPLETELY SETTLED AND FINISH GRADE APPROVED BY THE OWNER'S CONSTRUCTION MANAGER OR LANDSCAPE ARCHITECT PRIOR TO LAWN INSTALLATION. 5.CONTRACTOR SHALL REMOVE ALL ROCKS 3/4" IN DIAMETER AND LARGER. REMOVE ALL DIRT CLODS, STICKS, CONCRETE SPOILS, TRASH ETC PRIOR TO PLACING TOPSOIL AND GRASS INSTALLATION. 6.CONTRACTOR SHALL MAINTAIN ALL LAWN AREAS UNTIL FINAL ACCEPTANCE. 7.CONTRACTOR SHALL GUARANTEE ESTABLISHMENT OF ACCEPTABLE TURF AREA AND SHALL PROVIDE REPLACEMENT IF NECESSARY. SOLID SOD: 1.SOLID SOD SHALL BE PLACED ALONG ALL IMPERVIOUS EDGES, AT A MINIMUM. THIS SHALL INCLUDE CURBS, WALKS, INLETS, MANHOLES AND PLANTING BED AREAS. SOD SHALL COVER OTHER AREAS COMPLETELY AS INDICATED BY PLAN. 2.SOD SHALL BE STRONGLY ROOTED DROUGHT RESISTANT SOD, NOT LESS THAN 2 YEARS OLD, FREE OF WEEDS AND UNDESIRABLE NATIVE GRASS AND MACHINE CUT TO PAD THICKNESS OF 3/4" (+1/4"), EXCLUDING TOP GROWTH AND THATCH. 3.LAY SOD BY HAND TO COVER INDICATED AREAS COMPLETELY, ENSURING EDGES ARE TOUCHING WITH TIGHTLY FITTING JOINTS, NO OVERLAPS WITH STAGGERED STRIPS TO OFFSET JOINTS. 4.TOP DRESS JOINTS IN SOD BY HAND WITH TOPSOIL TO FILL VOIDS IF NECESSARY 5.SOD SHALL BE ROLLED TO CREATE A SMOOTH EVEN SURFACE. SOD SHOULD BE WATERED THOROUGHLY DURING INSTALLATION PROCESS. 6.SHOULD INSTALLATION OCCUR BETWEEN OCTOBER 1ST AND MARCH 1ST, OVERSEED BERMUDAGRASS SOD WITH WINTER RYEGRASS AT A RATE OF 4 POUNDS PER 1000 S.F. HYDROMULCH: 1.SCARIFY AND LOOSEN ALL AREAS TO BE HYDROMULCHED TO A MINIMUM DEPTH OF 4" PRIOR TO TOPSOIL AND HYDROMULCH INSTALLATION. 2.BERMUDA GRASS SEED SHALL BE EXTRA HULLED, TREATED LAWN TYPE. SEED SHALL BE DELIVERED TO THE SITE IN ITS ORIGINAL UNOPENED CONTAINER AND SHALL MEET ALL STATE/LOCAL LAW REQUIREMENTS. 3.FIBER SHALL BE 100% WOOD CELLULOSE FIVER, DELIVERED TO THE SITE IN ITS ORIGINAL UNOPENED CONTAINER AS MANUFACTURED BY "CONWEB' OR EQUAL. 4.FIBER TACK SHALL BE DELIVERED TO THE SITE IN ITS UNOPENED CONTAINER AND SHALL BE 'TERRO-TACK ONE', AS MANUFACTURED BY GROWERS, INC OR APPROVED EQUAL. 5.HYDROMULCH WITH BERMUDA GRASS SEET AT A RATE OF 2 POUNDS PER 1000 S.F. 6.USE A BATTER BOARD AGAINST ALL BED AREAS TO PREVENT OVER SPRAY. 7.IF INADEQUATE MOISTURE IS PRESENT IN SOIL, APPLY WATER AS NECESSARY FOR OPTIMUM MOISTURE FOR SEED APPLICATION. 8.IF INSTALLATION OCCURS BETWEEN SEPTEMBER 1ST AND MAY 1ST, ALL HYDORMULCH AREAS SHALL BE OVER-SEEDED WITH WINTER RYE GRASS AT A RATE OF FOUR POUNDS PER ONE THOUSAND SQUARE FEET. CONTRACTOR SHALL BE REQUIRED TO RE-HYDROMULCH WITH BERMUDA GRASS THE FOLLOWING GROWING SEASON AS PART OF THIS CONTRACT. 9.AFTER APPLICATION, NO EQUIPMENT SHALL OPERATE OVER APPLIED AREAS. WATER SEEDED AREAS IMMEDIATELY AFTER INSTALLATION TO SATURATION. 10.ALL LAWN AREAS TO BE HYDROMULCHED SHALL ACHIEVE 100% COVERAGE PRIOR TO FINAL ACCEPTANCE. LANDSCAPE NOTES 1.CONTRACTOR TO VERIFY AND LOCATE ALL PROPOSED AND EXISTING ELEMENTS. NOTIFY LANDSCAPE ARCHITECT OR DESIGNATED REPRESENTATIVE FOR ANY LAYOUT DISCREPANCIES OR ANY CONDITION THAT WOULD PROHIBIT THE INSTALLATION AS SHOWN. SURVEY DATA OF EXISTING CONDITIONS WAS SUPPLIED BY OTHERS 2.CONTRACTOR SHALL CALL 811 TO VERIFY AND LOCATE ANY AND ALL UTILITIES ON SITE PRIOR TO COMMENCING WORK. LANDSCAPE ARCHITECT SHOULD BE NOTIFIED OF ANY CONFLICTS. CONTRACTOR TO EXERCISE EXTREME CAUTION WHEN WORKING NEAR UNDERGROUND UTILITIES. 3.A MINIMUM OF 2% SLOPE SHALL BE PROVIDED AWAY FROM ALL STRUCTURES. 4.CONTRACTOR SHALL FINE GRADE AREAS TO ACHIEVE FINAL CONTOURS AS INDICATED. LEAVE AREAS TO RECEIVE TOPSOIL 3" BELOW FINAL FINISHED GRADE IN PLANTING AREAS AND 1" BELOW FINAL FINISHED GRADE IN LAWN AREAS. 5.LANDSCAPE ISLANDS SHALL BE CROWNED, AND UNIFORM THROUGHOUT THE SITE. 6.PLANTING AREAS AND SOD TO BE SEPARATED BY STEEL EDGING. NO STEEL EDGING SHALL BE INSTALLED ADJACENT TO BUILDINGS, WALKS OR CURBS. EDGING NOT TO BE MORE THAN 1/2" ABOVE FINISHED GRADE. 7.EDGING SHALL BE CUT AT 45 DEGREE ANGLE WHERE IT INTERSECTS WALKS AND/OR CURBS. 8.MULCH SHALL BE INSTALLED AT 1/2" BELOW THE TOPS OF SIDEWALKS AND CURBING. 9.QUANTITIES ON THESE PLANS ARE FOR REFERENCE ONLY. THE SPACING OF PLANTS SHOULD BE AS INDICATED ON PLANS OR OTHERWISE NOTED. ALL TREES AND SHRUBS SHALL BE PLANTED PER DETAILS. 10.CONTAINER GROWN PLANT MATERIAL IS PREFERRED HOWEVER BALL AND BURLAP PLANT MATERIAL CAN BE SUBSTITUTED IF NEED BE AND IS APPROPRIATE TO THE SIZE AND QUALITY INDICATED ON THE PLANT MATERIAL LIST. 11.TREES SHALL BE PLANTED AT A MINIMUM OF 5' FROM ANY UTILITY LINE, SIDEWALK OR CURB. TREES SHALL ALSO BE 10' CLEAR FROM FIRE HYDRANTS. 12.4" OF SHREDDED HARDWOOD MULCH (2" SETTLED THICKNESS) SHALL BE PLACED OVER WEED BARRIER FABRIC. MULCH SHALL BE SHREDDED HARDWOOD MULCH OR APPROVED EQUAL, PINE STRAW MULCH IS PROHIBITED. 13.WEED BARRIER FABRIC SHALL BE USED IN PLANT BEDS AND AROUND ALL TREES AND SHALL BE MIRAFI 1405 WEED BARRIER OR APPROVED EQUAL. 14.CONTRACTOR TO PROVIDE UNIT PRICING OF LANDSCAPE MATERIALS AND BE RESPONSIBLE FOR OBTAINING ALL LANDSCAPE AND IRRIGATION PERMITS. IRRIGATION: 1.ALL REQUIRED LANDSCAPE AREAS SHALL HAVE AN AUTOMATIC IRRIGATION SYSTEM WITH A FREEZE/RAIN SENSOR. SYSTEM SHALL ALSO HAVE AN ET WEATHER BASED CONTROLLER AND BE DESIGNED AND INSTALLED BY A LICENSED IRRIGATOR. MAINTENANCE REQUIREMENTS: 1.VEGETATION SHOULD BE INSPECTED REGULARLY TO ENSURE THAT PLANT MATERIAL IS ESTABLISHING PROPERLY AND REMAINS IN A HEALTHY GROWING CONDITION APPROPRIATE FOR THE SEASON. IF DAMAGED OR REMOVED, PLANTS MUST BE REPLACED BY A SIMILAR VARIETY AND SIZE. 2.MOWING, TRIMMING, EDGING AND SUPERVISION OF WATER APPLICATIONS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR UNTIL THE OWNER OR OWNER'S REPRESENTATIVE ACCEPTS AND ASSUMES REGULAR MAINTENANCE. 3.ALL LANDSCAPE AREAS SHOULD BE CLEANED AND KEPT FREE OF TRASH, DEBRIS, WEEDS AND OTHER MATERIAL. MISCELLANEOUS MATERIALS: 1.STEEL EDGING SHALL BE 3/16" X 4 X 16' DARK GREEN DURAEDGE STEEL LANDSCAPE EDGING UNLESS NOTED OTHERWISE ON PLANS/DETAILS. 2.RIVER ROCK SHALL BE ARIZONA RIVER ROCK, 2" - 4" DIAMETER. RIVER ROCK SHALL BE COMPACTED TO A MINIMUM OF 3" DEPTH OVER FILTER FABRIC. 3.DECOMPOSED GRANITE SHALL CONSIST OF A NATURAL MIX OF GRANITE AGGREGATE NOT TO EXCEED 1/8" IN DIAMETER AND COMPOSED OF VARIOUS STAGES OF DECOMPOSED EARTH BASE. DG SHALL BE PLACED OVER FILTER FABRIC AT A MINIMUM OF 3" DEPTH. 4.BOULDERS SHALL BE ON AVERAGE 36" X 24" X 24" AND A MIN. OF 500LBS. BOULDER TO BE SET IN GROUND ON A 1" SAND SETTING BED. APPROXIMATELY 2" BELOW FINISH GRADE. BOULDER SHOULD HAVE A WEATHERED FINISH. EACH BOULDER HAS A NATURAL TOP AND BOTTOM. ENSURE THAT THE BOULDER IS POSITIONED CORRECTLY BEFORE INSTALLATION. PRUNING AND TRIMMING NOTES 1.CONTRACTOR SHALL PRUNE ALL EXISTING TREES ON-SITE USING STANDARD GUIDELINES IN THE INDUSTRY. 2.ALL TREES SHALL BE TRIMMED SO THAT NATURAL SHAPES OF THE PLANTS ARE RETAINED. 3.DO NOT 'TOP' OR 'HEAD' TREES. 4.IF BALLING OR SHEARING OF TREES HAS OCCURRED IN THE PAST, DISCONTINUE THIS PRACTICE AND ALLOW PLANTS TO GROW INTO NATURAL SHAPE. 5.REMOVE SUCKERS, DEAD, DYING, DISEASED, BROKEN AND / OR WEAK BRANCHES FROM ALL TREES ALONG THE MAIN TRUNK STRUCTURE AND WITHIN THE BRANCHING AREA. 6.CONTRACTOR SHALL PRUNE EXISTING DECIDUOUS HARDWOOD BY REMOVING LOWER LIMBS TO RAISE THE CANOPY. THE BOTTOM OF THE CANOPY SHALL BE RAISED TO 12'-0" ABOVE GRADE FOR DECIDUOUS HARDWOOD TREES, WHEN POSSIBLE. THE INTEGRITY OF THE CANOPY AND STRUCTURE OF THE TREE SHALL BE MAINTAINED. DO NOT CUT OR PRUNE CENTRAL LEADERS. 7.CONTRACTOR SHALL THIN THE CANOPY BY ONE-FOURTH. PRUNE TREE TO EVENLY SPACE BRANCHES WITHIN THE CANOPY WHENEVER POSSIBLE. REMOVE THOSE LIMBS THAT CROSS OTHERS, DOUBLE LEADERS AND THOSE THAT EXCESSIVELY EXTEND BEYOND THE NATURAL CROWN OF THE TREE. 8.CONTRACTOR SHALL PROVIDE DEEP ROOT FEEDING AND INVIGORATION OF EXISTING TREES. THIS SHALL BE ORGANIC BASED NUTRIENTS BASED FOR ROOT GROWTH AND LEAF GROWTH STIMULATION. 9.CONTRACTOR SHALL BE REQUIRED TO CHIP ALL REMOVED BRANCHES, LEAFS, ETC. STA TE O F T E XASTCETHI R C A EPACSDNALDEE GEISRRT572 4AMANARICHDW. A RDSONa W R AWR Designs, LLC P.O. Box 1746 Aledo, Texas 76008 amanda@awr-designs.com c. 512.517.5589 STEVEN SCOGGINS 6406 REDSTONE DRIVE ARLINGTON, TEXAS 817-965-0763 LAMBERT HOMEHEADQUARTERS1700 N. WHITE CHAPEL ROADSOUTHLAKE, TEXASDATE: 04/01/2024 REVISION: CONCEPT AND SITE PLAN SUBMITTAL CASE #: ZA24-0009 CONCEPT AND SITE PLAN L1.3 LANDSCAPE SPECIFICATIONS AND DETAILS SHRUB PLANTING SHRUBS OR GROUNDCOVER AS SPECIFIED ON PLAN PLANTING SOIL MIX. TILL IN WITH PARTS EXISTING SOIL, EXCLUDING LARGE CLODS AND ROCKS. ROOT BALL, DO NOT DISTURB UNDISTURBED SUBGRADE / NATIVE SOIL WEED BARRIER FABRIC LAYER OF MULCH, SETTLED THICKNESS SHOULD BE 2" MIN.CURB OR SIDEWALK, NO STEEL EDGING ALONG WALK, TYP. TOP OF MULCH SHOULD BE, AT MINIMUM, 1/2" BELOW WALK OR CURBING REF. LANDSCAPE PLAN FOR SPACING 2 N.T.S. 1/2" MAXIMUM SHRUB SPACING AND PLANTING AT B.O.C.3 N.T.S. 4' MIN. 2.5' MIN. SPECIFIED BED BORDER 2' MIN. BACK OF CURB MULCH PER SPECIFICATIONS LAWN SHRUBS AND GROUNDCOVER REFER TO PLANS FOR PLANT TYPES PREPARED SOIL MIX PER SPECIFICATIONS 3/16" X 4" X 16" STEEL EDGING WITH STAKES NOTE: NO STEEL EDGING TO BE INSTALLED ALONG SIDEWALKS 1/2" MAXIMUM STEEL EDGING DETAIL4 N.T.S. DECOMPOSED GRANITE / RIVER ROCK5 N.T.S. DECOMPOSED GRANITE AND/OR RIVER ROCK TO BE COMPACTED TO A 3" DEPTH PLANTING AREA, REFERENCE LANDSCAPE PLAN DECOMPOSED GRANITE / RIVER ROCK ENSURE PROPER DRAINAGE STEEL EDGING FILTER FABRIC, WRAP UP AT EDGING, TYP. COMPACTED SUBGRADE SECTION 32 9300 - LANDSCAPE PART 1 - GENERAL 1.1 QUALIFICATIONS OF THE LANDSCAPE CONTRACTOR. A.ALL LANDSCAPE WORK SHOWN ON THESE PLANS SHALL BE PERFORMED BY A SINGLE FIRM SPECIALIZING IN LANDSCAPE PLANTING 1.2 REFERENCE DOCUMENTS A.REFER TO LANDSCAPE PLANS, NOTES, SCHEDULES AND DETAILS FOR ADDITIONAL REQUIREMENTS 1.3 SCOPE OF WORK / DESCRIPTION OF WORK A.WORK COVERED BY THESE SECTIONS INCLUDES: FURNISH ALL SUPERVISIONS, LABOR, MATERIALS, SERVICES, EQUIPMENT AND APPLIANCES REQUIRED TO COMPLETE THE WORK COVERED IN CONJUNCTION WITH THE LANDSCAPING COVERED IN LANDSCAPE PLANS AND SPECIFICATIONS INCLUDING: 1. PLANTING (TREES, SHRUBS, GRASSES) 1.BED PREP AND FERTILIZATION 3. NOTIFICATION OF SOURCES 4. WATER AND MAINTENANCE UNTIL ACCEPTANCE 5. GUARANTEE B.ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH ALL APPLICABLE LAWS, CODES AND REGULATIONS REQUIRED BY AUTHORITIES HAVING JURISDICTION OVER SUCH WORK, INCLUDING ALL INSPECTIONS AND PERMITS REQUIRED BY FEDERAL, STATE AND LOCAL AUTHORITIES IN SUPPLY, TRANSPORTATION AND INSTALLATION OF MATERIALS. C.THE LANDSCAPE CONTRACTOR SHALL VERIFY THE LOCATION OF ALL UNDERGROUND UTILITY LINES (WATER, SEWER, ELECTRICAL, TELEPHONE, GAS, CABLE, TELEVISION, ETC.) PRIOR TO THE START OF ANY WORK 1.4 REFERENCES A.AMERICAN STANDARD FOR NURSERY STOCK PUBLISHED BY AMERICAN ASSOCIATION OF NURSERYMEN; 27 OCTOBER 1980, EDITION; BY AMERICAN NATIONAL STANDARDS INSTUTUTE (Z60.1) - PLANT MATERIAL B.AMERICAN JOINT COMMITTEE ON HORTICULTURE NOMENCLATURE; 1942 EDITION OF STANDARDIZED PLANT NAMES. C.TEXAS ASSOCIATION OF NURSERYMEN, GRADES AND STANDARDS 1.5 SUBMITTALS A.PROVIDE REPRESENTATIVE QUANTITIES OF EACH SOIL, MULCH, BED MIX, GRAVEL AND STONE BEFORE INSTALLATION. SAMPLES TO BE APPROVED BY OWNER'S REPRESENTATIVE BEFORE USE. B.SOIL AMENDMENTS AND FERTILIZERS SHOULD BE RESEARCHED AND BASED ON THE SOILS IN THE AREA. C.BEFORE INSTALLATION, SUBMIT DOCUMENTATION THAT PLANT MATERIALS ARE AVAILABLE AND HAVE BEEN RESERVED. FOR ANY PLANT MATERIAL NOT AVAILABLE, SUBMIT REQUEST FOR SUBSTITUTION. 1.6 JOB CONDITIONS, DELIVERY, STORAGE AND HANDLING A.GENERAL CONTRACTOR TO COMPLETE WORK BEFORE LANDSCAPE CONTRACTOR TO COMMENCE. B.ALL PLANTING BED AREAS SHALL BE LEFT THREE INCHES BELOW FINAL GRADE OF SIDEWALKS, DRIVES AND CURBS. ALL AREAS TO RECEIVE SOLID SOD SHALL BE LEFT ONE INCH BELOW THE FINAL GRADE OF WALKS, DRIVES AND CURBS. CONSTRUCTION DEBRIS SHALL BE REMOVED PRIOR TO LANDSCAPE CONTRACTOR BEGINNING WORK C.STORAGE OF MATERIALS AND EQUIPMENT AT THE JOB SITE WILL BE AT THE RISK OF THE LANDSCAPE CONTRACTOR. THE OWNER CANNOT BE HELD RESPONSIBLE FOR THEFT OR DAMAGE. 1.7 SEQUENCING A.INSTALL TREES, SHRUBS, AND LINER STOCK PLANT MATERIALS PRIOR TO INSTALLATION OF LAWN/SOLID SOD. B.WHERE EXISTING TURF AREAS ARE BEING CONVERTED TO PLANTING BEDS, THE TURF SHALL BE CHEMICALLY ERADICATED TO MINIMIZE RE-GROWTH IN THE FUTURE. AREAS SHALL BE PROPERLY PREPARED WITH AMENDED ORGANIC MATTER. 1.8 MAINTENANCE AND GUARANTEE MAINTENANCE: A.THE LANDSCAPE CONTRACTOR SHALL BE HELD RESPONSIBLE FOR THE MAINTENANCE OF ALL WORK FROM THE TIME OF PLANTING UNTIL FINAL ACCEPTANCE BY OWNER. B.NO TREES, GRASS, GROUNDCOVER OR GRASS WILL BE ACCEPTED UNLESS THEY SHOW HEALTHY GROWTH AND SATISFACTORY FOLIAGE CONDITIONS. C.MAINTENANCE SHALL INCLUDE WATERING OF TREES AND PLANTS, CULTIVATION, WEED SPRAYING, EDGING, PRUNING OF TREES, MOWING OF GRASS, CLEANING UP AND ALL OTHER WORK NECESSARY FOR MAINTENANCE. D.A WRITTEN NOTICE REQUESTING FINAL INSPECTION AND ACCEPTANCE SHOULD BE SUBMITTED TO THE OWNER AT LEAST 7 DAYS PRIOR TO COMPLETION. AN ON SITE INSPECTION BY THE OWNER'S AUTHORIZED REPRESENTATIVE WILL BE COMPLETED PRIOR TO WRITTEN ACCEPTANCE. E.NOTIFY OWNER OR OWNER'S REPRESENTATIVE SEVEN DAYS PRIOR TO THE EXPIRATION OF THE WARRANTY PERIOD. F.REMOVE DEAD, UNHEALTHY AND UNSIGHTLY PLANTS DURING WARRANTY PERIOD G.REMOVE GUYING AND STAKING MATERIALS AFTER ONE YEAR H.ALL LANDSCAPE MUST BE MAINTAINED AND GRASS MOWED/EDGED ON A WEEKLY SCHEDULE UNTIL ACCEPTANCE BY OWNER. REMOVE CLIPPINGS AND DEBRIS FROM SITE PROMPTLY. I.REMOVE TRASH, DEBRIS, AND LITTER. WATER, PRUNE, RESTAKE TREES, FERTILIZE, WEED AND APPLY HERBICIDES AND FUNGICIDES AS REQUIRED. J.COORDINATE THE OPERATION OF IRRIGATION SYSTEM TO ENSURE THAT PLANTS ARE ADEQUATELY WATERED. HAND WATER AREAS NOT RECEIVING ADEQUATE WATER FROM AN IRRIGATION SYSTEM. K.THE LANDSCAPE CONTRACTOR SHALL MAINTAIN THE IRRIGATION SYSTEM IN ACCORDANCE TO THE MAINTENANCE SERVICE TO ENSURE THE SYSTEM IS IN PROPER WORKING ORDER WITH SCHEDULING ADJUSTMENTS BY SEASON TO MAXIMIZE WATER CONSERVATION. L.REAPPLY MULCH TO BARE AND THIN AREAS. M.SHOULD SEEDED AND/OR SODDED AREAS NOT BE COVERED BY AN AUTOMATIC IRRIGATION SYSTEM, THE LANDSCAPE CONTRACTOR SHALL BE RESPONSIBLE FOR WATERING THESE AREAS AND OBTAINING A FULL, HEALTHY STAND OF GRASS AT NO ADDITIONAL COST TO THE OWNER. N.TO ACHIEVE FINAL ACCEPTANCE AT THE END OF THE MAINTENANCE PERIOD, ALL OF THE FOLLOWING CONDITIONS MUST OCCUR: a.THE LANDSCAPE SHALL SHOW ACTIVE, HEALTHY GROWTH (WITH EXCEPTIONS MADE FOR SEASONAL DORMANCY). ALL PLANTS NOT MEETING THIS CONDITION SHALL BE REJECTED AND REPLACED BY HEALTHY PLANT MATERIAL PRIOR TO FINAL ACCEPTANCE. b.ALL HARDSCAPE SHALL BE CLEANED PRIOR TO FINAL ACCEPTANCE. c.SODDED AREAS MUST BE ACTIVELY GROWING AND MUST REACH A MINIMUM HEIGHT OF 1 1/2 INCHES BEFORE FIRST MOWING. HYDROMULCHED AREAS SHALL SHOW ACTIVE, HEALTHY GROWTH. BARE AREAS LARGER THAN TWELVE SQUARE INCHES MUST BE RESODDED OR RESEEDED (AS APPROPRIATE) PRIOR TO FINAL ACCEPTANCE. ALL SODDED TURF SHALL BE NEATLY MOWED. GUARANTEE: A.TREES, SHRUBS, GROUNDCVOER SHALL BE GUARANTEED (IN WRITING) FOR A 12 MONTH PERIOD (90 DAYS FOR ANNUAL PLANTING OR AT THE END OF THE SEASONAL COLOR GROWING SEASON, WHICHEVER COMES SOONER) AFTER FINAL ACCEPTANCE. THE CONTRACTOR SHALL REPLACE ALL DEAD MATERIALS AS SOON AS WEATHER PERMITS AND UPON NOTIFICATION OF THE OWNER. B.PLANTS INCLUDING TREES, WHICH HAVE PARTIALLY DIED SO THAT SHAPE, SIZE OR SYMMETRY HAVE BEEN DAMAGED SHALL BE CONSIDERED SUBJECT TO REPLACEMENT. IN SUCH CASES, THE OPINION OF THE OWNER SHALL BE FINAL. C.PLANTS USED FOR REPLACEMENT SHALL BE OF THE SAME SIZE AND KIND AS THOSE ORIGINALLY PLANTED OR SPECIFIED. ALL WORK INCLUDING MATERIALS, LABOR AND EQUIPMENT USED IN REPLACEMENTS SHALL CARRY A 12 MONTH GUARANTEE. ANY DAMAGE INCLUDING RUTS IN LAWN OR BED AREAS INCURRED AS A RESULT OF MAKING REPLACEMENTS SHALL BE IMMEDIATELY REPAIRED. D.WHEN PLANT REPLACEMENTS ARE MADE, PLANTS, SOIL MIX, FERTILIZER AND MULCH ARE TO BE UTILIZED AS ORIGINALLY SPECIFIED AND RE-INSPECTED FOR FULL COMPLIANCE WITH THE CONTRACT REQUIREMENTS. ALL REPLACEMENTS ARE INCLUDED UNDER "WORK" OF THIS SECTION. E.THE OWNER AGREES THAT FOR THE ONE YEAR WARRANTY PERIOD TO BE EFFECTIVE, HE WILL WATER PLANTS AT LEAST TWICE A WEEK DURING DRY PERIODS. F.THE ABOVE GUARANTEE SHALL NOT APPLY WHERE PLANTS DIE AFTER ACCEPTANCE BECAUSE OF DAMAGE DUE TO ACTS OF GOD, VANDALISM, INSECTS, DISEASE, INJURY BY HUMANS, MACHINES, THEFT OR NEGLIGENCE BY OWNER. G.ACCEPTANCE FOR ALL LANDSCAPE WORK SHALL BE GIVEN AFTER FINAL INSPECTION BY THE OWNER PROVIDED THE JOB IS IN A COMPLETE, UNDAMAGED CONDITION AND THERE IS A STAND OF GRASS IN ALL LAWN AREAS. AT THAT TIME, THE OWNER WILL ASSUME MAINTENANCE ON THE ACCEPTED WORK. 1.9 QUALITY ASSURANCE A.COMPLY WITH ALL FEDERAL, STATE, COUNTY AND LOCAL REGULATIONS GOVERNING LANDSCAPE MATERIALS AND WORK. B.EMPLOY PERSONNEL EXPERIENCED AND FAMILIAR WITH THE REQUIRED WORK AND SUPERVISION BY A FOREMAN. C.MAKE CONTACT WITH SUPPLIERS IMMEDIATELY UPON OBTAINING NOTICE OF CONTRACT ACCEPTANCE TO SELECT AND BOOK MATERIALS. D.DEVELOP A PROGRAM OF MAINTENANCE (PRUNING AND FERTILIZATION) WHICH WILL ENSURE THE PURCHASED MATERIALS WILL MEET AND/OR EXCEED PROJECT SPECIFICATIONS. E.DO NOT MAKE PLANT MATERIAL SUBSTITUTIONS. IF THE LANDSCAPE MATERIAL SPECIFIED IS NOT READILY AVAILABLE, SUBMIT PROOF TO LANDSCAPE ARCHITECT ALONG WITH THE PROPOSED MATERIAL TO BE USED IN LIEU OF THE SPECIFIED PLANT. F.AT THE TIME BIDS ARE SUBMITTED, THE CONTRACTOR IS ASSUMED TO HAVE LOCATED THE MATERIALS NECESSARY TO COMPLETE THE JOB AS SPECIFIED. G.OWNER'S REPRESENTATIVE SHALL INSPECT ALL PLANT MATERIAL AND RETAINS THE RIGHT TO INSPECT MATERIALS UPON ARRIVAL TO THE SITE AND DURING INSTALLATION. THE OWNER'S REPRESENTATIVE MAY ALSO REJECT ANY MATERIALS HE/SHE FEELS TO BE UNSATISFACTORY OR DEFECTIVE DURING THE WORK PROCESS. ALL PLANTS DAMAGED IN TRANSIT OR AT THE JOB SITE SHALL BE REJECTED. 1.10 PRODUCT DELIVERY, STORAGE AND HANDLING A.PREPARATION 1. BALLED AND BURLAPPED B&B PLANTS): DIG AND PREPARE SHIPMENT IN A MANNER THAT WILL NOT DAMAGE ROOTS, BRANCHES, SHAPE AND FUTURE DEVELOPMENT. 2. CONTAINER GROWN PLANTS: DELIVER PLANTS IN RIGID CONTAINER TO HOLD BALL SHAPE AND PROTECT ROOT MASS. B.DELIVERY 1. DELIVER PACKAGED MATERIALS IN SEALED CONTAINERS SHOWING WEIGHT, ANALYSIS AND NAME OF MANUFACTURER. PROTECT MATERIALS FROM DETERIORATION DURING DELIVERY AND WHILE STORED ON SITE. 2. DELIVER ONLY PLANT MATERIALS THAT CAN BE PLANTED IN ONE DAY UNLESS ADEQUATE STORAGE AND WATERING FACILITIES ARE AVAILABLE ON SITE 3. PROTECT ROOT BALLS BY HEELING IN WITH SAWDUST OR OTHER APPROVED MOISTURE RETAINING MATERIAL IF NOT PLANTED WITHIN 24 HOURS OF DELIVERY. 4. PROTECT PLANTS DURING DELIVERY TO PREVENT DAMAGE TO ROOT BALL OR DESICCATION OF LEAVES. 5. KEEP PLANTS MOIST AT ALL TIMES. COVER ALL MATERIALS DURING TRANSPORT. 6. NOTIFY OWNERS REPRESENTATIVE OF DELIVERY 72 HOURS PRIOR TO DELIVERY OF PLANT MATERIAL AT JOB SITE. 7. REMOVE REJECTED PLANT MATERIAL IMMEDIATELY FROM JOB SITE. 8. TO AVOID DAMAGE OR STRESS, DO NOT LIFT, MOVE, ADJUST TO PLUMB, OR OTHERWISE MANIPULATE PLANTS BY TRUNK OR STEMS. PART 2 - PRODUCTS 2.1 PLANT MATERIALS A.GENERAL: WELL FORMED NO. 1 GRADE OR BETTER NURSERY GROWN STOCK. LISTED PLANT HEIGHTS ARE FROM TOPS OF FOOT BALLS TO NOMINAL TOPS OF PLANTS. PLANT SPREAD REFERS TO NOMINAL OUTER WIDTH OF THE PLANT NOT THE OUTER LEAF TIPS. PLANTS SHALL BE INDIVIDUALLY APPROVED BY THE OWNERS REPRESENTATIVE AND THEIR DECISION AS TO THEIR ACCEPTABILITY SHALL BE FINAL. B.QUANTITIES: THE DRAWINGS AND SPECIFICATIONS ARE COMPLIMENTARY. ANYTHING CALLED FOR ON ONE AND NOT THE OTHER IS AS BINDING AS IF SHOWN AND CALLED FOR ON BOTH. THE PLANT SCHEDULE IS AN AID TO BIDDERS ONLY. CONFIRM ALL QUANTITIES ON PLAN. C.QUANTITIES AND SIZE: PLANT MATERIALS SHALL CONFORM TO THE SIZE GIVEN ON THE PLAN AND SHALL BE HEALTHY, WELL SHAPED, FULL BRANCHED AND WELL ROOTED. SYMMETRY IS ALSO IMPERATIVE. PLANTS SHALL BE FREE FROM INSECTS, INJURY, DISEASE, BROKEN BRANCHES, DISFIGUREMENTS, INSECT EGGS AND ARE TO BE OF SPECIMEN QUALITY. D.APPROVAL: ALL PLANTS WHICH ARE FOUND UNSUITABLE IN GROWTH OR ARE UNHEALTHY, BADLY SHAPED OR UNDERSIZED WILL BE REJECTED BY THE OWNERS REPRESENTATIVE EITHER BEFORE OR AFTER PLANTING AND SHALL BE REMOVED AT THE EXPENSE OF THE LANDSCAPE CONTRACTOR AND REPLACED WITH ACCEPTABLE SPECIMENS. E.TREES SHALL BE HEALTHY, FULL BRANCHED, WELL SHAPED AND SHALL MEET THE MINIMUM REQUIREMENTS AS SPECIFIED ON THE PLANT SCHEDULE. ALL TREES SHALL BE OBTAINED FROM SOURCES WITHIN 200 MILES OF THE PROJECT SITE IF POSSIBLE, AND WITH SIMILAR CLIMACTIC CONDITIONS. F.PRUNING: ALL PRUNING OF TREES AND SHRUBS SHALL BE EXECUTED BY THE LANDSCAPE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER, PRIOR TO FINAL ACCEPTANCE. G.PLANTS SHALL CONFORM TO THE MEASUREMENTS SPECIFIED, EXCEPT THE PLANTS LARGER THAN THOSE SPECIFIED MAY BE USED. USE OF LARGER PLANTS SHALL NOT INCREASE THE CONTRACT PRICE. H.WHERE MATERIALS ARE PLANTED IN MASSES, PROVIDE PLANTS OF UNIFORM SIZE. I.ROOT SYSTEMS SHALL BE HEALTHY, DENSELY BRANCHED, FIBROUS ROOT SYSTEMS, NON-POT-BOUND, FREE FROM ENCIRCLING AND/OR GIRDLING ROOTS, AND FREE FROM ANY OTHER ROOT DEFECTS (SUCH AS J-SHAPED ROOTS). J.ALL TREES SHALL BE STANDARD IN FORM, UNLESS OTHERWISE SPECIFIED. TREES WITH CENTRAL LEADERS WILL NOT BE ACCEPTED IF LEADER IS DAMAGED OR REMOVED. PRUNE ALL DAMAGED TWIGS AFTER PLANTING K.TREE TRUNKS TO BE STURDY, EXHIBIT HARDENED SYSTEMS AND VIGOROUS AND FIBROUS ROOT SYSTEMS, NOT ROOT OR POT BOUND. L.TREES WITH DAMAGED OR CROOKED LEADERS, BARK ABRASIONS, SUNSCALD, DISFIGURING KNOTS, OR\INSECT DAMAGE WILL BE REJECTED. M.CALIPER MEASUREMENTS FOR STANDARD (SINGLE TRUNK) TREES SHALL BE AS FOLLOWS: SIX INCHES ABOVE THE ROOT FLARE FOR TREES UP TO AND INCLUDING FOUR INCHES IN CALIPER, AND TWELVE INCHES ABOVE THE ROOT FLARE FOR TREES EXCEEDING FOUR INCHES IN CALIPER N.MULTI-TRUNK TREES SHALL BE MEASURED BY THEIR OVERALL HEIGHT, MEASURED FROM THE TOP OF THE ROOT BALL. O.ANY TREE OR SHRUB SHOWN TO HAVE EXCESS SOIL PLACED ON TOP OF THE ROOT BALL, SO THAT THE ROOT FLARE HAS BEEN COMPLETELY COVERED, SHALL BE REJECTED. P.SOD: PROVIDE WELL-ROOTED SOD OF THE VARIETY NOTED ON THE PLANS. SOD SHALL BE CUT FROM HEALTHY, MATURE TURF WITH SOIL THICKNESS OF 3/4" TO 1". EACH PALLET OF SOD SHALL BE ACCOMPANIED BY A CERTIFICATE FROM SUPPLIER STATING THE COMPOSITION OF THE SOD. 2.2 SOIL PREPARATION MATERIALS A.SANDY LOAM: 1. FRIABLE, FERTILE, DARK, LOAMY SOIL, FREE OF CLAY LUMPS, SUBSOIL, STONES AND OTHER EXTRANEOUS MATERIAL AND REASONABLY FREE OF WEEDS AND FOREIGN GRASSES. LOAM CONTAINING DALLASGRASS OR NUTGRASS SHALL BE REJECTED. 2. PHYSICAL PROPERTIES AS FOLLOWS: a.CLAY – BETWEEN 7-27% b.SILT – BETWEEN 15-25% c.SAND – LESS THAN 52% 3. ORGANIC MATTER SHALL BE 3%-10% OF TOTAL DRY WEIGHT. 4. IF REQUESTED, LANDSCAPE CONTRACTOR SHALL PROVIDE A CERTIFIED SOIL ANALYSIS CONDUCTED BY AN APPROVED SOIL TESTING LABORATORY VERIFYING THAT SANDY LOAM MEETS THE ABOVE REQUIREMENTS. B.ORGANIC MATERIAL: COMPOST WITH A MIXTURE OF 80% VEGETATIVE MATTER AND 20% ANIMAL WASTE. INGREDIENTS SHOULD BE A MIX OF COURSE AND FINE TEXTURED MATERIAL. C.PREMIXED BEDDING SOIL AS SUPPLIED BY VITAL EARTH RESOURCES, GLADEWATER, TEXAS; PROFESSIONAL BEDDING SOIL AS SUPPLIED BY LIVING EARTH TECHNOLOGY, DALLAS, TEXAS OR ACID GRO MUNICIPAL MIX AS SUPPLIED BY SOIL BUILDING SYSTEMS, DALLAS, TEXAS OR APPROVED EQUAL. D.SHARP SAND: SHARP SAND MUST BE FREE OF SEEDS, SOIL PARTICLES AND WEEDS. E.MULCH: DOUBLE SHREDDED HARDWOOD MULCH, PARTIALLY DECOMPOSED, DARK BROWN. F.ORGANIC FERTILIZER: FERTILAID, SUSTANE, OR GREEN SENSE OR EQUAL AS RECOMMENDED FOR REQUIRED APPLICATIONS. FERTILIZER SHALL BE DELIVERED TO THE SITE IN ORIGINAL UNOPENED CONTAINERS, EACH BEARING THE MANUFACTURER'S GUARANTEED STATEMENT OF ANALYSIS. G.COMMERCIAL FERTILIZER: 10-20-10 OR SIMILAR ANALYSIS. NITROGEN SOURCE TO BE A MINIMUM 50% SLOW RELEASE ORGANIC NITROGEN (SCU OR UF) WITH A MINIMUM 8% SULFUR AND 4% IRON, PLUS MICRONUTRIENTS. H.PEAT: COMMERCIAL SPHAGNUM PEAT MOSS OR PARTIALLY DECOMPOSED SHREDDED PINE BARK OR OTHER APPROVED ORGANIC MATERIAL. 2.3 MISCELLANEOUS MATERIALS A.STEEL EDGING - SHALL BE 3/16” X 4” X 16” DARK GREEN LANDSCAPE EDGING. DURAEDGE STEEL OR APPROVED EQUAL. B.TREE STAKING - TREE STAKING SOLUTIONS OR APPROVED SUBSTITUTE; REFER TO DETAILS. C.FILTER FABRIC - MIRAFI 1405 BY MIRAFI INC. OR APPROVED SUBSTITUTE. AVAILABLE AT LONE STAR PRODUCTS, INC. (469-523-0444) D.SAND - UNIFORMLY GRADED, WASHED, CLEAN, BANK RUN SAND. E.GRAVEL: WASHED NATIVE PEA GRAVEL, GRADED 1" TO 1.5" F.DECOMPOSED GRANITE - BASE MATERIAL OF NATURAL MATERIAL MIX OF GRANITE AGGREGATE NOT TO EXCEED 1/8” IN DIAMETER COMPOSED OF VARIOUS STAGES OF DECOMPOSED EARTH BASE. G.RIVER ROCK - LOCALLY AVAILABLE NATIVE RIVER ROCK BETWEEN 2”-4” IN DIAMETER. H.PRE-EMERGENT HERBICIDES: ANY GRANULAR, NON-STAINING PRE-EMERGENT HERBICIDE THAT IS LABELED FOR THE SPECIFIC ORNAMENTALS OR TURF ON WHICH IT WILL BE UTILIZED. PRE-EMERGENT HERBICIDES SHALL BE APPLIED PER THE MANUFACTURER'S LABELED RATES. PART 3 - EXECUTION 3.1 PREPARATION A.LANDSCAPE CONTRACTOR TO INSPECT ALL EXISTING CONDITIONS AND REPORT ANY DEFICIENCIES TO THE OWNER. B.ALL PLANTING AREAS SHALL BE CONDITIONED AS FOLLOWS: 1. PREPARE NEW PLANTING BEDS BY SCRAPING AWAY EXISTING GRASS AND WEEDS AS NECESSARY. TILL EXISTING SOIL TO A DEPTH OF SIX (6") INCHES PRIOR TO PLACING COMPOST AND FERTILIZER. APPLY FERTILIZER AS PER MANUFACTURER'S RECOMMENDATIONS. ADD SIX (6") INCHES OF COMPOST AND TILL INTO A DEPTH OF SIX (6") INCHES OF SPECIFIED MULCH (SETTLED THICKNESS). 2. BACKFILL FOR TREE PITS SHALL BE AS FOLLOWS: USE EXISTING TOP SOIL ON SITE (USE IMPORTED TOPSOIL AS NEEDED) FREE FROM LARGE CLUMPS, ROCKS, DEBRIS, CALICHE, SUBSOILS, ETC., PLACED IN NINE (9") INCH LAYERS AND WATERED IN THOROUGHLY. C.GRASS AREAS: 1. BLOCKS OF SOD SHOULD BE LAID JOINT TO JOINT (STAGGERED JOINTS) AFTER FERTILIZING THE GROUND FIRST. ROLL GRASS AREAS TO ACHIEVE A SMOOTH, EVEN SURFACE. THE JOINTS BETWEEN THE BLOCKS OF SOD SHOULD BE FILLED WITH TOPSOIL WHERE THEY ARE GAPED OPEN, THEN WATERED THOROUGHLY. 3.2 INSTALLATION A.MAINTENANCE OF PLANT MATERIALS SHALL BEGIN IMMEDIATELY AFTER EACH PLANT IS DELIVERED TO THE SITE AND SHALL CONTINUE UNTIL ALL CONSTRUCTION HAS BEEN SATISFACTORILY ACCOMPLISHED. B.PLANT MATERIALS SHALL BE DELIVERED TO THE SITE ONLY AFTER THE BEDS ARE PREPARED AND AREAS ARE READY FOR PLANTING. ALL SHIPMENTS OF NURSERY MATERIALS SHALL BE THOROUGHLY PROTECTED FROM THE WINDS DURING TRANSIT. ALL PLANTS WHICH CANNOT BE PLANTED AT ONCE, AFTER DELIVERY TO THE SITE, SHALL BE WELL PROTECTED AGAINST THE POSSIBILITY OF DRYING BY WIND AND BALLS OF EARTH OF B & B PLANTS SHALL BE KEPT COVERED WITH SOIL OR OTHER ACCEPTABLE MATERIAL. ALL PLANTS REMAIN THE PROPERTY OF THE CONTRACTOR UNTIL FINAL ACCEPTANCE. C.POSITION THE TREES AND SHRUBS IN THEIR INTENDED LOCATION AS PER PLAN. D.NOTIFY THE OWNER'S AUTHORIZED REPRESENTATIVE FOR INSPECTION AND APPROVAL OF ALL POSITIONING OF PLANT MATERIALS. E.EXCAVATE PITS WITH VERTICAL SIDES AND HORIZONTAL BOTTOM. TREE PITS SHALL BE LARGE ENOUGH TO PERMIT HANDLING AND PLANTING WITHOUT INJURY TO BALLS OF EARTH OR ROOTS AND SHALL BE OF SUCH DEPTH THAT,WHEN PLANTED AND SETTLED, THE CROWN OF THE PLANT SHALL BEAR THE SAME RELATIONSHIP TO THE FINISH GRADE AS IT DID TO SOIL SURFACE IN ORIGINAL PLACE OF GROWTH. THE SIDES OF THE HOLE SHOULD BE ROUGH AND JAGGED, NEVER SLICK OR GLAZED. F.SHRUB AND TREE PITS SHALL BE NO LESS THAN TWENTY-FOUR (24") INCHES WIDER THAN THE LATERAL DIMENSION OF THE EARTH BALL AND SIX (6") INCHES DEEPER THAN IT'S VERTICAL DIMENSION. REMOVE AND HAUL FROM SITE ALL ROCKS AND STONES OVER THREE-QUARTER (3 4") INCH IN DIAMETER. PLANTS SHOULD BE THOROUGHLY MOIST BEFORE REMOVING CONTAINERS. G.PERCOLATION TEST: FILL THE HOLE WITH WATER. IF THE WATER LEVEL DOES NOT PERCOLATE WITHIN 24 HOURS, THE TREE NEEDS TO MOVE TO ANOTHER LOCATION OR HAVE DRAINAGE ADDED. INSTALL A PVC STAND PIPE PER TREE IF THE PERCOLATION TEST FAILS. H.BACKFILL ONLY WITH 5 PARTS EXISTING SOIL OR SANDY LOAM AND 1 PART BED PREPARATION. WHEN THE HOLE IS DUG IN SOLID ROCK, TOPSOIL FROM THE SAME AREA SHOULD NOT BE USED. CAREFULLY SETTLE BY WATERING TO PREVENT AIR POCKETS. REMOVE THE BURLAP FROM THE TOP 13 OF THE BALL, AS WELL AS ALL NYLON, PLASTIC STRING AND WIRE. CONTAINER TREES WILL USUALLY BE ROOT BOUND, IF SO FOLLOW STANDARD NURSERY PRACTICE OF ‘ROOT SCORING’. I.DO NOT WRAP TREES. J.DO NOT OVER PRUNE. K.REMOVE NURSERY TAGS AND STAKES FROM ALL PLANTS L.REMOVE BOTTOM OF PLANT BOXES PRIOR TO PLACING PLANTS. REMOVE SIDES AFTER PLACEMENT AND PARTIAL BACKFILLING. M.REMOVE UPPER THIRD OF BURLAP FROM BALLED AND BURLAPPED TREES AFTER PLACEMENT. N.PLACE PLANT UPRIGHT AND PLUMB IN CENTER OF HOLE. ORIENT PLANTS FOR BEST APPEARANCE. O.MULCH THE TOP OF THE BALL. DO NOT PLANT GRASS ALL THE WAY TO THE TRUNK OF THE TREE. LEAVE THE AREA ABOVE THE TOP OF THE BALL AND MULCH WITH AT LEAST TWO (2") INCHES OF SPECIFIED MULCH. P.ALL PLANT BEDS AND TREES TO BE MULCHED WITH A MINIMUM SETTLED THICKNESS OF TWO (2") INCHES OVER THE ENTIRE BED OR PIT. Q.OBSTRUCTION BELOW GROUND: IN THE EVENT THAT ROCK, OR UNDERGROUND CONSTRUCTION WORK OR OBSTRUCTIONS ARE ENCOUNTERED IN ANY PLANT PIT EXCAVATION WORK TO BE DONE UNDER THIS SECTION, ALTERNATE LOCATIONS MAY BE SELECTED BY THE OWNER. WHERE LOCATIONS CANNOT BE CHANGED, THE OBSTRUCTIONS SHALL BE REMOVED TO A DEPTH OF NOT LESS THAN THREE (3') FEET BELOW GRADE AND NO LESS THAN SIX (6") INCHES BELOW THE BOTTOM OF BALL WHEN PLANT IS PROPERLY SET AT THE REQUIRED GRADE. THE WORK OF THIS SECTION SHALL INCLUDE THE REMOVAL FROM THE SITE OF SUCH ROCK OR UNDERGROUND OBSTRUCTIONS ENCOUNTERED AT THE COST OF THE LANDSCAPE CONTRACTOR. R.TREES AND LARGE SHRUBS SHALL BE STAKED AS SITE CONDITIONS REQUIRE. POSITION STAKES TO SECURE TREES AGAINST SEASONAL PREVAILING WINDS. S.PRUNING AND MULCHING: PRUNING SHALL BE DIRECTED BY THE LANDSCAPE ARCHITECT AND SHALL BE PRUNED IN ACCORDANCE WITH STANDARD HORTICULTURAL PRACTICE FOLLOWING FINE PRUNING, CLASS I PRUNING STANDARDS PROVIDED BY THE NATIONAL ARBORIST ASSOCIATION. 1.DEAD WOOD, SUCKERS, BROKEN AND BADLY BRUISED BRANCHES SHALL BE REMOVED. GENERAL TIPPING OF THE BRANCHES IS NOT PERMITTED. DO NOT CUT TERMINAL BRANCHES. 2.PRUNING SHALL BE DONE WITH CLEAN, SHARP TOOLS. 3.IMMEDIATELY AFTER PLANTING OPERATIONS ARE COMPLETED, ALL TREE PITS SHALL BE COVERED WITH A LAYER OF ORGANIC MATERIAL TWO (2") INCHES IN DEPTH. THIS LIMIT OF THE ORGANIC MATERIAL FOR TREES SHALL BE THE DIAMETER OF THE PLANT PIT. Q.STEEL EDGE INSTALLATION: EDGE SHALL BE ALIGNED AS INDICATED ON PLANS. STAKE OUT LIMITS OF STEEL CURBING AND OBTAIN OWNERS APPROVAL PRIOR TO INSTALLATION. 1.ALL STEEL CURBING SHALL BE FREE OF KINKS AND ABRUPT BENDS. 2.TOP OF EDGING SHALL BE 12" MAXIMUM HEIGHT ABOVE FINAL FINISHED GRADE. 3.STAKES ARE TO BE INSTALLED ON THE PLANTING BED SIDE OF THE CURBING, AS OPPOSED TO THE GRASS SIDE. 4.DO NOT INSTALL STEEL EDGING ALONG SIDEWALKS OR CURBS. 5.CUT STEEL EDGING AT 45 DEGREE ANGLE WHERE EDGING MEETS SIDEWALKS OR CURBS. 3.3 CLEANUP AND ACCEPTANCE A.CLEANUP: DURING THE WORK, THE PREMISES SHALL BE KEPT NEAT AND ORDERLY AT ALL TIMES. STORAGE AREAS FOR ALL MATERIALS SHALL BE SO ORGANIZED SO THAT THEY, TOO, ARE NEAT AND ORDERLY. ALL TRASH AND DEBRIS SHALL BE REMOVED FROM THE SITE AS WORK PROGRESSES. KEEP PAVED AREAS CLEAN BY SWEEPING OR HOSING THEM AT END OF EACH WORK DAY. B.REPAIR RUTS, HOLES AND SCARES IN GROUND SURFACES. C.ENSURE THAT WORK IS COMPLETE AND PLANT MATERIALS ARE IN VIGOROUS AND HEALTHY GROWING CONDITION. D.UPON COMPLETION OF THE WORK, THE LANDSCAPE CONTRACTOR SHALL PROVIDE THE SITE CLEAN, FREE OF DEBRIS AND TRASH, AND SUITABLE FOR USE AS INTENDED. THE LANDSCAPE CONTRACTOR SHALL THEN REQUEST AN INSPECTION BY THE OWNER TO DETERMINE FINAL ACCEPTABILITY. E.WHEN/IF THE INSPECTED PLANTING WORK DOES NOT COMPLY WITH THE CONTRACT DOCUMENTS, THE LANDSCAPE CONTRACTOR SHALL REPLACE AND/OR REPAIR THE REJECTED WORK TO THE OWNER'S SATISFACTION WITHIN 24 HOURS. F.THE LANDSCAPE MAINTENANCE PERIOD WILL NOT COMMENCE UNTIL THE LANDSCAPE WORK HAS BEEN RE-INSPECTED BY THE OWNER AND FOUND TO BE ACCEPTABLE. AT THAT TIME, A WRITTEN NOTICE OF FINAL ACCEPTANCE WILL BE ISSUED BY THE OWNER, AND THE MAINTENANCE AND GUARANTEE PERIODS WILL COMMENCE. END OF SECTION TREE PLANTING N.T.S. 1 (3) 2" DIA. X 8' LENGTH LARGE METAL "T" POSTS IN UNDISTURBED SOIL TIE TO STAKE WITH PLASTIC CHAIN TIES NEVER CUT LEADER SET TOP OF ROOT BALL 3" ABOVE FINISH GRADE. MULCH - 3" MIN. DEPTH BUILD 4" HT. SAUCER AROUND PLANTING PIT WITH TOPSOIL. 6" MIN. UNDISTURBED SUBGRADE 12" MIN. ALL SIDES 12" MIN. ALL SIDES PLACE TWO ON PREVAILING WIND SIDE OF TREE (PAINTED BLACK) BACK FILL / PLANTING SOIL MIX. TILL IN WITH PARTS EXISTING SOIL, EXCLUDING LARGE CLODS AND ROCKS. FINISH GRADE